Professional Documents
Culture Documents
26. Security
1 Personnel entering site
2 Security patrol
3 Security gate check
DAFTAR CLASS 1 RISK UP-DATE UNITEDA ARKATO
NO PROCESS / ACTIVITY APPROVAL DATE LAST UPDATE NEXT UPDATE
A.1 A.1.PIT-Land Clearing'!A1 10-Jan-17 10-Jan-18
A.2 A.2.PIT-LoadingAndFloorWorks'!A1 10-Jan-17 10-Jan-18
A.3 A.3 PIT-Hauling'!A1 10-Jan-17 10-Jan-18
A.4 A.4.PIT-Battering_Sloping'!A1 10-Jan-17 10-Jan-18
A.5 A.5.PIT-Dewatering'!A1 10-Jan-17 10-Jan-18
B.6 B.6.DISP-Tipping'!A1 10-Jan-17 10-Jan-18
B.7 B.7.DISP-DumpSupport'!A1 10-Jan-17 10-Jan-18
B.8 B.8.DISP-Sloping'!A1 10-Jan-17 10-Jan-18
C.9 C.9.PLANT-WSDaily'!A1 10-Jan-17 10-Jan-18
C.10 C.10.PLANT-Traffic'!A1 10-Jan-17 10-Jan-18
C.11 C.11.PLANT-ExcMaint'!A1 10-Jan-17 10-Jan-18
C.12 C.12.PLANT-TyreMgt'!A1 10-Jan-17 10-Jan-18
C.13 C.19.PLANT-Electrical'!A1 10-Jan-17 10-Jan-18
D.14 D.14.TRAFFIC-Design'!A1 10-Jan-17 10-Jan-18
E.15 E.15.ROAD-ConstRoad'!A1 10-Jan-17 10-Jan-18
E.16 E.16.ROAD-Maintenance'!A1 10-Jan-17 10-Jan-18
F.17 F.17.GEN-Vehicleinteraction (2'!A1 10-Jan-17 10-Jan-18
F.18 F.18.GEN-Parking (2)'!A1 10-Jan-17 10-Jan-18
F.19 F.19.GEN-EquipRecovery (2)'!A1 10-Jan-17 10-Jan-18
F.20 H.31.GEN-NearWater (2)'!A1 10-Jan-17 10-Jan-18
F.21 F.21.GEN-Fueling (2)'!A1 10-Jan-17 10-Jan-18
F.22 F.22.GEN-WAH (2)'!A1 10-Jan-17 10-Jan-18
F.23 F.23.GEN-Lifting (2)'!A1 10-Jan-17 10-Jan-18
F.24 F.24.GEN-Welding (2)'!A1 10-Jan-17 10-Jan-18
F.25 F.25.GEN-WasteDisposal (2)'!A1 10-Jan-17 10-Jan-18
F.26 F.26.GEN-Security (2)'!A1 10-Jan-17 10-Jan-18
RESPONSIBLE DEPT STATUS REMARK
Mining Routine HSE
Mining Routine HSE
Mining Routine HSE
Mining Routine HSE
Mining Routine HSE
Mining Routine HSE
Mining Routine HSE
Mining Routine HSE
Plant Routine HSE
Plant Routine HSE
Plant Routine HSE
Plant Routine HSE
Plant Routine HSE
Mining Routine HSE
Mining Routine HSE
Mining Routine HSE
Mining Routine HSE
Mining Routine HSE
Mining Routine HSE
Mining Routine HSE
Plant Routine HSE
Plant Routine HSE
Plant Routine HSE
Plant Routine HSE
Plant Routine HSE
Admin & HR Routine HSE
PT. UNITEDA ARKATO
(PM/Delegated)
Note: Attach meeting attandance if more.
Hirarchy Control
Hirarchy Control
Risk Identified
People /
Process / Activity / Task Environment at Hazard / Cause of Incident / Adverse L1 C1 RFN ** Current Mitigating Controls L2 C2 RRN * Additional Controls Required
Risk Adverse Effect / Effect / Environmental
Environmental Aspect Impact
A.1.1. 4 4 16 ENG/S ROPs installed in the excavator and 1 4 4 Using excavator for clearing to be
Cutting trees using excavator or dozer Operator in the cabin Equipment in the radius Tree falls over the EG dozer. ADM included in the UA-HSE-SOP-020
of equipment of falling tree. equipment
Rev.01 Clearing
ADM Dozer/Excavator stand on the safe
side while pushing /breaking tree
All personnel near Complaint from villager Demonstration / 4 3 12 ADM Client to conform the area is 'clear' 1 3 3
cutting activity disturbance by villager to be cleared before commencing
the task.
ADM Client representative and policeman
must be present during cutting
activity where necessary.
Feb 2010
Supervisor, People in the radius of Tree falls over the people 4 4 16 ENG/S No one should stay in the 60m 1 4 4
personnel, villager on falling tree. on the ground. EG radius of falling tree.
ground
ADM Pre start meeting prior to
commencing the tasks
Blind spot of equipment Unit run over or struck 4 5 20 ENG/S No personnel should stand behind 1 5 5
personnel on the ground EG or in 30m radius of working
equipment.
ADM Operator must has been trained &
has valid SIMPER
Wild animal (bee, snake, Animal attacks 5 4 20 BHV Never disturb wild animals. It's 1 4 4
etc.) better leave them or wait until they
run away.
ADM Carry out work prestart briefing.
Feb 2010
Operator in the cabin Working near cliff Dozer / excavator rolled 4 4 16 ENG/S Build a bund 10 meters from the 1 4 4
of equipment over the cliff EG face before dozer / excavator
commences clearing operation.
ADM Operator must has been trained &
has valid SIMPER
A.1.2. Drivers, operators, Uncontrolled movement Log fall from lifting 3 4 12 ENG/S Only use good sling condition and 1 4 4
Logging Chainsaw Crew of log when lifted; broken equipment and hit people EG attach tag line to control log
sling. movement.
ENG/S Never perform lifting above
EG personnel.
Chainsaw operator Personnel in the radius of Tree / branch falls over the 4 5 20 ENG/S No personnel should stay in the 1 5 5
and personnel on falling tree, excessive personnel on the ground. EG 60m radius of falling tree. Barricade
ground wind or rain, leaning trees the area when necessary (e.g near
or large branches road).
Feb 2010
PPE Always wear standard PPE, safety
boots, helmet, safety glass, hand
gloves and high visibility clothes /
vest.
A.1.4. Chainsaw operator Uncontrolled movement Log hit personnel; 4 3 12 ENG/S No unauthorized personnel in the 1 3 3
Trimming and Barking and personnel on of log when trimming and sawdust entering EG 15m radius from trimming and
ground barking; sawdust. personnel's eye. barking operation.
