FOR contrUction

BOOYOUNG INTERNATIONAL APARTMENTS


MO LAO URBAN AREA, HA DONG DISTRICT, HANOI
REVISION
CT7B: SUB - CIVIL WORK REV
01
02

DATE ISSUE
03
04
05
06
WORK METHOD DRAWING SCHEDULE 07
08
09
10
11
12
NO. DRAWING NUMBER DRAWING NAME ISSUE 13
14
1 FC - MS - F.01 LAYOUT PLAN AND SITE LOGISTIC 1 15
2 FC - MS - F.02 GENERAL CONSTRUCTION SEQUENCE 1
3 FC - MS - F.03A CONNECTION TO EXISING DRAIAGE SYSTEM LAYOUT 1
DEVELOPER
BOOYOUNG VINA
4 FC - MS - F.03B CONNECTION TO EXISING SEWAGE SYSTEM LAYOUT 1 DEVELOPMENT CO.,LTD
5 FC - MS - F.04A SEWAGE / DRAINAGE SYSTEM CONSTRUCTION SEQUENCE 1/2 1
6 FC - MS - F.04B SEWAGE / DRAINAGE SYSTEM CONSTRUCTION SEQUENCE 2/2 1
7 FC - MS - F.04C HUME CONCRETE PIPE INSTALLATION PROCEDURE 1 PROJECT TITLE
FOR CONSTRUCTION

