You are on page 1of 9

Monthly Generation Report

(Renewable Energy Sources)


2012-13 (August 12)

Central Electricity Authority


Grid Operation and Distribution Wing
Operation Performance Monitoring Division
BACKGROUND

As on 31st March, 1990 Renewable Energy Sources (RES) capacity was 18 MW and generation
during the year 1989-90 was 6 MU. Initially the annual capacity addition was very slow, but from
2008 onwards the contribution from RES is considerable. As on 31st March, 2012 the RES capacity
was 24503.45 MW and generation during the year 2011-12 is expected to be 51226 MU (provisional).
The growth of installed capacity and the growth of gross electrical energy generation from RES since
1989-90 onwards is given below:-
Growth of Installed Capacity & Percentage share of RES in the total installed
generating capacity
Total Installed Total Installed RES % of Total
Generating Capacity in Generating Capacity capacity
India (MW) (MW)

As on 31.03.1990 63636 18 0.03


As on 31.03.1992 69065 32 0.05
As on 31.03.1997 85795 902 1.05
As on 31.03.2002 105046 1658 1.58
As on 31.03.2007 132329 7761 5.86
As on 31.03.2008 143061 11125 7.78
As on 31.03.2009 147965 13242 8.95
As on 31.03.2010 159398 15521 9.74
As on 31.03.2011 173626 18455 10.63
As on 31.03.2012 199877 24503 12.26
As on 31.03.2017* 318414* 54503** 17.12
th
Source: General Review 2011, DMLF division, CEA, ** Tentative projection for XII plan
GROWTH OF ENERGY GENERATION & Percentage share of generation from RES in the
total energy generation
Generation during Total Gross Energy Total Gross RES % of Total
the Year Generation in India Energy Generation Generation
(MU) (MU)

1989 - 1990 245438 6 0.00


1991 - 1992 287029 39 0.01
1996 - 1997 395889 876 0.22
2001 - 2002 517439 2085 0.40
2006 - 2007 670654 9860 1.47
2007-2008 722626 25210 3.49
2008-2009 741167 27860 3.76
2009-2010 799850 36947 4.62
2010 - 2011 844846 41150 4.87
2011 - 2012* 928113 51226* 5.52
Source: General Review 2011, DMLF division, CEA, * Tentative

2
As on 31st March, 2012, the percentage share of RES in total generation capacity was 12.26%
which is expected to increase to 17.12% by 31st March, 2017. The percentage share of RES in total
generation in the country during 2011-12 was around 5.5 %.

The compilation as indicated below is provisional and would be updated on receipt of updated
information from State Load Despatch Centres (SLDC) and State Nodal Agencies (SNA).

3
Electricity Generation (provisional) from Renewable Energy Sources connected to grid during
the month of August’12 and during the period April’12- August’12 (updated as per information
received in CEA up to 01.10.2012)

HIGHLIGHTS

• The electricity generation from Renewable Energy Sources during the month of
August’12 has been 5.28 BU.
• The cumulative generation from Renewable Energy Sources during April- August’12 was
23.56 BU.
• The generation from Wind during August’12 was 4.51 BU with a growth rate of 27 %
over same period last year. Last year, the corresponding growth rate was 31 %.
• The generation from solar during August’12 was 83.48 MU.

Wind Generation performance in the country during August’12 & during the period
April’12- August’12:

The pattern of monthly wind energy generation in the country during 2010-11, 2011-12 and the
current financial year is graphically represented below:-

Monthly Wind generation during 2010-11 to 2011-12


6.0 and 2012-13 (April 12 to August 12)
Actual generation ( BU )

5.5
5.0
4.5
4.0
3.5
3.0
2.5
2.0
1.5
1.0
0.5
0.0
Apr May Jun Jul Aug Sep Oct Nov Dec Jan Feb Mar

2010-11 0.9713 1.6624 2.7416 2.7567 2.7033 2.1974 1.3654 0.9284 0.6958 0.8434 0.9004 0.8511
2011-12 1.0109 2.1693 3.5343 3.7442 3.5448 2.6187 1.7092 0.5162 1.1100 1.0373 1.2011 1.2035
2012-13 1.4361 2.6898 4.9223 5.3522 4.5087
2010-11 2011-12 2012-13

The peak generation from wind is during June to August. The contribution from wind is maximum
among RES. A Graph representing the monthly wind generation vis-à-vis the total RES generation
is shown below.