ADM Only competent chainsaw crew may
operate the chainsaw
A.1.5. Operators Uncontrolled movement Wood stump hit cabin 3 4 12 ENG/S Protect the cabs windows by guards 1 4 4
Clear up surface of wood stump when EG (FOPs)
clearing
ENG/S Cut the timber into smaller sections
EG
Supervisor, Blind spot of equipment Unit run over or struck 4 5 20 ENG/S No personnel should stand behind 1 5 5
personnel on ground personnel on the ground EG or in 30m radius of working
equipment.
ADM Operator must has been trained &
has valid SIMPER
Feb 2010
Names Dept. - Position Sign Off
Project Manager
ols Required By whom By When Status Legal and Other Requirements Reference
UA-HSE-SOP-020-Clearing
Feb 2010
UA-HSE-SOP-004-Rev.01 Personal protective Equipment
Feb 2010
UA-HSE-SOP-021-Rev.01 Safe Operation of Chainsaw
Feb 2010
PER.15/MEN/VII/2008 - First Aid Treatment
Feb 2010
PT. UNITEDA ARKATO
Approved By
(PM/Delegated)
Note: Attach meeting attandance if more.
Hirarchy Control
Hirarchy Control
Risk Identified
People /
Process / Activity / Task Environment at Hazard / Cause of Incident / Adverse L1 C1 RFN ** Current Mitigating Controls L2 C2 RRN * Additional Controls Re
Risk Adverse Effect / Effect / Environmental
Environmental Aspect Impact
A.2.1 Operators or Blind spot Excavator swings and hit 4 4 16 ENG/S All Heavy Equipment have closed 1 4 4
Loading preparation (clean up, leveling, personnel on the equipment or personnel EG cabin with ROPS installed.
windrow) ground. on the ground nearby.
ENG/S All working lamp and rotary are
EG on all the time.
ADM Competent operator and has
valid simper
BHV Stop activity while personnel on
the ground have to work close to
the Excavator, such as survey.
Feb 2010
ENG/S All Heavy Equipment have closed
EG cabin with ROPS installed.
ADM Competent excavator operator
and has valid simper
ADM Supervision on location.
A.2.2 Operators / driver Blind spot, confined area. Collision 4 4 16 ENG/S Maintain area level and wide 1 4 4
Truck, other mobile equipment and LV are EG enough for trucks to maneouver.
entering and out of loading point
Access near edge of cliff Equipment / LV run over 4 5 20 ENG/S Safety berm to be constructed 1 5 5
the cliff EG min. half of the larger truck wheel
along the edge of cliff.
Feb 2010
ADM Competent operator and has
valid simper
A.2.3 Operators Bench too high; unstable Excavator slides down and 4 4 16 ENG/S Select a correct size of excavator 1 4 4
Loading the truck ground fall onto truck. EG at a suitable ground condition.
Soft ground; hollow Truck or excavator bogged 3 3 9 ENG/S Dozer to prepare loading pad 1 3 3
ground EG before truck being loaded.
A.2.4 Operators Wall failures Land slide; rock fall 3 5 15 ENG/S Slopping / benching high wall 1 5 5
Loading the truck under EG
high wall
ENG/S Install prisma to monitor land
EG movement
Feb 2010
ADM High wall warning signs
A.2.5 Operators Blind spot Truck reversed and struck 4 4 16 ENG/S Maintain 10 m distance with the 1 4 4
Truck queueing to be loaded another truck behind him EG other truck in the front.
A.2.6 Operators Blind spot, confined area Collision 4 4 16 ENG/S Closed cabin as OEM 1 4 4
Floor clean up and leveling EG
Feb 2010
t Team
: Project Manager
UA-HSE-HO-SOP-004(01) Personal
Protective Equipment
Feb 2010
Uncontrolled Document When Printed 20 of 142 LCI-HSE-FM-001A(01)
Feb 2010
KEPMEN.555.K/26/M.PE/1995 Article
241 The height of working faces & the
width of working benches.
Feb 2010
Uncontrolled Document When Printed 22 of 142 LCI-HSE-FM-001A(01)
Feb 2010
PT. UNITEDA ARKATO
Approved By
(PM/Delegated)
Note: Attach meeting attandance if more.
Hirarchy Control
Hirarchy Control
Risk Identified
People /
Process / Activity / Task Environment at Hazard / Cause of Incident / Adverse L1 C1 RFN ** Current Mitigating Controls L2 C2 RRN * Additional Controls R
Risk Adverse Effect / Effect / Environmental
Environmental Aspect Impact
A.3.1 Operators Steep ramp; engine / Roll over, fall to lower 3 4 12 ENG/SEG Maximum 10% gradient of road. 1 4 4
Trucks traveling on steep ramp brake failure level, overtaking
ENG/SEG Safety berm on both sides of the
road
ENG/SEG Road maintenance
ADM SIMPER
ADM No overtaking
Feb 2010
ADM Maximum speed 40 km/h
ADM SIMPER
ADM No overtaking
ADM SIMPER
A.3.4 Operators Blind spot Collision 3 4 12 EL/SUB Cut all materials on the corner 1 4 4
Truck travelling on sharp corner that may cause blind spot
ENG/SEG Road maintenance
ADM SIMPER
ADM SIMPER
A.3.6 Operators Use mobile phone Collision 4 4 16 ADM Prohibited to bring mobile phone 1 1 1
General travel
ADM Socialized , Supervisor control
Feb 2010
Team
: Project manager
Feb 2010
Uncontrolled Document When Printed 26 of 142 LCI-HSE-FM-001A(01)
Feb 2010
PT. UNITEDA ARKATO
Approved By
(PM/Delegated)
Note: Attach meeting attandance if more.
Hirarchy Control
Hirarchy Control
Risk Identified
People /
Process / Activity / Task Environment at Hazard / Cause of Incident / Adverse L1 C1 RFN ** Current Mitigating Controls L2 C2 RRN * Additional Controls
Risk Adverse Effect / Effect / Environmental
Environmental Aspect Impact
A.4.1 Excavator Operator Poor visibility; busy traffic Collision 3 4 12 ENG/SEG Travel on Slow Moving 1 4 4
Excavator travelling to the designated area Equipment lane
Operators Use mobile phone Collision 4 4 16 ADM Prohibited to bring mobile phone 1 1 1
Feb 2010
A.4.2 Excavator Operator flaying rocks hit front glass cabin broken 3 4 12 ENG/SEG Stable pad 1 4 4
Excavator cutting butter and sloping high wall excavator
ADM Supervision
A.4.3 Truck Operator Blind spot; swing radius; Excavator swing into truck 3 4 12 ENG/SEG Block the road if possible 1 4 4
Cutting batter adjacent to haul road working close to busy travelling in side of the
road exclusion zone
ENG/SEG Stable pad
ADM Supervision
Feb 2010
Team
: Project Manager
Feb 2010
Uncontrolled Document When Printed 30 of 142 LCI-HSE-FM-001A(01)
Feb 2010
PT. UNITEDA ARKATO
Approved By :
(PM/Delegated)
Note: Attach meeting attandance if more.
