551 LPU LPU MAINTENANCE 24000 350-2P400076-0-91071Q1H2 VPR FRM REDCR TO INS
552 LPU LPU MAINTENANCE 24000 300-2P400006-0-151011-SHC LIQUID FROM 2P-4001
553 LPU LPU MAINTENANCE 24000 400-2P400019-0-91071Q1H2 VAPOUR FROM ENLARGE
554 LPU LPU MAINTENANCE 25100 251FCA-10006/VC MP STEAM TO MIXED FD
555 LPU LPU INSTRUMENTATION 25200 252PC-50471/UC DCS CONTROLLER FUNCTIO
556 LPU LPU MAINTENANCE 24800 350-2H480001-0-31160-H HTF LIQUID FROM REDUCER
Root valve needs to be replaced. Transmitter Replacement with new Type. Manual valve Gate
Replace transmitter root valve. Transmitter Replacement with new Type. Manual valve Gate
Installation of isolation valve Manual valve Gate &Ball
VLPS,CS hdr 2"150 gate valve replacement Manual valve Gate
MTAPASS, LR1 2E-1131 steam inlet bypass Manual valve N/A
T2 CCW PHE "E" CW SUPPLY VALVE PASSING Manual valve Butterfly
MTA 260LCA10003 Bypass Valve Replacement Manual valve N/A
T2 HP-IP LDS 2ND BYPASS VALVE PASSING Manual valve N/A
T2 HP-IP LDS 2ND ISOLATION VALVE PASSING Manual valve N/A
T2 HP-IP LDS 1ST BYPASS VALVE PASSING Manual valve N/A
T2 HP-IP LDS 1ST ISOLATION VALVE PASSING Manual valve N/A
WV-006 1ST ISO VALVE IS HARD TO OPERATE Manual valve Gate
Replace V1173 with higher grade material Manual valve Globe
TO REMOVE AND SERVICE RELIEF VALVE RV PSV
TO REMOVE AND SERVICE RELIEF VALVE RV PSV
To calibrate 224RV-10163 RV PSV
TO REMOVE AND SERVICE RELIEF VALVE RV PSV
TO REMOVE AND SERVICE RELIEF VALVE RV PSV
TO REMOVE AND SERVICE RELIEF VALVE RV PSV
TO REMOVE AND SERVICE RELIEF VALVE RV PSV
TO REMOVE AND SERVICE RELIEF VALVE RV PSV
TO REMOVE AND SERVICE RELIEF VALVE RV PSV
Steam Valve V1148 hard to operate Manual valve Globe
To service / replace 224-V-3010A Manual valve Butterfly
To service / replace 224-V-3010B Manual valve Butterfly
To service / replace 224-V-3011 Manual valve Butterfly
To service / replace 224-V-3013 Manual valve Butterfly
To service / replace 224-V-3020A Manual valve Butterfly
To service / replace 224-V-3020B Manual valve Butterfly
To service / replace 224-V-3021A Manual valve Butterfly
To service / replace 224-V-3021B Manual valve Butterfly
To service / replace 224-V-3024A Manual valve Globe
To service / replace 224-V-3024B Manual valve Globe
To service / replace 224-V-3104 Manual valve Butterfly
To service / replace 224-V-3105 Manual valve Butterfly
To service / replace 224-V-3106 Manual valve Butterfly
REPLACE LP COLUMN DRAIN VALVE WITH NEW Manual valve Globe
To calibrate 224RV-10005A RV PSV
To calibrate 224RV-10005B RV PSV
To calibrate 224RV-10005C RV PSV
To calibrate 224RV-10005D RV PSV
To calibrate 224RV-10005E RV PSV
To calibrate 224RV-10131 RV PSV
To calibrate 224RV-10132 RV PSV
To calibrate 224RV-10223 RV PSV
To calibrate 224RV-30001 RV PSV
To calibrate 224RV-30002 RV PSV
To calibrate 224RV-30003A RV PSV
To calibrate 224RV-30003B RV PSV
To calibrate 224RV-30003C RV PSV
To calibrate 224RV-30005 RV PSV
To calibrate 224RV-30020 RV PSV
To calibrate 224RV-40009 RV PSV
To calibrate 224RV-40013A RV PSV
To calibrate 224RV-40013B RV PSV
To open V4157 bonnet and inspect/repair Manual valve GATE
201RV-10002A U/S valve is passing Manual valve PSV
201RV10002B U/S valve passing. MTA-2 Manual valve N/A
201RV-10002C U/S valve passing Manual valve PSV
SCE-Overhaul Critical NRV 201-SP-855A NRV CHECK
SCE-Overhaul Critical NRV 201-SP-855B NRV CHECK
SCE-Overhaul Critical NRV 201-SP-855C NRV CHECK
SCE-Overhaul Critical NRV 201-SP-855D NRV CHECK
SCE-Overhaul Critical NRV 201-SP-855E NRV CHECK
Remove RV and Plug the Take off point RV Butterfly, Relief
001RV10002C RV U/S valve passing MTA-2 Manual valve PSV
2P-8113B DISCHARGE VALVE PASSING. Manual valve Gate
OIL SEEPAGE ON 223SP-169 Manual valve N/A
To calibrate 223RV-10005A RV PSV
To calibrate 223RV-10005B RV PSV
To calibrate 223RV-10005C RV PSV
To calibrate 223RV-10005D RV PSV
To calibrate 223RV-10005E RV PSV
To calibrate 223RV-10131 RV PSV
To calibrate 223RV-10132 RV PSV
To calibrate 223RV-10223 RV PSV
To calibrate 223RV-30001 RV PSV
To calibrate 223RV-30002 RV PSV
To calibrate 223RV-30003A RV PSV
To calibrate 223RV-30003B RV PSV
To calibrate 223RV-30003C RV PSV
To calibrate 223RV-30020 RV PSV
To calibrate 223RV-40009 RV PSV
To calibrate 223RV-40013A RV PSV
To calibrate 223RV-40013B RV PSV
TO REMOVE AND SERVICE RELIEF VALVE RV PSV
TO REMOVE AND SERVICE RELIEF VALVE RV PSV
TO REMOVE AND SERVICE RELIEF VALVE RV PSV
TO REMOVE AND SERVICE RELIEF VALVE RV PSV
TO REMOVE AND SERVICE RELIEF VALVE RV PSV
TO REMOVE AND SERVICE RELIEF VALVE RV PSV
TO REMOVE AND SERVICE RELIEF VALVE RV PSV
TO REMOVE AND SERVICE RELIEF VALVE RV PSV
Steam Valve V1148 hard to operate Manual valve Globe
To service / replace 223-V-3010A Manual valve Butterfly
To service / replace 223-V-3010B Manual valve Butterfly
To service / replace 223-V-3011 Manual valve Butterfly
To service / replace 223-V-3013 Manual valve Butterfly
To service / replace 223-V-3020A Manual valve Butterfly
To service / replace 223-V-3020B Manual valve Butterfly
To service / replace 223-V-3021A Manual valve Butterfly
To service / replace 223-V-3021B Manual valve Butterfly
To service / replace 223-V-3024A Manual valve Globe
To service / replace 223-V-3024B Manual valve Globe
To service / replace 223-V-3104 Manual valve Butterfly
To service / replace 223-V-3105 Manual valve Butterfly
To service / replace 223-V-3106 Manual valve Butterfly
Replace V1173 with higher grade material Manual valve Globe
System under MTA 0U.q-083.22 RV PSV
2KT3141 casing drain valve passing. Manual valve N/A
MTA-REPLACE HPSTEAM VALVES OF 2KT3141 Manual valve Butterfly
2K-3141 RE AUX EQ TAG 231PCV-10204/VP Instrument CVs (ShN/A
2K-3141 RE AUX EQ TAG 231PCV-10205/VP Instrument CVs (ShN/A
Isolation Valve Passing Manual valve Gate
231RV-10245-SV PM OF NON FOULING RV-Y4 RV PSV
231RV-10246-SV PM OF NON FOULING RV-Y4 RV PSV
231RV-10247-SV PM OF NON FOULING RV-Y4 RV PSV
2K-3141 RE AUX EQ TAG 231RV-10424A/SV RV PSV
2K-3141 RE AUX EQ TAG 231RV-10424B/SV RV PSV
231RV-10504-SV PM OF NON FOULING RV-Y4 RV PSV
2K-3141 RE AUX EQ TAG 231SCA-10611/VH Manual valve N/A
2K-3141 RE AUX EQ TAG 231SCA-10613/VH Manual valve N/A
Modify Instrument air connections Manual valve Globe
MOC-GTL-T-3100-0660 CCI VALVE SEAL Manual valve Gate
T/A Scope A/Surge pneu booster overhaul Manual valve CV
2K-3141 RE AUX EQ TAG 231UZ-10115/VH Manual valve N/A
2K-3141 RE AUX EQ TAG 2K-3141 Manual valve CHECK
MTA-MOC1517 REPLACE DRAIN VALVE 2P3121 Manual valve Globe to Gate
MTA-MOC1517 REPLACE DRAIN VALVE 2P3122 Manual valve Globe to Gate
MTA-MOC1517 REPLACE DRAIN VALVE 2P3123 Manual valve Globe to Gate
Isolation valve passing - HP steam to BA Manual valve N/A
231RV-10161-SV PM OF NON FOULING RV PSV
231RV-10323-SV PM OF NON FOULING RV Relief
231RV-10324-SV PM OF NON FOULING RV Relief
231RV-10412-SV PM OF NON FOULING RV PRV
231RV-10413-SV PM OF NON FOULING RV PRV
231RV-10414-SV PM OF NON FOULING RV PRV
MOC-GTL-P-3100-1138 Manual valve Globe
Remove RV and Plug the Take off point RV PRV
Remove RV and Plug the Take off point RV PRV
Remove RV and Plug the Take off point RV PRV
