You are on page 1of 29

BSCP

Project : Rehabilitation and Up gradation of Repalle to Eeppurpalem Section from Km 129/927 to Km 195/

PIPE CULVERT - WO

Proposed Excavation Head wall PCC Head wall 1st lif


DPR Ventage as TYPE OF
S.No Design Chainge Drawing Status
Chainge per STRUCTURE
Schedule-B
RHS LHS RHS LHS RHS LHS

1 123+110 2v×1.2 New

2 124+175 1v×1.2 New

3 124+456 1v×1.2 New

4 125+200 1v×1.2 New

5 125+250 1v×1.2 New

6 125+300 1v×1.2 New

7 127+825 1v×1.2 New

8 127+900 1v×1.2 New

9 128+200 1v×1.2 New

10 128+845 1v×1.2 New

11 129+135 1v×1.2 New

12 129+620 1v×1.2 New

13 129+755 1v×1.2 New

14 130+400 1v×1.2 New


BSCP

Project : Rehabilitation and Up gradation of Repalle to Eeppurpalem Section from Km 129/927 to Km 195/

PIPE CULVERT - WO

Proposed Excavation Head wall PCC Head wall 1st lif


DPR Ventage as TYPE OF
S.No Design Chainge Drawing Status
Chainge per STRUCTURE
Schedule-B
RHS LHS RHS LHS RHS LHS

15 130+995 1v×1.2 New

16 132+000 1v×1.2 New

17 132+950 1v×1.2 New

18 134+050 134+052 1v×1.2 New

19 136+095 136+032 1v×1.2 Reconstruction

20 137+230 137+267 1v×1.2 Reconstruction

21 138+300 138+338 1v×1.2 New

22 138+535 138+567 1v×1.2 New

23 139+465 139+492 1v×1.2 New

24 140+055 140+082 1v×1.2 New

25 141+488 141+508 1v×1.2 Reconstruction

26 142+630 142+656 1v×1.2 Reconstruction Not

27 144+200 144+228 1v×0.9 Widening

28 144+650 144+678 1v×1.2 Reconstruction Not


BSCP

Project : Rehabilitation and Up gradation of Repalle to Eeppurpalem Section from Km 129/927 to Km 195/

PIPE CULVERT - WO

Proposed Excavation Head wall PCC Head wall 1st lif


DPR Ventage as TYPE OF
S.No Design Chainge Drawing Status
Chainge per STRUCTURE
Schedule-B
RHS LHS RHS LHS RHS LHS

29 145+481 145+506 1v×1.2 Reconstruction Approved

30 145+623 145+647 1v×1.2 Reconstruction

31 146+285 146+311 1v×1.2 Reconstruction

32 148+520 148+548 1v×1.2 Reconstruction Approved

33 150+394 150+420 1v×1.2 Reconstruction Re-Submited

34 150+878 150+940 1v×1.2 Reconstruction Approved

35 154+340 154+303 1v×1.2 New Re-Submited

36 154+600 154+628 1v×1.2 New Approved

37 154+890 154+919 1v×1.2 New Approved

38 154+910 154+939 1v×1.2 New Approved

39 155+157 155+164 1v×1.2 New Approved

40 155+815 155+864 1v×1.2 New Approved

41 156+355 156+406 1v×1.2 New

42 162+662 162+666 1v×1.2 Reconstruction Approved


BSCP

Project : Rehabilitation and Up gradation of Repalle to Eeppurpalem Section from Km 129/927 to Km 195/

PIPE CULVERT - WO

Proposed Excavation Head wall PCC Head wall 1st lif


DPR Ventage as TYPE OF
S.No Design Chainge Drawing Status
Chainge per STRUCTURE
Schedule-B
RHS LHS RHS LHS RHS LHS