Hirarchy Control
Hirarchy Control
Risk Identified
People /
Process / Activity / Task Environment at Hazard / Cause of Incident / Adverse L1 C1 RFN ** Current Mitigating Controls L2 C2 RRN * Additional Controls Req
Risk Adverse Effect / Effect / Environmental
Environmental Aspect Impact
A.5.1 Pumpman, driver, Broken sling, unstandart Sling snapped, falling 4 3 12 ENG/S Stay away while pump being 1 3 3
Towing pump to the sump operator towing gear/attachement object EG towed by dozer
A.5.2 Operator Soft material Excavator or dozer fall into 4 4 16 ENG/S Build a level and firm bench or 1 4 4
Slide pump pontton into the sump sump and drown the EG deck for excavator or dozer.
operator
PPE All crew within 5 meter from the
edge wearing life jacket
Feb 2010
ADM HDPE pipe not under tension
A.5.4 Operator, pumpman, unlevel ground/activity at Excavator roll over, pipe 3 4 12 ADM Excavator in level ground. 1 4 4
Connect HDPE at the wall (High wall / low wall) other people at the toe of wall loose and fall to the lower
lower level level, rock fall, wall failure
A.5.5 Pumpman Drowning, slips, trips and Fatality, Permanent 4 4 16 PPE All personnel wear life jacket. 1 4 4
Refueling pump in the sump (Working near or falls Disability, Long term
over water) absence due to treatment
BHV Eyes on path to avoid slip and trip
hazards
A.5.6 Mechanic, pump Working near water, Trip, Slip and Fall to the 4 4 16 PPE Wear life jacket while near or over 1 4 4
Pump inspection and repair supervisor, safety stored energy pump deck and drowning water.
personnel
BHV Eyes on path and identify slip, trip
and fall potential
A.5.7 Mechanic, pump Overcapacity of the boat, Boat capsized and 4 4 16 ADM Do not over capacity of the boat. 1 4 4
Using crew boat from edge to pump back and crew, supervisor, boat was broken drawning
forth ERT
ADM Boat equipped with emergency
equipment such as rope, life
jacket.
PPE All crew on the boat wearing life
jacket
Mechanic, pump Poor ilumination/no Trip, Slip, Fall and 4 4 16 PPE Pump crew or person who going 1 4 4
supervisor, safety lighting drowning to pump preparing light torch,
personnel
BHV Bring radio, never work alone
near water
Feb 2010
ADM If can prepare / positioning
lighting tower or lighting plant to
pump area
Feb 2010
am
Project Manager
Feb 2010
Uncontrolled Document When Printed 35 of 142 LCI-HSE-FM-001A(01)
Feb 2010
Uncontrolled Document When Printed 36 of 142 LCI-HSE-FM-001A(01)
Feb 2010
PT. UNITEDA ARKATO
Team Leader :
Reference Number : B.6.DISP-Tipping
Facilitator :
Hirarchy Control
Hirarchy Control
Risk Identified
People /
Process / Activity / Task Environment at Hazard / Cause of Incident / Adverse L1 C1 RFN ** Current Mitigating Controls L2 C2 RRN * Additional Controls
Risk Adverse Effect / Effect / Environmental
Environmental Aspect Impact
B.6.1 Operators & Confined area, Crowded Collision 4 4 16 ADM Supervisor pre inspection 1 4 4
Truck entering disposal area. personnel on the traffic and low illumination
ground
ADM Pre start checklist
Feb 2010
ADM Waste dump identified with sign
to ensure tipping on correct dump
B.6.2 Operators Working near water, on Truck bogged, tilted, run 4 4 16 ENG/SEG Reverse alarm on the truck 1 4 4
Truck reversed into tip head soft soil, cracked area. over windrow, tipped over
or drowning into water.
ENG/SEG Safety berms at least 1.5 m high
on edges of waste dump
B.6.3 Operators, Superviro Interaction with people Truck tipped over, load 3 4 12 ADM Supervisor pre inspection 1 4 4
Tipping the load and other unit / Slide tipped over personnel on
material the ground
B.6.4 Operators Interaction with people Collision 3 4 12 ADM Supervisor pre inspection 1 4 4
Truck leaving tipping head and other unit
Feb 2010
ADM Lower bucket before driving off.
Feb 2010
Risk Assessment Team
Team Members :
(PM/Delegated)
Feb 2010
Uncontrolled Document When Printed 41 of 142 LCI-HSE-FM-001A(01)
Feb 2010
Uncontrolled Document When Printed 42 of 142 LCI-HSE-FM-001A(01)
Feb 2010
PT. UNITEDA ARKATO
Approved By
(PM/Delegated)
Note: Attach meeting attandance if more.
Hirarchy Control
Hirarchy Control
Risk Identified
People /
Process / Activity / Task Environment at Hazard / Cause of Incident / Adverse L1 C1 RFN ** Current Mitigating Controls L2 C2 RRN * Additional Controls Re
Risk Adverse Effect / Effect / Environmental
Environmental Aspect Impact
B.7.1 Operators Truck reversed into Fatality, Permanent 4 4 16 ADM Dozer operator trained and 1 4 4
Dozer pushes the dumped load working dozer Disability, Long term competend
absence due to treatment
B.7.2 Operators Inadequate windrow Fatality, Permanent 4 4 16 ENG/S Safety berm must always be 1 4 4
Dozer build tip head windrow height, truck impacting Disability, Long term EG maintained and 1.5 m high
working dozer absence due to treatment
Feb 2010
Team
: Project Manager
Feb 2010
PT. UNITEDA ARKATO
Approved By :
(PM/Delegated)
Note: Attach meeting attandance if more.