SCE-Overhaul Critical NRV 242-SP-005 Check valve CHECK
SCE-Overhaul Critical NRV 242-SP-024 Check valve CHECK
072RV-32001-SV PM OF NON FOULING RV-Y4 RV PRV
281RV-10002-SV PM OF NON FOULING RV PRV
281RV-10003-SV PM OF NON FOULING RV PRV
281RV-10004-SV PM OF FOULING RV-Y2 RV N/A
234RV-10004-SV PM OF NON FOULING RV PRV
205RV-10016-SV PM OF FOULING RV-Y2 RV N/A
205LCA10002 bypass valve passing Manual valve Ball
Remove RV and Plug the Take off point. 2K-0562 RE AUX EQ TAG 105UC-1RV Gatte&PRV
slip stream to 2R5112 B top valve passsi Manual valve Gate
212PVV-10001-SV PM OF NON FOULING RV-Y4 RV PVV(Breath Valve)
284RV10001 Spare U/S valve passing Manual valve Gate(2nos)
284RV10001 U/S valve passing Manual valve Gate(2nos)
284RV-10003-SV PM OF NON FOULING RV PRV
2F-1121 HT RV bypass 2nd I/V stuck Manual valve Globe
211FC34006 HPNG Ist and II valve passing Manual valve Butterfly(2nos)
MTA 2R-1114 HPNG 1st I/V Replcement Manual valve Butterfly
SCE-Overhaul Critical NRV Check valve Check
SCE-Overhaul Critical NRV Check valve Check
Pretreatment String # 1 NRV passing. NRV Check
MTA 211PC-38014 REPLACE BEARING D/S VALV Manual valve Gate
LP N2 TO 2E-1114A/B I/V STEM BEND Manual valve Globe
2R-1119 HPNG B/L 1st I/V passing Manual valve Butterfly
2R-1119 HPNG B/L 2nd I/V passing Manual valve Butterfly
Isolation valves passing 2F-1121,S/D job Manual valve Globe
Isolation valves passing 2F-1121,S/D job Manual valve Butterfly
Isolation valves passing 2F-1121,S/D job Manual valve Butterfly
PASSING, HPNG 2R-1115 FIRST MANUAL VALVE Manual valve Butterfly
O2 Replace BAM certified Gland Packing Manual valve Butterfly
S/D 2E-1119B Sparger steam valve passing Manual valve N/A
PASS, HPN2, 211RV-42001 U/S VALVE Manual valve N/A
211LSV-42021 passing Manual valve N/A
211RV-10161-SV PM OF NON FOULING RV PRV
211RV-10171-SV PM OF NON FOULING RV PRV
211RV-21001-SV PM OF NON FOULING RV PRV
2R-1114 O2 2nd isolation valve passing Manual valve Gate
2R1114O2 1st isolation valve bypass pass Manual valve Globe
2R1116 O2 2nd isolation valve passing Manual valve Gate
2R1116O2 1st isolation vlv bypass passin Manual valve Gate
206RV-10004A-SV Calibration during MTA RV PRV
206RV-10004B-SV Calibration during MTA RV PRV
206RV-10012A Upstream valve passing Manual valve Gate&PRV
206RV-10012B U/S valve is passing Manual valve Gate&PRV
206RV-10015 U/S valve is passing Manual valve Gate&PRV
206RV-10022 U/S valve is passing Manual valve CV-B/F
206RV-10023 U/S valve is passing Manual valve CV-B/F
206RV-10025 U/S black valve is passing Manual valve CV-B/F
206RV10027 u/s valve is passing. Manual valve Gate&PRV
206RV-10045 U/S valve is passing Manual valve CV-B/F
206RV-10048 U/S passing valve Manual valve Gate
206RV-10049 U/S block valve is passing Manual valve CV-B/F
SCE-Overhaul Critical NRV NRV CHECK
2P-0643A Provide DBB at pump inlet Manual valve N/A
2P-0643B Provide DBB at pump suction Manual valve N/A
300-2S060007PEFST-4.094.534 Manual valve N/A
SCE-Overhaul Critical NRV NRV CHECK
2P-0651B Provide DBB at pump suction Manual valve Gate
2P-0651A Provide DBB at pump suction Manual valve Gate
206RV-10018-SV PM OF NON FOULING RV-Y4 RV PRV
206RV-10050-SV PM OF NON FOULING RV-Y4 RV PRV
206RV-10055-SV PM OF NON FOULING RV-Y4 RV PRV
205RV-10013B inlet valve passing T/A job Manual valve Gate&PRV
205RV10050 inlet valve passing T/A job Manual valve Gate&PRV
205RV10001 U/S lock valve is passing Manual valve Gate&PRV
VALVE INSTALLATION ON HIGH POINT VENT Manual valve N/A
VALVE INSTALLATION ON HIGH POINT VENT Manual valve N/A
VALVE INSTALLATION ON HIGH POINT VENT Manual valve N/A
VALVE INSTALLATION ON HIGH POINT VENT Manual valve N/A
VALVE INSTALLATION ON HIGH POINT VENT Manual valve N/A
VALVE INSTALLATION ON HIGH POINT VENT Manual valve N/A
VALVE INSTALLATION ON HIGH POINT VENT Manual valve N/A
VALVE INSTALLATION ON HIGH POINT VENT Manual valve N/A
VALVE INSTALLATION ON HIGH POINT VENT Manual valve N/A
VALVE INSTALLATION ON HIGH POINT VENT Manual valve N/A
SCE-Overhaul Critical NRV 222SP-179 Check valve Check
SCE-Overhaul Critical NRV 222SP-178 NRV Check
SCE-Overhaul Critical NRV 222SP-159 NRV Check
SCE-Overhaul Critical NRV 222SP-150 Check valve Check
SCE-Overhaul Critical NRV 222SP-162 NRV Check
SCE-Overhaul Critical NRV 222SP-161 NRV Check
SCE-Overhaul Critical NRV 222SP-176 Check valve Check
SCE-Overhaul Critical NRV 222SP-177 NRV Check
SCE-Overhaul Critical NRV 222SP-152 NRV Check
SCE-Overhaul Critical NRV 222SP-173 Check valve Check
SCE-Overhaul Critical NRV 222SP-174 Check valve Check
SCE-Overhaul Critical NRV 222SP-175 Check valve Check
SCE-Overhaul Critical NRV 222SP-457 NRV Check
SCE-Overhaul Critical NRV 222SP-401 NRV Check
SCE-Overhaul Critical NRV 222SP-402 NRV Check
SCE-Overhaul Critical NRV 222SP-452 NRV Check
SCE-Overhaul Critical NRV 222SP-453 NRV Check
SCE-Overhaul Critical NRV 222SP-454 NRV Check
SCE-Overhaul Critical NRV 222SP-460 Check valve Check
SCE-Overhaul Critical NRV 222SP-201 Check valve Check
SCE-Overhaul Critical NRV 222SP-306A NRV Check
SCE-Overhaul Critical NRV 222SP-306B NRV Check
SCE-Overhaul Critical NRV 222SP-313 Check valve Check
To calibrate 222RV-10005A RV PSV
To calibrate 222RV-10005B RV PSV
To calibrate 222RV-10005C RV PSV
To calibrate 222RV-10005D RV PSV
To calibrate 222RV-10005E RV PSV
To calibrate 222RV-10131 RV PSV
To calibrate 222RV-10132 RV PSV
To calibrate 222RV-10163 RV PSV
To calibrate 222RV-10223 RV PSV
To calibrate 222RV-30001 RV PSV
To calibrate 222RV-30002 RV PSV
To calibrate 222RV-30003A RV PSV
To calibrate 222RV-30003B RV PSV
To calibrate 222RV-30003C RV PSV
To calibrate 222RV-30005 RV PSV
To calibrate 222RV-30020 RV PSV
To calibrate 222RV-40009 RV PSV
008RV-32007B U/S block valve passing Manual valve Gate & PRV
008RV-32005A U/S valve is heavely passin Manual valve Gate & PRV
PEF #T-4.292.488
LP column drain valve stem nut has failed .The original material of construction is not available another compatible material used for fabrication. AWR appr
**SCOPE CANCELLED FROM TRN1, CHECK DECISION APPLIES TO TRN2**
V-4157 and V-4016 will be maintained simultaneously and require isolation of LOX header at MTA.
Calibration of A081-201RV-10002A-SV during MTA and the replacement of the U/S valve since it is passing
18.11.2013 09:01:47 Amit Gaur (QRAGA0)
201RV10002B U/S valve passing .
Calibration of A081-201RV-10002C-SV during MTA and the replacment of U/S valve since it is passing
50-2P010014-93015-N, PEF T-4.094.355, 2 x set of NRVs on line 2P010014
50-2P010014-93015-N, PEF T-4.094.355, 2 x set of NRVs on line 2P010014
50-2P010014-93015-N, PEF T-4.094.355, 2 x set of NRVs on line 2P010014
50-2P010014-93015-N, PEF T-4.094.355, 2 x set of NRVs on line 2P010014
50-2P010014-93015-N, PEF T-4.094.355, 2 x set of NRVs on line 2P010014
12.03.2013 09:20:11 Selvaraj Muthu (QRSMU0)
MOC- PC-FGP-P-0ALL-0138 - Implementation
around (Removal for caliberation)
24.11.2013 18:51:47 Ahmed Muhammed Aftab (QRAMU1)
Scope;- De-bolt
04/08/13 - Frits - & remove,
Specify thetransfer
works toold
bevalve
donetoinlaydown area and
more details **DO NOTAdd
why? SCRAP**
drawing or PEFS to scope item.