4
Monthly Wind generation Vis-a-vis Total RES
Generation during 2012-13 (April 12 to August 12)
7.00
6.50
Actual generation ( BU ) 6.00
5.50
5.00
4.50
4.00
3.50
3.00
2.50
2.00
1.50
1.00
0.50
0.00
Ap Ma J Ju Au Se Oc No De J Fe Ma
r-1
2 y-1 un-1 l-1
2 g-1 p-1 t -1
2
v-1 c-1 an-1 b-1 r-1
2 2 2 2 2 2 3 3 3

Apr-12 M ay-12 Jun-12 Jul-12 Aug-12 Sep-12 Oct -12 Nov-12 Dec-12 Jan-13 Feb-13 M ar-13

Wind 1.436 2.690 4.922 5.352 4.509


Total 2.585 3.668 5.713 6.312 5.280

Wind Total

Monthly generation from Solar, Biomass, Bagasse, Small Hydel and others (except wind)
Generation during 2012-13 (April 12 to August 12) is shown below. Share of generation from
these sources are small. The generation from bagasse is seasonal and would start peaking up from
October onwards.

Monthly generation from Solar, Biomass, Bagasse, Small Hydel and


800
others (except wind) Generation during 2012-13 (April 12 to August 12)
Actual generation ( MU )

750
700
650
600
550
500
450
400
350
300
250
200
150
100
50
0
Ap J J
r- 1 May - un-1 J ul-12 Aug- 1 Sep- 1 Oc t- 1 No v-1 De c-1 an-1 Feb- 1 Mar- 1
2 12 2 2 2 2 2 2 3 3 3
Apr- 12 May- 12 Jun- 12 Jul- 12 Aug-12 Sep-12 Oct -12 Nov-12 Dec-12 Jan-13 Feb-13 Mar -13

Solar 114.766 130.013 115.219 95.725 83.483

Biomass 112.510 121.293 119.244 322.407 105.995

Bagasse 699.426 575.885 384.026 282.103 243.555

S. Hydel 203.910 133.093 152.153 240.602 330.083

Ot hers 18.587 17.747 19.746 19.266 7.900

Solar Biomass Bagasse S. Hydel Others

5
Category-wise Generation performance:

The category-wise details of electricity generation in the country during August ’12 and during
April 2012 to August 2012 are given below:

ACTUAL
ACTUAL
Monitored GENERATION
GENERATION
Category Capacity (MU) during
(MU) during
(MW) April 12 to
August 2012
August 2012

RES
Wind 14870.955 4508.687 18909.007
Solar 976.904 83.483 539.205
Biomass 707.250 105.995 781.449
Bagasse 2881.210 243.555 2184.995
Small Hydel 1290.293 330.083 1059.842
Others 131.760 7.900 83.246
Total RES 20858.372 5279.702 23557.744
Total
(Conventional) 181710.520 74498.360 382466.050
Total 202568.892 79778.062 406023.794

Share of RES monitored capacity (MW) wrt to the


total monitored generation capacity (MW)

Total RES,
20858.372,
10%

Total
(Conventional)
, 181710.520,
90%

Total RES
Total (Conventional)

6
Share of RES generation (MU) wrt to the total
generation (MU) during August 2012

Total RES,
5279.702, 7%

Total
(Conventional),
74498.360, Total RES
93%
Total (Conventional)

Share of RES generation (MU) wrt to the total


generation (MU) during 2012-13 (April 12 to
August 2012)

Total RES,
23557.744, 6%

Total Total RES


(Conventional)
, 382466.050, Total (Conventional)
94%

7
State-wise Generation:

Tamil Nadu is leading in generation from wind with an installed capacity of 7111.68 MW as on
31.08.2012 and energy generation of 2136.96 MU and 7617.29 MU during the month of August 12
and 2012-13 (April12 to August 12). There are some states which are yet to submit the RES
information to CEA (the data would be updated accordingly).
The details of State-wise generation during the month of August 12 and during 2012-
13(April12 to August 12) are given below.
STATE WISE MONTHLY GENERATION from Renewable Energy Sources
during August 2012
( Tentative, as per information received in CEA till 01.10.12)

( All figures in MU )