Hirarchy Control
Hirarchy Control
Risk Identified
People /
Process / Activity / Task Environment at Hazard / Cause of Incident / Adverse L1 C1 RFN ** Current Mitigating Controls L2 C2 RRN * Additional Controls Req
Risk Adverse Effect / Effect / Environmental
Environmental Aspect Impact
B.8.1 Operator Unlevel ground Dozer rolled over on the 3 4 12 ADM Dozer operator trained 1 4 4
Dozer smoothing the slope surface slope
ADM Supervision
ENG/S Planning
EG
Low ilumination Dozer rolled over on the 3 4 12 ADM L Plant at night time 1 4 4
slope
B.8.2 Operator Interaction with other unit Dozer working side ways 3 4 12 ENG/S No DT closer that 50 form dozing 1 4 4
Dozer spreading top soil and rolled over EG work
Feb 2010
ADM Survey pegs placed out
ADM Supervision
ADM Planning
B.8.3 Operator Misscommunication Small digger impacted by 3 4 12 ADM Supervision indicate where 1 4 4
Contour drainage working dozer, digger drainage should be done
rolled over on the slope
Feb 2010
m
Project Manager
Feb 2010
Uncontrolled Document When Printed 48 of 142 LCI-HSE-FM-001A(01)
Feb 2010
PT. Leighton Contractors Indonesia
RISK ASSESSMENT REPORT
Business Unit / Project : BU3/ID212/MSJ Coal Mine Project Risk Assessment Team
Hirarchy Control
Hirarchy Control
Risk Identified
People /
Process / Activity / Task Environment at L1 C1 RFN ** Current Mitigating Controls L2 C2 RRN * Additional Contro
Hazard / Cause of Adverse Incident / Adverse Effect /
Risk
Effect / Environmental Aspect Environmental Impact
C.11.1 Driver Interaction with other unit DT collision with OB truck, 4 4 16 ADM Radio contact prior approach the LP, 1 4 4
DT maneuver into loading position impacted by moving dozer Eye contact with the digger opt (if
or working grader due to possible)
poor visibility or
congestion, DT roll over,
coal digger swing and hit
cabin
C.11.3 Driver Interaction with other unit Reversed and impacted 4 4 16 ENG/ Maintain 10 meters distance with the 1 4 4
Coal DT queueing at loading point each other due to blind SEG other DT in the front
spot or narrow loading
point
Approved By :
(PM/Delegated)
Approved By :
(PM/Delegated)
Note: Attach meeting attandance if more.
Hirarchy Control
Hirarchy Control
Risk Identified
People /
Process / Activity / Task Environment at Hazard / Cause of Incident / Adverse L1 C1 RFN ** Current Mitigating Controls L2 C2 RRN * Additional Controls Req
Risk Adverse Effect / Effect / Environmental
Environmental Aspect Impact
D.9.1 Mechanics Interaction with other Personnel impacted by 4 4 16 ADM Assign competent spotters to 1 4 4
Bring large equipment IN and OUT of service object and people moving equipment while guide the truck while in and out
bays being positioned the service bays
ADM Ensure area clear and clean from
spillage or parts on the floor
Feb 2010
D.9.3 Mechanics Hydroulic pressure High pressure released 3 4 12 ADM Apply energy isolation (lock out 1 4 4
Servicing pressurized vessels due to improper energy tag out)
isolation
ADM Competent mechanics only and
under full supervision
D.9.4 Mechanics Hydroulic pressure High pressure released 3 4 12 ADM Ensure correct tools for the job 1 4 4
Servicing equipment using compressed air / due to improper energy
compressed gas cylinders isolation
ADM Authorized / competent
mechanics only
D.9.5 Mechanics Hot work/flame Equipment catch on fire 3 4 12 ADM Hot Work Permit 1 4 4
Hot works on heavy equipment other than on it's
buckets or boom
ADM Competent persons only
D.9.6 Mechanics Heavy part Dropped object, crushed 4 4 16 ADM Risk assessment (Take 5) 1 4 4
Engine remove and install by moving parts, sharp
objects
ADM Avoid pinch point
Feb 2010
am
Feb 2010
Uncontrolled Document When Printed 56 of 142 LCI-HSE-FM-001A(01)
Feb 2010
PT. UNITEDA ARKATO
Approved By :
(PM/Delegated)
Note: Attach meeting attandance if more.
Hirarchy Control
Hirarchy Control
Risk Identified
People /
Process / Activity / Task Environment at Hazard / Cause of Incident / Adverse L1 C1 RFN ** Current Mitigating Controls L2 C2 RRN * Additional Controls Req
Risk Adverse Effect / Effect / Environmental
Environmental Aspect Impact
C.10.1 People Interaction with other Run over by moving large 4 4 16 ADM Low gear prior entering the yard 1 4 4
Large equipment entering workshop yard object and people equipment, imapcting
each other
C.10.2 Wash bay crew Interaction with other Run over by moving large 3 4 12 ADM Engage low gear 1 4 4
Large equipment entering wash bay object and people equipment
Feb 2010
ADM Ensure wash bay clear of mud to
avoid skidded while entering bay
C.10.3 People Blind spot and interaction Tray impacting cabin while 4 4 16 ADM No reversing without assistance 1 4 4
Reversing large equipment / truck for parking with other object and reversing blind spot, of spotters
people people run over truck due
to congested space
Feb 2010
am
Feb 2010
Uncontrolled Document When Printed 60 of 142 LCI-HSE-FM-001A(01)
Feb 2010
PT. UNITEDA ARKATO
Approved By :
(PM/Delegated)
Note: Attach meeting attandance if more.
Risk Identified
People /
Process / Activity / Task Environment at Hazard / Cause of Incident / Adverse L1 C1 RFN ** Current Mitigating Controls L2 C2 RRN * Additional Controls Req
Risk Adverse Effect / Effect / Environmental
Environmental Aspect Impact
c.11.1 Mechanics, Unlevel ground and Crane tipped over, 4 4 16 ADM Set up crane on a stable ground 1 4 4
Bucket change Supervisor unstable ground overturned, collapsed,
Interaction with people Collision 4 4 16 ENG/S Clear lifting radius from un- 1 4 4
EG authorized personnel
Unstandart lifting gear Sling snapped, dropped 4 4 16 ADM Ensure all lifting gear and 1 4 4
load equipment inspected and color
coded correctly
Working at height Fall from height, Falling 4 4 16 ENG/S Fall protection for work at height 1 4 4
object EG or man basket
C.11.2 Mechanics, Hot work Arc welding injury, hot 4 4 16 PPE Welding personnal protective 1 4 4
Welding and Cutting Supervisor metals, fire and explosion equipment
of compressed gas cyl
ENG/S Keep combustible or flamable
EG away from the affected area
Feb 2010
C.11.3 Mechanics, Hyrdoulic pressure High pressure released 3 4 12 ENG/S Apply energy isolation (lock out 1 4 4
Hydraulic repair / stored energy Supervisor EG tag out)
C.11.4 Mechanics, Uncontroled movement of load dropped, crushed by 4 4 16 ADM Set up crane on a stable ground 1 4 4
Hydraulic cylinders change Supervisor suspended load, mis moving objects
communication during
installation
C.11.5 Mechanics, Heavy parts Hit object and people 4 4 16 ADM Lift plan required for complex 1 4 4
Under carriage change Supervisor lifting
C.11.6 Mechanics, Heavy parts Hit object and people 3 4 12 ADM Lift plan required for complex 1 4 4
Engine remove and Install Supervisor lifting
Feb 2010
am
Project Manager
Feb 2010
Uncontrolled Document When Printed 64 of 142 LCI-HSE-FM-001A(01)
Feb 2010
PT. UNITEDA ARKATO
Approved By :
(PM/Delegated)
Note: Attach meeting attandance if more.
