Wire Bonding Quality Assurance and Testing Methods
Global formulation:
• low cost technology
• easy to realize and flexible during application
• strong mechanical stability
• thermal stability (in regard to further processing steps) and
• good long term stability
• low contact resistance
• as much as possible great welding area between wire and metallization
• no physical and chemical interactions with other materials
Test methods:
• visual inspektion MIL-STD 883 method 2010, 2017
• pull test MIL-STD 883 methode 2011 (destructive), methode 2023 (non destructive)
• shear test ASTM F 1269-89
sheet 2
Wire Bonding Quality Assurance and Testing Methods
sheet 3
Wire Bonding Quality Assurance and Testing Methods
sheet 4
Wire Bonding Quality Assurance and Testing Methods
to proof:
proof: selective parameters:
parameters:
- geometry of bond contacts - wire deformation
- loop geometry - snap off behaviour
- placement of bond contacts - position and welded area
- predetermined quantity of loops - adhesion of metallization
- short circuits - missing bonds or loops
Remark:
Remark: Visual inspection of bondpads before wire bonding!
bonding!
sheet 5
Wire Bonding Quality Assurance and Testing Methods
sheet 6
Wire Bonding Quality Assurance and Testing Methods
sheet 7
Wire Bonding Quality Assurance and Testing Methods
sheet 8
Wire Bonding Quality Assurance and Testing Methods
sheet 9
Wire Bonding Quality Assurance and Testing Methods
sheet 10
Wire Bonding Quality Assurance and Testing Methods
sheet 11
Wire Bonding Quality Assurance and Testing Methods
Wedges on chip
Drahtbonds auf dem Chip
-• strongVerdrängung
Starke squeezing out of chip
der Chipmetallisierung
metallization while bonding
durch die Drahtbonds
-• possible evidence
Möglicherweise of aauf
Hinweis too
zusoften
weiche
surface metallization
Oberfläche
sheet 12
Wire Bonding Quality Assurance and Testing Methods
B 2Mil
125µm 150µm 200µm 75µm 90µm 125µm 140µm 70µm
.005in .006in .008in .003in .0036in .005in .0056in .0028in
180µm 200µm 250µm 125µm 120µm 170µm 150µm 112µm
3Mil .0072in .008in .01in .005in .0048in .0064in .006in .0045in
D 4Mil
200µm 280µm 280µm 130µm 150µm 220µm 190µm 130µm
.008in .0112in .0112in .0052in .006in .0088in .0076in .0052in
sheet 13
Wire Bonding Quality Assurance and Testing Methods
sheet 14
Wire Bonding Quality Assurance and Testing Methods
sheet 15
Wire Bonding Quality Assurance and Testing Methods
Optical inspection of die tilting
tilted chip
sheet 16
Wire Bonding Quality Assurance and Testing Methods
Normal Lead
bond line finger
α Swept lead
Integrated
circuit chip
L
sheet 17
Wire Bonding Quality Assurance and Testing Methods
Mechanical
Mechanical bond contact inspection (tests)
tests)
sheet 18
Wire Bonding Quality Assurance and Testing Methods
β β
β β
sheet 19
Wire Bonding Quality Assurance and Testing Methods
Failure modes:
1, 5 Bond lift off from pad metallization
(lift off)
2, 4 Wire break at bond (heelcrack or neck
FR break when ball/wedge bonding)
3 wire break
1. Bond 3
1 2. Bond
2
4 5
sheet 20
Wire Bonding Quality Assurance and Testing Methods
Load/Force
Load/Force distribution while bond pull test load at chip:
F cos (Θ2 - Φ)
2 1/2 F1 = F
F = F 1+ d Φ
F1 = F2 = sin (Θ1 + Θ2)
2 sin Θ 2 2h
load at substrate:
true for Φ = 0, both bond contacts at cos (Θ1 + Φ)
one level and Θ1 = Θ2 = Θ F2 = F
F1
sin (Θ1 + Θ2)
h
Θ1
F2
chip H
Θ2
d1 d2 support
d
sheet 21
Wire Bonding Quality Assurance and Testing Methods
β β
if β β
Conditions
Characteristics laboratory fabrication
pull force
- average value (based on nondeform ed wire) >50 % >50 %
- standard deviation (based on average value) <15 % <25 %
- proportion of values < (based on standards) cN 0% 0%
lift offs
- pull lift off 0% <10 %
- bond lift off 0% 0%
sheet 22
Wire Bonding Quality Assurance and Testing Methods
Minimum pull forces for destructive pull test (MIL STD 883, Methode 2011):
1000
1
2 Wires:
3
Minimum Bond Pull Limit [cN]
1 Au (preseal)
2 Al (preseal)
100
Au (postseal)
3 Al (postseal)
10
25 250 2500
wire diameter [µm]
sheet 23
Wire Bonding Quality Assurance and Testing Methods
Pull
Force
sheet 24
Wire Bonding Quality Assurance and Testing Methods
1 Substrate/Pad
2 Interface Ball/Substrate
3 Au-Ball
4 Shear Tool S Shear Heigth
5 Shear Level FS Shear Force
Source: Dage and „DVS-Merkblatt Drahtbonden“
sheet 25
Wire Bonding Quality Assurance and Testing Methods
Standard report of pull test: Standard AlSi1 wire (30 µm)
Fehlerrate
error rate Pullkraft
pull force
< 6 cN [%]
cN
pull force
US power
%
s [cN] 16,0
80
104/110 10,5 1,6 16,7 10,0 5,0
12,0
109/115 12,0 1,4 6,7 5,0 1,7
114/120 14,5 0,9 0,0 0,0 0,0 60
124/130 15,0 0,8 0,0 0,0 0,0
8,0
134/140 14,5 0,9 0,0 0,0 0,0
144/150 11,5 1,0 11,5 0,0 0,0 40
154/160 8,5 1,2 20,0 0,0 0,0 4,0
20
average
Pullkraft MWpull[cN]
force [cN]
standard deviations[cN]
Standardabweichung [cN]
number of tests: n = 30
0 pull force< <
Pullkraft 6 cN
6 cN [%][%]
104/ Pullabheber [%]
pull lift offs [%]
109/
110 114/ 124/ Bondabheber
bond lift offs[%]
[%]
US time: 30 ms 115 134/
120 130 144/
140 154/
bond force: 32 cN 150
160
tensile wire strength: 19 cN US power 1./2. bond [scale]
scale]
sheet 26
Wire Bonding Quality Assurance and Testing Methods
Failure modes while shear test
schear tool
metallization
ball
shear heigth
sheet 27
Wire Bonding Quality Assurance and Testing Methods
sheet 28
Wire Bonding Quality Assurance and Testing Methods
Heavy wire wedge shear testing
Fshear
Pitch = W + S
W S
sheet 29
Wire Bonding Quality Assurance and Testing Methods
Problems while evaluation of heavy wire shear test results
950
250 µm Al heavy wire on Al sheet
900
800
750
650
0 25 50 75 100 125
Partial shear lift off shear heigth [µm]
Questions: Where is the limit between shear lift off and shear through the
bond? What shear heigth should be choosen while shear testing?
Source: IZM Berlin