UNITEDA ARKATO CLASS #1 POTENTIAL RISKS REGISTER

A PIT B DISPOSAL C PLANT D TRAFFIC MANAGEMENT E ROAD WORK F GENERIC


1. Land Clearing 6. Tipping the Load 9. Workshop Daily Servicing 14. Road Traffic Design 15. Constructing New Road 17. Vehicle Interaction
1 Cutting trees using excavator or dozer 1 Truck entering disposal area 1 In / out heavy equipment at bays 1 Intersection design 1 Tip good material on the road 1 LV / medium vehicle traveling in the pit
2 Logging 2 Truck reversed into tip head 2 Stored energy 2 T Junction design 2 Dozing road material 2 LV / medium vehicle traveling in the dump
3 Chainsaw operation 3 Tipping the load 3 Pressurize vessels 3 Y Junction design 3 Grade the road 3 Vehicle approaching intersections
4 Trimming and Barking 4 Truck leaving tipping head 4 Compressed air 4 Traffic signs 4 Build windrow / road devider 4 Vehicle / Equipment servicability
5 Clear up surface 5 Hot works 5 Windrows / road devider design 5 Fatigue / Fitness for work
7. Dump Support 6 Engine remove and install 6 Road design at the disposal 16. Roads Maintaining 6 Unskilled operator / driver
2. Loading and Floor Works 1 Dozer pushes the dumped load 7 Speed limit 1 Ripping / grading 7 Heavy haulage with low boy
1 Loading preparation (clean up, leveling, windrow) 2 Dozer build tip head windrow 10. Traffic Management 8 Roadway width 2 Back fill pot holes 8 Equipment catch fire
2 1 9 Superelevation 3 Drainage
Truck, other mobile equipment and LV are entering and out of loading point Vehicle enter / exit workshop yard
3 Loading the truck 8. Sloping Works 2 Vehicle enter / exit wash bay 18. Parking
4 Loading the truck under high wall 1 Smoothing 3 Parking area and reversing 1 LV parking in the pit
5 Truck queueing to be loaded 2 Spreading top soil 2 LV parking at the disposal
6 Floor clean up 3 Contour drainage 11. Excavator Maintenance
1 Bucket change 19. Equipment Recovery / Towing
3. Hauling 2 Hydraulic repair 1 Truck rolled over recovery
1 Trucks traveling on steep ramp 3 Welding and Cutting 2 Towing broken down equipment
2 Truck traveling on wet ramp 4 Hydraulic cylinder change 3 Towing lighting plant / Lighting tower
3 Truck traveling on intersection 5 Undercarriege change 4 Setting up lighting plant
4 Truck travelling on sharp corner 6 Engine remove and install
5 Traveling on dusty road 20. Working Near or Over Water
6 General travel 12. Tyre Management 1 Sediment pond
1 Inflate tyre 2 River / lake
4. Battering / Sloping 2 Stripping tyre 3 Port / jetty
1 Excavator travelling to the designated area 3 Change tyre
2 Excavator cutting butter and sloping high wall 4 Hot tyre inspection
3 Cutting batter adjacent to haul road 5 Branding rim 21. Fueling at Fuel Farm
6 Load / unload tyre from / to truck 1 Truck entering fuel farm
5. Dewatering in the Sump 2 Truck exiting fuel farm
1 Towing pump to the sump 13. Electrical Works 3 Fuel transfer
2 Slide pump pontton into the sump 1 Replace bulb lighting tower 4 Truck inspection
3 Connect HDPE to the pump over the sump 2 Power genset termination
4 Connect HDPE at the wall (High wall / low wall) 3 Working on life electrical circuit 22. Working at Height
5 Refueling pump in the sump (Working near or over water) 4 Temporary electrical splicing 1 Scaffolding / work platform
6 Pump inspection and repair 2 Deep excavation / unprotected edge
7 Using crew boat from edge to pump back and forth 3 Descending / accending ladders
4 Suspended work platform

23. Lifting and Rigging


1 Complex lifting
2 Routine lifting

24. Welding and Cutting


1 Hot works adjacent to fuel storage
2 Hot works in confined spaces

25. Hazardous Waste Disposal


1 Scrap metal
2 Chemical waste disposal

26. Security
1 Personnel entering site
2 Security patrol
3 Security gate check
DAFTAR CLASS 1 RISK UP-DATE UNITEDA ARKATO
NO PROCESS / ACTIVITY APPROVAL DATE LAST UPDATE NEXT UPDATE
A.1 A.1.PIT-Land Clearing'!A1 10-Jan-17 10-Jan-18
A.2 A.2.PIT-LoadingAndFloorWorks'!A1 10-Jan-17 10-Jan-18
A.3 A.3 PIT-Hauling'!A1 10-Jan-17 10-Jan-18
A.4 A.4.PIT-Battering_Sloping'!A1 10-Jan-17 10-Jan-18
A.5 A.5.PIT-Dewatering'!A1 10-Jan-17 10-Jan-18
B.6 B.6.DISP-Tipping'!A1 10-Jan-17 10-Jan-18
B.7 B.7.DISP-DumpSupport'!A1 10-Jan-17 10-Jan-18
B.8 B.8.DISP-Sloping'!A1 10-Jan-17 10-Jan-18
C.9 C.9.PLANT-WSDaily'!A1 10-Jan-17 10-Jan-18
C.10 C.10.PLANT-Traffic'!A1 10-Jan-17 10-Jan-18
C.11 C.11.PLANT-ExcMaint'!A1 10-Jan-17 10-Jan-18
C.12 C.12.PLANT-TyreMgt'!A1 10-Jan-17 10-Jan-18
C.13 C.19.PLANT-Electrical'!A1 10-Jan-17 10-Jan-18
D.14 D.14.TRAFFIC-Design'!A1 10-Jan-17 10-Jan-18
E.15 E.15.ROAD-ConstRoad'!A1 10-Jan-17 10-Jan-18
E.16 E.16.ROAD-Maintenance'!A1 10-Jan-17 10-Jan-18
F.17 F.17.GEN-Vehicleinteraction (2'!A1 10-Jan-17 10-Jan-18
F.18 F.18.GEN-Parking (2)'!A1 10-Jan-17 10-Jan-18
F.19 F.19.GEN-EquipRecovery (2)'!A1 10-Jan-17 10-Jan-18
F.20 H.31.GEN-NearWater (2)'!A1 10-Jan-17 10-Jan-18
F.21 F.21.GEN-Fueling (2)'!A1 10-Jan-17 10-Jan-18
F.22 F.22.GEN-WAH (2)'!A1 10-Jan-17 10-Jan-18
F.23 F.23.GEN-Lifting (2)'!A1 10-Jan-17 10-Jan-18
F.24 F.24.GEN-Welding (2)'!A1 10-Jan-17 10-Jan-18
F.25 F.25.GEN-WasteDisposal (2)'!A1 10-Jan-17 10-Jan-18
F.26 F.26.GEN-Security (2)'!A1 10-Jan-17 10-Jan-18
RESPONSIBLE DEPT STATUS REMARK
Mining Routine HSE
Mining Routine HSE
Mining Routine HSE
Mining Routine HSE
Mining Routine HSE
Mining Routine HSE
Mining Routine HSE
Mining Routine HSE
Plant Routine HSE
Plant Routine HSE
Plant Routine HSE
Plant Routine HSE
Plant Routine HSE
Mining Routine HSE
Mining Routine HSE
Mining Routine HSE
Mining Routine HSE
Mining Routine HSE
Mining Routine HSE
Mining Routine HSE
Plant Routine HSE
Plant Routine HSE
Plant Routine HSE
Plant Routine HSE
Plant Routine HSE
Admin & HR Routine HSE
PT. UNITEDA ARKATO

RISK ASSESSMENT REPORT

Risk Assessment Team


Business Unit / Project : UA/HSE-HO/BSI Gold Mine Project
Names Dept - Position Sign Off
Date : 10-Jan-17

Team Leader : Prod Manager Team Members :


Reference Number : A.1.PIT-Land Clearing
Facilitator : HSE Supt :

Process/Activity : Team Members : Mining Supt


Land Clearing

Mining Supt Approved By :

(PM/Delegated)
Note: Attach meeting attandance if more.

Hirarchy Control

Hirarchy Control
Risk Identified
People /
Process / Activity / Task Environment at Hazard / Cause of Incident / Adverse L1 C1 RFN ** Current Mitigating Controls L2 C2 RRN * Additional Controls Required
Risk Adverse Effect / Effect / Environmental
Environmental Aspect Impact

A.1.1. 4 4 16 ENG/S ROPs installed in the excavator and 1 4 4 Using excavator for clearing to be
Cutting trees using excavator or dozer Operator in the cabin Equipment in the radius Tree falls over the EG dozer. ADM included in the UA-HSE-SOP-020
of equipment of falling tree. equipment
Rev.01 Clearing
ADM Dozer/Excavator stand on the safe
side while pushing /breaking tree

ADM Operator to check the tree & wind


direction before cutting the tree. Do
not push the tree when oblique
toward the dozer or wind direction
toward the dozer

ADM Operator must has been trained &


has valid SIMPER

ADM Pre-Start Inspection on equipment


& Work Location

ADM Pre start meeting prior to


commencing the tasks

All personnel near Complaint from villager Demonstration / 4 3 12 ADM Client to conform the area is 'clear' 1 3 3
cutting activity disturbance by villager to be cleared before commencing
the task.
ADM Client representative and policeman
must be present during cutting
activity where necessary.

BHV All personnel never fighting back


agains the villager.

Uncontrolled Document When Printed 7 of 142 LCI-HSE-FM-001A(02)

Feb 2010
Supervisor, People in the radius of Tree falls over the people 4 4 16 ENG/S No one should stay in the 60m 1 4 4
personnel, villager on falling tree. on the ground. EG radius of falling tree.
ground
ADM Pre start meeting prior to
commencing the tasks

ADM Radio communication available for


heavy equipment operator and the
supervisor.
PPE Always wear standard PPE, safety
boots, helmet, safety glass and high
visibility clothes / vest.

ADM Fully supervised by an experience


supervisor

Blind spot of equipment Unit run over or struck 4 5 20 ENG/S No personnel should stand behind 1 5 5
personnel on the ground EG or in 30m radius of working
equipment.
ADM Operator must has been trained &
has valid SIMPER

PPE Always wear standard PPE, safety


boots, helmet, safety glass and high
visibility clothes / vest.

Wild animal (bee, snake, Animal attacks 5 4 20 BHV Never disturb wild animals. It's 1 4 4
etc.) better leave them or wait until they
run away.
ADM Carry out work prestart briefing.

PPE Wear appropriate PPE such safety


boot, safety glass, Face net cover (if
necessary)

Uncontrolled Document When Printed 8 of 142 LCI-HSE-FM-001A(02)

Feb 2010
Operator in the cabin Working near cliff Dozer / excavator rolled 4 4 16 ENG/S Build a bund 10 meters from the 1 4 4
of equipment over the cliff EG face before dozer / excavator
commences clearing operation.
ADM Operator must has been trained &
has valid SIMPER

A.1.2. Drivers, operators, Uncontrolled movement Log fall from lifting 3 4 12 ENG/S Only use good sling condition and 1 4 4
Logging Chainsaw Crew of log when lifted; broken equipment and hit people EG attach tag line to control log
sling. movement.
ENG/S Never perform lifting above
EG personnel.

ENG/S DO NOT use excavator teeth


EG bucket as ancorage to lift logs. Use
only eye bolt attached on the
bucket.

ADM Competent rigger

PPE Always wear standard PPE, safety


boots, helmet, safety glass, hand
gloves and high visibility clothes /
vest.
A.1.3. Chainsaw operator Kick back, sharp and Cut or hit by chainsaw 4 4 16 ENG/S All safety guards/devices must be in 1 4 4
Chainsaw operation rotating object EG place and in working order.

ADM Only competent chainsaw crew may


operate the chainsaw

ADM Do a pre-start check to components


of chainsaw & the area free from
falling branch prior to commencing
the task

ADM Deadman switch active and working


order

BHV Do not force chainsaw to cut deep


cutst

PPE Always wear standard PPE, safety


boots, helmet, safety glass, hand
gloves and high visibility clothes /
vest.

Chainsaw operator Personnel in the radius of Tree / branch falls over the 4 5 20 ENG/S No personnel should stay in the 1 5 5
and personnel on falling tree, excessive personnel on the ground. EG 60m radius of falling tree. Barricade
ground wind or rain, leaning trees the area when necessary (e.g near
or large branches road).

ADM Only trained / competent person


shall operate chainsaw

ADM No chainsaw activities when there is


excessive wind or rain; No night
chainsaw activities

ADM Carry out work prestart briefing.

Uncontrolled Document When Printed 9 of 142 LCI-HSE-FM-001A(02)

Feb 2010
PPE Always wear standard PPE, safety
boots, helmet, safety glass, hand
gloves and high visibility clothes /
vest.
A.1.4. Chainsaw operator Uncontrolled movement Log hit personnel; 4 3 12 ENG/S No unauthorized personnel in the 1 3 3
Trimming and Barking and personnel on of log when trimming and sawdust entering EG 15m radius from trimming and
ground barking; sawdust. personnel's eye. barking operation.
ADM Only competent chainsaw crew may
operate the chainsaw

PPE Always wear standard PPE, safety


boots, helmet, safety glass, hand
gloves and high visibility clothes /
vest.
Fuel leak Chainsaw burned; soil / 3 2 6 ENG/S Chainsaw fuel tank and fuel 1 2 2
water contamination EG container in good condition. No leak
or modification that may lead to fuel
leak and burnt.