Hirarchy Control
Hirarchy Control
Risk Identified
People /
Process / Activity / Task Environment at Hazard / Cause of Incident / Adverse L1 C1 RFN ** Current Mitigating Controls L2 C2 RRN * Additional Controls Req
Risk Adverse Effect / Effect / Environmental
Environmental Aspect Impact
C.12.1 Tyreman Fatigue / defect material, Tyre burst 4 4 16 ENG/S Tyres should be inflated only in a 1 4 4
Inflate tyre over pressure. EG restraining device (e.g. tyre
cage), which will contain flying
parts should a blow off occur
Feb 2010
BHV No person stand next to tyre
while inflating
C.12.2 Tyreman Equipment movement, Struck by moving 4 4 16 ENG/S Parking break is on, wheel chock 1 4 4
Stripping tyre improper tools used, equipment, hit by bead EG in place and put the padlock &
incompetent personnel, breaker, hit by hammer, danger tag on isolation point.
fatigue, wrong work flying objects, hearing
method used, Execive loss.
noise.
Feb 2010
PPE Helmet, ear plug, hand gloves,
safety glass, safety shoes.
C.12.3 Tyreman, Opt Tyre Equipment movement, Struck by moving 4 4 16 ENG/S Parking break is on, wheel chock 1 4 4
Change tyre Handler improper tools used, equipment, falling tyre EG in place and put the padlock &
incompetent personnel, danger tag on isolation point.
fatigue, wrong work
method used. ENG/S Put the certified and correct size
EG stand underneath the equipment.
C.12.4 Tyreman Hot tyre Tyre burst 3 4 12 ENG/S Stop DT at safe place, stay away 1 4 4
Hot tyre inspection EG from any moving equipment.
C.12.5 Tyreman, pedestrian Metal splinters, hit by hammer 4 3 12 ADM Use standart tool 1 3 3
Branding rim
Feb 2010
C.12.6 Tyreman, truck crew Uncontroll movement Fall from height, crushed 4 4 16 ENG/S Use tyre handler to grab the tyre 1 4 4
Load/unload tyre from/to truck by falling tyre EG
Feb 2010
am
Project Manager
Feb 2010
Uncontrolled Document When Printed 70 of 142 LCI-HSE-FM-001A(01)
Feb 2010
Uncontrolled Document When Printed 71 of 142 LCI-HSE-FM-001A(01)
Feb 2010
Uncontrolled Document When Printed 72 of 142 LCI-HSE-FM-001A(01)
Feb 2010
PT. UNITEDA ARKATO
Approved By :
(PM/Delegated)
Note: Attach meeting attandance if more.
Hirarchy Control
Hirarchy Control
Risk Identified
People /
Process / Activity / Task Environment at Hazard / Cause of Incident / Adverse L1 C1 RFN ** Current Mitigating Controls L2 C2 RRN * Additional Controls Req
Risk Adverse Effect / Effect / Environmental
Environmental Aspect Impact
C.13.1 Electricians Working at height, electric Fall from height, 4 4 16 ADM Qualified electrician to perform 1 4 4 Nil
Replace bulb on lighting tower current electrocuted task
Feb 2010
C.13.2 Electricians Electrical shock Electrocuted 4 4 16 ADM Qualified electrician to perform 1 4 4 Nil
Power Genset termination task
ADM Take 5
C.13.3 Electricians Electrical shock Electrocuted 4 4 16 ADM Isolate work area from unececary 1 4 4 Nil
Working on life electrical circuit people
ADM Take 5
C.13.4 Electricians Electrical shock Electrocuted 4 4 16 ADM Qualified electrician to perform 1 4 4 Nil
Temporary electrical splicing task
Feb 2010
ADM Take 5
Feb 2010
am
Project Manager
Feb 2010
Nil N/A N/A N/A
Feb 2010
Uncontrolled Document When Printed 78 of 142 LCI-HSE-FM-001A(01)
Feb 2010
PT. UNITEDA ARKATO
Approved By :
(PM/Delegated)
Note: Attach meeting attandance if more.
Hirarchy Control
Hirarchy Control
Risk Identified
People /
Process / Activity / Task Environment at Hazard / Cause of Incident / Adverse L1 C1 RFN ** Current Mitigating Controls L2 C2 RRN * Additional Controls Req
Risk Adverse Effect / Effect / Environmental
Environmental Aspect Impact
D.14.1 Road users Uncontrol intersection, Collision, hit safety berm, 4 5 20 PPE Install signs + minimum 100 1 5 5
Intersection design inadequate traffic signs rolled over meters away from intersection
posted, inadequate road
devider or island
ENG/S Build 10 meters road devider at
EG each section
D.14.2 Road users Inadequate traffic signs Collision, hit safety berm, 4 5 20 ADM Install signs + minimum 100 1 5 5
T Junction design posted, inadequate road rolled over meters away from intersection
devider or island
ENG/S Build 10 meters road devider at
EG each section
Feb 2010
D.14.3 Road users Poor visibility (blind spot) Collision, hit safety berm, 4 5 20 ADM Install signs + minimum 100 1 5 5
Y Junction design (if necessary) rolled over meters away from intersection
ADM Reflective
ADM Up dated
D.14.5 Road users Substandard windrow Collision, hit safety berm, 4 4 16 ENG/S Windrow built as per standard 1 4 4
Windrows / road devider design design, windrow height rolled over EG length, width along the edges,
road sides, certain location such
as fuel farms, parking area in the
pit and disposal
D.14.6 Road users Inappropriate Collision, rolled over 4 4 16 ADM Road leading to tipping head 1 4 4
Road design at the disposal identification of road delineated or identified by
leading to dump head windrow from grader blade
ADM Road designed from left to right
to ensure in and out of the trucks
safely
ADM Ensure clean from scattered
rocks or rock projection
D.14.7 Road users Poor risk assessment on Collision, hit safety berm, 4 4 16 ADM Speed limit max 40 km for pit and 1 4 4
Speed limit speed limitation rolled over disposal areas
D.14.8 Road users Narrow road access Collision 4 4 16 ENG/SE • Single lane roadways - 1.5 x 1 4 4
Roadway width vehicle operating width
• Double lane roadways - 3.5 x
vehicle operating width
Feb 2010
D.14.9 Road users High superelevation rate Rolled over 4 4 16 ENG/SESuperelevation rates of 2% - 5% 1 4 4
Superelevation
Feb 2010
am
Project Manager
Feb 2010
TG-H&S-PR-4141-M - TRAFFIC Core
Procedure R11
Feb 2010
TG-H&S-PR-4141-M - TRAFFIC Core
Procedure R11
Feb 2010
PT. UNITEDA ARKATO
Approved By
(PM/Delegated)
Note: Attach meeting attandance if more.
