Objectives:
Supervision, inspection, planning and commissioning in manufacturing, construction and assembly of piping, steel structures and
mechanical equipment.

Summary of qualifications:
Great experience in manufacturing, construction and erection of steel structures, piping and mechanical equipment, knowledge
and application of the following standards: AWS D1.1, D1.2, D1.5, D1.6, D1.8, ASME I, II, V, VIII, IX, B31.1, B31.3, B31.4, API 650,
620, 1104, AISC 303, 360, AS/NZS 4100, 1554 and others. Qualification of welders and welding procedures, issuance of
inspections procedures. Extensive experience in managing teams and coordinating working groups. Capacity and ease in learning
and teamwork.

- Data Book Evaluation - Interpretation, use and application of inspection


- QC/QA Coordination procedures
- Supervision of inspection and testing plans - Inspection Reporting
- Reading and interpreting drawings GD&T
Training courses:
School or educational entity: UNINTER - Porto Velho / RO
Course: Industrial Technologist (Associate Degree)
Status: Completed

School or educational entity: Lloyd’s Register Training - Santo Domingo / Dominican Republic
Course: ASME Certification process, Introduction to ASME Codes and National Board (Design, Fabrication, Materials, Welding
and NDT)
Status: Completed
School or educational entity: AWS (American Welding Society) / ABS Soldagem – São Paulo/SP
Course: Seminar CWI (Certified Welding Inspector)
Status: Completed – Cert. No.: 15123421
School or educational entity: Odebrecht Infrastructure - Porto Velho / RO
Course: Visual Test Inspector
Status: Completed - ASNT Cert. No.: SNT-TC 1A - VT-4865
School or educational entity: Odebrecht Infrastructure - Porto Velho / RO
Course: Penetrant Test Inspector
Status: Completed – ASNT Cert. No.: SNT-TC 1A - PT-4862
School or educational entity: ZEPTO / ABENDI - São Leopoldo / RS
Course: Dimensional Control of Boiler and Pipe Inspector
Status: Completed - SNQC / DIM: 13119
School or educational entity: DRN Engineering / CREA-CE - Fortaleza / CE
Course: Welding Inspector
Status: Completed
School or educational entity: University Center Claretiano- Porto Velho / RO
Course: Production Engineering
Status: In progress

Languages:
Portuguese: Reading and communication to participate in technical and professional activities.
English: Reading and communication to participate in technical and professional activities.
Spanish: Reading and communication to participate in technical and professional activities.

Additional Information:
I am willing to travel and / or relocate.

CV Fábio Madeira - Page 1 / 3


Professional history

Company: First Quantum Minerals - Copper Mine / Thermoelectric Plant 2x 150 MW – Panama (January / 2018 – Actual)
Positions: QA/QC Corrdinator / Certified Welding Inspector - CWI
Assignments:
Coordinator of the assembly activities inspection team, including: Equipment assembly inspections;
Inspections on welded joints (designed under AWS D1.1, AWS D1.6, ASME I, ASME VIII, ASME B31.1, ASME B31.3 and others);
Supervision of non-destructive testing inspectors (VT, PT, MT, UT and RT);
Also realizing qualification of welders and welding procedures under the following codes: AWS D1.1 and ASME IX.

Company: OECI - Thermoelectric Plant 2x 360 MW - Dominican Republic (November / 2016 – December / 2017)
Positions: QA/QC Coordinator / Certified Welding Inspector - CWI
Assignments:
Responsible for the company's QA / QC department, during the certification process by ASME.
Supervisor of the team inspections of assembly activities, including: Assembly of equipment such as boilers, turbines, generators,
filters, fans, rotors, cranes, tanks, pressure vessels and other mechanical equipment; Welding inspections in joints (designed
under AWS D1.1, AWS D1.6, ASME I, ASME VIII, ASME B31.1, ASME B31.3 and others) and non-destructive testing (VT, PT, MT, UT
and RT);
Performing qualification of welder and procedures, Including materials such as P11(Pn4), P22(Pn5A) and P91(Pn15E);

Company: Industria Naval do Ceará – Shipyard (May / 2016 – November / 2016)


Positions: Certified Welding Inspector - CWI
Assignments:
Inspections of assembly activities, including equipment such as boilers, turbines, pump, filters, fans, rotors, cranes and tanks;
Welding inspections in joints (designed under AWS D1.1, D1.6, ASME B31.3) and non-destructive testing (VT, PT, MT and UT);
Performing qualification of welder and procedures under the codes: AWS D1.1, ASME IX and ABS Material and Welding Code
(American Bureau of Shipping).

Company: Consortium Odebrecht – Tecnimont – Estrella


Project Punta Catalina Thermal Power Plant (2X 360 MW) - Dominican Republic (March / 2015 – January / 2016)
Positions: Quality Technician / Quality Supervisor
Assignments:
Supervisor of the team inspections of assembly activities, including: Inspections in the assembly of equipment such as boilers,
turbines, generators, filters, fans, rotors, cranes, tanks, pressure vessels and other mechanical equipment; Welding inspections
structural joints (designed under AWS D1.1) and non-destructive testing (VT, PT, MT, UT and RT);
Supervisor of hydrostatic and pneumatic testing in piping and equipment, under the codes: API 1104, API 650, ASME B31.1, ASME
B31.3, ASME I, and others;
Performing qualification of welder and procedures under the codes: API 1104, AWS D1.1 and ASME IX;
Responsible for evaluation of subcontractors, performing inspection in the manufacturing equipment by subcontractors.