BOOYOUNG INTERNATIONAL
8 FC - MS - F.05 'U' SHAPE GUTTER CONSTRUCTION SEQUENCE 1 APARTMENTS IN MO LAO
URBAN AREA, VIETNAM
9 FC - MS - F.06A STONE PAVING INSTALLATION 1/2 1
LOCAL
10 FC - MS - F.06B STONE PAVING INSTALLATION 2/2 1 MOLAO NEW URBAN AREA,
HA DONG, HANOI, VIETNAM
CT-02,CT-03,CT-04,CT-05,CT-06
11 FC - MS - F.06C STONE PAVER INSTALLATION PROCEDURE 1 AND CT-07
LOCAL ARCHITECTS
12 FC - MS - F.07 KERB CONSTRUCTION SEQUENCE 1
HANOI CONSTRUCTION CONSULTANT
13 FC - MS - F.08A INTERLOCKING CONCRETE PAVER INSTALLATION 1 AND URBAN DEVELOPMENT INVESTMENT JSC
14 FC - MS - F.08B INTERLOOKING CONCRETE PAVER INSTALLATION PROCEDURE 1
15 FC - MS - F.09A PAINT MAKING CONSTRUCTION SEQUENCE 1/2 1
16 FC - MS - F.09B PAINT MAKING CONSTRUCTION SEQUENCE 2/2 1
17 FC - MS - F.10 PLANTER WALL CONSTRUCTION SEQUENCE 1
18 FC - MS - F.11 SOFTSCAPE WORKING SEQUENCE 1 CONTRACTOR
19 FC - MS - F.12A PLANTS AND TREES 1/3 1
20 FC - MS - F.12B PLANTS AND TREES 2/3 1 VILAI VIET CONSTRUCTION JOINT STOCK COMPANY
21 FC - MS - F.13A SAFETY MANAGEMENT PLAN 1/2 1
22 FC - MS - F.13B SAFETY MANAGEMENT PLAN 2/2 1
DRAWN
DRAWN TITLE
COVER SHEET
APRIL - 2017 STAGE FOR CONTRUCTION
SCALE DATE DRAWING NO.
A3 1/
A1 1/
FOR contrUction
LAYOUT PLAN AND SITE LOGISTIC
ĐƯỜNG TRỤC CHÍNH (MỖ LAO) REVISION
REV DATE ISSUE
MAIN ROAD (MỖ LAO) 01
02
03
04
05
06
07
08
09
10
11
12
13
14
15
3
DEVELOPER
BOOYOUNG VINA
DEVELOPMENT CO.,LTD
PROJECT TITLE
BOOYOUNG INTERNATIONAL
APARTMENTS IN MO LAO
URBAN AREA, VIETNAM
LOCAL
MOLAO NEW URBAN AREA,
HA DONG, HANOI, VIETNAM
1 2 CT-02,CT-03,CT-04,CT-05,CT-06
AND CT-07
LOCAL ARCHITECTS
HANOI CONSTRUCTION CONSULTANT
AND URBAN DEVELOPMENT INVESTMENT JSC
CONTRACTOR
VILAI VIET CONSTRUCTION JOINT STOCK COMPANY
LEGEND
DRAWN
1 2 3 DRAWN TITLE
LAYOUT PLAN AND SITE LOGISTIC
Stockpiling Yard Storage & Fabrication Storage STAGE
SCALE
FOR CONTRUCTION
DATE DRAWING NO.
A3 1/
FC - MS - F.01
A1 1/
FOR contrUction
GENERAL CONSTRUCTION SEQUENCE
MAIN ROAD (MỖ LAO)
CONSTRUCTION SEQUENCE: ĐƯỜNG TRỤC CHÍNH (MỖ LAO)
4 3 1
REVISION
REV DATE ISSUE
01
02
03
04
05
06
07
08
09
10
11
12
13
14
15
DEVELOPER
BOOYOUNG VINA
DEVELOPMENT CO.,LTD
PROJECT TITLE
BOOYOUNG INTERNATIONAL
2 APARTMENTS IN MO LAO
URBAN AREA, VIETNAM
LOCAL
MOLAO NEW URBAN AREA,
HA DONG, HANOI, VIETNAM
CT-02,CT-03,CT-04,CT-05,CT-06
AND CT-07
LOCAL ARCHITECTS
HANOI CONSTRUCTION CONSULTANT
AND URBAN DEVELOPMENT INVESTMENT JSC
KERB INSTALLATION
CONTRACTOR
- GET PERMIT FROM
AUTHORITY LAYING STONE TILE
CONSTRUCTION OF 'U' CARPARK & MOTOBIKE
- CONSTRUCTION OF PAVER CLEANING &
SHAPE GUTTER SOFTSCAPE WORK
SEWAGE & INTERLOCKING LINE MARKING HANDOVER VILAI VIET CONSTRUCTION JOINT STOCK COMPANY
DRAINAGE SYSTEM CONRETE PAVER
CONSTRUCTION OF DRAWN
CONCRETE PLANTER DRAWN TITLE
WALL GENERAL CONSTRUCTION SEQUENCE
STAGE FOR CONTRUCTION
SCALE DATE DRAWING NO.
A3 1/
FC - MS - F.02
A1 1/
FOR contrUction
CONNECTION TO EXISTING DRAINAGE SYSTEM LAYOUT
REVISION
REV DATE ISSUE
01
02
CP1 CP2 CP4 03
04
05
GT7 GT6 GT5
06
07
GT8 08
09
10
TN3 L=5.9 L=6.6 m 11
HG1 L=17.1 m TN1 L=8.3 mTN2 L=10.9 m m TN4 TN5 L=14 m TN6 L=14.4 mTN7 TN8 L=13.6 m TN9 12
13
m MAIN ENT. SUB ENT
6 14
3. 15
L=
L=4,5 m

L=4,5 m
L=4,5 m

L=4,5 m
D.A D.A
D.A
L= m
L=10.1 m

6.0
D.A
TN20 6.
OUT
L=18,4 m L=15,0 m L=24,8 m L=6,3 m DN
L=
COME
2 DN.

L=8.4 m
D.A
m
DEVELOPER
L=4,5 m BOOYOUNG VINA

L=16,4 m
DEVELOPMENT CO.,LTD
CORRIDOR
TN19 SECURITY
L=6.9 m CORRIDOR HALL HALL
MOTOR-BIKE
L=4,5 m m PROJECT TITLE
3.0
PARKING LOT(8)
BOOYOUNG INTERNATIONAL
L=
L=31.9 m

D.A
GARBAGE
ROOM
P.S
P.S
GARBAGE
ROOM
P.S
D.A
APARTMENTS IN MO LAO
S.T S.T L=17.5 m URBAN AREA, VIETNAM
L=5.4 m
L=4.9 m

E. S.T S.T
P. LOCAL
S ELEV. ELEV.
DN HALL HALL MOLAO NEW URBAN AREA,

L=10.5 m
MAIN ENT. MAIN ENT HA DONG, HANOI, VIETNAM
DN
DN UP L=7,2 m MOTOR-BIKE CT-02,CT-03,CT-04,CT-05,CT-06

L=10.5 m
D.A UP
DN PARKING LOT(23)
AND CT-07
E.P.S
9m

LOCAL ARCHITECTS
UP
CAR RAMP MOTOR-BIKE RAMP#3
L=5.

