You are on page 1of 16

Water Supply Projects

INITIAL ENVIRONMENTAL EXAMINATION (IEE) CHECKLIST REPORT


For

Project name or Title

This IEE Checklist Report shall be used for proposed WATER SUPPLY PROJECTs to be located
within Environmentally Critical Areas (ECA).

Please check applicable project category


9 Type Threshold
≤ 6 wells and other systems (e.g.
Water Supply Systems (Complete System)
infiltration gallery, etc.)
Level III – with household connection
Water Supply System (Distribution Only)
and water treatment

For ECC applications, this IEE Checklist Report shall be submitted with:
• Proof of Compatibility with the existing Land Use Plan
• Proof of Authority over the Project Site
• Accountability Statements of Proponent (see attached form) and the Preparer (if
any, following Annexes 2-22 of Revised Procedural Manual for DAO 2003-30)
• Photographs or plates/vicinity map of the project site showing impact areas and
affected areas and communities
• Duly Accomplished Project Environmental Monitoring & Audit Prioritization
Scheme (PEMAPS) Questionnaire (see Annex 2-7d of Revised Procedural Manual for DAO
2003-30)

(No other documents shall be required as pre-requisite to ECC applications per DENR MC 2010-14)

Read the questions carefully and write the required information on the blank spaces
provided or otherwise check (a) the appropriate boxes □ or parenthesis ( ). Boxes
with check marks(;) are automatically required. Use additional sheets if necessary
and indicate this in the appropriate space.

Project proponents are strongly discouraged to engage the services


of consultants/facilitators/preparers to accomplish/fill-up the IEE
Checklist Report Form. The Report Forms have been designed to be
user-friendly.

Furthermore, EMB Regional Office is required to complete the


processing of an ECC application using the IEE Checklist Report
within twenty (20) working days upon receipt for duly-accomplished
forms with complete attachments.

Misleading or erroneous answers are basis for legal actions and/or denial of ECC issuance.

PROJECT FACT SHEET

Project Name: ______________________________________________________

Project Location: _______________________________________________________

1
Total Project Land Area:

Total Project/Facilities _____________________________________________________


Area
(Area actually utilized)
Project Proponent: ______________________________________________________
______________________________________________________
Office Address:
Contact Person: ______________________________________________________
Designation: ______________________________________________________
Contact Information
Telephone Number: ______________________________________________________
Fax Number: ______________________________________________________
Mobile Number: ______________________________________________________
E-mail Address: ______________________________________________________

I. PROJECT DESCRIPTION
1.1 PROJECT LOCATION AND AREA: Street Name, Barangay, and Municipality/City, Province
________________________________________________________________________________
________________________________________________________________________________
________________________________________________________________________________

See attached vicinity map/s and photographs of the project site and site development/layout plan

Geographic coordinates of the project area (Preferably use WGS 84 datum - GPS setting, otherwise
specify datum used).
Perimeter/Boundary points
Longitude Latitude
(based on OCT/TCT/etc)

2
1.2 PROJECT COMPONENTS

Facilities Number of Specification/Description/Remarks


Units (Include capacity, length or other size
description)
Water collection
Production wells
Infiltration gallery
Diversion/Collection Weir
Others, specify
2. Water treatment facility
Chemical treatment (e.g.,
precipitation, coagulation, etc.)
Physical treatment (e.g.,
screening, sedimentation, etc.)
Disinfection (e.g., chlorination,
etc.)
3. Water distribution system (Indicate service area in m2 and number
of households served)
__________________ square meters
__________________ households

Communal box/faucet (new)


Communal box/faucet (for
rehabilitation)
Water pipelines, distribution main
(new)
Water pipelines distribution main
(for rehabilitation)
Water pipelines, service line
(new)
Water pipelines service line (for
rehabilitation)
Pumping stations
4. Chemical storage facility
5. Waste water management facility
6. Solid waste management facility
7. Drainage System
8. Others, specify
_____________________
(Use additional sheets if needed)
___________________________________________________________________________________

1.3 UTILITIES/REQUIREMENTS (Operation Phase):

Utilities Source Estimated Demand/Consumption


Power/Electricity KWh
(Total)
Power/Electricity KWh
(From Renewable Energy
Sources)
Water m3/day
(Total)
(Fill-up table below if water is not
obtained from the local water utility)
Water m3/day
(Rainwater Collection
System)