Hirarchy Control
Hirarchy Control
Risk Identified
People /
Process / Activity / Task Environment at Hazard / Cause of Incident / Adverse L1 C1 RFN ** Current Mitigating Controls L2 C2 RRN * Additional Controls R
Risk Adverse Effect / Effect / Environmental
Environmental Aspect Impact
E.15.1 Operator, supervisor, Interaction with other unit Run over by truck, truck 4 4 16 ADM Identify road work location 1 4 4
Tip good material on the road spotter & people impacting each other while
maneuvered
Operators Use mobile phone Collision 4 4 16 ADM Prohibited to bring mobile phone 1 1 1
Feb 2010
ADM Max speed 50 Kph
E.15.2 Operator, supervisor, Interaction with other unit Equipment impacting each 4 4 16 ADM Spotter assigned to control traffic 1 4 4
Dozing road material spotter & people other prior dozing road material
E.15.3 Operator, supervisor, Interaction with other unit Grader maneuver and 4 3 12 ADM Ensure the overall road condition 1 3 3
Grade the road spotter & people impacting other vehicle is not dusty
ADM SIMPER
E.15.4 Operator, supervisor, Interaction with other unit Equipment impacting each 3 4 12 ADM Safety cone placed at both ends 1 4 4
Build windrow / road devider spotter & people other
Feb 2010
ADM Spotter assigned to control traffic
(divert traffic or 2 lanes traffic)
Feb 2010
Team
Feb 2010
Uncontrolled Document When Printed 89 of 142 LCI-HSE-FM-001A(01)
Feb 2010
Uncontrolled Document When Printed 90 of 142 LCI-HSE-FM-001A(01)
Feb 2010
PT. UNITEDA ARKATO
Approved By :
(PM/Delegated)
Note: Attach meeting attandance if more.
Hirarchy Control
Hirarchy Control
Risk Identified
People /
Process / Activity / Task Environment at Hazard / Cause of Incident / Adverse L1 C1 RFN ** Current Mitigating Controls L2 C2 RRN * Additional Controls Req
Risk Adverse Effect / Effect / Environmental
Environmental Aspect Impact
E.16.1 Operator, supervisor, Interaction with other Run over by moving heavy 4 4 16 ADM Graded ripping and grading down 1 4 4
Ripping and Grading spotter equipment equipment, Grader hill and when the condition permit
impacting trucks while (dry and dust properly controlled)
maneuvered
Operators Use mobile phone Collision 4 4 16 ADM Prohibited to bring mobile phone 1 1 1
Feb 2010
ADM Max speed 40 Kph
E.16.2 Operator, supervisor, Unlevel ground and Tipped over while tipping 4 4 16 ADM Inform to all trucks in the affected 1 4 4
Back filling pot holes spotter interaction with other the load area
equipment/people
Interaction with other Run over by moving heavy 4 4 16 ADM Spotter assigned to control the 1 4 4
equipment/people equipment, Trucks traffic
impacting each other due
to narrow road,
ADM SIMPER
E.16.3 Operator, supervisor, Interaction with other Crushed by moving 4 4 16 ADM inform to all trucks in the affected 1 4 4
Drainage works spotter unit / people / structure equipment, impacted by area
bucket of excavator while
being swung
ADM Traffic signs, spotter assigned to
control the traffic
E.16.4 Operator, supervisor, Interaction with other Run over by moving heavy 4 4 16 ADM Inform to all vehicle in the 1 4 4
Build windrow / road devider spotter unit / people / structure equipment, Trucks affected area
impacting each other due
to narrow road, Tipped
over while tipping the load,
excavator swing into other
moving equipment nearby
Feb 2010
ADM Do not swing to direction of traffic
flow
Feb 2010
Team
Project Manager
Feb 2010
Uncontrolled Document When Printed 95 of 142 LCI-HSE-FM-001A(01)
Feb 2010
Uncontrolled Document When Printed 96 of 142 LCI-HSE-FM-001A(01)
Feb 2010
PT. UNITEDA ARKATO
Approved By
(PM/Delegated)
Note: Attach meeting attandance if more.
Hirarchy Control
Hirarchy Control
Risk Identified
People /
Process / Activity / Task Environment at Hazard / Cause of Incident / Adverse L1 C1 RFN ** Current Mitigating Controls L2 C2 RRN * Additional Controls Re
Risk Adverse Effect / Effect / Environmental
Environmental Aspect Impact
F.17.1 Driver and Blind spot Struck by heavy 4 5 20 ENG/S Separation lane between heavy 1 5 5
LV/Medium vehicle traveling in the pit passengers equipments EG equipments & Light/medium
vehicle tracks
Slippery road Collision with other 4 5 20 ENG/S Scrap the road using grader 1 5 5
vehicle, hit windrow, roll EG
over
ENG/S Vehicles must have 4x4 FWD
EG
Feb 2010
Speeding Collision with other 4 5 20 ENG/S Standard Safety berm 1 5 5
vehicle, hit windrow, roll EG
over
ADM Driver must has valid PIT
SIMPER
ADM Speed Limit signs
BHV Drive to condition
ADM Traffic Management Training
Fatigue Collision with other 4 5 20 ENG/S Standard Safety berm on haul 1 5 5
vehicle, hit windrow, roll EG road
over
ENG/S All LVs and Manhauls have
EG ROPS intalled.