43 163+060 163+056 1v×1.2 Widening Approved

44 163+243 163+247 1v×1.2 Reconstruction Approved

45 163+520 163+524 2v×1.2 New

46 163+660 163+664 2v×1.2 New

47 164+233 164+230 1v×1.2 New

48 164+699 164+702 1v×1.2 New

49 164+919 164+923 1v×1.2 New

50 165+150 165+147 2v×1.2 New

51 166+407 166+410 1v×1.2 Reconstruction Not

52 167+750 167+754 2v×0.9 Reconstruction Not

53 169+607 169+609 1v×0.9 Widening/Rec Not

54 171+530 171+531 1v×1.2 Reconstruction Not

55 172+735 172+738 1v×1.2 New

56 173+055 173+058 1v×1.2 New


BSCP

Project : Rehabilitation and Up gradation of Repalle to Eeppurpalem Section from Km 129/927 to Km 195/

PIPE CULVERT - WO

Proposed Excavation Head wall PCC Head wall 1st lif


DPR Ventage as TYPE OF
S.No Design Chainge Drawing Status
Chainge per STRUCTURE
Schedule-B
RHS LHS RHS LHS RHS LHS

57 173+720 173+723 1v×1.2 New

58 174+655 174+658 1v×1.2 New

59 174+975 174+978 1v×1.2 New

60 175+615 175+618 1v×1.2 New

61 175+935 175+938 1v×1.2 New

62 176+895 176+896 1v×1.2 New

63 177+535 177+535 1v×1.2 New

64 177+855 177+855 1v×1.2 New

65 178+495 178+495 1v×1.2 New

66 178+815 178+815 1v×1.2 New

67 179+460 179+474 1v×1.2 New

68 179+775 179+775 1v×1.2 New

69 180+415 180+415 1v×1.2 New

70 180+735 180+735 1v×1.2 New


SCPL INFRASTEUCTURE LTD

95/000 of NH-214A (New NH-216) to two lane with paved shoulder in the State of Andhra Pradesh under NHDP-IV on EPC Basis

WORK PROGRESS (up to 31-08-2018)

Bedding for Pipe Laying Pipe Laying Head wall 2nd lif Final lif ENCASING

RHS LHS RHS LHS RHS LHS RHS LHS PCC (RHS) SLAB (RHS) PCC (LHS) SLAB (LHS)
SCPL INFRASTEUCTURE LTD

95/000 of NH-214A (New NH-216) to two lane with paved shoulder in the State of Andhra Pradesh under NHDP-IV on EPC Basis

WORK PROGRESS (up to 31-08-2018)

Bedding for Pipe Laying Pipe Laying Head wall 2nd lif Final lif ENCASING

RHS LHS RHS LHS RHS LHS RHS LHS PCC (RHS) SLAB (RHS) PCC (LHS) SLAB (LHS)
SCPL INFRASTEUCTURE LTD

95/000 of NH-214A (New NH-216) to two lane with paved shoulder in the State of Andhra Pradesh under NHDP-IV on EPC Basis

WORK PROGRESS (up to 31-08-2018)

Bedding for Pipe Laying Pipe Laying Head wall 2nd lif Final lif ENCASING

RHS LHS RHS LHS RHS LHS RHS LHS PCC (RHS) SLAB (RHS) PCC (LHS) SLAB (LHS)

- - - -

- - - -

- - - -

- - - -

- - - -
SCPL INFRASTEUCTURE LTD

95/000 of NH-214A (New NH-216) to two lane with paved shoulder in the State of Andhra Pradesh under NHDP-IV on EPC Basis

WORK PROGRESS (up to 31-08-2018)

Bedding for Pipe Laying Pipe Laying Head wall 2nd lif Final lif ENCASING

RHS LHS RHS LHS RHS LHS RHS LHS PCC (RHS) SLAB (RHS) PCC (LHS) SLAB (LHS)

- - - -
SCPL INFRASTEUCTURE LTD

95/000 of NH-214A (New NH-216) to two lane with paved shoulder in the State of Andhra Pradesh under NHDP-IV on EPC Basis

WORK PROGRESS (up to 31-08-2018)