3
Water Source
[ ] ground water [ ] well [ ] spring [ ] others: ____________________________

[ ] Surface water [ ] river [ ] lake [ ] others: ____________________________

Location of water source


__________________________________________________________________________
(Sitio/Zone, Barangay, Municipality/City, Province, Region)

Energy/Water Efficiency
Utilities Estimated Savings Proposed Efficiency/Conservation
Measures
Power/Electricity KWh

Water m3/day

1.4 MANPOWER

a. Construction Phase
Manpower Expertise/Skills Total
Requirement

b. Operation Phase
Manpower Expertise/Skills Total
Requirement

1.5 INDICATIVE PROJECT COST

Project Cost (PhP): ____________

4
II. ENVIRONMENTAL IMPACTS AND MANAGEMENT PLAN

Possible Environmental/ Baseline Environment Preventive/ Mitigating Measures Monitoring Parameters/ Cost of Mitigation/ Monitoring
Social Impacts Implementation
LAND
; Consistency with land Current land use w/in 1km radius
(as per zoning ordinance):
; See attached proof of compatibility with
use land use
Residential
Commercial/ Institutional
Industrial
Agricultural/ Recreational
Protected Areas
Others, specify
____________

Actual land uses w/in 1km radius:


Residential
Commercial/ Institutional
Industrial
Agricultural/ Recreational
Protected Areas
Others, specify
_____________

Disturbance to wildlife Existing vegetation in the area:


; Compliance with conditions of DENR/LGU ; Annual inspection of area ; Cost integrated in the
due to vegetation Forestland SLUP, Tree Cutting Permit, ROW, PCA replanted/ revegetated construction /operation cost
clearing Marshland Permit
Grassland ; Limit land clearing as much as possible
Mangrove ; Provide temporary fencing to vegetation
that will be retained
Wetland
Others, specify ; Promote restoration of damaged or
_____________ destroyed vegetation where possible (e.g.,
tree planting);

5
Possible Environmental/ Baseline Environment Preventive/ Mitigating Measures Monitoring Parameters/ Cost of Mitigation/ Monitoring
Social Impacts Implementation
Change in surface Slope: Provide erosion control and slope Regular inspection of slope Slope/ Erosion Control
landform/ topography/ flat (0-3%) protection measures protection measures in Cost: ___________
terrain/slope gently sloping to rolling (3-18%) Designate a Spoils Storage Area, with erosion-prone areas Others, specify
steep (>18%) topsoil set aside for later use and allow Regular inspection for new ____ ________
Soil Erosion maximum re-use of spoils eroded areas near the site
Construction during dry season Others, specify
Stabilization of embankment with grasses ______________
or other soil cover
Others, specify
______________
Is the project site located in an area
identified by MGB/PAG-ASA/ Compliance with the DENR Administrative
PHIVOLCS as hazard prone? Order No. 2003-30 and DENR
Yes Administrative Order No. 2000-28,
Implementing Guidelines on Engineering
No Geological and Geo-hazard Assessment
(EGGA).

; Soil/Land contamination Existing soil type in the area: ; Implementation of the Ecological Solid ; Daily inspection of ; Cost integrated in the
due to improper solid sandy Waste Management Plan (ESWMP) waste/recycling bins for construction /operation cost
waste disposal
clay Set-up temporary fence around the segregation

sandy-loam
construction area ; Daily inspection for presence
; Implement re-use and recycling of waste of mixed garbage in the
Others, specify
materials facility
________________ ; Weekly inspection of waste
; Implement proper segregation, collection
and disposal of domestic wastes in accumulated
designated areas Others, specify
Implement proper collection, labeling and ___________
storage of hazardous waste
; Provide receptacles / bins for solid wastes
Coordinate with the municipal / city waste
collectors
Engage third party company for waste
collection
Others, specify
________________

6
Possible Environmental/ Baseline Environment Preventive/ Mitigating Measures Monitoring Parameters/ Cost of Mitigation/ Monitoring
Social Impacts Implementation
Impairment of Presence of visually significant
landforms/landscape/structures?
Implement landscaping and other Regular inspection of ; Cost integrated in the
visual aesthetics beautification measures landscaping and other construction/ operation cost
Devaluation of land Yes Provide adequate buffer beautification activities
values No Compensate adjacent property owners Regular monitoring of buffer
zones
Others, specify
; Regularly monitor
________________
presence/absence of
complaints from adjacent
property owners
WATER