Sl. State Wind Solar Biomass Bagasse Small Others Total


No. Hydel
Northern Region
1 Delhi 0.217 4.949 5.166
2 Haryana 0.000
3 HP 0.000
4 J&K 0.000
5 Punjab 0.000
6 Rajasthan 265.808 19.134 18.325 0.350 303.617
7 Uttar Pradesh ( 0.978 1.658 21.916 2.043 2.581 29.176
8 Uttarakhand 0.000
Sub Total (Northern Region) 265.808 20.329 19.983 21.916 2.393 7.530 337.959
Western Region
1 Chhattisgarh 0.000
2 Gujarat 686.927 59.361 1.969 0.000 5.790 754.047
3 Madhya Pradesh 74.650 0.200 1.360 22.830 0.370 99.410
4 Maharashtra 656.800 656.800
Sub Total (Western Region) 1418.377 59.561 3.329 0.000 28.620 0.370 1510.257
Southern Region
1 Andhra Pradesh 60.450 60.450
2 Karnataka 614.917 1.293 21.683 120.521 218.594 977.008
3 Kerala 12.176 3.838 51.737 67.750
4 Tamil Nadu 2136.959 2.300 61.000 97.280 2297.539
Sub Total (Southern Region) 2824.502 3.593 82.683 221.639 270.331 0.000 3402.747
Eastern Region
1 Bihar 10.508 10.508
2 Orissa 0.000
3 West Bengal 0.000
4 DVC 18.231 18.231
Sub Total (Eastern Region) 0.000 0.000 0.000 0.000 28.739 0.000 28.739
North Eastern Region
1 Arunachal Pradesh 0.000
2 Assam 0.000
3 Manipur 0.000
4 Meghalaya 0.000
5 Nagaland 0.000
6 Tripura 0.000
Sub Total (North Eastern 0.000 0.000 0.000 0.000 0.000 0.000 0.000
Region)
Total 4508.687 83.483 105.995 243.555 330.083 7.900 5279.702

8
STATE WISE MONTHLY GENERATION from Renewable Energy Sources
during APRIL 2012 to AUGUST 2012
( Tentative, as per information received in CEA till 01.10.12)

( All figures in MU )

Sl. State Wind Solar Biomass Bagasse Small Others Total


No Hydel
.
Northern Region
1 Delhi 0.000 1.924 0.000 0.000 0.000 30.320 32.244
2 Haryana 0.000 0.000 0.000 0.000 25.304 0.000 25.304
3 HP 0.000 0.000 0.000 0.000 0.000 0.000 0.000
4 J&K 0.000 0.000 0.000 0.000 0.000 0.000 0.000
5 Punjab 0.000 0.000 0.000 0.000 0.000 0.000 0.000
6 Rajasthan 2107.460 72.980 128.945 0.000 1.810 0.000 2311.195
7 Uttar Pradesh 0.000 5.628 28.887 681.008 10.739 17.836 744.098
8 Uttarakhand 0.000 0.000 0.000 0.000 52.200 0.000 52.200
Sub Total (Northern 2107.460 80.532 157.832 681.008 90.053 48.156 3165.040
Region)
Western Region
1 Chhattisgarh 0.000 0.000 0.000 0.000 1.720 0.000 1.720
2 Gujarat 3375.328 400.196 26.705 0.000 16.040 0.000 3818.269
3 Madhya Pradesh 293.420 1.380 5.530 0.000 60.470 2.280 363.080
4 Maharashtra 2792.477 0.000 0.000 0.000 72.660 0.000 2865.137
Sub Total (Eastern 6461.225 401.576 32.235 0.000 150.890 2.280 7048.206
Region)
Southern Region
1 Andhra Pradesh 210.080 35.720 189.600 63.200 20.760 32.810 552.170
2 Karnataka 2465.092 5.307 100.428 548.767 484.160 0.000 3603.754
3 Kerala 47.859 0.000 0.000 21.209 194.085 0.000 263.153
4 Tamil Nadu 7617.290 10.699 278.280 843.160 0.000 0.000 8749.429
Sub Total (Southern 10340.321 51.726 568.308 1476.336 699.005 32.810 13168.506
Region)
Eastern Region
1 Bihar 0.000 0.000 0.000 27.651 21.057 0.000 48.708
2 Orissa 0.000 5.372 23.074 0.000 62.206 0.000 90.651
4 West Bengal 0.000 0.000 0.000 0.000 0.000 0.000 0.000
3 DVC 0.000 0.000 0.000 0.000 35.575 0.000 35.575
Sub Total (Eastern 0.000 5.372 23.074 27.651 118.838 0.000 174.935
Region)
North Eastern
Region
1 Arunachal Pradesh 0.000 0.000 0.000 0.000 1.057 0.000 1.057
2 Assam 0.000 0.000 0.000 0.000 0.000 0.000 0.000
3 Manipur 0.000 0.000 0.000 0.000 0.000 0.000 0.000
4 Meghalaya 0.000 0.000 0.000 0.000 0.000 0.000 0.000
5 Nagaland 0.000 0.000 0.000 0.000 0.000 0.000 0.000
6 Tripura 0.000 0.000 0.000 0.000 0.000 0.000 0.000
Sub Total (North 0.000 0.000 0.000 0.000 1.057 0.000 1.057
Eastern Region)
Total 18909.007 539.205 781.449 2184.995 1059.842 83.246 23557.744