INSTALLATION & OPERATION

© 2013 Eaton. All rights reserved.


Regulator Installation
• Ground the regulator tank AND the control
cabinet.

© 2013 Eaton. All rights reserved.


45
Connections
Source Bypass Switch

4 Wire grounded wye: B

C
N

• 3 regulators required Disconnect Shunt


Lightning
Arrester

• ± 10% regulation
Series
Lightning L L L
Arrester
S SL S SL S SL

Bypass Switch
3 Wire open delta:
Phase A
Phase B
Phase C

• 2 regulators required Disconnect


Switch
• ± 10% regulation L L

S SL S SL

Phase A Bypass Switch

3 Wire closed delta: Phase B


Phase C
Disconnect
• 3 regulators required Switches

• ± 15% regulation L
SL
L

SL
L
SL
S S S

© 2013 Eaton. All rights reserved.


46
Paralleling Regulators

2 situations to consider :
• Continuous Parallel operation (in substation)
• Tying Feeders through N.O. point (or with Bus Tie switch)

© 2013 Eaton. All rights reserved.


47
Paralleling Regulators

Simplified Diagram – 2 Voltage sources, 2 Impedances


Must have:
• Same %Z
V
• Same turns ratio

Regulators must use a “Leader-


V Follower” control setup
Reactive Circulating Current

© 2013 Eaton. All rights reserved.


48
Paralleling Regulators

Tying Feeders through a N.O. switching operation

R R
N.O.

How do you set the Regulators ?


Block Regulators (at least one)
-Match Tap position? What tap?
-Match Voltage? Where?
-Impedance is your friend

© 2013 Eaton. All rights reserved.


49
Bypassing a Regulator

Definition: Bypassing means installing a regulator


or removing a regulator from service.

! Warning!
Installing or removing the regulator with the tap changer
off neutral will short circuit part of the series winding!
Before bypassing, the regulator must be in neutral.

© 2013 Eaton. All rights reserved.


50
Bypassing a Regulator
Prior to Bypassing
 Place the regulator in neutral position
 A minimum of four indications are recommended
for neutral determination.

– Neutral lamp is “on” continuously

Tap Position
At Limit
0
– Verify the tap position of the control indicates Neutral
P.I. ADD-AMP -16, 16

– Position indicator is in neutral position

– Verify that there is no voltage difference


between the S and L bushings

© 2013 Eaton. All rights reserved.


51
Theory and Application

© 2013 Eaton. All rights reserved.


52
BYPASSING
1 step = 5/8% = .00625

Base Voltage
voltage per step

120 .75
2400 15
4800 30
7200 45
7620 48
12000 75
14400 90
19920 125

© 2013 Eaton. All rights reserved.


53
Bypassing a Regulator
Prior to Bypassing

 Take action to prevent the tap changer motor operation

• Power switch is OFF

• ‘Auto/Off/Manual’ switch is OFF

• Remove motor fuse

• V1 & V6 knife switches are OPEN

© 2013 Eaton. All rights reserved.


54
Bypassing
Regulator Connected Line-to-Ground (GY)

Source Load

Phase A Bypass

Disconnect Disconnect

S L

SL

Neutral

© 2013 Eaton. All rights reserved.


55
Bypassing - Remove Procedure
Regulator Connected Line-to-Ground (GY)

Source Load

Phase A B

S-DIS L-DIS

S L

Start 1 2 3
SL
B O C C C
S-Dis C C C O
L-Dis C C O O

Neutral
Step 1 is Critical Operation.

© 2013 Eaton. All rights reserved.


56
Bypassing
Regulator Connected Line-to-Line (Delta)

Source Load

Phase A Bypass

Disconnect Disconnect

S L

SL

Disconnect

Phase B

© 2013 Eaton. All rights reserved.


57
Bypassing - Remove Procedure
Regulator Connected Line-to-Line (Delta)

Source Load

Phase A B

L-DIS
S-DIS

S L
Start 1 2 3 4
SL B O C C C C
SL-Dis C C C C O
S-Dis C C C O O
SL-DIS
L-Dis C C O O O

Phase B
Step 1 is Critical Operation.

© 2013 Eaton. All rights reserved.


58
© 2013 Eaton. All rights reserved.
59
Regulators

• Questions??