ENG/S Use funnel when refueling chainsaw


EG fuel tank.

BHV DO NOT smoking when working


with fuel.

ADM First aid kits must be available all


the time in the workplace

A.1.5. Operators Uncontrolled movement Wood stump hit cabin 3 4 12 ENG/S Protect the cabs windows by guards 1 4 4
Clear up surface of wood stump when EG (FOPs)
clearing
ENG/S Cut the timber into smaller sections
EG

Supervisor, Blind spot of equipment Unit run over or struck 4 5 20 ENG/S No personnel should stand behind 1 5 5
personnel on ground personnel on the ground EG or in 30m radius of working
equipment.
ADM Operator must has been trained &
has valid SIMPER

PPE Always wear standard PPE, safety


boots, helmet, safety glass and high
visibility clothes / vest.

Uncontrolled Document When Printed 10 of 142 LCI-HSE-FM-001A(02)

Feb 2010
Names Dept. - Position Sign Off

Project Manager

ols Required By whom By When Status Legal and Other Requirements Reference

clearing to be KEPMEN 555.K/26/M.PE/1995 - Article


HSE-SOP-020 255 - Bulldozers

UA-HSE-SOP-020-Clearing

UA-SOP-402- Dozer Operation


IDI212-DEP-SOP-404-Rev.01 Excavator
Operation

UA-PRO-028(02) Equipment Pre Use


Inspection

Uncontrolled Document When Printed 11 of 142 LCI-HSE-FM-001A(02)

Feb 2010
UA-HSE-SOP-004-Rev.01 Personal protective Equipment

Uncontrolled Document When Printed 12 of 142 LCI-HSE-FM-001A(02)

Feb 2010
UA-HSE-SOP-021-Rev.01 Safe Operation of Chainsaw

Uncontrolled Document When Printed 13 of 142 LCI-HSE-FM-001A(02)

Feb 2010
PER.15/MEN/VII/2008 - First Aid Treatment

UA-PRO-024(02) Specification of Assets

Uncontrolled Document When Printed 14 of 142 LCI-HSE-FM-001A(02)

Feb 2010
PT. UNITEDA ARKATO

RISK ASSESSMENT REPORT

Risk Assessment Team


Business Unit / Project : UA/HSE-HO/BSI Gold Mine Project
Names Dept - Position Sign Off
Date : 10-Jan-17

Team Leader : Team Members


Reference Number : A.2.PIT-Loading And Floor Works
Facilitator :

Process/Activity : Team Members :


Loading and Floor Works

Approved By

(PM/Delegated)
Note: Attach meeting attandance if more.

Hirarchy Control

Hirarchy Control
Risk Identified
People /
Process / Activity / Task Environment at Hazard / Cause of Incident / Adverse L1 C1 RFN ** Current Mitigating Controls L2 C2 RRN * Additional Controls Re
Risk Adverse Effect / Effect / Environmental
Environmental Aspect Impact

A.2.1 Operators or Blind spot Excavator swings and hit 4 4 16 ENG/S All Heavy Equipment have closed 1 4 4
Loading preparation (clean up, leveling, personnel on the equipment or personnel EG cabin with ROPS installed.
windrow) ground. on the ground nearby.
ENG/S All working lamp and rotary are
EG on all the time.
ADM Competent operator and has
valid simper
BHV Stop activity while personnel on
the ground have to work close to
the Excavator, such as survey.

BHV Maintain positive contact between


excavator operator and personnel
on the ground.

BHV Maintain safe working distance


between mobile equipment and
personnel on the ground.

PPE Mandatory PPE to be worn by


personnel on the ground.
Unstable ground / work Land slide, Excavator tip 4 4 16 ENG/S Bench / slope is constructed 1 4 4
pad / slope over EG based on Kepmen 555 / 1995
article 241.

ENG/S Install land slide monitoring


EG device where required.
ENG/S Excavator working pad must be
EG level and strong enough to
supprot excavator weight.

ENG/S Adequate tower lamp available to


EG monitor land movement during
night shift.

Uncontrolled Document When Printed 15 of 142 LCI-HSE-FM-001A(01)

Feb 2010
ENG/S All Heavy Equipment have closed
EG cabin with ROPS installed.
ADM Competent excavator operator
and has valid simper
ADM Supervision on location.

A.2.2 Operators / driver Blind spot, confined area. Collision 4 4 16 ENG/S Maintain area level and wide 1 4 4
Truck, other mobile equipment and LV are EG enough for trucks to maneouver.
entering and out of loading point

ENG/S Safety berm to be constructed


EG min. half of the larger truck wheel
along the edge of bench.

ENG/S Provide designated parking area


EG for LV and manhaul separate
from heavy mobile equipment.

ADM Competent operator and has


valid simper

BHV Radio contact prior approach the


loading point
BHV Drive to conditions

BHV Never reversing while queuing.

BHV Digger use horn to stop/warn DT

Access near edge of cliff Equipment / LV run over 4 5 20 ENG/S Safety berm to be constructed 1 5 5
the cliff EG min. half of the larger truck wheel
along the edge of cliff.

ENG/S Adequate tower lamp available to


EG illuminate the edge of cliff during
night shift.

Uncontrolled Document When Printed 16 of 142 LCI-HSE-FM-001A(01)

Feb 2010
ADM Competent operator and has
valid simper

BHV Drive to conditions

A.2.3 Operators Bench too high; unstable Excavator slides down and 4 4 16 ENG/S Select a correct size of excavator 1 4 4
Loading the truck ground fall onto truck. EG at a suitable ground condition.

ENG/S Excavator working pad must be


EG level and strong enough to
supprot excavator weight.
ADM Competent operator and has
valid simper

Soft ground; hollow Truck or excavator bogged 3 3 9 ENG/S Dozer to prepare loading pad 1 3 3
ground EG before truck being loaded.

ADM Mark the soft / hollow ground to


be avoided or improved.

BHV Area supervisor to inspect the


area before loading activity
began.
Operators Incompetent operator During top loading digger 4 4 16 ENG/S Position the truck to a suitable 1 4 4
swing and bucket and hit EG location to be loaded
the truck
ENG/S All Heavy Equipment have closed
EG cabin with ROPS installed.
ADM Competent operator and has
valid simper

BHV Digger lift and swing the bucket


high enough to avoid contact with
the DT
BHV Do not over reach to prevent
digger rolled over/toppled
BHV Do not over load the bucket to
avoid coal falling and hitting the
DT
BHV Do not overlaod the DT bucket to
avoid coal spills

BHV No person allowed within 50 m of


loading zone
BHV Production Supervisor to ensure
that highwall is safe and stable-
pre shift inspection

A.2.4 Operators Wall failures Land slide; rock fall 3 5 15 ENG/S Slopping / benching high wall 1 5 5
Loading the truck under EG
high wall
ENG/S Install prisma to monitor land
EG movement

ENG/S All equipment has closed cabin


EG

Uncontrolled Document When Printed 17 of 142 LCI-HSE-FM-001A(01)

Feb 2010
ADM High wall warning signs

ADM Supervision on location.

A.2.5 Operators Blind spot Truck reversed and struck 4 4 16 ENG/S Maintain 10 m distance with the 1 4 4
Truck queueing to be loaded another truck behind him EG other truck in the front.

ENG/S Clock wise scheme to approach


EG the excavator
ADM Traffic signs

ADM Competent operator and has


valid simper
BHV Maintain positive communication
by means of radio.
BHV Apply park brakes of DT

BHV Park/Wait on left side of loading


area Low wall side

A.2.6 Operators Blind spot, confined area Collision 4 4 16 ENG/S Closed cabin as OEM 1 4 4
Floor clean up and leveling EG

ENG/S Usegrid box to keep loading area


EG level at all times

ENG/S All trucks are parked outside


EG loading area while floor being
cleaned.
ENG/S Provide designated parking area
EG for LV and manhaul

BHV Maintain positive contact between


equipment operator

BHV Maintain safe working distance


between mobile equipment

Uncontrolled Document When Printed 18 of 142 LCI-HSE-FM-001A(01)

Feb 2010
t Team

Names Dept. - Position Sign Off

: Project Manager

Legal and Other Requirements


ional Controls Required By whom By When Status
Reference

UA-HSE-HO-SOP-043 Radio Procedure

UA-OPR-SOP-403 Haul Truck Operations

UA-HSE-HO-PR.01 Simper System Policy

UA-HSE-HO-SOP-004(01) Personal
Protective Equipment

Uncontrolled Document When Printed 19 of 142 LCI-HSE-FM-001A(01)

Feb 2010
Uncontrolled Document When Printed 20 of 142 LCI-HSE-FM-001A(01)

Feb 2010
KEPMEN.555.K/26/M.PE/1995 Article
241 The height of working faces & the
width of working benches.

Uncontrolled Document When Printed 21 of 142 LCI-HSE-FM-001A(01)

Feb 2010
Uncontrolled Document When Printed 22 of 142 LCI-HSE-FM-001A(01)

Feb 2010
PT. UNITEDA ARKATO

RISK ASSESSMENT REPORT

Risk Assessment Team


Business Unit / Project : UA/HSE-HO/BSI Gold Mine Project
Names Dept - Position Sign Off
Date : 10-Jan-17

Team Leader : Team Members


Reference Number : A.3 PIT-Hauling
Facilitator :

Process/Activity : Team Members :


Hauling

Approved By

(PM/Delegated)
Note: Attach meeting attandance if more.

Hirarchy Control

Hirarchy Control
Risk Identified
People /
Process / Activity / Task Environment at Hazard / Cause of Incident / Adverse L1 C1 RFN ** Current Mitigating Controls L2 C2 RRN * Additional Controls R
Risk Adverse Effect / Effect / Environmental
Environmental Aspect Impact

A.3.1 Operators Steep ramp; engine / Roll over, fall to lower 3 4 12 ENG/SEG Maximum 10% gradient of road. 1 4 4
Trucks traveling on steep ramp brake failure level, overtaking
ENG/SEG Safety berm on both sides of the
road
ENG/SEG Road maintenance

ADM 40 m tail gating

ADM Maximum speed 40 km/h

ADM Traffic sign

ADM SIMPER

ADM No overtaking

BHV Drive to condition

BHV Use correct gear selection as per


area / condition and trainer
instruction
A.3.2 Operators Slippery; steep ramp; Collision 3 4 12 ENG/SEG Maximum 10% gradient of road. 1 4 4
Truck traveling on wet ramp engine / brake failure
ENG/SEG Safety berm on both sides of the
road
ENG/SEG Spot water spray only

ENG/SEG Road maintenance

ADM 40 m tail gating

Uncontrolled Document When Printed 23 of 142 LCI-HSE-FM-001A(01)

Feb 2010
ADM Maximum speed 40 km/h

ADM Traffic sign

ADM SIMPER

ADM No overtaking

BHV Drive to condition

A.3.3 Operators Uncontrol intersection; Collision 3 4 12 ENG/SEG "T" intersection constructed. 1 4 4


Truck traveling on intersection blind spot Avoid "Y" intersection.
ENG/SEG Good lighting

ENG/SEG Road maintenance

ADM SIMPER

ADM Traffic sign

A.3.4 Operators Blind spot Collision 3 4 12 EL/SUB Cut all materials on the corner 1 4 4
Truck travelling on sharp corner that may cause blind spot
ENG/SEG Road maintenance

ADM Traffic sign

ADM SIMPER

BHV Drive to condition

A.3.5 Operators Low visibility Collision 4 4 16 ENG/SEG Water spray 1 4 4


Traveling on dusty road
ENG/SEG Ensure all working and head
lights on
ADM Traffic sign

ADM SIMPER

BHV Drive to condition

A.3.6 Operators Use mobile phone Collision 4 4 16 ADM Prohibited to bring mobile phone 1 1 1
General travel
ADM Socialized , Supervisor control

Operators Fatigue Collision 4 4 16 ADM Fatigue management training 3 3 9

ADM Mid Shift Fatigue Check

ADM Rotating operator

Operators Overspeed Collision 4 4 16 ADM SIMPER Process 3 2 6

ADM Safety Induction

ADM Max speed 40 Kph

Uncontrolled Document When Printed 24 of 142 LCI-HSE-FM-001A(01)

Feb 2010
Team

Names Dept. - Position Sign Off

: Project manager

Legal and Other Requirements


ional Controls Required By whom By When Status
Reference

Uncontrolled Document When Printed 25 of 142 LCI-HSE-FM-001A(01)

Feb 2010
Uncontrolled Document When Printed 26 of 142 LCI-HSE-FM-001A(01)

Feb 2010
PT. UNITEDA ARKATO

RISK ASSESSMENT REPORT

Risk Assessment Team


Business Unit / Project : UA/HSE-HO/BSI Gold Mine Project
Names Dept - Position Sign Off
Date : 10-Jan-17

Team Leader : Team Members


Reference Number : A.4.PIT-Battering/Sloping
Facilitator :

Process/Activity : Team Members :


Battering or Sloping

Approved By

(PM/Delegated)
Note: Attach meeting attandance if more.