10/11/13 - Wenses - JOB COMPLETED, WAS ATTENDED DURING UNIT SD. SAP NO: 10080017
To replace valve like for like or next grade material. Pl note that tag number for this valve is 223-V-1173 which is bypass valve of Process air trap SP 194;
One of the casing drain valves of 2KT3141 is passing, to be rectified during shutdown / Turnaround.
04/08/13 -- Frits
2KT-3141 - Please specify
MTA-REPLACE more VALVES
HPSTEAM details onOF
scope, please add PEFS / ISO to scope.
2KT3141
20/11/13 - Frits - MOC required because of drain in between TOSV valves to install, just like in Train 1.
SCOPE BEEN REMOVED FROM MTA1 ,VIPUL TO ADVICE:Rotating Equipment auxiliary Equipment work scope for 2K-3141. Equipment Tag Number to be w
SCOPE BEEN REMOVED FROM MTA1:VIPUL TO ADVICE:Rotating Equipment auxiliary Equipment work scope for 2K-3141. Equipment Tag Number to be wo
31/07/13 - Frits - No information added to scope
Is this instrumentation or mechanical?
**SCOPE CANCELLED FROM TRN1, CHECK DECISION APPLIES TO TRN2**
Task: As-Received Dirty Test, Overhaul, Cold Bench Set Pressure test SAP INSP ID : 1100018612
**SCOPE CANCELLED FROM TRN1, CHECK DECISION APPLIES TO TRN2**
Task: As-Received Dirty Test, Overhaul, Cold Bench Set Pressure test SAP INSP ID : 1100018613
**SCOPE CANCELLED FROM TRN1, CHECK DECISION APPLIES TO TRN2**
Task: As-Received Dirty Test, Overhaul, Cold Bench Set Pressure test SAP INSP ID : 1100020757
Rotating Equipment auxiliary Equipment work scope for 2K-3141. Equipment Tag Number to be worked: 231RV-10424A/SV.Description of work : RVs (2) o
Rotating Equipment auxiliary Equipment work scope for 2K-3141. Equipment Tag Number to be worked: 231RV-10424B/SV.Description of work : RVs (2) o
**SCOPE CANCELLED FROM TRN1, CHECK DECISION APPLIES TO TRN2**
Task: As-Received Dirty Test, Overhaul, Cold Bench Set Pressure test SAP INSP ID : 1100018619
Rotating Equipment auxiliary Equipment work scope for 2K-3141. Equipment Tag Number to be worked: 231SCA-10611/VH.Description of work : Turbine t
Rotating Equipment auxiliary Equipment work scope for 2K-3141. Equipment Tag Number to be worked: 231SCA-10613/VH .Description of work : Turbine
As per the MOC-GTL-P-3000-1137, the instrument air connections to be modified with the Flexible hoses.
Temporary MOC installed to use a temporary teflon insert seat seal, made locally. New metal seat ring and teflon insert to be ordered and fitted at a suitab
Major Turnaround CCI vendor scope. Contract required.
04/08/13 - Frits - Scope description missing. Please specify what to do and why. Add PEFS
Rotating Equipment auxiliary Equipment work scope for 2K-3141. Equipment Tag Number to be worked: 231UZ-10115/VH. Description of work : Turbine tr
Rotating Equipment auxiliary Equipment work scope for 2K-3141. Equipment Tag Number to be worked: 131-SP-501-NSV. Description of work : Compresso
REPLACEMENT OF 2P3121 CASING DRAIN VALVE in line 50-2P311953-93012-S2 HC LIQUID FROM 1P-3121 TO MISC See also ATTACHED MARKED-UP PEF
REPLACEMENT OF 2P3121 CASING DRAIN VALVE in line 50-2P312953-93012-S2 HC LIQUID FROM 1P-3122 TO MISC See also ATTACHED MARKED-UP PEF
31/10/13 - Frits - Scope description is not clear. Why and What do we have to do in MTA?
LP N2 TO 2E-1114A/B 1ST I/V STEM FOUND SLIGHTLY BEND. LP N2 header AC area needs to be offline, this is only during MTA possible
2R-1119 HPNG B/L 1st isolation valve passing, need to be attended. Only possible during S/D of finger # 3/Train-2. Following installation of finger isolating
2R-1119 HPNG B/L 2nd isolation valve passing, need to be attended. Only possible during train-2/finger # 3 S/D. MTA Following installation of finger isolat
2F-1121 inlet 1st isolation valve's bypass valve is suspected passing. It is flanged valve and 2 inch in size.
These are flanged valves.
22.01.2014 10:22:50 Maheshkumar Balubhai Dhanani (QRMDH1)
Line no for above notification is 600-2P112036-92011-H1
2F-1121 HT outlet valve is passing. This is flanged valve. Marked up PEFS attached. This is HT outlet 2nd isoaltion valve.
2R-1115 HPNG Manual DBB valves ( both valves) found passing as found few times, while hand over for HPNG strainer cleaning. To be fixed. Job TA scope
O2 Replace BAM certified gland packing to vent ASL 2nd isolation valve
during MTA.
RALPH TO PRINT NOTIFICATION TO ADD TO AWR PLUS.
2E-1119B Sparger steam First isolation valve found passing. To be attended. Note: passing was observed during spading activity of sparger steam line, as
211RV-42001 U/S ISOLATION VALVE PASSING TO BE ATTEND
IBD drum 2V-1123 BFW makeup 211LSA-42021 is passing to be rectified
06.12.2014 07:28:25 Alvin Englis Siglos (QRASI2)
REFER
Old TOofPREVIOUS
valve NOTIFICATION
MTA1 should 10062879
be sending for repairs, to install in MTA2.
If not:
Old valve of MTA1 should be sending for repairs, to install in MTA2.
If not:
Old valve of MTA1 should be sending for repairs, to install in MTA2.
If not:
2R-1114 O2 2nd isolation valve passing. As per MTA planner request during scope challenge, raised separate notification for passing O2 valve for 2R-1114
2R-1114 O2 1st isolation valve bypass passing.
2R1116 O2 2nd isolation valve passing
2R1116O2 1st isolation vlv bypass passing. Separate notification for each passing O2 valve as agreed in MTA scope challenge. see PEFS 3/4
Calibration of RV A081-206RV-10004ASV during MTA.Decided in RV work shop meeting Can be done during Train-2 Slow down.
Calibration of RV A081-206RV-10004B-SV during MTA.Decided in RV work shope meeting to put addenda Can be done during Train-2 Slow down.
206RV-10012A Upstream valve passing
Calibration ov A081-206RV-10012B-SV during MTA and the replacement of U/S valve since it is passing.
Calibration of A081-206RV-10015-SV during MTA and the replacment of U/S valve since it is passing
Calibration of A081-206RV-10022-SV during MTA-1 and the replacment of U/S block valve since it is passing 2P-0643A pump suction - T-4.094.549
Calibration of A081-206RV-10023-SV during MTA-1 and the replacment of U/S bloack valve since it is passing
Calibration of A081-206RV-10025-SV during MTA-1 and the replacement of U/S block valve since it is passing
206RV10027 upstream block valve is heavily passing.
Calibration of A081-206RV-10045-SV during MTA-1 and the replacment of the U/S block valve since it is passing
Calibration of A081-206RV-10048-SV during MTA-1 and the replacment of the U/S block valve since it is passing
Calibration of A081-206RV-10049-SV during MTA-1 and replacement of the U/S block valve since it is passing
450-2S060026-11261-H1, PEF T-4.094.550, threat: leak in steam coil in reboilers
13.06.2013 09:59:53 Justin Joseph Kachappilly (QRJKA1)
Project Scope- Install new line manual isolation valves in pump suction
13.06.2013 10:07:45 Justin Joseph Kachappilly (QRJKA1)
lines as well as drain valves (to DLT)
Project Scope- Install new line manual isolation valves in pump suction
300-2S060007 PEFS T-4.094.534SAP Line # 300-2S060007-0-31261-H1 SCE Internal Insp. Internal Inspection required to validate
lines as well as drain valves (to DLT)
proper functionality. Pull bonnet to facilitate internal inspections if applicable or remove valve from line to facilitate
internal inspection. Location Information:
300-2S060009-11261-H1, PEF T-4.094.539, threat: leak in steam coil in reboilers
13.06.2013 10:19:14 Justin Joseph Kachappilly (QRJKA1)
Project Scope- Install new line manual isolation valves in pump suction
13.06.2013 10:13:24 Justin Joseph Kachappilly (QRJKA1)
lines as well as drain valves (to DLT)
Project Scope- Install new line manual isolation valves in pump suction
2013-06-13 07:26:28 Anant Darak (QRADA2) Phone +974 4403 2971
lines as well as drain valves (to DLT)
/ Task: As-Received Dirty Test, Overhaul, Cold Bench Set Pressure test
2013-06-13 07:26:29 Anant Darak (QRADA2) Phone +974 4403 2971
/ SAP INSP ID : 1100020629
/ Task: As-Received Dirty Test, Overhaul, Cold Bench Set Pressure test
2013-06-13 07:26:30 Anant Darak (QRADA2) Phone +974 4403 2971
/ SAP INSP ID : 1100020609
/ Task: As-Received Dirty Test, Overhaul, Cold Bench Set Pressure test
25.09.2013 03:39:54 Pankaj Bhuva (QRPBH0)
/ SAP INSP ID : 1100020611
2V-0512 vessel 205RV-10013B inlet valve minor passing
T/A job
04.10.2013 01:23:39 Pankaj Bhuva (QRPBH0)
205RV-10050u/s
205RV10001 (2S-0521 to 2V-0263
block valve line)line
is passing main RV inlet
number valve minor passing.
100-2P050050-61380-C.