Bedding for Pipe Laying Pipe Laying Head wall 2nd lif Final lif ENCASING

RHS LHS RHS LHS RHS LHS RHS LHS PCC (RHS) SLAB (RHS) PCC (LHS) SLAB (LHS)
esh under NHDP-IV on EPC Basis

Remarks
esh under NHDP-IV on EPC Basis

Remarks

Encasement
esh under NHDP-IV on EPC Basis

Remarks

Encasement

Encasement

Completed (LHS)

Completed (BHS)

Completed (RHS)

Completed (BHS)

Completed (BHS)

Completed (BHS)

Completed (BHS)

Completed (RHS)
esh under NHDP-IV on EPC Basis

Remarks

Completed (BHS)

Completed (RHS)

Completed (RHS)

Completed (RHS)

Completed (RHS)
esh under NHDP-IV on EPC Basis

Remarks
BSCPL INFRASTEUCTURE LT
Project: Rehabilitation and Up gradation of Repalle to Eeppurpalem Section from Km 129/927 to Km 195/000 of NH-214A (New NH-216)

BOX CULVERT - WORK PROGRES


BOX PORTION
Design Proposed Ventage TYPE OF
S.No DPR Chainge SIDE BOTTOM
Chainge as per Schedule-B STRUCTURE Excavation PCC RAFT TOP HAUNCH WALLS SLAB
HAUNCH

LHS
1 124+440 124+473 1v×4 New
RHS

LHS
2 124+905 124+926 1v×3 New
RHS

LHS
3 125+686 125+716 1v×4 New
RHS

LHS
4 125+700 125+731 1v×4 New
RHS

LHS
5 127+060 127+095 1v×2 New
RHS

LHS
6 127+360 127+405 1v×2 New
BOX PORTION
Design Proposed Ventage TYPE OF
S.No DPR Chainge SIDE BOTTOM
Chainge as per Schedule-B STRUCTURE Excavation PCC RAFT TOP HAUNCH WALLS SLAB
HAUNCH
6 127+360 127+405 1v×2 New
RHS

LHS
7 128+483 128+515 1v×5.5 New
RHS

LHS
8 129+457 129+486 1v×3 New
RHS

LHS
9 131+875 131+900 1v×2 New
RHS

LHS
10 133+360 133+376 1v×2 New
RHS

LHS
11 133+920 133+941 1v×2 New
RHS

LHS
12 134+010 134+012 1v×2 New
RHS

LHS
13 134+310 134+338 1v×2 New
RHS
BOX PORTION
Design Proposed Ventage TYPE OF
S.No DPR Chainge SIDE BOTTOM
Chainge as per Schedule-B STRUCTURE Excavation PCC RAFT TOP HAUNCH WALLS SLAB
HAUNCH

LHS
14 135+150 135+184 1v×4 New
RHS

LHS
15 135+515 135+546 1v×4 New
RHS

LHS
Re-
16 136+500 136+584 1v×4 Construction
RHS

LHS
17 138+378 138+413 1v×2 New
RHS

LHS
18 138+845 138+877 1v×2 New
RHS

LHS
19 139+745 139+772 1v×2 New
RHS

LHS
20 140+705 140+813 1v×2 New
RHS

LHS
Re-
21 142+325 142+351 1v×4
BOX PORTION
Design Proposed Ventage TYPE OF
S.No DPR Chainge SIDE BOTTOM
Chainge as per Schedule-B STRUCTURE Excavation PCC RAFT TOP HAUNCH WALLS SLAB
HAUNCH
Re-
21 142+325 142+351 1v×4 Construction
RHS

LHS
Re-
22 146+688 146+716 1v×3 Construction
RHS

LHS
Re-
23 147+665 147+691 1v×3 Construction
RHS

LHS
Re-
24 147+915 147+941 1v×2 Construction
RHS

LHS
25 149+222 149+249 1v×2 Widening
RHS

LHS
Re-
26 152+470 152+495 1v×4 Construction
RHS

LHS
Re-
27 153+655 153+679 1v×2 Construction
RHS

LHS
28 153+685 153+801 1v×4.6 Widening
RHS
BOX PORTION
Design Proposed Ventage TYPE OF
S.No DPR Chainge SIDE BOTTOM
Chainge as per Schedule-B STRUCTURE Excavation PCC RAFT TOP HAUNCH WALLS SLAB
HAUNCH