Company: Odebrecht Infrastructure / Santo Antônio Hydroelectric Power Plant 50x 72MW – Brazil (April / 2013 - March / 2015)
Positions: Quality Technician / Quality Supervisor
Assignments:
Team coordinator of non-destructive testing and inspection (VT, PT, MT and UT), planning inspection activities in the field in order
to optimize the productivity of inspector’s team getting within 180 days an increase of 150% in productivity team, developing
training for inspectors in the modalities of VT, PT, MT and Dimensional Control, generating performance reports of welders and
general index of repairs and other controls inherent in the inspections activities.
Acting on quality assurance, responsible for interface with suppliers and customers, the treatment of non-compliance and for
validating calibration certificates of the instruments used in the assembly.
Monitoring of internal and external audits for recertification ISO9000.
Responsible for the preparation and review of the quality procedures for the mechanical assembly, piping, welding, surface
treatment, non-destructive testing and inspections.

CV Fábio Madeira - Page 2 / 3


Company: Odebrecht Engineering and Construction - CNO / Petrochemical Suape (June / 2011 - April / 2013)
Positions: Electromechanical Supervisor / Planning Supervisor
Assignments:
Mechanical assembly supervisor of piping, steel structure and equipment, performing the receiving, pre-assembly, assembly in
equipment as pressure vessels, heat exchangers, reactors, silos, filters, fans, cyclones, pumps, tanks, blowers and compressors.
Responsible for monitoring the planning and execution of logistics (route and rigging plan) for mounting.
The mechanical discipline coordinator in planning the implementation and preparation of test folders and commissioning of piping
and mechanical equipment (static and rotating).
Responsible for the analysis and validation of test folders testing of rotary and static mechanical equipment.

Company: CONSULGAL Brazil - Engineering Consultants / Pecem Thermal Power Plant (June / 2010 - June / 2011)
Position: Quality Inspector / Fiscal Mechanical Assembly (Owner's Engineer)
Assignments:
Responsible for receive inspection on the site of piping, steel structures and equipment, during the assembly of thermal plants
Pecém I - 2X 360 MW and Pecém II - 1X 360 MW.
Monitor the implementation of NDT such as PT, MT, UT, RT, hydrostatic testing and others, in steel structures and equipment.
Supervision of mechanical assembly of steel structures, pipe, pipe fittings and equipment such as boilers, turbines, generators,
filters, fans, rotors, cranes, tanks, pressure vessels, etc ...
Analysis of the manufacturing data book and dimensional, welding and NDT reports generated during assembly.

Company: SGS Brazil (June / 2008 - June / 2010)


Position: Quality Inspector (Dimensional, Equipment, Welding and Painting)
Assignments:
Inspections on suppliers during fabrication of piping, mechanical equipment and steel structures.
Dimensional control, VT, Hydrostatic Test and Painting Inspection in steel structures, towers, ducts, pressure vessels, tanks, valves,
hoists and others equipment, as well as monitoring the performance of NDT during fabrication and assembly.
Intervening when necessary, seeking to diagnose non-conformities in the materials used before, during and after the manufacture
of the equipment, reducing delivery delays and rework costs, inspecting equipment for the projects:

• Rhodia - Polyamide and Specialities Supplier: SDEPCI (China)


Supplier: CONGER • MPX / EDP Power Generation - TPP Porto do Pecém
• VALE - Mining Onca Puma (Thermoelectric Plant Pecém-CE)
Suppliers: ICEC, IESA, PYTHON, KOCH, DISPAN and VALTEK Suppliers: MABE and Doosan (China)
• VALE - TPP Barcarena (Thermoelectric Plant Barcarena- • IMPSA Wind
PA) Suppliers: ICEC

Company: Muller Metal Industry (October / 2006 - June / 2008)


Position: Quality Inspector (Dimensional, welding, Painting and Receiving)
Assignments:
Execution of Dimensional Control, VT and painting inspection in the equipment manufactured by the company and received
from subcontractors.
Coordinator of the Department of Quality Control responsible for the traceability of materials and preparation of documentation
including data book for Petrobras projects (Candeias / Biodiesel, Montes Claros / Biodiesel, Quixadá / Biodiesel), Andritz, TMSA
and other customers.

Company: PARTEX Oil and Gas (June / 2005 - August / 2006)


Position: Manufacturing and Assembly inspector
Assignments:
Realization of dimensional control during manufacture and assembly of oil storage tanks in production field and structures, piping,
flanges and other accessories belonging to the tanks.
Monitoring the performance of the NDT and hydrostatic testing.

Company: ZMO Industrial Equipment (February / 2004 - April / 2005)


Position: Manufacturing inspector and Boiler Installation and Piping
Assignments:
Monitoring the manufacture and assembly of steel structures, pipelines and equipment for use in ethanol plants.