Professional Documents
Culture Documents
Geomechanical Foundations is a specialist ground improvement, piling and Typical top feed
1 2 3 4
Vibrator penetrates The vibrator is withdrawn Vibrator is reintroduced, the Successive charges and
weak soils. and a charge of stone or stone is compacted to form compacting of stone
recycled material is an interlocking matrix significantly improve the
placed in to the hole. between the stone columns load bearing and
and the surrounding settlement characteristics
confining soils. of the ground.
The stone column layout can be arranged to suit varying combinations of load,
soil type and settlement requirement. This forms a raft of stiffened material
creating an integrated foundation support. Typically column spacings range
between 1.0 metre and 2.5 metres under load bearing foundations and up to
3.0 metres beneath floor slabs.
GeMech will design and construct the entire building platform utilising a variety
of ground improvement solutions ranging from vibro displacement stone
columns, dynamic compaction (and consolidation), soil recycling and
stabilisation, bored or driven piles, reinforced concrete ground beams,
suspended concrete floors, ground bearing floors, blockwork up to DPC and
drainage within the footprint of the building.
Why take the chance. Insist upon a GeMech building platform at a quality and
price you will find hard to beat.
Geomechanical Foundations
Bristol Freephone 0800 389 8515
This data sheet is for general information purposes only and shall not form part of any specification, offer or contract.
London Freephone 0800 169 2100 In keeping with our policy of continuous development we reserve the right to amend this document without prior notice.
www.gemech.co.uk
© 2006 Geomechanical Foundations. The GeMech logo and GeMech Piling Carpet are registered trademarks of
Geomechanical Foundations Limited.