Hirarchy Control

Hirarchy Control
Risk Identified
People /
Process / Activity / Task Environment at Hazard / Cause of Incident / Adverse L1 C1 RFN ** Current Mitigating Controls L2 C2 RRN * Additional Controls
Risk Adverse Effect / Effect / Environmental
Environmental Aspect Impact

A.4.1 Excavator Operator Poor visibility; busy traffic Collision 3 4 12 ENG/SEG Travel on Slow Moving 1 4 4
Excavator travelling to the designated area Equipment lane

ENG/SEG Rotary lamp and other light are


on.

ADM Valid SIMPER

ADM Radio communication

ADM Prestart checklist

Operators Use mobile phone Collision 4 4 16 ADM Prohibited to bring mobile phone 1 1 1

ADM Socialized , Supervisor control

Operators Fatigue Collision 4 4 16 ADM Fatigue management training 3 3 9

ADM Mid Shift Fatigue Check

ADM Rotating operator

Uncontrolled Document When Printed 27 of 142 LCI-HSE-FM-001A(01)

Feb 2010
A.4.2 Excavator Operator flaying rocks hit front glass cabin broken 3 4 12 ENG/SEG Stable pad 1 4 4
Excavator cutting butter and sloping high wall excavator

ADM Continuously high wall monitoring

ADM Radio communication

ADM Supervision

ADM Competent operator with valid


SIMPER

A.4.3 Truck Operator Blind spot; swing radius; Excavator swing into truck 3 4 12 ENG/SEG Block the road if possible 1 4 4
Cutting batter adjacent to haul road working close to busy travelling in side of the
road exclusion zone
ENG/SEG Stable pad

ADM Continuously high wall monitoring

ADM Radio communication

ADM Supervision

ADM Competent operator with valid


SIMPER

Uncontrolled Document When Printed 28 of 142 LCI-HSE-FM-001A(01)

Feb 2010
Team

Names Dept. - Position Sign Off

: Project Manager

Legal and Other Requirements


ional Controls Required By whom By When Status
Reference

Uncontrolled Document When Printed 29 of 142 LCI-HSE-FM-001A(01)

Feb 2010
Uncontrolled Document When Printed 30 of 142 LCI-HSE-FM-001A(01)

Feb 2010
PT. UNITEDA ARKATO

RISK ASSESSMENT REPORT

Risk Assessment Team


Business Unit / Project : UA/HSE-HO/BSI Gold Mine Project
Names Dept - Position Sign Off
Date : 10-Jan-17

Team Leader : Team Members :


Reference Number : A.5.PIT-Dewatering
Facilitator : :

Process/Activity : Team Members :


Dewatering in the Sump

Approved By :

(PM/Delegated)
Note: Attach meeting attandance if more.

Hirarchy Control

Hirarchy Control
Risk Identified
People /
Process / Activity / Task Environment at Hazard / Cause of Incident / Adverse L1 C1 RFN ** Current Mitigating Controls L2 C2 RRN * Additional Controls Req
Risk Adverse Effect / Effect / Environmental
Environmental Aspect Impact

A.5.1 Pumpman, driver, Broken sling, unstandart Sling snapped, falling 4 3 12 ENG/S Stay away while pump being 1 3 3
Towing pump to the sump operator towing gear/attachement object EG towed by dozer

ADM Pull sling / chain slowly to avoid


snapped

ADM Inspect all rigging equipment


(chain, shakle, sling) prior towing
the pump
ADM Secure the chain onto
grader/dozer and pump with lock
pins
ADM Plan route to travel and time to
move pump

A.5.2 Operator Soft material Excavator or dozer fall into 4 4 16 ENG/S Build a level and firm bench or 1 4 4
Slide pump pontton into the sump sump and drown the EG deck for excavator or dozer.
operator
PPE All crew within 5 meter from the
edge wearing life jacket

ENG/S No one entering the sump area


EG without supervision /
authorization
A.5.3 Pumpman, Pinch point, work near Drowning, crushed by 4 4 16 PPE Glove shall be worn while 1 4 4
Connect HDPE to the pump over the sump supervisor water heavy pipe connecting the pipe.

PPE Life jacket shall be worn by all


people within 5 meters from the
edge.
ADM Pipe in absolute straight position

Uncontrolled Document When Printed 31 of 142 LCI-HSE-FM-001A(01)

Feb 2010
ADM HDPE pipe not under tension

A.5.4 Operator, pumpman, unlevel ground/activity at Excavator roll over, pipe 3 4 12 ADM Excavator in level ground. 1 4 4
Connect HDPE at the wall (High wall / low wall) other people at the toe of wall loose and fall to the lower
lower level level, rock fall, wall failure

ENG/S Connection done at least 2


EG meters from toe of the wall or
inside of bunded area.
ADM Spotter and supervision while
connection taking place

ADM Use correct tools for the job

A.5.5 Pumpman Drowning, slips, trips and Fatality, Permanent 4 4 16 PPE All personnel wear life jacket. 1 4 4
Refueling pump in the sump (Working near or falls Disability, Long term
over water) absence due to treatment
BHV Eyes on path to avoid slip and trip
hazards

ENG/S Ensure fuel hose long enough to


EG reach pontoon

A.5.6 Mechanic, pump Working near water, Trip, Slip and Fall to the 4 4 16 PPE Wear life jacket while near or over 1 4 4
Pump inspection and repair supervisor, safety stored energy pump deck and drowning water.
personnel
BHV Eyes on path and identify slip, trip
and fall potential

ADM Life ring and rope attached to the


pontoon

ENG/S All guards in place around


EG moving / rotating parts

ADM Apply LOTO correctly

A.5.7 Mechanic, pump Overcapacity of the boat, Boat capsized and 4 4 16 ADM Do not over capacity of the boat. 1 4 4
Using crew boat from edge to pump back and crew, supervisor, boat was broken drawning
forth ERT
ADM Boat equipped with emergency
equipment such as rope, life
jacket.
PPE All crew on the boat wearing life
jacket

Mechanic, pump Poor ilumination/no Trip, Slip, Fall and 4 4 16 PPE Pump crew or person who going 1 4 4
supervisor, safety lighting drowning to pump preparing light torch,
personnel
BHV Bring radio, never work alone
near water

Uncontrolled Document When Printed 32 of 142 LCI-HSE-FM-001A(01)

Feb 2010
ADM If can prepare / positioning
lighting tower or lighting plant to
pump area

Uncontrolled Document When Printed 33 of 142 LCI-HSE-FM-001A(01)

Feb 2010
am

Names Dept. - Position Sign Off

Project Manager

Legal and Other Requirements


al Controls Required By whom By When Status
Reference

Uncontrolled Document When Printed 34 of 142 LCI-HSE-FM-001A(01)

Feb 2010
Uncontrolled Document When Printed 35 of 142 LCI-HSE-FM-001A(01)

Feb 2010
Uncontrolled Document When Printed 36 of 142 LCI-HSE-FM-001A(01)

Feb 2010
PT. UNITEDA ARKATO

RISK ASSESSMENT REPORT

Risk Assessment Team


Business Unit / Project : UA/HSE-HO/BSI Gold Mine Project
Names Dept - Position Sign Off
Date : 10-Jan-17

Team Leader :
Reference Number : B.6.DISP-Tipping
Facilitator :

Process/Activity : Team Members :


Tipping the load

Note: Attach meeting attandance if more.

Hirarchy Control

Hirarchy Control
Risk Identified
People /
Process / Activity / Task Environment at Hazard / Cause of Incident / Adverse L1 C1 RFN ** Current Mitigating Controls L2 C2 RRN * Additional Controls
Risk Adverse Effect / Effect / Environmental
Environmental Aspect Impact

B.6.1 Operators & Confined area, Crowded Collision 4 4 16 ADM Supervisor pre inspection 1 4 4
Truck entering disposal area. personnel on the traffic and low illumination
ground
ADM Pre start checklist

ADM Commisioning and re-


comissioning of DT

ADM Maintenance on DT as per


schedule

BHV No cell phones may be use while


operating equipment

ADM No overtaking on ramp

ADM Correct gear selection by


operator

ADM Maintain ramp to waste dump

ADM Do not over spray ramp with


water

ENG/SEG Ramp design

ENG/SEG Safety berm in place on ramp

Uncontrolled Document When Printed 37 of 142 LCI-HSE-FM-001A(01)

Feb 2010
ADM Waste dump identified with sign
to ensure tipping on correct dump

BHV Always wear seatbelt while


operating equipment

B.6.2 Operators Working near water, on Truck bogged, tilted, run 4 4 16 ENG/SEG Reverse alarm on the truck 1 4 4
Truck reversed into tip head soft soil, cracked area. over windrow, tipped over
or drowning into water.
ENG/SEG Safety berms at least 1.5 m high
on edges of waste dump

ENG/SEG Standard haul road/ramp design

ADM Tipping done in sequence on


waste dump

ADM Tipping as per clockwise

ADM Use mirrors to reverse into


position

BHV Use horn before reversing


backwards

ADM Ensure the area is safe before


moving backwards

B.6.3 Operators, Superviro Interaction with people Truck tipped over, load 3 4 12 ADM Supervisor pre inspection 1 4 4
Tipping the load and other unit / Slide tipped over personnel on
material the ground

ADM Standard waste dump design

ADM Do not tip load over the edge,tip


on the inside of safety berm

ENG/SEG No person may stand 50 m from


load being tipped

ADM Tipping area must be identified

ADM Tipping done in sequence from


left to right

ENG/SEG Dozer at least 50 m form tipping


area

B.6.4 Operators Interaction with people Collision 3 4 12 ADM Supervisor pre inspection 1 4 4
Truck leaving tipping head and other unit

Uncontrolled Document When Printed 38 of 142 LCI-HSE-FM-001A(01)

Feb 2010
ADM Lower bucket before driving off.

ADM Gear interlock if bucket in tipping


position

ADM Use horn before moving forward

Uncontrolled Document When Printed 39 of 142 LCI-HSE-FM-001A(01)

Feb 2010
Risk Assessment Team

Names Dept. - Position Sign Off

Team Members :

Approved By : Project Manager

(PM/Delegated)

Legal and Other Requirements


Additional Controls Required By whom By When Status
Reference

Uncontrolled Document When Printed 40 of 142 LCI-HSE-FM-001A(01)

Feb 2010
Uncontrolled Document When Printed 41 of 142 LCI-HSE-FM-001A(01)

Feb 2010
Uncontrolled Document When Printed 42 of 142 LCI-HSE-FM-001A(01)

Feb 2010
PT. UNITEDA ARKATO

RISK ASSESSMENT REPORT

Risk Assessment Team


Business Unit / Project : UA-HSE-HO-BSI Gold Mine Project
Names Dept - Position Sign Off
Date : 10-Jan-17

Team Leader : Team Members


Reference Number : B.7.DISP-DumpSupport
Facilitator :

Process/Activity : Team Members :


Dump Support

Approved By

(PM/Delegated)
Note: Attach meeting attandance if more.

Hirarchy Control

Hirarchy Control
Risk Identified
People /
Process / Activity / Task Environment at Hazard / Cause of Incident / Adverse L1 C1 RFN ** Current Mitigating Controls L2 C2 RRN * Additional Controls Re
Risk Adverse Effect / Effect / Environmental
Environmental Aspect Impact

B.7.1 Operators Truck reversed into Fatality, Permanent 4 4 16 ADM Dozer operator trained and 1 4 4
Dozer pushes the dumped load working dozer Disability, Long term competend
absence due to treatment

ADM Do not push waste with open


dozer blade ,use waste to push
over berm.
ENG/S No DT 50 m form dozing
EG

ADM Pre use checklist L Plant at waste


dump

B.7.2 Operators Inadequate windrow Fatality, Permanent 4 4 16 ENG/S Safety berm must always be 1 4 4
Dozer build tip head windrow height, truck impacting Disability, Long term EG maintained and 1.5 m high
working dozer absence due to treatment

ENG/S The dumping area must have a


EG 2% positive slope

ADM Dozing always in 1st gear

ENG/S No moving equipment within 50


EG m from dozer while dozing waste
material

Uncontrolled Document When Printed 43 of 142 LCI-HSE-FM-001A(01)

Feb 2010
Team

Names Dept. - Position Sign Off

: Project Manager

Legal and Other Requirements


ional Controls Required By whom By When Status
Reference

Uncontrolled Document When Printed 44 of 142 LCI-HSE-FM-001A(01)

Feb 2010
PT. UNITEDA ARKATO

RISK ASSESSMENT REPORT

Risk Assessment Team


Business Unit / Project : UA-HSE-HO-BSI Gold Coal Mine Project
Names Dept - Position Sign Off
Date : 10-Jan-17

Team Leader : Team Members :


Reference Number : B.8.DISP-Sloping
Facilitator : :

Process/Activity : Team Members :


Sloping Work on Disposal

Approved By :

(PM/Delegated)
Note: Attach meeting attandance if more.