F.17.3 Driver and Uncontrolled intersection Collision with other 4 5 20 ENG/S Provide road divider on 1 5 5
Vehicle approaching intersections passengers vehicle, hit windrow, roll EG intersection
over
Feb 2010
ADM Accelerate while crossing the
intersection
F.17.4 Trainee & Trainer Unskilled operator Collision with other 4 4 16 ENG/S All LVs and Manhauls have 1 4 4
Vehicle operated by Trainee vehicle, hit windrow, roll EG ROPS intalled.
over
ADM Don’t drive solo, trainer shall
accompany the trainee at all time
F.17.5 Driver or operator Uncontrolled low boy Collision with other 4 4 16 ENG/S Escort the low boy 1 4 4
Heavy haulage with low boy movement; blind spot. vehicle, impacting other EG
vehicle while maneuvering
Low boy crew Broken / Loosen sling Sling snapped while 4 4 16 ENG/S Use correct sling and in good 1 4 4
securing the load and fall EG condition.
onto people, load fall while
crawling to the bed
ADM Inspect all sling by competent
person and make sure all the
sling have been tagged
Feb 2010
ADM Clear away un-necessary
personnel from the area while
load and un-load
F.17.6 Driver and Uncontrolled unit/ vehicle Collision with other 3 3 9 ENG/S Vehicles must have 4x4 FWD 1 3 3
Service vehicle in pit passengers movement. vehicle, hit windrow, roll EG
over
Driver and Overheat unit/ vehicle Unit on fire 3 3 9 ADM Pre-start check at the beginning 1 3 3
passengers of the shift shall cover spillage
potential on the hot parts of the
equipment
ADM Ensure engines do not over
heated by ensuring coolent
system properly
ADM Train driver on basic fire fighting
Feb 2010
t Team
: Mining Supt
: Project Manager
IAM-ASP-PRO-024(02) Specification of
assets
Feb 2010
Uncontrolled Document When Printed 102 of 142 LCI-HSE-FM-001A(01)
Feb 2010
Uncontrolled Document When Printed 103 of 142 LCI-HSE-FM-001A(01)
Feb 2010
Uncontrolled Document When Printed 104 of 142 LCI-HSE-FM-001A(01)
Feb 2010
PT. UNITEDA ARKATO
Approved By
(PM/Delegated)
Note: Attach meeting attandance if more.
Hirarchy Control
Hirarchy Control
Risk Identified
People /
Process / Activity / Task Environment at Hazard / Cause of Incident / Adverse L1 C1 RFN ** Current Mitigating Controls L2 C2 RRN * Additional Controls Re
Risk Adverse Effect / Effect / Environmental
Environmental Aspect Impact
F.18.1 Driver and Parking at the hauling Run over by moving truck, 4 5 20 ENG/S Provide fundamentally stable 1 4 4
Vehicle parking in the pit due to breakdown passengers road impacted by working dozer EG parking area
or grader
ADM Installed wheel chock
F.18.2 Driver and Close interaction with Run over by moving truck, 4 5 20 ENG/S Provide LV parking area, drive 1 5 4
LV/Medium vehicle parking at disposal / Loading passengers heavy equipment impacted by working dozer EG through parking fundamentaly
area or grader stable
ENG/S Parked up at safe place such as
EG near lighting plant or lighting
tower and bundwall as barricade
ADM Supervise on the disposal
Feb 2010
t Team
: Mining Supt
: Project Manager
Feb 2010
PT. UNITEDA ARKATO
Approved By
(PM/Delegated)
Note: Attach meeting attandance if more.
Hirarchy Control
Hirarchy Control
Risk Identified
People /
Process / Activity / Task Environment at Hazard / Cause of Incident / Adverse L1 C1 RFN ** Current Mitigating Controls L2 C2 RRN * Additional Controls Re
Risk Adverse Effect / Effect / Environmental
Environmental Aspect Impact
F.19.1 Rescue team, Rescue equipment fingers pinched 4 4 16 ENG All rigging equipment inspected 1 4 4
Install Sling supervisor failures, mis-
communication
ENG Use suitable equipment to
recover the rolled over equipment
Feb 2010
4 4 16 ADM competent operator and has 1 4 4
Collision with other vehicle Simper
Operator incompetent
on the road
Feb 2010
t Team
: Project Manager
Feb 2010
Uncontrolled Document When Printed 110 of 142 LCI-HSE-FM-001A(01)
Feb 2010
PT. UNITEDA ARKATO
Approved By
(PM/Delegated)
Note: Attach meeting attandance if more.
Hirarchy Control
Hirarchy Control
Risk Identified
People /
Process / Activity / Task Environment at Hazard / Cause of Incident / Adverse L1 C1 RFN ** Current Mitigating Controls L2 C2 RRN * Additional Controls Re
Risk Adverse Effect / Effect / Environmental
Environmental Aspect Impact
F.20.1 Dewatering crew Fall into pond and 4 4 16 PPE Life jacket shall be worn if 1 4 4
Working on sediment ponds Slippery drowning working inside of the bund wall
F.20.2 Dewatering crew, Fall into deep river / lake 4 4 16 ADM Fill the water cart only from 1 4 4
Pumping water from river or lake water cart driver Slippery and drowning designated water filling point,
Feb 2010
H.31.3 Supervisor, survey Slippery Fall into the sea and 4 4 16 PPE Crew wearing life jacket. 1 4 4
Working at port or jetty crew, operators drowning
Feb 2010
t Team
: Project Manager
Feb 2010
Uncontrolled Document When Printed 114 of 142 LCI-HSE-FM-001A(01)
Feb 2010
PT. UNITEDA ARKATO
Approved By
(PM/Delegated)
Note: Attach meeting attandance if more.
Hirarchy Control
Hirarchy Control
Risk Identified
People /
Process / Activity / Task Environment at Hazard / Cause of Incident / Adverse L1 C1 RFN ** Current Mitigating Controls L2 C2 RRN * Additional Controls Re
Risk Adverse Effect / Effect / Environmental
Environmental Aspect Impact
F.21.1 Fuel farm crew Blind spot Truck run over fuel farm 4 4 16 ENG/S Bund wall around the fuel 1 4 4
Trucks entering fuel farm crew EG tankAuthorized operator
ADM Spotter
Speeding Truck run over fuel farm ENG/S Speed limit 10km
crew EG
F.21.2 Operator Blind spot Truck run over fuel farm 4 4 16 ADM Bund wall around the fuel tank 1 4 4
Truck exiting fuel farm crew
Feb 2010
ADM Spotter
Speeding Truck run over fuel farm ENG/S Speed limit 10km
crew EG
F.21.3 Fuel farm crew Tangki / hose fuel leaking Truck fire, run over, Oil 3 4 12 ADM Wheel chocked 1 4 4
Fuel transfer from tank to truck spilled into ground
Feb 2010
t Team
: Project Manager
Feb 2010
Uncontrolled Document When Printed 118 of 142 LCI-HSE-FM-001A(01)
Feb 2010
PT. UNITEDA ARKATO
Approved By
(PM/Delegated)
Note: Attach meeting attandance if more.
