Whatsapp - Centre hole for lifting purpose Centre Drill done at Supplier Incoming material Inspection
2 27.03.2018 J503000 LOT Impact Wear Plate C12 5 Incoming Inspection not done 8412
missed,driling not done end. must done
8D 8412
For Aim 156 CV218 Crushing chamber,door Actuslly,door closing application Slightly grinding done on door Discuss this issue on shop
By What's
2 26.04.2018 SAPL 488.0135 CV218 Door Handle 1 handle position was wrong,handle top face fullfilled,but its not asthetically handle,small amount of material floor, and awareness generated
Photo touch item no 04 in drawing 488.0135 ok.Not focused on this point. removed. in shop floor as well.
BY Email &
Whatsap
1 18.05.2018 SAPL BG0083 2Lot Bearing Housing PrisecI-II 2 Shots Found
8D 8411
AIMENGINEERS INDIA PVT LTD
CUSTOMER COMPLAINTS REGISTER
MONTH OF JAN -2018
CAPA by Mail or
What's up Drawing Project Rejection / Remarks 8D
Sl. No. Month / Date Customer
8D Number
AIM SLNO Part Descrption
Module Rework Qty
Photos Problem Description Root Cause Corrective Action Action Plan
Receipt No
By What's Mesh gaurd cutout required distance While fitup Drawing not seen
2 11.06.2018 SAPL Mesh guard 1
Photo 310mm observed 270mm properly
By What's UJ210 required RHS leg assembly but All LHS assembly sent matched
3 11.06.2018 SAPL 1
Photo received LHS assembly with RHS assembly 5nos
By What's Metal particle remained as it is after After tapping tapping burr not
4 13.06.2018 SAPL 751.0670-901 HSI Bearing housing HSI 1
Photo tapping process cleaned properly
By What's
8 15.06.2018 SAPL 701.2576 Telescopic assembly 1 Pin mounting holes too oval/ grinding done Welding destortion
Photo
By What's
10 18.06.2018 SAPL PII Rotor HSI Prisec II 1 Tapping not done properly
Photo
AIMENGINEERS INDIA PVT LTD
CUSTOMER COMPLAINTS REGISTER
MONTH OF JAN -2018
CAPA by Mail or
What's up Drawing Project Rejection / Remarks 8D
Sl. No. Month / Date Customer
8D Number
AIM SLNO Part Descrption
Module Rework Qty
Photos Problem Description Root Cause Corrective Action Action Plan
Receipt No
By What's
11 22.06.2018 SAPL Lifting hook CV 218 1 Poor plating quality
Photo
By What's
12 30.06.2018 SAPL Rotor P I rotor 1 Blasting shots found inside the threads
Photo
By What's
1 02.07.2018 SAPL 701.5268 UJ300 CMVR 1 Slot size 18 x 36 required 22 x 36
Photo
By What's
2 07.07.2018 SAPL 1 Hole not matching
Photo
By What's
3 11.07.2018 SAPL Feed kit assembly CV 218 1 Feed kit assembly nut not tightened
Photo
By What's
24.07.2018 SAPL Curtain Prisec II 1 Grease Nipple not fitted
Photo
Prepared By : Approved By :
REWORK FROM JAN2018 TO APRIL 2018
REWORK FABERICATION/MACHINING CODE
TAPER CUTTING/FINISHING FABERICATION TFC
DIMENSION CORRECTION FABERICATION DMF
WELDING CORRECTION FABERICATION WC
FLATNESS CORRECTION FABERICATION FC
DIMENSION CORRECTION MACHINING DMM
TAPPING CORRECTION MACHINING TC
DEBARRING/CHAMFER PENDING MACHINING DC
AESTHETICALLY FABERICATION AC
REWORK DATA
7
0
TFC DMF WC FC DMM TC DC AC
TOTAL
3 Chart Title
4
REWORK DATA
1 2 3
1
1
6
0
2
6 4
1
1 1
TFC DMF WC FC DMM TC DC AC