Hirarchy Control

Hirarchy Control
Risk Identified
People /
Process / Activity / Task Environment at Hazard / Cause of Incident / Adverse L1 C1 RFN ** Current Mitigating Controls L2 C2 RRN * Additional Controls Req
Risk Adverse Effect / Effect / Environmental
Environmental Aspect Impact

B.8.1 Operator Unlevel ground Dozer rolled over on the 3 4 12 ADM Dozer operator trained 1 4 4
Dozer smoothing the slope surface slope

ADM Maximum angle for dozing

ADM Supervision

ADM Radio communication

ADM Pre shift instructions

ENG/S Planning
EG

ADM Closed off area for dozer work

ADM Survey identified areawith pegs

BHV Look behind / area before


reversing

Low ilumination Dozer rolled over on the 3 4 12 ADM L Plant at night time 1 4 4
slope

B.8.2 Operator Interaction with other unit Dozer working side ways 3 4 12 ENG/S No DT closer that 50 form dozing 1 4 4
Dozer spreading top soil and rolled over EG work

Uncontrolled Document When Printed 45 of 142 LCI-HSE-FM-001A(01)

Feb 2010
ADM Survey pegs placed out

ADM Supervision

ADM Planning

B.8.3 Operator Misscommunication Small digger impacted by 3 4 12 ADM Supervision indicate where 1 4 4
Contour drainage working dozer, digger drainage should be done
rolled over on the slope

Uncontrolled Document When Printed 46 of 142 LCI-HSE-FM-001A(01)

Feb 2010
m

Names Dept. - Position Sign Off

Project Manager

Legal and Other Requirements


al Controls Required By whom By When Status
Reference

Uncontrolled Document When Printed 47 of 142 LCI-HSE-FM-001A(01)

Feb 2010
Uncontrolled Document When Printed 48 of 142 LCI-HSE-FM-001A(01)

Feb 2010
PT. Leighton Contractors Indonesia
RISK ASSESSMENT REPORT

Business Unit / Project : BU3/ID212/MSJ Coal Mine Project Risk Assessment Team

Date : 9-Nov-15 (Rev 01) Names Dept - Position Sign Off

Reference Number : C.11.COAL-Loading Team Leader : Subani Prod Manager

Facilitator : Y. Danie Fikalana HSE Supt

Process/Activity : Coal Loading Team Members : Budiyanto Mining Supt

Elia Ingan Mining Supt

Note: Attach meeting attandance if more.

Hirarchy Control

Hirarchy Control
Risk Identified
People /
Process / Activity / Task Environment at L1 C1 RFN ** Current Mitigating Controls L2 C2 RRN * Additional Contro
Hazard / Cause of Adverse Incident / Adverse Effect /
Risk
Effect / Environmental Aspect Environmental Impact

C.11.1 Driver Interaction with other unit DT collision with OB truck, 4 4 16 ADM Radio contact prior approach the LP, 1 4 4
DT maneuver into loading position impacted by moving dozer Eye contact with the digger opt (if
or working grader due to possible)
poor visibility or
congestion, DT roll over,
coal digger swing and hit
cabin

ADM Skill operator with appropriate


authorization

ADM Ensure LP flate and adequate for


maneuvering

BHV Drive to condition

ADM Make sure Supervisor already checked


floor of loading point to make sure truck
not bogged or problem around loading
point
C.11.2 Driver Rock fall onto driver cabin, Falling rock, bucket hit DT 4 4 16 ADM Position the digger at a suitable location 1 4 4
Digger loading coal into DT bucket swing into truck cabin, hit DT, digger rolled over
Unstable ground and fall onto DT

ADM Position the truck at a suitable location to


be loaded

ADM Maintain positive communication

ADM Simpered driver


ADM Digger lift and swing the backet high
enough to avoid contact with the cabin

ADM Do not over reach to prevent digger rolle


over / toppled

ADM Do not over load the bucket to prevent


rock fall and hit the cabin

C.11.3 Driver Interaction with other unit Reversed and impacted 4 4 16 ENG/ Maintain 10 meters distance with the 1 4 4
Coal DT queueing at loading point each other due to blind SEG other DT in the front
spot or narrow loading
point

ADM Always facing the digger or DT being


loaded if possible

ADM Maneuver clock wise to approach the


digger

ADM Each loading point must provide parking


area and separate between LV & Truck
to control colision between vehicle
ADM Maintain positive communication
k Assessment Team

Names Dept. - Position Sign Off

Team Members : I Ketut Arta Mining Supt

: M Bismark HSE Officer

Approved By :

(PM/Delegated)

Legal and Other


Additional Controls Required By whom By When Status
Requirements Reference
PT. UNITEDA ARKATO

RISK ASSESSMENT REPORT

Risk Assessment Team


Business Unit / Project : UA-HSE-HO- BSI Gold Mine Project
Names Dept - Position Sign Off
Date : 10-Jan-17

Team Leader : Team Members :


Reference Number : C.9.PLANT-WSDaily
Facilitator : :

Process/Activity : Team Members :


Workshop Daily Servicing

Approved By :

(PM/Delegated)
Note: Attach meeting attandance if more.

Hirarchy Control

Hirarchy Control
Risk Identified
People /
Process / Activity / Task Environment at Hazard / Cause of Incident / Adverse L1 C1 RFN ** Current Mitigating Controls L2 C2 RRN * Additional Controls Req
Risk Adverse Effect / Effect / Environmental
Environmental Aspect Impact

D.9.1 Mechanics Interaction with other Personnel impacted by 4 4 16 ADM Assign competent spotters to 1 4 4
Bring large equipment IN and OUT of service object and people moving equipment while guide the truck while in and out
bays being positioned the service bays
ADM Ensure area clear and clean from
spillage or parts on the floor

ADM Review risk assessment such as


Take 5 conducted in the
beginning of the shift
ADM Good housekeeping

ADM Clear communication between


spotter and driver.

ADM Use horn to warm bystanders


Clear area/service bay of all
workers
D.9.2 Mechanics Store energy, LOTO not Equipment energized 4 4 16 ADM Apply energy isolation (lock out 1 4 4
Servicing energized equipment / stored energy completed while being serviced due tag out)
to improper energy
isolation
ADM Competent mechanics only and
under full supervision

ADM Risk assessment prior isolate the


energy

ADM Full time supervision

Uncontrolled Document When Printed 53 of 142 LCI-HSE-FM-001A(01)

Feb 2010
D.9.3 Mechanics Hydroulic pressure High pressure released 3 4 12 ADM Apply energy isolation (lock out 1 4 4
Servicing pressurized vessels due to improper energy tag out)
isolation
ADM Competent mechanics only and
under full supervision

ADM Risk assessment prior isolate the


energy

ADM Full time supervision

D.9.4 Mechanics Hydroulic pressure High pressure released 3 4 12 ADM Ensure correct tools for the job 1 4 4
Servicing equipment using compressed air / due to improper energy
compressed gas cylinders isolation
ADM Authorized / competent
mechanics only

ADM Apply correct pressure

ADM Inspect tools prior used

D.9.5 Mechanics Hot work/flame Equipment catch on fire 3 4 12 ADM Hot Work Permit 1 4 4
Hot works on heavy equipment other than on it's
buckets or boom
ADM Competent persons only

ADM Inspect tools and equipment used

ENG/S Keep all flammable resources


EG away from naked flame

D.9.6 Mechanics Heavy part Dropped object, crushed 4 4 16 ADM Risk assessment (Take 5) 1 4 4
Engine remove and install by moving parts, sharp
objects
ADM Avoid pinch point

ADM Use correct tools for the job

ADM Inspect all tools before used

ADM Ensure floor clear and clean to


prevent trip and slip and fall

Uncontrolled Document When Printed 54 of 142 LCI-HSE-FM-001A(01)

Feb 2010
am

Names Dept. - Position Sign Off

Shidieq Setiawan Project Manager

Legal and Other Requirements


al Controls Required By whom By When Status
Reference

Uncontrolled Document When Printed 55 of 142 LCI-HSE-FM-001A(01)

Feb 2010
Uncontrolled Document When Printed 56 of 142 LCI-HSE-FM-001A(01)

Feb 2010
PT. UNITEDA ARKATO

RISK ASSESSMENT REPORT

Risk Assessment Team


Business Unit / Project : UA-HSE-HO-BSI Gold Mine Project
Names Dept - Position Sign Off
Date : 10-Jan-17

Team Leader : Team Members :


Reference Number : C.10.PLANT-Workshop Traffic Management
Facilitator : :

Process/Activity : Team Members :


Workshop Traffic Management

Approved By :

(PM/Delegated)
Note: Attach meeting attandance if more.

Hirarchy Control

Hirarchy Control
Risk Identified
People /
Process / Activity / Task Environment at Hazard / Cause of Incident / Adverse L1 C1 RFN ** Current Mitigating Controls L2 C2 RRN * Additional Controls Req
Risk Adverse Effect / Effect / Environmental
Environmental Aspect Impact

C.10.1 People Interaction with other Run over by moving large 4 4 16 ADM Low gear prior entering the yard 1 4 4
Large equipment entering workshop yard object and people equipment, imapcting
each other

ADM Follow the direction or traffic


signs

ADM Ensure clear visibility

ADM Communicate thru two way radio

ADM Spotter needed prior entering


tight space and reversing

C.10.2 Wash bay crew Interaction with other Run over by moving large 3 4 12 ADM Engage low gear 1 4 4
Large equipment entering wash bay object and people equipment

ADM Spotter assigned

ADM Ensure wash bay clear of mud to


avoid skidded while entering bay

ADM Engage low gear

ADM Spotter assigned

Uncontrolled Document When Printed 57 of 142 LCI-HSE-FM-001A(01)

Feb 2010
ADM Ensure wash bay clear of mud to
avoid skidded while entering bay

PPE Use visible PPE

ENG/S Handrails at washbay


EG

ADM No person to enter water sum

C.10.3 People Blind spot and interaction Tray impacting cabin while 4 4 16 ADM No reversing without assistance 1 4 4
Reversing large equipment / truck for parking with other object and reversing blind spot, of spotters
people people run over truck due
to congested space

ADM Blast 3x horn for reversing

ADM Ensure clear visibility before


move / reverse the truck

ADM No parking behind equipment at


wash bay

Uncontrolled Document When Printed 58 of 142 LCI-HSE-FM-001A(01)

Feb 2010
am

Names Dept. - Position Sign Off

Shidieq Setiawan Project Manager

Legal and Other Requirements


al Controls Required By whom By When Status
Reference

Uncontrolled Document When Printed 59 of 142 LCI-HSE-FM-001A(01)

Feb 2010
Uncontrolled Document When Printed 60 of 142 LCI-HSE-FM-001A(01)

Feb 2010
PT. UNITEDA ARKATO

RISK ASSESSMENT REPORT

Risk Assessment Team


Business Unit / Project : UA-HSE-HO-BSI Gold Mine Project
Names Dept - Position Sign Off
Date : 10-Jan-17

Team Leader : Team Members :


Reference Number : C.11.PLANT-ExcMaint
Facilitator : :

Process/Activity : Team Members :


Excavator Maintenance

Approved By :

(PM/Delegated)
Note: Attach meeting attandance if more.

Risk Identified
People /
Process / Activity / Task Environment at Hazard / Cause of Incident / Adverse L1 C1 RFN ** Current Mitigating Controls L2 C2 RRN * Additional Controls Req
Risk Adverse Effect / Effect / Environmental
Environmental Aspect Impact

c.11.1 Mechanics, Unlevel ground and Crane tipped over, 4 4 16 ADM Set up crane on a stable ground 1 4 4
Bucket change Supervisor unstable ground overturned, collapsed,

ADM Review available risk assesement

Interaction with people Collision 4 4 16 ENG/S Clear lifting radius from un- 1 4 4
EG authorized personnel

Unstandart lifting gear Sling snapped, dropped 4 4 16 ADM Ensure all lifting gear and 1 4 4
load equipment inspected and color
coded correctly
Working at height Fall from height, Falling 4 4 16 ENG/S Fall protection for work at height 1 4 4
object EG or man basket

C.11.2 Mechanics, Hot work Arc welding injury, hot 4 4 16 PPE Welding personnal protective 1 4 4
Welding and Cutting Supervisor metals, fire and explosion equipment
of compressed gas cyl
ENG/S Keep combustible or flamable
EG away from the affected area

ADM Treat compressed gas cylinder


correctly

ADM Inspect all welsing and cutting


line before used

ADM Fit flash back arrestors at the


regulator

Uncontrolled Document When Printed 61 of 142 LCI-HSE-FM-001A(01)

Feb 2010
C.11.3 Mechanics, Hyrdoulic pressure High pressure released 3 4 12 ENG/S Apply energy isolation (lock out 1 4 4
Hydraulic repair / stored energy Supervisor EG tag out)

ADM Competent mechanics only and


under full supervision

ADM Risk assessment prior isolate the


energy

ADM Full time supervision

C.11.4 Mechanics, Uncontroled movement of load dropped, crushed by 4 4 16 ADM Set up crane on a stable ground 1 4 4
Hydraulic cylinders change Supervisor suspended load, mis moving objects
communication during
installation

ADM Review available risk assesement

ENG/S Clear lifting radius from un-


EG authorized personnel

ADM Ensure all lifting gear and


equipment inspected and color
coded correctly
ENG/S Fall protection for work at height
EG or man basket

EL/SUB No one under suspended load

ADM Assign one signalman to direct


the lifting equipment

C.11.5 Mechanics, Heavy parts Hit object and people 4 4 16 ADM Lift plan required for complex 1 4 4
Under carriage change Supervisor lifting

ADM Risk assessment reviewed or


create specific one for engine R&I

EL/SUB No one under suspended load

C.11.6 Mechanics, Heavy parts Hit object and people 3 4 12 ADM Lift plan required for complex 1 4 4
Engine remove and Install Supervisor lifting

ADM Risk assessment reviewed or


create specific one for engine R&I

EL/SUB No one under suspended load

Uncontrolled Document When Printed 62 of 142 LCI-HSE-FM-001A(01)

Feb 2010
am

Names Dept. - Position Sign Off

Project Manager

Legal and Other Requirements


al Controls Required By whom By When Status
Reference

Uncontrolled Document When Printed 63 of 142 LCI-HSE-FM-001A(01)

Feb 2010
Uncontrolled Document When Printed 64 of 142 LCI-HSE-FM-001A(01)

Feb 2010
PT. UNITEDA ARKATO

RISK ASSESSMENT REPORT

Risk Assessment Team


Business Unit / Project : UA-HSE-HO-BSI Gold Mine Project
Names Dept - Position Sign Off
Date : 10-Jan-17

Team Leader : Team Members :


Reference Number : C.12.PLANT-TyreMgt
Facilitator : :

Process/Activity : Team Members :


Tyre Management

Approved By :

(PM/Delegated)
Note: Attach meeting attandance if more.