PEFS no. T-4.094.470
02.10.2013 08:49:38 Ahmed Muhammed Aftab (QRAMU1)
Installation of valve no2 on high point vent(HPV) on chilled water network(Line NO:300-0W722003-1102-C) Ref valve no2 in Marked up PEFS T- 4.002.702
Installation of valve no1 on high point vent(HPV) on chilled water network(Line NO:900-0W722003-1102-C) Ref valve no1 in Marked up PEFS T- 4.002.702
Installation of valve no7 on high point vent(HPV) on chilled water network(Line NO:900-0W722003-11021-C) Ref valve no7 in Marked up PEFS T- 4.074.92
Installation of valve no4 on high point vent(HPV) on chilled water network(Line NO:900-0W722003-11021-C) Ref valve no4 in Marked up PEFS T- 4.074.92
Installation of valve no5 on high point vent(HPV) on chilled water network(Line NO:900-0W722003-11021-C) Ref valve no5 in Marked up PEFS T- 4.074.92
Installation of valve no3 on high point vent(HPV) on chilled water network(Line NO:900-0W722003-11021-C) Ref valve no3 in Marked up PEFS T- 4.074.92
Installation of valve no6 on high point vent(HPV) on chilled water network(Line NO:900-0W722003-11021-C) Ref valve no6 in Marked up PEFS T- 4.074.92
Installation of valve no10 on high point vent(HPV) on chilled water network(Line NO:900-0W722004-11021-C) Ref valve no10 in Marked up PEFS T-4.074.9
Installation of valve no9 on high point vent(HPV) on chilled water network(Line NO:900-0W722003-11021-C) Ref valve no9 in Marked up PEFS T- 4.074.92
Installation of valve no8 on high point vent(HPV) on chilled water network(Line NO:900-0W722003-11021-C) Ref valve no8 in Marked up PEFS T- 4.074.92
PEF T-4.290.048, Service: PUMP DISCHARGE, assoc equip: 2P-2213
PEF T-4.290.048, Service: PUMP DISCHARGE, assoc equip: 2P-2211A
PEF T-4.290.045, Service: PUMP DISCHARGE, assoc equip: 2P-2219
PEF T-4.290.038, Service: IA to MAC, assoc equip: 2K-2211
PEF T-4.290.045, Service: WASH WATER TO TURBINE, assoc equip: 2K-2211
PEF T-4.290.045, Service: WASH WATER TO TURBINE, assoc equip: 2K-2211
PEF T-4.290.048, Service: BLOWER SUCTION, assoc equip: 2K-2213B
PEF T-4.290.048, Service: PUMP DISCHARGE, assoc equip: 2P-2211B
PEF T-4.290.040, Service: aftercooler to process, assoc equip: 2E-2215
PEF T-4.290.048, Service: BLOWER DISCHARGE, assoc equip:2K-2213A
PEF T-4.290.048, Service: BLOWER DISCHARGE, assoc equip: 2K-2213B
PEF T-4.290.048, Service: BLOWER SUCTION, assoc equip: 2K-2213A
PEF T-4.114.650, Service: air bypass around BAC, assoc equip: 400-2A224017-AD6L06-3
PEF T-4.114.650, Service: aftercooler outlet, assoc equip: 2E-2241
PEF T-4.248.265, Service: lube oil pump discharge, assoc equip: 2P-2247A
PEF T-4.248.265, Service: lube oil pump discharge, assoc equip: 2P-2247B
PEF T-4.248.265, Service: OIL TO EXPANSION TURBINE, assoc equip: 2K/KT-2241
PEF T-4.248.265, Service: OIL MIST VENT, assoc equip: 2V-2247
PEF T-4.114.612, Service: NCC from ACC, assoc equip: 300-2S222002-11011-H2
PEF T-4.114.627, Service: chilled water pump discharge, assoc equip: 2P-2231A
PEF T-4.114.627, Service: chilled water pump discharge, assoc equip: 2P-2231B
PEF T-4.114.630, Service: NCC from steam heater, assoc equip: 1E-2232
PEF T-4.114.661, Service: HP GOX to header, after PCA-40012A, assoc equip: 400-2P224004-63200-N
May need valve replacement
As per ARP, this is SLD scope MTA2016 scope on ASU5
21/11/13 - Information from Wences,
These SAP were raised because all these valves were very hard to Operate, so basically the task is to service the gearbox, either dismantle, service the inte
Valve to be serviced
Valve to be servcied
Valve to be serviced
Valve ot be serviced
Valve to be serviced
Valve to be serviced
Valve to be serviced
Vavlev to be serviced
Vavle to be serviced
Vavlev to be serviced
Valve to be serviced
Vavlev to be serviced
To replace valve like for like or next grade material. Pl note that tag number for this valve is 222-V-1173 which is bypass valve of Process air trap SP 194;
AWR+ AWR Approved by OTC and forwarded for ROM
AWR+ AWR Approved by OTC and forwarded for ROM
AWR+ AWR Approved by OTC and forwarded for ROM
AWR+ AWR Approved by OTC and forwarded for ROM
AWR+ AWR Approved by OTC and forwarded for ROM
AWR+ AWR Approved by OTC and forwarded for ROM
AWR+ AWR Approved by OTC and forwarded for ROM
AWR+ AWR Approved by OTC and forwarded for ROM
Deriming drain valve 222V-4013 was hard to operate.This valve was opened with mechanical assistance during deriming.After that not able to close it durin
Scope;- De-bolt & remove, transfer old valve to laydown area **DO NOT SCRAP**
SMR/HMU CONDENSATE FROM SMR/2V-5201/2V-5202 TO 2V-8401 LINE'S ISOLATION VALVE STEM GOT BENT.NOW VALVE IS IN CLOSED CONDITION, N
2E3222 CH Water INLET valve passing.Need to attend/replace. Common chilled water supply with HPS-2 cannot be isolated OTR
2E3222 CH Water outlet valve passing.need replacement or to attend passing. Cannot be isolated, common Chilled water return from to HPS-2
Downstream of P0661A, 200-2P060056-31111Q1-1, PEF T-4.094.535
Downstream of P0661B, 200-2P060056-31111Q1-1, PEF T-4.094.535
Downstream of P0681, 50-2P060142-63012-N, PEF T-4.094.548
Upstream of 2E0608, 25-2P060105-63012-N, PEF T-4.094.524, 1C1-T09 Backflow into methanol injection system; 50-OP010002-91380-N;
50-OP010002-91380-N;
206FC-10066O 50-OP010014-93015-N
PEFS T-4.094.529SAP Line # 150-2S060030-0-31261-H1 SCE Internal Insp. Internal Inspection required to validate
proper functionality. Pull bonnet to facilitate internal inspections if applicable or remove valve from line to facilitate
206FC-10067O PEFS T-4.094.529SAP Line # 150-2S060031-0-31261-H1 SCE Internal Insp. Internal Inspection required to validate
internal inspection. Location Information:
proper functionality. Pull bonnet to facilitate internal inspections if applicable or remove valve from line to facilitate
internal inspection.
Condenser E0656 hasLocation Information:
insufficient capacity for blocked outlet case whilst
operating in J-T mode. This has been confirmed by independent P&T study.
15.04.2013 08:40:37 Shankar Singh (QRSSI0)
206KS-10551 upstream block valve is passing
12.03.2013 11:17:14 Selvaraj Muthu (QRSMU0)
MOC- PC-FGP-P-0ALL-0138
2013-06-13 07:26:33 Anant-Darak
Implementation
(QRADA2) Phone +974 4403 2971
/ Task: As-Received Dirty Test, Overhaul, Cold Bench Set Pressure test
2013-06-13 07:26:34 Anant Darak (QRADA2) Phone +974 4403 2971
/ SAP INSP ID : 1100016746
/ Task: As-Received Dirty Test, Overhaul, Cold Bench Set Pressure test
2013-06-13 07:26:33 Anant Darak (QRADA2) Phone +974 4403 2971
/ SAP INSP ID : 1100018925
/ Task: As-Received Dirty Test, Overhaul, Cold Bench Set Pressure test
/ SAP INSP ID : 1100018935
40-2G060703-11021-N, PEF T-4.094.553
40-2G060603-11180-N, PEF T-4.094.553
40-2G060604-31111Q1-N, PEF T-4.094.555
40-2G060604-31111Q1-N, PEF T-4.094.555
Description of work : Compressor discharge check valve (NRV) - Cannot inspect or repair on the run.
Pull, Inspect and repair. Failure of NRV to close properly can result in compressor damage.
Description of work : Compressor discharge NRV- Cannot inspect or repair on the run. Inspect and repair.
Failure of NRV to close properly can result in compressor damage. PEFS Associated with scope: T-4.094.55.
50-OP010002-91380-N; 50-OP010014-93015-N, PEF T-4.094.521
50-OP010002-91380-N; 50-OP010014-93015-N, PEF T-4.094.521
50-OP010002-91380-N; 50-OP010014-93015-N, PEF T-4.094.522
50-OP010002-91380-N; 50-OP010014-93015-N, PEF T-4.094.531
50-OP010002-91380-N; 50-OP010014-93015-N, PEF T-4.094.531
50-OP010002-91380-N; 50-OP010014-93015-N, PEF T-4.094.525
50-OP010002-91380-N; 50-OP010014-93015-N, PEF T-4.094.525
50-OP010002-91380-N; 50-OP010014-93015-N, PEF T-4.094.527
200-2S060001-11261-H1, PEF T-4.094.529, threat: leak in steam coil in reboilers
SCE Insp. No Tag PEFS T-4.094.535SAP Line # 200-2P060056-31111Q1-1 SCE Internal Insp. Internal Inspection required to
validate proper functionality. Pull bonnet to facilitate internal inspections if applicable or remove valve from line
to facilitate internal
12.03.2013 11:11:17inspection.