Increased siltation due Specify nearest/receiving water ; Set-up proper and adequate sanitary Regular (ocular) inspection of: ; Cost integrated in the
to project activities body:
____________________________
facilities Drainage / canal systems construction/ operation cost
Water quality Strictly require the contractor and its Water treatment facility (i.e.,
degradation Distance to nearest/receiving water workers to observe proper waste disposal grease trap, septic tank, etc.)
and proper sanitation
Others, specify body:
__________ 0 to less than 0.5 km
; Strictly observe proper waste handling and
disposal Quarterly monitoring of the
0.5 to 1 km
Provision of wastewater treatment facility
following:
More than 1 km
Set up silt trap/stilling ponds to minimize
pH

If nearest/receiving water body is


downstream siltation TSS concentration
fresh water, specify classification: Provide ring canals around fuelling tanks/ BOD
AA
motorpool/ maintenance areas Total Coliform
A
Others, specify Color
______________
B Oil and Grease
C
D

If nearest/receiving water body is


coastal or marine water, specify
classification:
SA
SB
SC
SD

7
Possible Environmental/ Baseline Environment Preventive/ Mitigating Measures Monitoring Parameters/ Cost of Mitigation/ Monitoring
Social Impacts Implementation

Current Water Use:


Fishery
Tourist Zone / Park
Recreational
Industrial
Agricultural

Distance of project area to the


nearest well used:
0 to less than 0.5 km
0.5 to 1 km
More than 1 km

Use of the nearest well:


Drinking/Domestic
Industrial
Agricultural
Competition in water Size of population using receiving Implement rainwater harvesting and similar ; Cost integrated in the
use surface water: measures as an alternative source of water ; Regularly monitor construction/ operation cost
Depletion of water ≤ 1,000 persons ; Observe water conservation measures; presence/absence of
complaints
resources >1,000 and ≤ 5,000persons ; Careful selection of project site to avoid
>5,000person disruption of traditional water uses ; Regular coordination with
concerned agencies
; Obtain Water Permit from NWRB
Available/nearest water source. ; Regularly monitor
; Improve efficiency of water supply and occurrences of water
Deepwell distribution system shortages
Water district/LGU Implement community ponds and similar Others, specify
Surface water measures as alternative water source for
non-domestic uses
__________
Others, specify
; Increase, when practical, storage
___________
capacities of water supply structures for
resilience to greater climate variations and
extremes
Others, specify ________________

8
Possible Environmental/ Baseline Environment Preventive/ Mitigating Measures Monitoring Parameters/ Cost of Mitigation/ Monitoring
Social Impacts Implementation
Increased occurrence Is the project site located in an area
identified by MGB/PAG-ASA as
Use appropriate design for project facilities ; Regularly monitor ; Cost integrated in the
presence/absence of construction/ operation cost
of flooding
flood prone? Implement appropriate drainage system
complaints
Yes Regularly remove debris and other
; Regular coordination with
materials that may obstruct water flow
No concerned agencies
Use appropriate technology (e.g. raised ; Regularly monitor increased
hand-pumps) to protect drinking water from frequency of flooding
flood contamination
Others, specify
Others, specify
_____________
________________

AIR / NOISE

Air quality degradation Distance to nearest community: Properly operate and maintain all emission ; Regularly monitor ; Cost integrated in the
0 to less than 0.5 km sources (e.g. vehicles, pumps, generator, presence/absence of construction/ operation cost
complaints
0.5 to 1 km etc)
More than 1 km Install when applicable, the appropriate air
Regular (ocular) inspection of:
pollution control device/s
Strictly enforce good housekeeping Absence of white or black
smoke from vehicles,
practices
generator, etc.
Control vehicle speed to lessen
Presence of truck cover
suspension of road dust
during deliveries
Conduct water spraying to suppress dust
sources and minimize discomfort to nearby
residents
Use covered vehicles to deliver materials
that may generate dust
Other, specify
___________________

Nuisance due to noise Distance to nearest community: Properly operate and maintain all noise ; Regularly monitor ; Cost integrated in the
generation 0 to less than 0.5 km sources (e.g. vehicles, pumps, generator, presence/absence of construction/ operation cost
complaints
0.5 to 1 km etc)
More than 1 km Install when applicable, the appropriate Regular monitoring of buffer
noise control device/s (e.g., mufflers, zones
silencer, sound barriers, etc.)
Implement appropriate operating hours

9
Possible Environmental/ Baseline Environment Preventive/ Mitigating Measures Monitoring Parameters/ Cost of Mitigation/ Monitoring
Social Impacts Implementation