Hirarchy Control

Hirarchy Control
Risk Identified
People /
Process / Activity / Task Environment at Hazard / Cause of Incident / Adverse L1 C1 RFN ** Current Mitigating Controls L2 C2 RRN * Additional Controls Req
Risk Adverse Effect / Effect / Environmental
Environmental Aspect Impact

C.12.1 Tyreman Fatigue / defect material, Tyre burst 4 4 16 ENG/S Tyres should be inflated only in a 1 4 4
Inflate tyre over pressure. EG restraining device (e.g. tyre
cage), which will contain flying
parts should a blow off occur

ENG/S Inflate the tyre to the


EG manufactures recommended air
pressure
ENG/S Tyre pressure gauge calibration
EG

ENG/S Restraining area special for


EG heavy equipment.

ADM JSEA and SOP

ADM Tyre handling training for tyreman

ADM Tyre use management to control


the tyre life time, stock, etc.

BHV Any tyre undergoing an inflation


must never be left unattended

ADM Use inline gauge

ADM Use final gauge to check tyre


pressure

Uncontrolled Document When Printed 65 of 142 LCI-HSE-FM-001A(01)

Feb 2010
BHV No person stand next to tyre
while inflating

BHV Set compressor at maks working


pressure, dont over inflated tyre

BHV Air pipes connected and not


tripping hazard

PPE Helmet, hand gloves, safety


glass, safety shoes.

C.12.2 Tyreman Equipment movement, Struck by moving 4 4 16 ENG/S Parking break is on, wheel chock 1 4 4
Stripping tyre improper tools used, equipment, hit by bead EG in place and put the padlock &
incompetent personnel, breaker, hit by hammer, danger tag on isolation point.
fatigue, wrong work flying objects, hearing
method used, Execive loss.
noise.

ENG/S Put the certified and correct size


EG stand underneath the equipment.

ENG/S Replace any component that may


EG be suspect to any abnormalities

ENG/S Use tyre handler to grab the tyre


EG

ENG/S Isolate the working area from


EG unauthorized people.

ADM Tyre handling training for tyreman

ADM SIMPER of Manitou Telehandler

ADM JSEA & SOP

ADM Prestart checklist of Manitou


telehandler

BHV Fit to work & fatigue management

BHV Remove or repair defect tools if


necessary. DO NOT use defect
tools.
BHV Supervision or spotter to control
Manitou movement.

Uncontrolled Document When Printed 66 of 142 LCI-HSE-FM-001A(01)

Feb 2010
PPE Helmet, ear plug, hand gloves,
safety glass, safety shoes.

C.12.3 Tyreman, Opt Tyre Equipment movement, Struck by moving 4 4 16 ENG/S Parking break is on, wheel chock 1 4 4
Change tyre Handler improper tools used, equipment, falling tyre EG in place and put the padlock &
incompetent personnel, danger tag on isolation point.
fatigue, wrong work
method used. ENG/S Put the certified and correct size
EG stand underneath the equipment.

ENG/S Replace any component that may


EG be suspect to any abnormalities

ENG/S Use tyre handler to grab the tyre


EG

ENG/S Isolate the working area from


EG unauthorized people.

ADM Tyre handling training for tyreman

ADM SIMPER of Manitou Telehandler

ADM JSEA & SOP

ADM Prestart checklist of Manitou


telehandler

BHV Fit to work & fatigue management

BHV Remove or repair defect tools if


necessary. DO NOT use defect
tools.
BHV Supervision or spotter to control
Manitou movement.

PPE Helmet, hand gloves, safety


glass, safety shoes.

C.12.4 Tyreman Hot tyre Tyre burst 3 4 12 ENG/S Stop DT at safe place, stay away 1 4 4
Hot tyre inspection EG from any moving equipment.

PPE Visible PPE

ADM Tyre report

ADM Calibrated pressure gauge

ADM Pressure temperature check

ADM Monthly trad depth check

C.12.5 Tyreman, pedestrian Metal splinters, hit by hammer 4 3 12 ADM Use standart tool 1 3 3
Branding rim

ADM Identified line of fire and pinch


point

Uncontrolled Document When Printed 67 of 142 LCI-HSE-FM-001A(01)

Feb 2010
C.12.6 Tyreman, truck crew Uncontroll movement Fall from height, crushed 4 4 16 ENG/S Use tyre handler to grab the tyre 1 4 4
Load/unload tyre from/to truck by falling tyre EG

ENG/S Use chock on the ground to


EG prevent tyre roll

Uncontrolled Document When Printed 68 of 142 LCI-HSE-FM-001A(01)

Feb 2010
am

Names Dept. - Position Sign Off

Project Manager

Legal and Other Requirements


al Controls Required By whom By When Status
Reference

Uncontrolled Document When Printed 69 of 142 LCI-HSE-FM-001A(01)

Feb 2010
Uncontrolled Document When Printed 70 of 142 LCI-HSE-FM-001A(01)

Feb 2010
Uncontrolled Document When Printed 71 of 142 LCI-HSE-FM-001A(01)

Feb 2010
Uncontrolled Document When Printed 72 of 142 LCI-HSE-FM-001A(01)

Feb 2010
PT. UNITEDA ARKATO

RISK ASSESSMENT REPORT

Risk Assessment Team


Business Unit / Project : UA-HSE-HO-BSI Gold Mine Project
Names Dept - Position Sign Off
Date : 10-Jan-17

Team Leader : Team Members :


Reference Number : C.13.PLANT-Electrical
Facilitator : :

Process/Activity : Team Members :


Electrical Works

Approved By :

(PM/Delegated)
Note: Attach meeting attandance if more.

Hirarchy Control

Hirarchy Control
Risk Identified
People /
Process / Activity / Task Environment at Hazard / Cause of Incident / Adverse L1 C1 RFN ** Current Mitigating Controls L2 C2 RRN * Additional Controls Req
Risk Adverse Effect / Effect / Environmental
Environmental Aspect Impact

C.13.1 Electricians Working at height, electric Fall from height, 4 4 16 ADM Qualified electrician to perform 1 4 4 Nil
Replace bulb on lighting tower current electrocuted task

ADM Wroker already had training


working at heght training

ENG/S Using full fall protection / body


EG harness, complete with
suspension trauma self rescue
leg strap

ENG/S Conduct three contact point


EG

ADM Inspect ladder/ step before using

ADM Test for energy

ADM Only use approved multitesters


provide by company

ADM Select correct multiple tester for


task

ADM Fill working at height permit

ADM Do not carry a cell phone while


working at height

Uncontrolled Document When Printed 73 of 142 LCI-HSE-FM-001A(01)

Feb 2010
C.13.2 Electricians Electrical shock Electrocuted 4 4 16 ADM Qualified electrician to perform 1 4 4 Nil
Power Genset termination task

ADM Competent person traineed

ENG/S Energy isolation


EG

ADM Test for energy

ADM Take 5

C.13.3 Electricians Electrical shock Electrocuted 4 4 16 ADM Isolate work area from unececary 1 4 4 Nil
Working on life electrical circuit people

ADM Standby person on isolation


point, in case of emergency,
stand by person shut down power
ADM Qualified electrician to perform
task

ADM Competent person traineed

ENG/S Energy isolation (ELCB)


EG

ADM Test for energy

ADM Take 5

ADM Emergency eye wash station


available

ADM Provide low voltage rescue kit,


and standby person / observer
had electric rescue training or
equivalent

C.13.4 Electricians Electrical shock Electrocuted 4 4 16 ADM Qualified electrician to perform 1 4 4 Nil
Temporary electrical splicing task

ADM Competent person traineed

ENG/S Energy isolation


EG

ADM Test for energy

Uncontrolled Document When Printed 74 of 142 LCI-HSE-FM-001A(01)

Feb 2010
ADM Take 5

Uncontrolled Document When Printed 75 of 142 LCI-HSE-FM-001A(01)

Feb 2010
am

Names Dept. - Position Sign Off

Project Manager

Legal and Other Requirements


al Controls Required By whom By When Status
Reference

Nil N/A N/A N/A

Uncontrolled Document When Printed 76 of 142 LCI-HSE-FM-001A(01)

Feb 2010
Nil N/A N/A N/A

Nil N/A N/A N/A

Nil N/A N/A N/A

Uncontrolled Document When Printed 77 of 142 LCI-HSE-FM-001A(01)

Feb 2010
Uncontrolled Document When Printed 78 of 142 LCI-HSE-FM-001A(01)

Feb 2010
PT. UNITEDA ARKATO

RISK ASSESSMENT REPORT

Risk Assessment Team


Business Unit / Project : UA-HSE-HO-BSI Gold Mine Project
Names Dept - Position Sign Off
Date : 10-Jan-17

Team Leader : Team Members :


Reference Number : D.14 TRAFFIC-Design
Facilitator : :

Process/Activity : Team Members :


Road Traffic Design

Approved By :

(PM/Delegated)
Note: Attach meeting attandance if more.

Hirarchy Control

Hirarchy Control
Risk Identified
People /
Process / Activity / Task Environment at Hazard / Cause of Incident / Adverse L1 C1 RFN ** Current Mitigating Controls L2 C2 RRN * Additional Controls Req
Risk Adverse Effect / Effect / Environmental
Environmental Aspect Impact

D.14.1 Road users Uncontrol intersection, Collision, hit safety berm, 4 5 20 PPE Install signs + minimum 100 1 5 5
Intersection design inadequate traffic signs rolled over meters away from intersection
posted, inadequate road
devider or island
ENG/S Build 10 meters road devider at
EG each section

ADM Main stream have right of way

ADM Install lighting pole to provide


adequate illumination during the
night
ENG/S Ensure intersection are square to
EG have maximum visibility

D.14.2 Road users Inadequate traffic signs Collision, hit safety berm, 4 5 20 ADM Install signs + minimum 100 1 5 5
T Junction design posted, inadequate road rolled over meters away from intersection
devider or island
ENG/S Build 10 meters road devider at
EG each section

ADM Main stream have right of way

ADM Provide adequate illumination


during the night

ENG/S Ensure T juctions are square to


EG have maximum visibility

Uncontrolled Document When Printed 79 of 142 LCI-HSE-FM-001A(01)

Feb 2010
D.14.3 Road users Poor visibility (blind spot) Collision, hit safety berm, 4 5 20 ADM Install signs + minimum 100 1 5 5
Y Junction design (if necessary) rolled over meters away from intersection

ADM Main stream have right of way

ADM Provide adequate illumination


during the night

ENG/S Ensure Y juctions with minimum


EG 70 degree angle to have better
visibility
D.14.4 Road users Inappropriate traffic signs, Collision, hit safety berm, 4 4 16 ADM Standard traffic sign designed 1 4 4
Traffic signs not reflective, small size, rolled over
wrongly located

ADM Reflective

ADM Properly located as per risk


assesment

ADM Weather resistance

ADM Up dated

D.14.5 Road users Substandard windrow Collision, hit safety berm, 4 4 16 ENG/S Windrow built as per standard 1 4 4
Windrows / road devider design design, windrow height rolled over EG length, width along the edges,
road sides, certain location such
as fuel farms, parking area in the
pit and disposal

D.14.6 Road users Inappropriate Collision, rolled over 4 4 16 ADM Road leading to tipping head 1 4 4
Road design at the disposal identification of road delineated or identified by
leading to dump head windrow from grader blade
ADM Road designed from left to right
to ensure in and out of the trucks
safely
ADM Ensure clean from scattered
rocks or rock projection

