UJIAN PERCUBAAN CAMPURAN KONKRIT (TRIAL MIX)

UNIQUE MIX (PG) SDN BHD


PROJEK PEMBINAAN IBU PEJABAT POLIS DAERAH MUALLIM

DESIGN MIX PROPORTION COMPRESSIVE STRENGTH (N/mm2)

TARGET SLUMP (mm)


CONCRET
BACTH NO LOCATION USED RETARDER SUPERPLASTICI CEMENT WATER CEMENT SLUMP TEST (mm) (REF.SECTION D :
E GRADE
(ml/m3) SER (ml/m3) CONTENT(kg/m3 RATIO TABLE D7)
3 DAYS 7 DAYS 28 DAYS
(REF.SECTION (REF.SECTION D ) (REF.SECTION (REF.SECTION D
D : 2.4.2) : 2.4.2) D : TABLE D6) : TABLE D6)

1 4
BATCH 1 (DESIGN
MIX WITH X 2 5
1500 1350 300 0.58
ADMIXTURE)
3 6
SAMPLE 1,2,3
AVG:
RC Cover Type A & B,
1 4
BATCH 2 ( DESIGN Half round drain
MIX WITHOUT concrete X 2 5
C20/20 ADMIXTURE) base(H<1050mm),RC - - 300 0.58 100-150 (S3)
CONTROL MIX base brick sump, RC 3 6
SAMPLE 4,5,6 Sump (rubbish trap),
sewerage pipe bedding AVG:

BATCH 3 (JKR
SPEC WITH
- - - -
ADMIXTURE)
SAMPLE 7,8,9

1 4
BATCH 1 (DESIGN
MIX WITH X 2 5
1600 1440 320 0.55
ADMIXTURE)
3 6
SAMPLE 1,2,3
AVG:

Half round drain 1 4


BATCH 2 ( DESIGN
concrete
MIX WITHOUT X 2 5
base(1050mm<H<2400
C20/25 ADMIXTURE) - - 320 0.55 100-150 (S3)
mm), pipe trench
CONTROL MIX 3 6
concrete base, RC
SAMPLE 4,5,6
sump (detention pond) AVG:

BATCH 3 (JKR
SPEC WITH
- - - -
ADMIXTURE)
SAMPLE 7,8,9
1 4 7
BATCH 1 (DESIGN
MIX WITH 2 5 8
1875 1875 375 0.47
ADMIXTURE)
3 6 9
SAMPLE 1,2,3
AVG:

1 4 7
BATCH 2 ( DESIGN All conventional
MIX WITHOUT structure (Pile cap, Pad 2 5 8
C30/37 ADMIXTURE) footing, Stump, Slab, - - 375 0.47 100-150 (S3)
CONTROL MIX Columns, RC Wall, 3 6 9
SAMPLE 4,5,6 Shear Wall)
AVG:

1 4 7
BATCH 3 (JKR
Adjust on plant 2 5 8
SPEC WITH
Adjust on plant Adjust on plant 350 (should not more
ADMIXTURE)
than 0.55) 3 6 9
SAMPLE 7,8,9
AVG: