Professional Documents
Culture Documents
Soudan.
Page 2
This focuses on:
ESP projects.
Page 3
Content
I. Introduction
II. Overview of Gas Lift & ESP systems
III. Modelling of ESP & Gas lifted equipped well
Ne-03 of Neem field
IV. Economic study of Gas lift & ESP projects
for well Ne-03 of Neem Field
V. Artificial lift selection
VI. Conclusions and Recommendations
Page 4
I. Introduction
Page 5
There are four basic methods of producing an oil
well by artificial lift, which are:
Artificial lift
• Gas Lifting
Page 6
1. Gas lift system
Outlet Injected
Gas
Surface
Introduction of gas in
the tubing
Tubing
Casin
Casing
Reduction of oil g
Gas
Static
density oil
lift
Annulus valves
Generation of
drawdown
Drawdown
Packer
Page 7
2. Electric submersible pump (ESP)
Diffuser
Oil back
flow Impeller
Cable
Pump
Multistage centrifugal
pump
Motor Impeller
rotation
Page 8
3. Characteristics and limitations of Gas lift and ESP
Gas lift VS ESP system
Well’s outflow
performance Tubing
response
No No
intersection production
Well’s inflow performance
Reservoir response
Page 11
3. ESP well Ne-03 design
Pump Pump
design
Production
Well fluid operation
data
data
condition parameters
Page 12
3. ESP well Ne-03 design
Pump operation
parameters
Pump
solution rate
VLP
Pump
discharge
pressure
2445
Gas
Valve
lifttype
datadata
Production
33
626
First unloading valve level
Gas lift
solution rate VLP
476
Gas lift
discharge VLP
pressure Pump
discharge
pressure
476
2445
Page 19
IV. Economic study of Gas lift & ESP projects
for well Ne-03 of Neem Field
Economic
analysis
Page 20
1. Gain calculation of ESP and gas lift projects
Gas lift ESP
6
REVENUE (MMU$)
5
4
3
2
1
0
2010 2011 2012 2013 2014 2015 2016 2017 2018 2019
Duration (years)
Revenue evolution of Gas lifted & ESP well during ten years
4
3
2
1
0
2010 2011 2012 2013 2014 2015 2016 2017 2018 2019
Duration (Year)
Gain variation of Gas lifted & ESP projects
OPEX evolution of Gas lifted & ESP well during ten years Page 21
2. NPV and PI calculation of ESP and gas lift projects
PI 1,81 1,13
Based on NPV and PI, Gas lift project in well Ne-03 is considered the
methods.
Page 24
Recommandations
Based on production point of view and gross profit,
ESP system was recommended as a best artificial
lift system.
Based on the economic and operations point of
view, gas lift was recommended as a best artificial
lift method.
However, during the production progress, when the
water cut rises, it would be recommended to
replace gas lift by the ESP technique.
Page 25
Thank you for your
attention
Page 26