Selvaraj Muthu (QRSMU0)
MOC- PC-FGP-P-0ALL-0138 - Implementation
12.03.2013 11:19:14 Selvaraj Muthu (QRSMU0)
MOC- PC-FGP-P-0ALL-0138 - Implementation
Remove the valve to workshop, carry out valve passing test and repair
Remove the valve to workshop, carry out valve passing test and repair.
206UZ10852 ‘UZ†valve is passing. To be attended during plant shut down.
23.12.2012 13:24:46 Ahmed Muhammed Aftab (QRAMU1)
206UZ20351 ‘UZ†valve is passing. To be attended during plant shut down.
23.12.2012 13:25:14 Ahmed Muhammed Aftab (QRAMU1)
Remove the valve to workshop, carry out valve passing test and repair.
12.03.2013 11:09:28 Selvaraj Muthu (QRSMU0)
MOC- PC-FGP-P-0ALL-0138 - Implementation
X WPS/ Work instruction needed
X Insulation
PEF T-4.245.099, Service: OIL MIST VENT, assoc equip: 2V-2147
PEF T-4.245.099, Service: OIL TO EXPANSION TURBINE, assoc equip: 2K/KT-2141
PEF T-4.157.405, Service: N2 TO SEAL, LOX BACK-UP PUMP, assoc equip: 2P-2181A
PEF T-4.157.405, Service: N2 TO SEAL, LOX BACK-UP PUMP, assoc equip: 2P-2181B
PEF T-4.157.405, Service: N2 TO SEAL, LOX BACK-UP PUMP, assoc equip: 2P-2181C
PEF T-4.290.415, Service: aftercooler to process, assoc equip: 2E-2115
PEF T-4.290.413, Service: IA to MAC, assoc equip: 2K-2111
PEF T-4.290.420, Service: PUMP DISCHARGE, assoc equip: 2P-2119
PEF T-4.290.423, Service: BLOWER SUCTION, assoc equip: 2K-2113B
PEF T-4.290.423, Service: BLOWER SUCTION, assoc equip: 2K-2113A
PEF T-4.290.423, Service: BLOWER DISCHARGE, assoc equip: 2K-2113B
PEF T-4.290.423, Service: BLOWER DISCHARGE, assoc equip: 2K-2113A
PEF T-4.290.420, Service: WASH WATER TO TURBINE, assoc equip: 2K-2111
PEF T-4.290.420, Service: WASH WATER TO TURBINE, assoc equip: 2K-2111
To calibrate 221RV-10005A
To calibrate 221RV-10005B
To calibrate 221RV-10005C
To calibrate 221RV-10005D
To calibrate 221RV-10005E
To calibrate 221RV-10131
PEF T-4.114.527, Service: chilled water pump discharge, assoc equip: 2P-2131A
PEF T-4.114.527, Service: chilled water pump discharge, assoc equip: 2P-2131B
PEF T-4.114.581, Service: PUMP DISCHARGE, assoc equip: 2P-2181A
PEF T-4.114.582, Service: PUMP DISCHARGE, assoc equip: 2P-2181B
PEF T-4.114.583, Service: PUMP DISCHARGE, assoc equip: 2P-2181C
04/08/13 - Frits - Scope description missing. Please specify what to do and why. Add PEFS
05/08/13 - Frits - Scope details are missing. What is the problem and what do you want us to do in MTA? Please specify.
As per ARP, this is SLD scope MTA2016 scoep on ASU 5
21/11/13 - Information from Wences,
These SAP were raised because all these valves were very hard to Operate, so basically the task is to service the gearbox, either dismantle, service the inte
Valve to be serviced
Valve to be serviced
Valve to be serviced
Valve to be serviced
Valve to be serviced
Valve to be serviced
Valve to be serviced
Valve to be serviced
Valve to be serviced
Valve to be serviced
VAlve to be serviced
Valve to be serviced
04/08/13 - Frits - Please specify the works to be done in more detail and what is the issue? Please add PEFS / ISO or drawing to it.
Replacement of gear boxes in LOX valves can be done only during MTA. Linde handed over the gearboxes ,to be replaced during MTA pp Jothi
Replacement of gear boxes in LOX valves can be done only during MTA. Linde handed over the gearboxes ,to be replaced during MTA pp Jothi
Replacement of gear boxes in LOX valves can be done only during MTA. Linde handed over the gearboxes ,to be replaced during MTA pp Jothi
Degrease of gear boxes in LOX valves can be done only during MTA. pp Jothi
Replacement of gear boxes in LOX valves can be done only during MTA. Linde handed over the gearboxes ,to be replaced during MTA pp Jothi
To repalce the gearbox on 221-V-8124B
Replacement of gear boxes in LOX valves can be done only during MTA. Linde handed over the gearboxes ,to be replaced during MTA pp Jothi
Degrease of gear boxes in LOX valves can be done only during MTA. pp Jothi
To replace valve like for like or next grade material. Pl note that tag number for this valve is 221-V-1173 which is bypass valve of Process air trap SP 194;
AWR+ AWR Approved by OTC and forwarded for ROM
AWR+ AWR Approved by OTC and forwarded for ROM
AWR+ AWR Approved by OTC and forwarded for ROM
AWR+ AWR Approved by OTC and forwarded for ROM
AWR+ AWR Approved by OTC and forwarded for ROM
AWR+ AWR Approved by OTC and forwarded for ROM
AWR+ AWR Approved by OTC and forwarded for ROM
AWR+ AWR Approved by OTC and forwarded for ROM
Calibration of A081-207RV-10049-SV during Turaround as agreed in RV workshop
Calibration of A081-207RV-10058-SV during MTA-1. the U/S valve need to be replaced since it is passing
207RV-10104S Upstream isolation passing. Found ice formation. (207RV- 10104S Spool piece upstream valve )
19.01.2014 00:07:09 Rajesh Arumugam (QRRAR0)
2V-0742:207RV10104 U/S ISOLATION VALVE PASSING.SPARE RV INSTALLED AND
ONLINE.
50-2W070526-91011Q1-N, PEF T-4.094.587, Check Valve on Cooled HP BFW from 2E-0223
2013-06-13 07:26:29 Anant Darak (QRADA2) Phone +974 4403 2971
/ Task: As-Received Dirty Test, Overhaul, Cold Bench Set Pressure test
2013-06-13 07:26:29 Anant Darak (QRADA2) Phone +974 4403 2971
/ SAP INSP ID : 1100020489
/ Task: As-Received Dirty Test, Overhaul, Cold Bench Set Pressure test
2013-06-13 07:26:29 Anant Darak (QRADA2) Phone +974 4403 2971
/ SAP INSP ID : 1100020490
/ Task: As-Received Dirty Test, Overhaul, Cold Bench Set Pressure test
2013-06-13 07:26:31 Anant Darak (QRADA2) Phone +974 4403 2971
/ SAP INSP ID : 1100019516
/ Task: As-Received Dirty Test, Overhaul, Cold Bench Set Pressure test
2013-06-13 07:26:31 Anant Darak (QRADA2) Phone +974 4403 2971
/ SAP INSP ID : 1100020492
/ Task: As-Received Dirty Test, Overhaul, Cold Bench Set Pressure test
2013-06-13 07:26:31 Anant Darak (QRADA2) Phone +974 4403 2971
/ SAP INSP ID : 1100020497
/ Task: As-Received Dirty Test, Overhaul, Cold Bench Set Pressure test
2013-06-13 07:26:31 Anant Darak (QRADA2) Phone +974 4403 2971
/ SAP INSP ID : 1100020181
/ Task: As-Received Dirty Test, Overhaul, Cold Bench Set Pressure test
2013-06-13 07:26:31 Anant Darak (QRADA2) Phone +974 4403 2971
/ SAP INSP ID : 1100020500
/ Task: As-Received Dirty Test, Overhaul, Cold Bench Set Pressure test
2013-06-13 07:26:32 Anant Darak (QRADA2) Phone +974 4403 2971
/ SAP INSP ID : 1100020182
/ Task: As-Received Dirty Test, Overhaul, Cold Bench Set Pressure test
2013-06-13 07:26:32 Anant Darak (QRADA2) Phone +974 4403 2971
/ SAP INSP ID : 1100020502
/ Task: As-Received Dirty Test, Overhaul, Cold Bench Set Pressure test
2013-06-13 07:26:32 Anant Darak (QRADA2) Phone +974 4403 2971
/ SAP INSP ID : 1100020506
/ Task: As-Received Dirty Test, Overhaul, Cold Bench Set Pressure test
2013-06-13 07:26:33 Anant Darak (QRADA2) Phone +974 4403 2971
/ SAP INSP ID : 1100020064
/ Task: As-Received Dirty Test, Overhaul, Cold Bench Set Pressure test
/ SAP INSP ID : 1100020559
Project proposal raised from FGP-Technology to provide DBB isolation for dryer bed 1V-0741A
Project proposal raised from FGP-Technology to provide DBB isolation for dryer bed
Project proposal raised from FGP-Technology to provide DBB isolation for dryer bed
found passing.Need to be replaced.
Line number:50-2D070630-63012
PEFS number:T-4.094.594
80-2P070206-61374-H2, PEF T-4.094.585, 2P-0732A discharge line 2P070206
80-2P070206-61374-H2, PEF T-4.094.585, 2P-0732B discharge line 2P070206
13.06.2013 10:34:26 Justin Joseph Kachappilly (QRJKA1)
Project Scope- Install new line manual isolation valves in pump suction
13.06.2013 10:37:43 Justin Joseph Kachappilly (QRJKA1)
lines as well as drain valves (to DLT)
Project Scope- Install new line manual isolation valves in pump suction
lines as well as(2V-741B)
207LS-10034 drain valves (to DLT)
HP side isolation valve is passing.