Hirarchy Control
Hirarchy Control
Risk Identified
People /
Process / Activity / Task Environment at Hazard / Cause of Incident / Adverse L1 C1 RFN ** Current Mitigating Controls L2 C2 RRN * Additional Controls Re
Risk Adverse Effect / Effect / Environmental
Environmental Aspect Impact
F.22.1 People The workers not use body Fall from height 4 4 16 ADM Trained people only to work at 1 4 4
Working on scaffold or work platform harness height
Competent person only to erect
scaffold.
ADM Competent person only to erect
scaffold.
F.22.2 People Ladders broken, ladders Fall from height 4 4 16 ADM Inspect ladders from cracks, 1 4 4
Descending / accending ladders non standart damaged
F.22.3 People The workers not use body Fall from height, platform 4 4 16 PPE Full body harnesses 1 4 4
Suspended work platforms harness collapsed, crane
overturned
ADM Competent person only
Feb 2010
ADM Within rated capacity
Feb 2010
Team
: Project Manager
Feb 2010
Uncontrolled Document When Printed 122 of 142 LCI-HSE-FM-001A(01)
Feb 2010
PT. UNITEDA ARKATO
Approved By
(PM/Delegated)
Note: Attach meeting attandance if more.
Hirarchy Control
Hirarchy Control
Risk Identified
People /
Process / Activity / Task Environment at Hazard / Cause of Incident / Adverse L1 C1 RFN ** Current Mitigating Controls L2 C2 RRN * Additional Controls Re
Risk Adverse Effect / Effect / Environmental
Environmental Aspect Impact
F.23.1 Crane crew Miscommunication Load fall and crush 4 5 20 ADM Risk assessment completed prior 1 5 5
Lifting the load using more than one crane or between the operator and people, crane tipped over, lifting (JSEA, Lift Plan)
lifting the load with unknown weight or center of rigger crane collapsed due to
grafity improperly set up on well
compacted ground
F.23.2 Crane crew Miscommunication Load fall and crush 4 5 20 ADM Risk assessment completed prior 1 5 5
Routine lifting using single crane / lifting between the operator and people, crane tipped over, lifting (Take 5, ref to JSEA)
equipment rigger crane collapsed due to
improperly set up on well
compacted ground
Feb 2010
ADM All lifting gears inspected and
certified
Feb 2010
t Team
: Project Manager
Feb 2010
Uncontrolled Document When Printed 126 of 142 LCI-HSE-FM-001A(01)
Feb 2010
PT. UNITEDA ARKATO
Approved By
(PM/Delegated)
Note: Attach meeting attandance if more.
Hirarchy Control
Hirarchy Control
Risk Identified
People /
Process / Activity / Task Environment at Hazard / Cause of Incident / Adverse L1 C1 RFN ** Current Mitigating Controls L2 C2 RRN * Additional Controls Re
Risk Adverse Effect / Effect / Environmental
Environmental Aspect Impact
F.24.1 Welding crew Flammable gas or liquid Explosion, 3rd degree 4 5 20 ENG/S Energy isolation, Clear the area 1 5 5
Hot work adjacent to fuel storage leaking, spark burns EG from combustible / flammable
materials.
ENG/S Fire extinguisher available nearby
EG
F.24.2 Welding crew Flammable / combustable Explosion, 3rd degree 4 5 20 Eliminat Remove the flammable / 1 5 5
Hot work in a confined spaces materials, Ventilation burns, toxicated, ion combustable materials out from
deficient asphexiated confined space
Eliminat Wash the fuel/oil tank out with
ion water and dispensant if available
to remove the flammable material.
ENG/S Energy isolation
EG
Feb 2010
ENG/S Adequate Ventilation / Exhaust fan
EG
Feb 2010
Team
: Project Manager
Feb 2010
Uncontrolled Document When Printed 130 of 142 LCI-HSE-FM-001A(01)
Feb 2010
PT. UNITEDA ARKATO
Approved By
(PM/Delegated)
Note: Attach meeting attandance if more.
Hirarchy Control
Hirarchy Control
Risk Identified
People /
Process / Activity / Task Environment at Hazard / Cause of Incident / Adverse L1 C1 RFN ** Current Mitigating Controls L2 C2 RRN * Additional Controls Re
Risk Adverse Effect / Effect / Environmental
Environmental Aspect Impact
F.25.1 Crane crew Overcapacity Crane tipped over, 4 4 16 ADM All lifting equipment inspected 1 4 4
Lifting steel scraps dropped objects, sling before used
snapped, slip, trip and fall,
serious cuts
ADM Rigging and lifting done by
competent persons
F.25.2 Corrosive, burn, toxic, 3 5 15 ADM Identify the the source of waste 1 5 5
Chemical hazardous waste disposal bacteria, inhalation,
Environmental crew Did not have a landfill ingestion, absorbtion
through the skin
ADM Folllow instruction from MSDS
Feb 2010
PPE PPE worn properly
Feb 2010
t Team
: Project Manager
Feb 2010
Uncontrolled Document When Printed 134 of 142 LCI-HSE-FM-001A(01)
Feb 2010
PT. UNITEDA ARKATO
Approved By
(PM/Delegated)
Note: Attach meeting attandance if more.
Hirarchy Control
Hirarchy Control
Risk Identified
People /
Process / Activity / Task Environment at Hazard / Cause of Incident / Adverse L1 C1 RFN ** Current Mitigating Controls L2 C2 RRN * Additional Controls Re
Risk Adverse Effect / Effect / Environmental
Environmental Aspect Impact
F.26.1 Paassengers, Lost, entering restricted Vehicle roll over, new 4 4 16 ADM Complete pre start check 1 4 4
Personnel entering site driver,Visitor, areas personnel, wrong route
unauthorized
personnel
Feb 2010
t Team
: Project Manager
Feb 2010
Risk Evaluation
Legend
Hirarchy control
EL/SUB Elimination/Subtitution
ENG/SEG Engineering/Segregation
ADM Administration
BHV Behaviour
PPE Personal Protective Equipment
Residual Risk Number (RRN)
1-2: Negligible
3-5: Minor L1 Likelihood as is
6-9: Moderate L2 Likelihood with mitigating controls in place
10-15: Major C1 Consequence as is
16-25: Substantial C2 Consequence with mitigating controls in place
ing controls in place