D.14.7 Road users Poor risk assessment on Collision, hit safety berm, 4 4 16 ADM Speed limit max 40 km for pit and 1 4 4
Speed limit speed limitation rolled over disposal areas

ADM Speed limit max 50 km for


secondary roads / non pit roads

ADM Speed limit max 60 km for coal


haul road

D.14.8 Road users Narrow road access Collision 4 4 16 ENG/SE • Single lane roadways - 1.5 x 1 4 4
Roadway width vehicle operating width
• Double lane roadways - 3.5 x
vehicle operating width

Uncontrolled Document When Printed 80 of 142 LCI-HSE-FM-001A(01)

Feb 2010
D.14.9 Road users High superelevation rate Rolled over 4 4 16 ENG/SESuperelevation rates of 2% - 5% 1 4 4
Superelevation

Uncontrolled Document When Printed 81 of 142 LCI-HSE-FM-001A(01)

Feb 2010
am

Names Dept. - Position Sign Off

Project Manager

Legal and Other Requirements


al Controls Required By whom By When Status
Reference

Uncontrolled Document When Printed 82 of 142 LCI-HSE-FM-001A(01)

Feb 2010
TG-H&S-PR-4141-M - TRAFFIC Core
Procedure R11

Uncontrolled Document When Printed 83 of 142 LCI-HSE-FM-001A(01)

Feb 2010
TG-H&S-PR-4141-M - TRAFFIC Core
Procedure R11

Uncontrolled Document When Printed 84 of 142 LCI-HSE-FM-001A(01)

Feb 2010
PT. UNITEDA ARKATO

RISK ASSESSMENT REPORT

Risk Assessment Team


Business Unit / Project : UA-HSE-HO-BSI Gold Mine Project
Names Dept - Position Sign Off
Date : 10-Jan-17

Team Leader : Team Members


Reference Number : E.15.ROAD-ConstRoad
Facilitator :

Process/Activity : Team Members :


Constructing New Road

Approved By

(PM/Delegated)
Note: Attach meeting attandance if more.

Hirarchy Control

Hirarchy Control
Risk Identified
People /
Process / Activity / Task Environment at Hazard / Cause of Incident / Adverse L1 C1 RFN ** Current Mitigating Controls L2 C2 RRN * Additional Controls R
Risk Adverse Effect / Effect / Environmental
Environmental Aspect Impact

E.15.1 Operator, supervisor, Interaction with other unit Run over by truck, truck 4 4 16 ADM Identify road work location 1 4 4
Tip good material on the road spotter & people impacting each other while
maneuvered

ADM Assign spotters to control traffic

ENG/SE Tip the road material , spotter


G step away from tipping point

EL/SUB Tip location level and solid to


avoid roll over whilst tipping

Operators Use mobile phone Collision 4 4 16 ADM Prohibited to bring mobile phone 1 1 1

ADM Socialized , Supervisor control

Operators Fatigue Collision 4 4 16 ADM Fatigue management training 3 3 9

ADM Mid Shift Fatigue Check

ADM Rotating operator

Operators Overspeed Collision 4 4 16 ADM SIMPER Process 3 2 6

ADM Safety Induction

Uncontrolled Document When Printed 85 of 142 LCI-HSE-FM-001A(01)

Feb 2010
ADM Max speed 50 Kph

E.15.2 Operator, supervisor, Interaction with other unit Equipment impacting each 4 4 16 ADM Spotter assigned to control traffic 1 4 4
Dozing road material spotter & people other prior dozing road material

BHV Dozer operator to ensure no


scattered rock on the road

ADM Ensure edge or drop off location


baricaded

ADM park dozer at appropriate location


after finish

ADM Adequate illumination during


night time

ADM Place adequate traffic signs

E.15.3 Operator, supervisor, Interaction with other unit Grader maneuver and 4 3 12 ADM Ensure the overall road condition 1 3 3
Grade the road spotter & people impacting other vehicle is not dusty

ADM Communicate thru the 2 way


radio to all turcks on the route
being grade
ADM Max leght of the road being
graded is 100 meters

ADM Turns all lights on

ADM Adjust blade position


appropriately (especially RH side)

Operators dusty road, low visibility Collision 4 4 16 ENG/SE Water spray 1 4 4


G

ENG/SE Ensure all working and head


G lights on

ADM Traffic sign

ADM SIMPER

BHV Drive to condition

E.15.4 Operator, supervisor, Interaction with other unit Equipment impacting each 3 4 12 ADM Safety cone placed at both ends 1 4 4
Build windrow / road devider spotter & people other

ADM Do not swing to the direction of


the road

Uncontrolled Document When Printed 86 of 142 LCI-HSE-FM-001A(01)

Feb 2010
ADM Spotter assigned to control traffic
(divert traffic or 2 lanes traffic)

ADM Ensure no rocks scattered on the


road

BHV Informed to all trucks at the area

Uncontrolled Document When Printed 87 of 142 LCI-HSE-FM-001A(01)

Feb 2010
Team

Names Dept. - Position Sign Off

Legal and Other Requirements


ional Controls Required By whom By When Status
Reference

Uncontrolled Document When Printed 88 of 142 LCI-HSE-FM-001A(01)

Feb 2010
Uncontrolled Document When Printed 89 of 142 LCI-HSE-FM-001A(01)

Feb 2010
Uncontrolled Document When Printed 90 of 142 LCI-HSE-FM-001A(01)

Feb 2010
PT. UNITEDA ARKATO

RISK ASSESSMENT REPORT

Risk Assessment Team


Business Unit / Project : UA-HSE-HO-BSI Gold Mine Project
Names Dept - Position Sign Off
Date : 10-Jan-17 (Rev 03)

Team Leader : Team Members :


Reference Number : E.16.ROAD-Maintenance
Facilitator : :

Process/Activity : Team Members :


Maintenance Roads

Approved By :

(PM/Delegated)
Note: Attach meeting attandance if more.

Hirarchy Control

Hirarchy Control
Risk Identified
People /
Process / Activity / Task Environment at Hazard / Cause of Incident / Adverse L1 C1 RFN ** Current Mitigating Controls L2 C2 RRN * Additional Controls Req
Risk Adverse Effect / Effect / Environmental
Environmental Aspect Impact

E.16.1 Operator, supervisor, Interaction with other Run over by moving heavy 4 4 16 ADM Graded ripping and grading down 1 4 4
Ripping and Grading spotter equipment equipment, Grader hill and when the condition permit
impacting trucks while (dry and dust properly controlled)
maneuvered

ADM Grade and Ripping short area,


not more than 100 meters

ADM Radio communication with all


trucks affected

Operators Use mobile phone Collision 4 4 16 ADM Prohibited to bring mobile phone 1 1 1

ADM Socialized , Supervisor control

Operators Fatigue Collision 4 4 16 ADM Fatigue management training 3 3 9

ADM Mid Shift Fatigue Check

ADM Rotating operator

Operators Overspeed Collision 4 4 16 ADM SIMPER Process 3 2 6

ADM Safety Induction

Uncontrolled Document When Printed 91 of 142 LCI-HSE-FM-001A(01)

Feb 2010
ADM Max speed 40 Kph

E.16.2 Operator, supervisor, Unlevel ground and Tipped over while tipping 4 4 16 ADM Inform to all trucks in the affected 1 4 4
Back filling pot holes spotter interaction with other the load area
equipment/people

Interaction with other Run over by moving heavy 4 4 16 ADM Spotter assigned to control the 1 4 4
equipment/people equipment, Trucks traffic
impacting each other due
to narrow road,

ADM Safety cones or bariccade to


identify holes being repaired

Operators dusty road, low visibility Collision 4 4 16 ENG/S Water spray 1 4 4


EG

ENG/S Ensure all working and head


EG lights on

ADM Traffic sign

ADM SIMPER

BHV Drive to condition

E.16.3 Operator, supervisor, Interaction with other Crushed by moving 4 4 16 ADM inform to all trucks in the affected 1 4 4
Drainage works spotter unit / people / structure equipment, impacted by area
bucket of excavator while
being swung
ADM Traffic signs, spotter assigned to
control the traffic

ADM Safety cones or bariccade to


identify area being worked

ADM Do not swing to direction of traffic


flow

ADM Ensure cross fall gradient as per


minimim standard

E.16.4 Operator, supervisor, Interaction with other Run over by moving heavy 4 4 16 ADM Inform to all vehicle in the 1 4 4
Build windrow / road devider spotter unit / people / structure equipment, Trucks affected area
impacting each other due
to narrow road, Tipped
over while tipping the load,
excavator swing into other
moving equipment nearby

ADM Spotter assigned to control traffic

Uncontrolled Document When Printed 92 of 142 LCI-HSE-FM-001A(01)

Feb 2010
ADM Do not swing to direction of traffic
flow

ADM Place traffic signs

ADM Truck tip the load only on the


spotted area

Uncontrolled Document When Printed 93 of 142 LCI-HSE-FM-001A(01)

Feb 2010
Team

Names Dept. - Position Sign Off

Project Manager

Legal and Other Requirements


al Controls Required By whom By When Status
Reference

Uncontrolled Document When Printed 94 of 142 LCI-HSE-FM-001A(01)

Feb 2010
Uncontrolled Document When Printed 95 of 142 LCI-HSE-FM-001A(01)

Feb 2010
Uncontrolled Document When Printed 96 of 142 LCI-HSE-FM-001A(01)

Feb 2010
PT. UNITEDA ARKATO

RISK ASSESSMENT REPORT

Risk Assessment Team


Business Unit / Project : UA-HSE-HO-BSI Gold Mine Project
Names Dept - Position Sign Off
Date : 10-Jan-17

Team Leader : Team Members


Reference Number : F.17.GEN-Vehicle Interaction
Facilitator :

Process/Activity : Team Members :


Vehicle Interaction

Approved By

(PM/Delegated)
Note: Attach meeting attandance if more.

Hirarchy Control

Hirarchy Control
Risk Identified
People /
Process / Activity / Task Environment at Hazard / Cause of Incident / Adverse L1 C1 RFN ** Current Mitigating Controls L2 C2 RRN * Additional Controls Re
Risk Adverse Effect / Effect / Environmental
Environmental Aspect Impact

F.17.1 Driver and Blind spot Struck by heavy 4 5 20 ENG/S Separation lane between heavy 1 5 5
LV/Medium vehicle traveling in the pit passengers equipments EG equipments & Light/medium
vehicle tracks

ENG/S All LVs and Manhauls have


EG ROPS intalled.

ENG/S "T" intersections are constructed


EG in pit. Avoid "Y" intersectin.

ENG/S Haulroad width is constructed to


EG fit 3 times of the largest truck in
pit.

ADM Traffic sign erected


ADM Driver must has valid PIT
SIMPER

BHV Maintain safe distance with heavy


equipment

BHV Maintain two way radio


communication

Slippery road Collision with other 4 5 20 ENG/S Scrap the road using grader 1 5 5
vehicle, hit windrow, roll EG
over
ENG/S Vehicles must have 4x4 FWD
EG

ADM Prestart check

ADM Driver must has valid PIT


SIMPER
BHV Drive to condition

Uncontrolled Document When Printed 97 of 142 LCI-HSE-FM-001A(01)

Feb 2010
Speeding Collision with other 4 5 20 ENG/S Standard Safety berm 1 5 5
vehicle, hit windrow, roll EG
over
ADM Driver must has valid PIT
SIMPER
ADM Speed Limit signs
BHV Drive to condition
ADM Traffic Management Training
Fatigue Collision with other 4 5 20 ENG/S Standard Safety berm on haul 1 5 5
vehicle, hit windrow, roll EG road
over
ENG/S All LVs and Manhauls have
EG ROPS intalled.

ADM Work roster (4 weeks on; 2 weeks


off)

ADM Fatigue Management Training

ADM Report to supervisor if fatigue and


STOP the vehicle immediately at
the safe location
F.17.2 Driver and Geting too close with Struck by heavy 4 5 20 ENG/S All LVs and Manhauls have 1 5 5
LV/Medium vehicle traveling at disposal / passengers heavy equipment equipment; Hit by falling EG ROPS intalled.
Loading area rocks

ENG/S Level and wide area constructed


EG
ENG/S Designated LV / Manhaul parking
EG area

ADM Supervisor standby on the area

BHV Maintain safe following distance


with another vehicle

ADM Driver must has valid PIT


SIMPER
ADM Traffic Management Training

BHV Maintain two way radio


communication

F.17.3 Driver and Uncontrolled intersection Collision with other 4 5 20 ENG/S Provide road divider on 1 5 5
Vehicle approaching intersections passengers vehicle, hit windrow, roll EG intersection
over

ENG/S "T" intersections are constructed


EG in pit. Avoid "Y" intersectin.