24.07.2013 13:49:14 Ahmed Muhammed Aftab (QRAMU1)
250-0P070024-61013-N, PEF T-13.372.160
200-2P060056-31111Q1-1, PEF T-4.094.575
50-2W070352-31012-N, PEF T-4.094.583
40-2G070602-11374-N, PEF T-4.094.584, NRV of Dissimilar Type and SS
40-2G070602-11374-N, PEF T-4.094.584, NRV of Dissimilar Type and SS
50-2P07 0244-13012- N, PEF T-4.094.587
Clear description of the problem. 207RV-10104S upstream block valve is passing during the time that 2V- 0742 pressure is 15 barg. PEFS: T-4.094.593 Pri
Clear description of the problem. 207LG-10004 (2V-0724) top LP side root valve passing observed. PEFS: T-4.094.579 Prioriteit: Product information : Pro
207UZ-10651 NEED TO DROP
X LOTO/Spading
207UZ-10701 NEED TO DROP
X LOTO/Spading
202LC10002 together with its u/s and d/s isoaltion valves are passing.
02.12.2013 19:49:34 Ahmed Muhammed Aftab (QRAMU1)
T/AJob-Additional Block valve202LZA10044 to be attended
202LC-10002 U/S, D/S and Bypass valves are passing, same passing valve
The root valve for 202LZA-10044 is passing and needs to be replaced. See attached PEFS.
50-2P020514-630 12Q1-N, PEF T-13.370-075, SOUR CONDENSATE FROM 2V-0263
50-2D020670-66050Q1, PEF T-4.094.381, Different type Non Return Valve on Make-up Water from 2E-0223
22.12.2012 13:34:36 Sudhakaran Ravindran (QRSRAA)
T/AJob-Additional Block valve202LCA10004 tobe provided
22.12.2012 13:33:07 Sudhakaran Ravindran (QRSRAA)
T/AJob-Additional Block valve202LG10005 tobe provided
22.12.2012 13:30:12 Sudhakaran Ravindran (QRSRAA)
T/AJob-Additional Block valve202LG10058 tobe provided
22.12.2012 13:27:59 Sudhakaran Ravindran (QRSRAA)
T/AJob-Additional Block valve202LSA10010 tobe provided
22.12.2012 13:25:58 Sudhakaran Ravindran (QRSRAA)
T/AJob-Additional Block valve202LZA10011 tobe provided
22.12.2012 13:24:37 Sudhakaran Ravindran (QRSRAA)
T/AJob-Additional Block valve202LZA10043 tobe provided
22.12.2012 13:19:08 Sudhakaran Ravindran (QRSRAA)
T/AJob-Additional Block valve202LZA10045 tobe attended
22.12.2012 13:38:41 Sudhakaran Ravindran (QRSRAA)
T/AJob-Additional Block valve202LZA10046 tobe attended
202RV-10015B inlet isolation valve is passing. To be attended.
21.04.2013 14:33:10
202RV-10003S Ahmed
upstream Muhammed
valve Aftab
mild passing. (QRAMU1)job)
( Shutdown
REF PEFS:T.4.094.382
19.02.2013 07:29:40 Viresh Shah (QRVSH1)
20.05.2013 13:55:19 Ahmed Muhammed Aftab (QRAMU1)
202LC10036 bypass valve suspected passing, 202LC10036 bypass valve to be
replaced during
202LC10036 train-2 and
upstream turndownstream
around. valve to be replaced during
turnaround of train-2. both valves at upstream and downstream of
Scope;- De-bolt & remove, inspect linework for blockage, transfer old valve to laydown area **DO NOT SCRAP**
Scope;- De-bolt & remove gland follower, remove packing,check valve operation.
Re-pack valve gland, check operation & QA
Scope;- De-bolt & remove, transfer old valve to laydown area **DO NOT SCRAP**
Rotating Equipment auxiliary Equipment work scope for 2K-4101. Equipment Tag Number to be worked: 141-SP-008. Description of work : Compressor d
PEFS: T-13.370.605 LINE: 200-2P410068-31012-N Location: P-4103 discharge line Ground level
Scope;- De-bolt & remove, install blinds, transfer to cleaning area.
Open valve & clean, transfer offsite for overhaul (ensure transfer doc & datasheet attached)
Scope;- De-bolt & remove, install blinds, transfer to cleaning area.
Open valve & clean, transfer offsite for overhaul (ensure transfer doc & datasheet attached)
Task: As-Received Dirty Test, Overhaul, Cold Bench Set Pressure test SAP INSP ID : 1100020716
Task: As-Received Dirty Test, Overhaul, Cold Bench Set Pressure test SAP INSP ID : 1100018769
Scope;- De-bolt & remove, install blinds, transfer to cleaning area.
Open valve & clean, transfer offsite for overhaul (ensure transfer doc & datasheet attached)
Task: As-Received Dirty Test, Overhaul, Cold Bench Set Pressure test SAP INSP ID : 1100019182
Task: As-Received Dirty Test, Overhaul, Cold Bench Set Pressure test SAP INSP ID : 1100019183
Scope;- Mark / check damper orientation PRIOR to work commencing (mark shaft / photograph as required)
Isolate actuator air signal.
Remove paddle linkage arm, de-bolt bearing block & remove to grade.
PEFS: T-4.101.082 LINE: 100-2H760104-31160-S2 Location: P-7605 discharge line Ground level
PEFS: T-4.101.082 LINE: 50-2H760128-31160-H1 Location: V-7602 heater coil Ground level
N2P4 CONNECTION (NITROGEN CONNECTION TO REACTOR 2R-3022 RECYCLE LINE ) FIRST BLOCK VALVE IS STUCK OPEN AND ITS VALVE STEM SPIND
31/07/13 - Frits - Scope details are missing
31/07/13 - Frits - Scope details are missing
Rotating Equipment auxiliary Equipment work scope for 2K-3041. Equipment Tag Number to be worked: 230PCV-10254/VP.Description of work : N2 direct
Rotating Equipment auxiliary Equipment work scope for 2K-3041. Equipment Tag Number to be worked: 230PCV-10255/VP.Description of work : N2 direct
Rotating Equipment auxiliary Equipment work scope for 2K-3041. Equipment Tag Number to be worked: 230RV-10019S/SV.Description of work : Relief val
**SCOPE CANCELLED FROM TRN1, CHECK DECISION APPLIES TO TRN2**
Task: As-Received Dirty Test, Overhaul, Cold Bench Set Pressure test SAP INSP ID : 1100018495
**SCOPE CANCELLED FROM TRN1, CHECK DECISION APPLIES TO TRN2**
Task: As-Received Dirty Test, Overhaul, Cold Bench Set Pressure test SAP INSP ID : 1100020738
Task: As-Received Dirty Test, Overhaul, Cold Bench Set Pressure test SAP INSP ID : 1100019530
**SCOPE CANCELLED FROM TRN1, CHECK DECISION APPLIES TO TRN2**
Task: As-Received Dirty Test, Overhaul, Cold Bench Set Pressure test SAP INSP ID : 1100018498
RV REMOVE AND CALIBERATION.
RV REMOVE AND CALIBERATION
RV REMOVE AND CALIBERATION.
Rotating Equipment auxiliary Equipment work scope for 2K-3041. Equipment Tag Number to be worked: 230RV-10474A/SV.Description of work : RVs (2) o
Rotating Equipment auxiliary Equipment work scope for 2K-3041. Equipment Tag Number to be worked: 230RV-10474B/SV.Description of work : RVs (2) o
Rotating Equipment auxiliary Equipment work scope for 2K-3041. Equipment Tag Number to be worked: 230SCA-10661/VH .Description of work : Turbine
Rotating Equipment auxiliary Equipment work scope for 2K-3041. Equipment Tag Number to be worked: 230SCA-10662/VH.Description of work : Turbine t
Major Turnaround CCI vendor scope. Contract required.
04/08/13 - Frits - Scope description missing. Please specify what to do and why. Add PEFS
Rotating Equipment auxiliary Equipment work scope for 2K-3041. Equipment Tag Number to be worked: 230UC-10151/VC. Description of work : Anti-Surg
As per the MOC-GTL-P-3000-1137, the instrument air connections to be modified with the Flexible hoses.
Rotating Equipment auxiliary Equipment work scope for 2K-3041. Equipment Tag Number to be worked: 230UZ-10165/VH. Description of work : Turbine tr
Rotating Equipment auxiliary Equipment work scope for 2K-3041. Equipment Tag Number to be worked: 230UZ-10166/VH. Description of work : Turbine tr
Rotating Equipment auxiliary Equipment work scope for 2K-3041. Equipment Tag Number to be worked: 130-SP-503-NSV. Description of work : Compresso
PROVIDE THE VENT VALVE ON SYN GAS FLARE LINE (2" FLARE LINE HAVING NO VENT VALVE TO DEPRESSURISED FOR REVERSING THE SPADE) ON INL
2J3001 ASL depressurization 1st valve stuck in one thread and unable to open further. At present we are using this line for depressurization of 2E-3011. Pl
Old valve of MTA1 should be sending for repairs, to install in MTA2.
If not:
Old valve of MTA1 should be sending for repairs, to install in MTA2.
If not:
Old valve of MTA1 should be sending for repairs, to install in MTA2.
If not:
Old valve of MTA1 should be sending for repairs, to install in MTA2.
If not:
Old valve of MTA1 should be sending for repairs, to install in MTA2.
If not:
Old valve of MTA1 should be sending for repairs, to install in MTA2.
If not:
Old valve of MTA1 should be sending for repairs, to install in MTA2.
If not:
Old valve of MTA1 should be sending for repairs, to install in MTA2.
If not:
Old valve of MTA1 should be sending for repairs, to install in MTA2.
If not:
Old valve of MTA1 should be sending for repairs, to install in MTA2.
