Professional Documents
Culture Documents
*Presently there is only one traffic Hand who is assisted by Aerodrome attendant to manage 24 Hrs shift in one unit (Tower) by performing extra Duties. A
second ATC unit (Lower ACC) is proposed to be open this year for 24 Hrs. In order to manage two units for 24 Hrs, 3 Traffic hands in each unit are required with
the leave reserve. Total requirement = 3+3+1 =7
Airport Authority of India
Directorate of Engineering
Subject: Contract Worked Engaged by AAI. (Ref. Lok Sabha Question No. 9557 to be answered on 15.03.2018)
ATC
Annexure-A
Regarding Point a, b & c of the Parliament Question Regarding point d, e & f of the Parliament Question
S. No. Region Airport No. of Contract Nature of jobs Whether Complaints Action Taken No. of If these If the Works
Worker being carried out Regarding Exploitation Against such Contractors Contractor Transfer to
Engaged by Contract From The Contract contractors regarding Engaged at Transfer the other Sub-
Workers Workers Received, If Yes, Exploitation of Chennai and Works to other Contractors,
Give Detail Worker Jaipur Sub- Contractor/ Give Ref. of
Airports Labours for Policy of
Execution, If Yes, Government
Give Detail.
1 2 3 4 5 6 7 8 9 10
1 18 Man Poer for Nil N/A N/A NO N/A
Bird, Animal
Scaring and
Allied Services
in the
Operational
Area.
2 2 Data Entry
Operator for
ATM Section.