LHS
Re-
29 153+770 153+706 1v×4.6 Construction
RHS

LHS
30 155+550 155+586 1v×3 New
RHS

LHS
Re-
31 161+970 161+984 1v×2 Construction
RHS

LHS
32 162+300 162+299 1v×5 Widening
RHS

LHS
33 162+916 162+911 1v×2.2 Widening
RHS

1v×1.2 LHS
34 163+972 163+970 Widening
RHS

LHS
Re-
35 165+365 165+339 1v×3 Construction
RHS

LHS
36 165+685 165+685 1v×4.1 Widening
BOX PORTION
Design Proposed Ventage TYPE OF
S.No DPR Chainge SIDE BOTTOM
Chainge as per Schedule-B STRUCTURE Excavation PCC RAFT TOP HAUNCH WALLS SLAB
HAUNCH
36 165+685 165+685 1v×4.1 Widening
RHS

LHS
37 168+937 168+941 1v×2 Widening
RHS

LHS
38 171+500 171+503 1v×2 Widening
RHS

LHS
39 172+298 172+301 1v×3.2 Widening
RHS

LHS
40 173+306 173+310 1v×4 New
RHS

LHS
41 173+375 173+378 1v×2 New
RHS

LHS
42 173+887 173+890 1v×4 New
RHS

LHS
43 174+335 174+338 1v×2 New
RHS
BOX PORTION
Design Proposed Ventage TYPE OF
S.No DPR Chainge SIDE BOTTOM
Chainge as per Schedule-B STRUCTURE Excavation PCC RAFT TOP HAUNCH WALLS SLAB
HAUNCH

LHS
44 176+024 176+010 1v×2 New
RHS

LHS
45 176+587 176+586 1v×5.5 New
RHS

LHS
46 177+215 177+215 1v×2 New
RHS

LHS
47 178+175 178+175 1v×2 New
RHS

LHS
48 179+135 179+135 1v×5 New
RHS

LHS
49 180+095 180+095 1v×2 New
RHS

LHS
50 181+055 1v×2 New
RHS
ASTEUCTURE LTD
NH-214A (New NH-216) to two lane with paved shoulder in the Stat`e of Andhra Pradesh under NHDP-IV on EPC Basis

- WORK PROGRESS
U-TROUGH CURTAIN / ANCHOR WALL
BOTTOM REMARKS
Excavation PCC RAFT WALLS Excavation PCC WALL
HAUNCH
U-TROUGH CURTAIN / ANCHOR WALL
BOTTOM REMARKS
Excavation PCC RAFT WALLS Excavation PCC WALL
HAUNCH
U-TROUGH CURTAIN / ANCHOR WALL
BOTTOM REMARKS
Excavation PCC RAFT WALLS Excavation PCC WALL
HAUNCH
U-TROUGH CURTAIN / ANCHOR WALL
BOTTOM REMARKS
Excavation PCC RAFT WALLS Excavation PCC WALL
HAUNCH
U-TROUGH CURTAIN / ANCHOR WALL
BOTTOM REMARKS
Excavation PCC RAFT WALLS Excavation PCC WALL
HAUNCH

SLAB Completed

SLAB Completed

SLAB Completed
U-TROUGH CURTAIN / ANCHOR WALL
BOTTOM REMARKS
Excavation PCC RAFT WALLS Excavation PCC WALL
HAUNCH

SLAB Completed

SLAB Completed
U-TROUGH CURTAIN / ANCHOR WALL
BOTTOM REMARKS
Excavation PCC RAFT WALLS Excavation PCC WALL
HAUNCH

You might also like