If not:
Old valve of MTA1 should be sending for repairs, to install in MTA2.
If not:
Old valve of MTA1 should be sending for repairs, to install in MTA2.
If not:
Old valve of MTA1 should be sending for repairs, to install in MTA2.
If not:
Old valve of MTA1 should be sending for repairs, to install in MTA2.
If not:
Old valve of MTA1 should be sending for repairs, to install in MTA2.
If not:
VALVE PASSING , NEED TO BE REPLAED THE VALVE
REACTOR EFFLUENT LINE N2 P4 CONNECTION LINE MAIN INLET VALVE DAMAGE. VALVE REQUIRED TO REPLACE DURING MTA. Awaiting AWR
2KT-3001 - MTA-REPLACE HPSTEAM INLET PASSING VALVES-2KT3001
2KT-3041 - MTA-REPLACE HPSTEAM INLET VALVES-2KT3041
20/11/13 - Frits - MOC required because of drain in between TOSV valves to install, just like in Train 1.
20/11/13 - Frits - MOC required because of drain in between TOSV valves to install, just like in Train 1.
SHUTDOWN COOLER VALVE PASSING Will be subject to AWR process
SHUTDOWN COOLER VALVE PASSING
SHUTDOWN COOLER VALVE PASSING Will be subject to AWR process
04/08/13 - Frits - Scope description is unclear. Please specify what to do and add PEFS.
PEFS: T-13.371.096 LINE: 150-2H760038-31160-S2 Location: HTF make-up line to V-7601 At the top of V-7601
Old valve of MTA1 should be sending for repairs, to install in MTA2.
If not:
Old valve of MTA1 should be sending for repairs, to install in MTA2.
If not:
Train-2 HTF, 2P-7604A discharge I/V found heavily passing during spading/despading. valve is welded one. It can only be replaced/repaired in TA-2016. PE
2P4108A Discharge isolation valve is passing, Needs to be repaired. *Ref. No. 10122943 Routine Wrk LvL 5 SAP raised in MLMM2.
FOS line first v/v (LES BL valve d/s) is to be replaced on next available oppertunity.The gland leak was reported earlier and rectified by two times.During v
Notification for TA Activity.
Pressure controlling element-Seal Gas Supply (Start-Up & Stand-By)
09.03.2014 08:44:52 Alagappan Pichappan (QRAPI0)
NOTIFICATION FOR TA ACTIVITY.
Valve tuning required for the booster relay by the CCI valve specailist.Also if require, replace the rubber pneumatic parts in the field. After valve tuning wo
Valve position
MOC- feedback value
PC-FGP-P-0ALL-0138 appearing in DCS is reverse. Refer secondary variable showing at section "HART variables". When checked in FDM, device co
- Implementation
Rotating Equipment auxiliary Equipment work scope for 2K-0602. Equipment Tag Number to be worked: 206UC-10401/VC. Description of work : Anti-Su
MOC- PC-FGP-P-0ALL-0138 - Implementation
Valve tuning required for the booster relay by the CCI valve specailist.Also if require, replace the rubber pneumatic parts in the field. After valve tuning wo
MOC- PC-FGP-P-0ALL-0138 - Implementation
Valve tuning required for the booster relay by the CCI valve specailist.Also if require, replace the rubber pneumatic parts in the field. After valve tuning wo
X WPS/ Work instruction needed
X Insulation
Was there a process disturbance? Share info.
Not directly but apparently if ever 2P--0661A will not be available NGL
Clear description of the problem. 2KT-0601 suction manual block valve is passing. PEFS: T-4.094.535 Prioriteit: Clear description of the problem, answer
PEFS: T-13.370.756 LINE: 200-2S510018-92020Q1-H1 Location: Process line from E-5115A/B Below Fin Fan
Scope;- De-bolt & remove, install blinds, transfer to cleaning area.
Open valve & clean, transfer offsite for overhaul (ensure transfer doc & datasheet attached)
Scope;- De-bolt & remove, install blinds, transfer to cleaning area.
Open valve & clean, transfer offsite for overhaul (ensure transfer doc & datasheet attached)
Task: As-Received Dirty Test, Overhaul, Cold Bench Set Pressure test SAP INSP ID : 1100016766
Task: As-Received Dirty Test, Overhaul, Cold Bench Set Pressure test SAP INSP ID : 1100019068
Task: As-Received Dirty Test, Overhaul, Cold Bench Set Pressure test SAP INSP ID : 1100019069
PEFS: T-13.370.757 LINE: 400-2P510035-61261-H1 Location: Process line from V-5121 2nd level of platform
PEFS: T-13.370.770 LINE: 600-2P510702-31071-4 Location: K-5181 discharge line Inside SMR SYNGAS Comp. house
PEFS: T-13.370.750 LINE: 750-2P510016-33015-4 Location: between V-5141 and E-5151 Last level on Fin Fan
PEFS: T-13.370.770 LINE: 350-2P510705-61071-4 Location: K-5181 discharge line Ground level
PEFS: T-13.370.750 LINE: 40-2W510015-33031-N Location: P-5151A/B discharge line Ground level
Description of work ;- Rotate isolation valve through 90 degrees.
Description of work ;- Rotate isolation valve through 90 degrees.
Scope;- De-bolt & remove, rotate through 90 degrees
Scope;- De-bolt & remove, rotate through 90 degrees
Scope;- De-bolt & remove, transfer old valve to laydown area **DO NOT SCRAP, OVERHAUL POST TA**
Scope;- De-bolt & remove gland follower, remove packing,check valve operation.
Prep line ends.
U/T preps.
Installline
Prep flanges,
ends. set, tack, root & hot pass.
U/T preps.
Install flanges,
27.08.2013 set, tack,
04:09:09 rootAbdurrahman
Sarole & hot pass. (QRSAB0)
008RV-32012B U/S VALVE IS PASSING.
27.08.2013 08:56:27 Ahmed Muhammed Aftab (QRAMU1)
008RV-32007B
Replace the valve U/Sand
block
4Y valve
PM ofpassing , RV
RV during removal WPS not prepared for
MTA-1
RV calibration Ref PEFS T-4.094.614
24.08.2013 12:03:43 Ahmed Muhammed Aftab (QRAMU1)
RV need to calibrate in MTA-1 Valve needs to replace due to passing
24.08.2013 12:08:04
Clear description Ahmed
of the Muhammed
problem. Aftab (QRAMU1)
202-PDI-10042 UPPER SIDE ISOLATION VALVE IS PASSING AND WPS WAS NOT ABLE TO EXECUTE FOR ATENDING THE
202RV10001 spare upstream valve is badly passing. Found RV spare u/s valve badly passing when the spool piece pipe tried to depressurised. Installation
PEFS: T-13.370.575 LINE: 350-2P400076-91071Q1-S2 Location: ANTI-SURGE BYPASS connecting to 2E-4005 Inlet line
PEFS: T-13.370.572 LINE: 300-2P400006-151011-S1 Location: P-4001 discharge line Ground level
PEFS: T-13.370.577 LINE: 400-2P400019-91071Q1-4 Location: 2K-4001 Disch line to 2E-4003
251FC-10006U/S and D/S VALVES PASSING. SO WE HAVE RAISED NOTIIFCATION- 10111558(WO-90213051) AND INITIATED VALVE PROCUREMENT. SIN
New control logic and control elements to be installed as per recommendation from RCA
*Upstream Isolation valve of 248XC10013 is passing . needs to be attended. * SAP Ref No, 10122945 Routine Wrk LvL 5 Raised for MLMM2.
Calibration of A081-008RV-32005A-SV during MTA and the replacment of U/S valve since it is passing
SCE Insp. 008-SP-855 PEFS T-4.094.615SAP Line # 80-0W082106-33031-N SCE
Internal Insp. Internal Inspection required to validate proper
008-SP-853 PEFS T-4.094.613SAP Line # 50-0A081068-0-13031-N SCE Internal Insp. Internal Inspection required to validate
functionality. Pull bonnet to facilitate internal inspections if
proper functionality. Pull bonnet to facilitate internal inspections if applicable or remove valve from line to facilitate
02.06.2013 09:15:16 Shankar Singh (QRSSI0)
internal inspection. Location Information:
MTA2 scope: 0V-0831 variable sampler is leaking
PEFS: T-4.094.610 rev E
PEFS: T-13.370.572 LINE: 200-2P400048-92110Q1-S1 Location: P-4001 discharge line Level Two
PEFS: T-13.370.572 LINE: 200-2P400048-92110Q1-S1 Location: P-4001 discharge line Level Two
PEFS: T-13.370.585 LINE: 150-2P400093-92110Q1-S2 Location: P-4010 A/B discharge line Ground level
2P0573 discharge NRV passing alongwith its bypass valve, both NRV and
its bypass valve replacement to be done to avoid over pressurisation of
LP steam B/V at utility point is passing (near 2V-0511A pillar no 8)
06.02.2013 07:58:05 Selvaraj Muthu (QRSMU0)
18.07.2013 02:30:12 Rajesh Arumugam (QRRAR0)
2V-0512;205RV10013A
26.09.2013 U/S ISOLATION
01:47:32 Pankaj VALVE MILD PASSING.