ADM Provide proper safety sign on


each intersection

ADM Ensure clear visibility and safe


before crossing

ADM Give way to trucks or working


equipment

Uncontrolled Document When Printed 98 of 142 LCI-HSE-FM-001A(01)

Feb 2010
ADM Accelerate while crossing the
intersection

F.17.4 Trainee & Trainer Unskilled operator Collision with other 4 4 16 ENG/S All LVs and Manhauls have 1 4 4
Vehicle operated by Trainee vehicle, hit windrow, roll EG ROPS intalled.
over
ADM Don’t drive solo, trainer shall
accompany the trainee at all time

ADM Put mark "T" or "L" on vehicle


being used for training

ADM Avoid busy routes for learning


purposes

F.17.5 Driver or operator Uncontrolled low boy Collision with other 4 4 16 ENG/S Escort the low boy 1 4 4
Heavy haulage with low boy movement; blind spot. vehicle, impacting other EG
vehicle while maneuvering

ADM Maintain two way radio


communication

ADM Travel only through permanent


roads

ADM Driver must has valid PIT


SIMPER
ADM Head lights on

BHV Drive to condition


Driver or operator Low boy stall on the ramp Reversing into other 4 5 20 ENG/S Wheel chock and parking brake 1 5 5
vehicle, hit widrow, roll EG
over
ADM Driver must has valid PIT
SIMPER
ADM Pre start check completed by the
assigned driver / operator at the
beginning of the shift
ADM Make sure load doesn't exceed
the maximum load capacity

Low boy crew Broken / Loosen sling Sling snapped while 4 4 16 ENG/S Use correct sling and in good 1 4 4
securing the load and fall EG condition.
onto people, load fall while
crawling to the bed
ADM Inspect all sling by competent
person and make sure all the
sling have been tagged

ADM Only competent persons to rig up


the load

ADM Secure the load using inspected


sling, chain block and shakles

ADM Spotters assigned during up and


down the ramp

Uncontrolled Document When Printed 99 of 142 LCI-HSE-FM-001A(01)

Feb 2010
ADM Clear away un-necessary
personnel from the area while
load and un-load
F.17.6 Driver and Uncontrolled unit/ vehicle Collision with other 3 3 9 ENG/S Vehicles must have 4x4 FWD 1 3 3
Service vehicle in pit passengers movement. vehicle, hit windrow, roll EG
over

ENG/S Road maintenance


EG
ADM Safety cones in front and behind
serviced vehicle.
ADM Pre start check completed by the
assigned driver / operator at the
beginning of the shift

ADM Routine service schedule

BHV Treat vehicle appropriately

BHV Report to supervisor / radio


room / dispatch / workshop if
items found broken

Driver and Overheat unit/ vehicle Unit on fire 3 3 9 ADM Pre-start check at the beginning 1 3 3
passengers of the shift shall cover spillage
potential on the hot parts of the
equipment
ADM Ensure engines do not over
heated by ensuring coolent
system properly
ADM Train driver on basic fire fighting

BHV No smoking in the cabin

ADM Ensure adequate fire protection in


the unit as well as ERT and water
canon

Uncontrolled Document When Printed 100 of 142 LCI-HSE-FM-001A(01)

Feb 2010
t Team

Names Dept. - Position Sign Off

: Mining Supt

: Project Manager

Legal and Other Requirements


ional Controls Required By whom By When Status
Reference

ID212-HSE-PLN-001 Project Traffic


Management Plan

IAM-ASP-PRO-024(02) Specification of
assets

IAM-OEU-PR.008(01) Simper System Policy

Uncontrolled Document When Printed 101 of 142 LCI-HSE-FM-001A(01)

Feb 2010
Uncontrolled Document When Printed 102 of 142 LCI-HSE-FM-001A(01)

Feb 2010
Uncontrolled Document When Printed 103 of 142 LCI-HSE-FM-001A(01)

Feb 2010
Uncontrolled Document When Printed 104 of 142 LCI-HSE-FM-001A(01)

Feb 2010
PT. UNITEDA ARKATO

RISK ASSESSMENT REPORT

Risk Assessment Team


Business Unit / Project : UA-HSE-HO-BSI Gold Mine Project
Names Dept - Position Sign Off
Date : 10-Jan-17

Team Leader : Team Members


Reference Number : F.18.GEN-Parking
Facilitator :

Process/Activity : Team Members :


Parking

Approved By

(PM/Delegated)
Note: Attach meeting attandance if more.

Hirarchy Control

Hirarchy Control
Risk Identified
People /
Process / Activity / Task Environment at Hazard / Cause of Incident / Adverse L1 C1 RFN ** Current Mitigating Controls L2 C2 RRN * Additional Controls Re
Risk Adverse Effect / Effect / Environmental
Environmental Aspect Impact

F.18.1 Driver and Parking at the hauling Run over by moving truck, 4 5 20 ENG/S Provide fundamentally stable 1 4 4
Vehicle parking in the pit due to breakdown passengers road impacted by working dozer EG parking area
or grader
ADM Installed wheel chock

ADM Turn on the hazard lights

F.18.2 Driver and Close interaction with Run over by moving truck, 4 5 20 ENG/S Provide LV parking area, drive 1 5 4
LV/Medium vehicle parking at disposal / Loading passengers heavy equipment impacted by working dozer EG through parking fundamentaly
area or grader stable
ENG/S Parked up at safe place such as
EG near lighting plant or lighting
tower and bundwall as barricade
ADM Supervise on the disposal

ADM Maintain two way radio


communication if required to
approach trucks or support
equipment

Uncontrolled Document When Printed 105 of 142 LCI-HSE-FM-001A(01)

Feb 2010
t Team

Names Dept. - Position Sign Off

: Mining Supt

: Project Manager

Legal and Other Requirements


ional Controls Required By whom By When Status
Reference

Uncontrolled Document When Printed 106 of 142 LCI-HSE-FM-001A(01)

Feb 2010
PT. UNITEDA ARKATO

RISK ASSESSMENT REPORT

Risk Assessment Team


Business Unit / Project : UA-HSE-HO-BSI Gold Mine Project
Names Dept - Position Sign Off
Date : 10-Jan-17

Team Leader : Team Members


Reference Number : F.19.GEN-EquipRecovery
Facilitator :

Process/Activity : Team Members :


Equipment recovery and Towing

Approved By

(PM/Delegated)
Note: Attach meeting attandance if more.

Hirarchy Control

Hirarchy Control
Risk Identified
People /
Process / Activity / Task Environment at Hazard / Cause of Incident / Adverse L1 C1 RFN ** Current Mitigating Controls L2 C2 RRN * Additional Controls Re
Risk Adverse Effect / Effect / Environmental
Environmental Aspect Impact

F.19.1 Rescue team, Rescue equipment fingers pinched 4 4 16 ENG All rigging equipment inspected 1 4 4
Install Sling supervisor failures, mis-
communication
ENG Use suitable equipment to
recover the rolled over equipment

BHV keep hand and fingers away from


pinch point

ADM Maintain two way radio


communication

ADM Competent person to rig up

F.19.2 4 4 16 ENG All rigging equipment inspected 1 4 4


Towing unit Rescue team, Collision with other vehicle
rescue equipment failur
supervisor, operators on the road

ENG Use suitable equipment to


recover the rolled over equipment

ENG Ensure brake function properly

ADM Maintain two way radio


communication

ADM Competent person to rig up

Uncontrolled Document When Printed 107 of 142 LCI-HSE-FM-001A(01)

Feb 2010
4 4 16 ADM competent operator and has 1 4 4
Collision with other vehicle Simper
Operator incompetent
on the road

Spotters to control affected traffic

F.19.3 4 4 16 ADM Ensure sling or chain in good 1 4 4


Towing lighting plant or lighting tower condition
Tower collapsed while
Operator fall onto people / workers
being towed

ADM Attached the sling onto grader or


dozer rear hook/lifting lugs

ADM Drag the lighting tower or plant


slowly

ADM Ensure no one around the lighting


plant / tower being towed

ADM Spotter / radio communication


prior crossing the road or
intersections
F.19.4 Operator Lighting plant fell onto Serious injury 4 3 12 ADM Understand the instruction 1 3 3
Setting up lighting plant people manual and risk involve

ENG/S Set lighting plant on level ground


EG and protected by appropriate
windrow
ADM Competent persons

ADM Avoid pinch points

ADM Positive communication with


other people involve

Uncontrolled Document When Printed 108 of 142 LCI-HSE-FM-001A(01)

Feb 2010
t Team

Names Dept. - Position Sign Off

: Project Manager

Legal and Other Requirements


ional Controls Required By whom By When Status
Reference

Uncontrolled Document When Printed 109 of 142 LCI-HSE-FM-001A(01)

Feb 2010
Uncontrolled Document When Printed 110 of 142 LCI-HSE-FM-001A(01)

Feb 2010
PT. UNITEDA ARKATO

RISK ASSESSMENT REPORT

Risk Assessment Team


Business Unit / Project : UA-HSE-HO-BSI Gold Mine Project
Names Dept - Position Sign Off
Date : 10-Jan-17

Team Leader : Team Members


Reference Number : F.20.GEN-NearWater
Facilitator :

Process/Activity : Team Members :


Working near or over water

Approved By

(PM/Delegated)
Note: Attach meeting attandance if more.

Hirarchy Control

Hirarchy Control
Risk Identified
People /
Process / Activity / Task Environment at Hazard / Cause of Incident / Adverse L1 C1 RFN ** Current Mitigating Controls L2 C2 RRN * Additional Controls Re
Risk Adverse Effect / Effect / Environmental
Environmental Aspect Impact

F.20.1 Dewatering crew Fall into pond and 4 4 16 PPE Life jacket shall be worn if 1 4 4
Working on sediment ponds Slippery drowning working inside of the bund wall

ENG/S Standard bund wall constructed


EG

ADM Clear warning signs posted on


the bund wall around the sed
pond
F.20.2 Pit service crew, excavator work area Fall into pond and 4 4 16 ENG/S Maintain exclusion zone for 1 4 4
Constructing sediment ponds supervisor restricted drowning EG excavator

ENG/S Water management to avoid


EG flooded while heavy rain

ADM competent operator and has


Simper

ADM Spotters to control traffic in and


out the pond.

F.20.2 Dewatering crew, Fall into deep river / lake 4 4 16 ADM Fill the water cart only from 1 4 4
Pumping water from river or lake water cart driver Slippery and drowning designated water filling point,

ENG/S construct the adequate bund


EG around the stand pipe,

ADM At least two people working at the


fill point,

PPE wear life jacket adjacent to the


water edge.

Uncontrolled Document When Printed 111 of 142 LCI-HSE-FM-001A(01)

Feb 2010
H.31.3 Supervisor, survey Slippery Fall into the sea and 4 4 16 PPE Crew wearing life jacket. 1 4 4
Working at port or jetty crew, operators drowning

ADM Identify risk associated prior


commencing the task,

ADM Working only at the designated


working area,

ADM Full time supervision,

PPE Ring buoys avilable and equipped


with suitable leght of rope

Uncontrolled Document When Printed 112 of 142 LCI-HSE-FM-001A(01)

Feb 2010
t Team

Names Dept. - Position Sign Off

: Project Manager

Legal and Other Requirements


ional Controls Required By whom By When Status
Reference

Uncontrolled Document When Printed 113 of 142 LCI-HSE-FM-001A(01)

Feb 2010
Uncontrolled Document When Printed 114 of 142 LCI-HSE-FM-001A(01)

Feb 2010
PT. UNITEDA ARKATO

RISK ASSESSMENT REPORT

Risk Assessment Team


Business Unit / Project : UA-HSE-HO-BSI Gol Mine Project
Names Dept - Position Sign Off
Date : 10-Jan-17

Team Leader : Team Members


Reference Number : F.21.GEN-Fueling
Facilitator :

Process/Activity : Team Members :


Fueling at Fuel Farms

Approved By

(PM/Delegated)
Note: Attach meeting attandance if more.

Hirarchy Control

Hirarchy Control
Risk Identified
People /
Process / Activity / Task Environment at Hazard / Cause of Incident / Adverse L1 C1 RFN ** Current Mitigating Controls L2 C2 RRN * Additional Controls Re
Risk Adverse Effect / Effect / Environmental
Environmental Aspect Impact

F.21.1 Fuel farm crew Blind spot Truck run over fuel farm 4 4 16 ENG/S Bund wall around the fuel 1 4 4
Trucks entering fuel farm crew EG tankAuthorized operator

ADM Speed limit 10km.

ADM Engage 1st gear.

ADM Spotter

Speeding Truck run over fuel farm ENG/S Speed limit 10km
crew EG

ADM Adequate illumination during


night time

ADM Follow sign posted

ADM Appropriate traffic management

F.21.2 Operator Blind spot Truck run over fuel farm 4 4 16 ADM Bund wall around the fuel tank 1 4 4
Truck exiting fuel farm crew

ADM Speed limit 10km.

ADM Engage 1st gear.