Provide adequate buffer and/or planting of


trees
Others, specify
______________

PEOPLE

Displacement of Provide relocation/disturbance ; Regularly monitor ; Cost integrated in the


residents in the project compensation packages presence/absence of construction/ operation cost
site and within its Size of population of host barangay: ; Prioritize local residents for employment complaints
vicinity
≤ 1,000 persons ; Promptly pay local taxes and other ; Regular coordination with
Displacement of
>1,000 and ≤ 5,000persons financial obligations LGU
Indigenous People Others, specify
; Regular coordination with LGU ______________
Enhanced employment >5,000person
Prior consultation & coordination to
and/or livelihood
Classification of host barangay: minimize disruption on daily domestic
opportunities
activities & respect for IP rights and
Reduced employment Urban
cultural practices
and/or livelihood Rural
Ensure participation of IPs in consultations
opportunities
and dialogues
Increased revenues for Available services within/near the
host barangay: Provide appropriate traffic/warning
LGU
signs, lighting, etc
Disruption/Competition Schools (e.g. elementary, high
in delivery of public school, college) Others, specify
______________
services (e.g., Health facilities (e.g., clinics,
education, peace and hospitals, etc.)
order, etc.) Peace and order (e.g., police
Enhanced delivery of outpost, brgy. Tanod, etc.)
public services (e.g.,
education, peace and
Recreation and sports facilities
order, etc.) Others, specify
______________
Increase in traffic
volume and worsening
of traffic flow

10
Possible Environmental/ Baseline Environment Preventive/ Mitigating Measures Monitoring Parameters/ Cost of Mitigation/ Monitoring
Social Impacts Implementation
Impacts on community ; Regular coordination with LGU ; Regularly monitor ; Cost integrated in the
health and safety Provide appropriate warning signs, lighting presence/absence of
complaints
construction/ operation cost
Others, specify and barricades, whenever practicable
__________ ; Observe proper housekeeping ; Regular coordination with
LGU
Provide on-site medical services for any
; Regularly monitor
emergency.
submission of reports to
Participate in public awareness programs concerned agency
on health and safety Others, specify
Implement appropriate safety programs for ______________
both community and workers
; Strictly comply with fire, safety and similar
regulatory requirements
Strictly comply with requirements of RA
6969
Others, specify
____________________

11
III. ABANDONMENT /DECOMMISSIONING/REHABILITATION POLICIES AND
GENERIC GUIDELINES (if Applicable)

Project Life or Service : ___________ years


Provide description of the Abandonment activities, such as, dismantling and waste
disposal.
______________________________________________________________________
______________________________________________________________________
______________________________________________________________________
______________________________________________________________________
IV. INSTITUTIONAL PLAN FOR EMP IMPLEMENTATION

Organization Chart:

4.1. Abandonment Plan (if Applicable)

12
Attach drawing/plan of air pollution source and control installations (with
dimensions and descriptions)

13
Process Flow

14
Attach drawing/plan of waste water treatment facility (with dimensions and
descriptions)

15
SWORN STATEMENT OF ACCOUNTABILITY OF THE PROPONENT

This is to certify that all the information and commitments in this Initial
Environmental Examination (IEE) Checklist Report are accurate and complete to the
best of my knowledge.

By the authority vested in me by the _____(Company Name) as


___(Position/Designation), I hereby commit to ensure implementation of all
commitments, mitigating measures and monitoring requirements indicated in this IEE
Checklist Report as well as the following:
• Conform to pertinent provisions of applicable environmental laws e.g.,
R.A. No. 6969 (Toxic Substances and Hazardous and Nuclear Wastes
Control Act of 1990), R.A. No. 9003 (Ecological Solid Waste
Management Act of 2000), R.A. No. 9275 (Philippine Clean Water Act
of 2004), and R.A. No. 8749 (Philippine Clean Air Act of 1999).
• Abide and conform to LGU development plans and guidelines.
• Promptly pay local taxes and other financial obligations.
• Regularly submit reports to concerned agencies.

I hereby bind myself to answer any penalty that may be imposed arising from
any misrepresentation or failure to state material information in this IEE Checklist.

In witness whereof, I hereby set my hand this ____ day of __________ at


______________________.

__________________________
NAME OF PROPONENT HEAD
(Position)
(Company Name)

SUBSCRIBED AND SWORN TO before me this _____ day of ____________


201__, affiant exhibiting his/her Community Tax Certificate No.
___________________ issued at ______________________ on
__________________________.

Doc. No. ____________________


Page No. ____________________
Book No. ____________________
Series of ____________________

16

You might also like