Bhuva (QRPBH0)
2V-0501 vessel 205RV-10001 spare RV inlet valve passing
T/A job required
passing rate is moderate
04.10.2013 01:29:07 Pankaj Bhuva (QRPBH0)
205RV-10021B (2V-0541) inlet valve minor passing
04.10.2013 01:26:46 Pankaj Bhuva (QRPBH0)
205RV-10024 (2C-0543) main RV inlet valve minor passing
50-2W050602-61011-N, PEF T-4.094.979, NRV of Dissimilar Type on Cooled HP BFW from 2E-0223
200-2S050343-61261-H1, PEF T-4.094.475
Rotating Equipment auxiliary Equipment work scope for 2K-5181. Equipment Tag Number to be worked: 241PCA-10110/VC. Description of work : Temp
TWAP notification created to fix gland leak of Discharge Valve 2P-5111A. Online tightening done, but gland nut very hard to tighten. Old WO: 90229316 G
23.12.2012 09:12:55 Sudhakaran Ravindran (QRSRAA)
T/AJob-Additional Block valve205LCA10013 tobe provided
23.12.2012 09:14:43 Sudhakaran Ravindran (QRSRAA)
T/AJob-Additional Block valve205LG-10011 tobe provided
23.12.2012 09:16:15 Sudhakaran Ravindran (QRSRAA)
T/AJob-Additional Block valve205LG-10049 tobe provied
23.12.2012 09:23:12 Sudhakaran Ravindran (QRSRAA)
T/AJob-Additional
2013-06-13 Block
07:26:26 valve205LZA10014
Anant Darak (QRADA2) to Phone
be provided
+974 4403 2971
/ Task: As-Received Dirty Test, Overhaul, Cold Bench Set Pressure test
/ SAP INSP ID : 1100018819
rresponds to Mtce WO# 90078188
rresponds to Mtce WO# 90078189
f heat exchanger after the workshop cleaning is completed and this notification can be corrected accordingly, if required) Gear box
this notification.
ve of Process air trap SP 194; refer PEFS T-4.292.995 Replace valve with higher grade material
used for fabrication. AWR approved by OTC and forwarded for ROM
ve of Process air trap SP 194; refer PEFS T-4.292.807 Replace valve with higher grade material
quipment Tag Number to be worked: 231PCV-10204/VP.Description of work : N2 direct acting pressure control valves- Cannot work on or replace on the run.Pull for serv
uipment Tag Number to be worked: 231PCV-10205/VP.Description of work : N2 direct acting pressure control valves- Cannot work on or replace on the run.Pull for servic
Description of work : RVs (2) on cooling water exchangers- These cannot be removed separately since outlets are linked together.Pulled and re-installed by TA contractor
Description of work : RVs (2) on cooling water exchangers- These cannot be removed separately since outlets are linked together.Pulled and re-installed by TA contractor
Description of work : Turbine trip valves and turbine governor valves- pulled by Rotating Equip Contractor and sent to OEM shop for repair.PEFS Associated with scope: 8
Description of work : Turbine trip valves and turbine governor valves- pulled by Rotating Equip Contractor and sent to OEM shop for repair. PEFS Associated with scope:
Description of work : Turbine trip valves and turbine governor valves- pulled by Rotating Equip Contractor and sent to OEM shop for repair.PEFS Associated with scope: 85
escription of work : Compressor discharge check valve (NRV) - Cannot inspect or repair on the run. Pull by TA Contractor. Inspect and repair. Failure of NRV to close prop
so ATTACHED MARKED-UP PEFS/ISO MOC-1517 is available in GTL MOC register. (NOTE THAT LINE DESCRIPTION UNDER SAP EQUIPMENT IS INCORRECT. THIS ISSUE
so ATTACHED MARKED-UP PEFS/ISO MOC-1517 is available in GTL MOC register. (NOTE THAT LINE DESCRIPTION UNDER SAP EQUIPMENT IS INCORRECT. THIS ISSUE
Description of work : Anti-Surge Recycle valve. Pull for inspect and any necessary repairs. Pull, inspect and re-install. Instrument engineer to determine scope of repair.
valve on 2R 5112 B I/L from Slip stream . OMC- If this valve needs to be replaced, then we need to procure new valve, So please create WO and assign Revision Code. T
g installation of finger isolating B/V during TA 2015, this will be SLOW DOWN scope.
wing installation of finger isolation during TA 2015, this will be SLOW DOWN scope.
ing. To be fixed. Job TA scope. Separate notification for both valves. This is for 1st isolation valve.
vity of sparger steam line, as part of 2E-1119A/B preparation for maintanence. As per ARP, this is OTR scope on TREJ review 01/05/201
passing O2 valve for 2R-1114. see PEFS 1 of 4
suction - T-4.094.549
er that not able to close it during start up.So valve was removed and blind is in place.TPC PC- ASU-T-2200 is in place now.New / service
ve of Process air trap SP 194; refer PEFS T-4.290.414 Replace valve with higher grade material
5 barg. PEFS: T-4.094.593 Prioriteit: Clear description of the problem, answer the following questions : Was there a process distu
teit: Product information : Product left in equipment LPG X Liquid Expected amount : X Turn around related Turn around reason : U-07
iption of work : Compressor discharge check valve (NRV) - Cannot inspect or repair on the run. Pull by . Inspect and repair. Failure of NRV to close properly can result i
AND ITS VALVE STEM SPINDDLE DAMAGE. LP N2 header need to be out of service!
Description of work : N2 direct acting pressure control valves- Cannot work on or replace on the run.Pull for servicing by TA contractor. PEFS Associated with scope: 8523
Description of work : N2 direct acting pressure control valves- Cannot work on or replace on the run.Pull for servicing by TA contractor. PEFS Associated with scope: 8523
Description of work : Relief valves (3)– Cannot isolate. Cannot pull without shutting down compressor train. Pulled and re-installed by TA contractor. PEFS Associated w
Description of work : RVs (2) on cooling water exchangers- These cannot be removed separately since outlets are linked together.Pulled and re-installed by TA contractor
Description of work : RVs (2) on cooling water exchangers- These cannot be removed separately since outlets are linked together.Pulled and re-installed by TA contractor
Description of work : Turbine trip valves and turbine governor valves- pulled by Rotating Equip Contractor and sent to OEM shop for repair.PEFS Associated with scope: 8
Description of work : Turbine trip valves and turbine governor valves- pulled by Rotating Equip Contractor and sent to OEM shop for repair.PEFS Associated with scope: 8
Description of work : Anti-Surge Recycle valve. Pull for inspect and any necessary repairs. Pulled and re-installed by TA contractor. PEFS Associated with scope: T-13.370.
Description of work : Turbine trip valves and turbine governor valves- pulled by Rotating Equip Contractor and sent to OEM shop for repair.PEFS Associated with scope: 85
Description of work : Turbine trip valves and turbine governor valves- pulled by Rotating Equip Contractor and sent to OEM shop for repair.PEFS Associated with scope: 85
escription of work : Compressor discharge check valve (NRV) - Cannot inspect or repair on the run. Pull by TA Contractor. Inspect and repair. Failure of NRV to close prop
EVERSING THE SPADE) ON INLET LINES OF BOTH STRINGS OF GURAD BED(2R-3011A/B AND 2R-3012A/B).
epressurization of 2E-3011. Please see the attached PEFS for your reference. MTA
MTA. Awaiting AWR
placed/repaired in TA-2016. PEFS no: T-4.101.284 SAP is raised based on passing valve OI register.
rectified by two times.During valve operation,an internal chattering noise noticed and so this notifiacation has been raised for replacement. No scaffolding required. Anoth
he field. After valve tuning work, confirm the smooth stroke from DCS.
hen checked in FDM, device configuration showed parameter "Zero Pwr Cond" as valve closed. This should be valve open. Perform a stroke check and confirm secondary
Description of work : Anti-Surge Recycle valve. Pull for inspect and any necessary repairs. Pulled, inspected and re-installed. Instrument engineer to issue scope and re
he field. After valve tuning work, confirm the smooth stroke from DCS.
he field. After valve tuning work, confirm the smooth stroke from DCS.
ption of the problem, answer the following questions : Was there a process disturbance? Share info. Yes, this requires phase-2 s
EXECUTE FOR ATENDING THE 202-PDI-10042. PEFS: T-4.094.387 REV F Prioriteit: Clear description of the problem, answer the following questions :
ED VALVE PROCUREMENT. SINCE VALVE REPALCEMENT IS POSSIBLE ONLY TA, THIS NOTIFICATION IS CREATED. REGARDING AMM ADVICE, PLEASE SEE MAIL ATTACH
Description of work : Temperature Control valves- Desuperheater- Valves to be pulled and installed by . Scope by Instr. Cannot isolate control valve on the run. Need
tighten. Old WO: 90229316 Gland leak is coming from 2nd Discharge valve. one more TWAP notification-10079573 is existing for easin
k on or replace on the run.Pull for servicing by TA contractor. PEFS Associated with scope: 85252315 Item Number marked on PEFS: 5b
k on or replace on the run.Pull for servicing by TA contractor. PEFS Associated with scope: 85252315 Item Number marked on PEFS: 5b
Pulled and re-installed by TA contractor. PEFS Associated with scope: 85252215 Item Number marked on PEFS: 3e
Pulled and re-installed by TA contractor. PEFS Associated with scope: 85252215 Item Number marked on PEFS: 3e
ctor. PEFS Associated with scope: 85238915 Item Number marked on PEFS: 5b
ctor. PEFS Associated with scope: 85238915 Item Number marked on PEFS: 5b
ed by TA contractor. PEFS Associated with scope: 85239015. Item Number marked on PEFS: 1b
Pulled and re-installed by TA contractor. PEFS Associated with scope: 85238815 Item Number marked on PEFS: 3e
Pulled and re-installed by TA contractor. PEFS Associated with scope: 85238815 Item Number marked on PEFS: 3e
or repair.PEFS Associated with scope: 85239015 Item Number marked on PEFS: 1d
or repair.PEFS Associated with scope: 85239015 Item Number marked on PEFS: 1d
t isolate control valve on the run. Need to work during TA. . PEFS Associated with scope: T-13.370.772. Item Number marked on PEFS: 2a
mber marked on PEFS: 7c
mber marked on PEFS: 7c