Uncontrolled Document When Printed 115 of 142 LCI-HSE-FM-001A(01)

Feb 2010
ADM Spotter

Speeding Truck run over fuel farm ENG/S Speed limit 10km
crew EG

ADM Adequate illumination during


night time

ADM Follow sign posted (STOP)

ADM Appropriate traffic management

F.21.3 Fuel farm crew Tangki / hose fuel leaking Truck fire, run over, Oil 3 4 12 ADM Wheel chocked 1 4 4
Fuel transfer from tank to truck spilled into ground

BHV Operator get off the cabin

ADM Turn the engine off

ADM Apply LOTO prior truck walk


around inspection

ADM Inpection and Ensure no leak or


flame within the perimeter of the
fuel farm bay
F.21.4 Tyreman, operator Brake function Tyreman run over due tp 4 4 16 ADM Ensure brake function properly 1 4 4
Truck inspection while being fueling truck improperly braked, and using Wheel chocked
truck moving before
inspection completed

BHV Operator get off the cabin

ADM Turn the engine off

ADM Apply LOTO prior truck walk


around inspection

Uncontrolled Document When Printed 116 of 142 LCI-HSE-FM-001A(01)

Feb 2010
t Team

Names Dept. - Position Sign Off

: Project Manager

Legal and Other Requirements


ional Controls Required By whom By When Status
Reference

Uncontrolled Document When Printed 117 of 142 LCI-HSE-FM-001A(01)

Feb 2010
Uncontrolled Document When Printed 118 of 142 LCI-HSE-FM-001A(01)

Feb 2010
PT. UNITEDA ARKATO

RISK ASSESSMENT REPORT

Risk Assessment Team


Business Unit / Project : UA-HSE-HO-BSI Gold Mine Project
Names Dept - Position Sign Off
Date : 10-Jan-17

Team Leader : Team Members


Reference Number : F.22.GEN-WAH
Facilitator :

Process/Activity : Team Members :


Working at Height

Approved By

(PM/Delegated)
Note: Attach meeting attandance if more.

Hirarchy Control

Hirarchy Control
Risk Identified
People /
Process / Activity / Task Environment at Hazard / Cause of Incident / Adverse L1 C1 RFN ** Current Mitigating Controls L2 C2 RRN * Additional Controls Re
Risk Adverse Effect / Effect / Environmental
Environmental Aspect Impact

F.22.1 People The workers not use body Fall from height 4 4 16 ADM Trained people only to work at 1 4 4
Working on scaffold or work platform harness height
Competent person only to erect
scaffold.
ADM Competent person only to erect
scaffold.

PPE Full body harnesses to be worn

F.22.2 People Ladders broken, ladders Fall from height 4 4 16 ADM Inspect ladders from cracks, 1 4 4
Descending / accending ladders non standart damaged

ADM Apply three points contact

ADM Ensure steps clean and free from


grease, oil

ADM Secure ladders, placed on level


and firm ground

F.22.3 People The workers not use body Fall from height, platform 4 4 16 PPE Full body harnesses 1 4 4
Suspended work platforms harness collapsed, crane
overturned
ADM Competent person only

ADM Fitness for work

ADM Platform inspected

Uncontrolled Document When Printed 119 of 142 LCI-HSE-FM-001A(01)

Feb 2010
ADM Within rated capacity

Uncontrolled Document When Printed 120 of 142 LCI-HSE-FM-001A(01)

Feb 2010
Team

Names Dept. - Position Sign Off

: Project Manager

Legal and Other Requirements


ional Controls Required By whom By When Status
Reference

Uncontrolled Document When Printed 121 of 142 LCI-HSE-FM-001A(01)

Feb 2010
Uncontrolled Document When Printed 122 of 142 LCI-HSE-FM-001A(01)

Feb 2010
PT. UNITEDA ARKATO

RISK ASSESSMENT REPORT

Risk Assessment Team


Business Unit / Project : UA-HSE-HO-BSI Gold Mine Project
Names Dept - Position Sign Off
Date : 10-Jan-17

Team Leader : Team Members


Reference Number : F.23.GEN-Lifting
Facilitator :

Process/Activity : Team Members :


Lifting and Rigging

Approved By

(PM/Delegated)
Note: Attach meeting attandance if more.

Hirarchy Control

Hirarchy Control
Risk Identified
People /
Process / Activity / Task Environment at Hazard / Cause of Incident / Adverse L1 C1 RFN ** Current Mitigating Controls L2 C2 RRN * Additional Controls Re
Risk Adverse Effect / Effect / Environmental
Environmental Aspect Impact

F.23.1 Crane crew Miscommunication Load fall and crush 4 5 20 ADM Risk assessment completed prior 1 5 5
Lifting the load using more than one crane or between the operator and people, crane tipped over, lifting (JSEA, Lift Plan)
lifting the load with unknown weight or center of rigger crane collapsed due to
grafity improperly set up on well
compacted ground

ADM Competent riggers and signalman

ADM All lifting gears inspected and


certified

ADM Lifting Procedure

ADM ERP understood and prepared

ADM Work fully supervised

ADM Traffic management, barricade


the affected area

F.23.2 Crane crew Miscommunication Load fall and crush 4 5 20 ADM Risk assessment completed prior 1 5 5
Routine lifting using single crane / lifting between the operator and people, crane tipped over, lifting (Take 5, ref to JSEA)
equipment rigger crane collapsed due to
improperly set up on well
compacted ground

ADM Competent riggers and signalman

Uncontrolled Document When Printed 123 of 142 LCI-HSE-FM-001A(01)

Feb 2010
ADM All lifting gears inspected and
certified

ADM Lifting Procedure

ADM Traffic management, barricade


the affected area

Uncontrolled Document When Printed 124 of 142 LCI-HSE-FM-001A(01)

Feb 2010
t Team

Names Dept. - Position Sign Off

: Project Manager

Legal and Other Requirements


ional Controls Required By whom By When Status
Reference

Uncontrolled Document When Printed 125 of 142 LCI-HSE-FM-001A(01)

Feb 2010
Uncontrolled Document When Printed 126 of 142 LCI-HSE-FM-001A(01)

Feb 2010
PT. UNITEDA ARKATO

RISK ASSESSMENT REPORT

Risk Assessment Team


Business Unit / Project : UA-HSE-HO-BSI Gold Mine Project
Names Dept - Position Sign Off
Date : 10-Jan-17

Team Leader : Team Members


Reference Number : F.24.GEN-Hot Work
Facilitator :

Process/Activity : Team Members :


Hot Work at Fuel Storage or Confined Space

Approved By

(PM/Delegated)
Note: Attach meeting attandance if more.

Hirarchy Control

Hirarchy Control
Risk Identified
People /
Process / Activity / Task Environment at Hazard / Cause of Incident / Adverse L1 C1 RFN ** Current Mitigating Controls L2 C2 RRN * Additional Controls Re
Risk Adverse Effect / Effect / Environmental
Environmental Aspect Impact

F.24.1 Welding crew Flammable gas or liquid Explosion, 3rd degree 4 5 20 ENG/S Energy isolation, Clear the area 1 5 5
Hot work adjacent to fuel storage leaking, spark burns EG from combustible / flammable
materials.
ENG/S Fire extinguisher available nearby
EG

ENG/S Welding Screen


EG

ADM Isolation the work area with


barricade tape or hard barrier if
available.
ADM Hot work permit (hot work
procedure)

ADM Competent persons only

ADM Emergency Response Plan

PPE Correct welding PPE to be worn

F.24.2 Welding crew Flammable / combustable Explosion, 3rd degree 4 5 20 Eliminat Remove the flammable / 1 5 5
Hot work in a confined spaces materials, Ventilation burns, toxicated, ion combustable materials out from
deficient asphexiated confined space
Eliminat Wash the fuel/oil tank out with
ion water and dispensant if available
to remove the flammable material.
ENG/S Energy isolation
EG

Uncontrolled Document When Printed 127 of 142 LCI-HSE-FM-001A(01)

Feb 2010
ENG/S Adequate Ventilation / Exhaust fan
EG

ENG/S Clear access in and out the space


EG

ENG/S Authorized gas tester to check the


EG air condition

ENG/S Fire extinguisher available nearby


EG

ENG/S Rotation time for working inside


EG confined space

ENG/S Low voltage hand tools


EG

ADM Emergency Response Plan

ADM Entry Permit and Competent


Person

ADM Full time supervisison

PPE Additional PPE such as full body


harnesses and gas mask to be
worn

Uncontrolled Document When Printed 128 of 142 LCI-HSE-FM-001A(01)

Feb 2010
Team

Names Dept. - Position Sign Off

: Project Manager

Legal and Other Requirements


ional Controls Required By whom By When Status
Reference

TCI-H&S-PR-067 Hot work permit

TCI-H&S-PR-067 Hot work permit

TCI-H&S-PR-058 Entry and work in


confined space

Uncontrolled Document When Printed 129 of 142 LCI-HSE-FM-001A(01)

Feb 2010
Uncontrolled Document When Printed 130 of 142 LCI-HSE-FM-001A(01)

Feb 2010
PT. UNITEDA ARKATO

RISK ASSESSMENT REPORT

Risk Assessment Team


Business Unit / Project : UA-HSE-HO-BSI Gold Mine Project
Names Dept - Position Sign Off
Date : 10-Jan-17

Team Leader : Team Members


Reference Number : F.25.GEN-WasteDisposal
Facilitator :

Process/Activity : Team Members :


Waste Disposal

Approved By

(PM/Delegated)
Note: Attach meeting attandance if more.

Hirarchy Control

Hirarchy Control
Risk Identified
People /
Process / Activity / Task Environment at Hazard / Cause of Incident / Adverse L1 C1 RFN ** Current Mitigating Controls L2 C2 RRN * Additional Controls Re
Risk Adverse Effect / Effect / Environmental
Environmental Aspect Impact

F.25.1 Crane crew Overcapacity Crane tipped over, 4 4 16 ADM All lifting equipment inspected 1 4 4
Lifting steel scraps dropped objects, sling before used
snapped, slip, trip and fall,
serious cuts
ADM Rigging and lifting done by
competent persons

EL/SUB Never under suspended load

ADM Fully supervised

ADM Risk assesment prior lifting

ADM SIMPERED crane operator

ADM Hand glove to prevent sharp


object

ADM Manual lifting techniques

F.25.2 Corrosive, burn, toxic, 3 5 15 ADM Identify the the source of waste 1 5 5
Chemical hazardous waste disposal bacteria, inhalation,
Environmental crew Did not have a landfill ingestion, absorbtion
through the skin
ADM Folllow instruction from MSDS

Uncontrolled Document When Printed 131 of 142 LCI-HSE-FM-001A(01)

Feb 2010
PPE PPE worn properly

ADM Ensure approved transporter

ADM Manual lifting techniques

ADM Transporter escorted

ADM Drive to condition

Uncontrolled Document When Printed 132 of 142 LCI-HSE-FM-001A(01)

Feb 2010
t Team

Names Dept. - Position Sign Off

: Project Manager

Legal and Other Requirements


ional Controls Required By whom By When Status
Reference

Uncontrolled Document When Printed 133 of 142 LCI-HSE-FM-001A(01)

Feb 2010
Uncontrolled Document When Printed 134 of 142 LCI-HSE-FM-001A(01)

Feb 2010
PT. UNITEDA ARKATO

RISK ASSESSMENT REPORT

Risk Assessment Team


Business Unit / Project : UA-HSE-HO-BSI Gold Mine Project
Names Dept - Position Sign Off
Date : 10-Jan-17

Team Leader : Team Members


Reference Number : F.26.GEN-Security
Facilitator :

Process/Activity : Team Members :


Security

Approved By

(PM/Delegated)
Note: Attach meeting attandance if more.

Hirarchy Control

Hirarchy Control
Risk Identified
People /
Process / Activity / Task Environment at Hazard / Cause of Incident / Adverse L1 C1 RFN ** Current Mitigating Controls L2 C2 RRN * Additional Controls Re
Risk Adverse Effect / Effect / Environmental
Environmental Aspect Impact

F.26.1 Paassengers, Lost, entering restricted Vehicle roll over, new 4 4 16 ADM Complete pre start check 1 4 4
Personnel entering site driver,Visitor, areas personnel, wrong route
unauthorized
personnel

ADM Travel through assigned route


(haul road)

BHV Obey speed limit and drive to


condition

PPE Wear seat belt all the time, Do


not over capacity

ADM Authorized driver

ADM Non rotine driver shall be


escorted from the main gate

ADM Complete the induction and


clearence processes at the main
gate
ADM Escort required from the gate all
way to the destination

Uncontrolled Document When Printed 135 of 142 LCI-HSE-FM-001A(01)

Feb 2010
t Team

Names Dept. - Position Sign Off

: Project Manager

Legal and Other Requirements


ional Controls Required By whom By When Status
Reference

Uncontrolled Document When Printed 136 of 142 LCI-HSE-FM-001A(01)

Feb 2010
Risk Evaluation
Legend

Likelihood Consequence Risk Factor Number (RFN)


1 : Rare 1 : Very Low 1-2: Negligible
2 : Unlikely 2 : Low 3-5: Minor
3 : Possible 3 : Moderate 6-9: Moderate
4 : Likely 4 : High 10-15: Major
5 : Almost certain 5 : Very High 16-25: Substantial

Hirarchy control
EL/SUB Elimination/Subtitution
ENG/SEG Engineering/Segregation
ADM Administration
BHV Behaviour
PPE Personal Protective Equipment
Residual Risk Number (RRN)
1-2: Negligible
3-5: Minor L1 Likelihood as is
6-9: Moderate L2 Likelihood with mitigating controls in place
10-15: Major C1 Consequence as is
16-25: Substantial C2 Consequence with mitigating controls in place
ing controls in place

igating controls in place