CAR ENT. HANOI CONSTRUCTION CONSULTANT


DN CAR PARKING LOT(28) IN AND URBAN DEVELOPMENT INVESTMENT JSC

m
L=5.1 m

.6
L=4.
L =5
TN18 L L =
OIL TANK

L=4.
=8
430 1

11
L=1 1.0
1 .1 m L=5.8 m .0 m
MOTOR-BIKE

.4 m

L=
MOTOR-BIKE
m PARKING LOT ( 26 )
L=15.5 m

9m
PARKING LOT(36)
L=13.5 m L=15.5 m

9m
GAS HOUSE
L=5.9 m L=6.6 m L=12.8 m
TN17 L=17.9 m TN16 TN15 TN14 TN13 TN12 TN11
TN11'
CONTRACTOR
MAIN ENT. MAIN ENT.
LEGEND VILAI VIET CONSTRUCTION JOINT STOCK COMPANY
HUME CONCRETE D500, L=29.0 m BIG MANHOLE DRAINAGE, 3 NOS
HUME CONCRETE D300, L=113,8 m PIT DRAINAGE, 40 NOS
PVC D250 , L=18,5 m
DRAWN
PVC D200, L=192.6 m DRAWN TITLE
CONNECTION TO EXISTING
SEWAGE SYSTEM LAYOUT
PVC D100 , L=155.5 m
STEEL D150, L=38.7 m STAGE
SCALE
FOR CONTRUCTION
DATE DRAWING NO.
A3 1/
FC - MS - F.03A
A1 1/
FOR contrUction
CONNECTION TO EXISTING SEWAGE SYSTEM LAYOUT
REVISION
REV DATE ISSUE
01
02
CP1 CP2 CP4 03
04
05
GT7 GT6 GT5
06
07
GT8 08
09
10
TN3 L=5.9 L=6.6 m 11
HG1 L=17.1 m TN1 L=8.3 mTN2 L=10.9 m m TN4 TN5 L=14 m TN6 L=14.4 mTN7 TN8 L=13.6 m TN9 12
13
m MAIN ENT. SUB ENT
6 14
3. 15
L=
L=4,5 m

L=4,5 m
L=4,5 m

L=4,5 m
D.A D.A
D.A
L= m
L=10.1 m

6.0
D.A
TN20 6.
OUT
L=18,4 m L=15,0 m L=24,8 m L=6,3 m DN
L=
COME
2 DN.

L=8.4 m
D.A
m
DEVELOPER
L=4,5 m BOOYOUNG VINA

L=16,4 m
DEVELOPMENT CO.,LTD
CORRIDOR
TN19 SECURITY
L=6.9 m CORRIDOR HALL HALL
MOTOR-BIKE
L=4,5 m m PROJECT TITLE
3.0
PARKING LOT(8)
BOOYOUNG INTERNATIONAL
L=
L=31.9 m

D.A
GARBAGE
ROOM
P.S
P.S
GARBAGE
ROOM
P.S
D.A
APARTMENTS IN MO LAO
S.T S.T L=17.5 m URBAN AREA, VIETNAM
L=5.4 m
L=4.9 m

E. S.T S.T
P. LOCAL
S ELEV. ELEV.
DN HALL HALL MOLAO NEW URBAN AREA,

L=10.5 m
MAIN ENT. MAIN ENT HA DONG, HANOI, VIETNAM
DN
DN UP L=7,2 m MOTOR-BIKE CT-02,CT-03,CT-04,CT-05,CT-06

L=10.5 m
D.A UP
DN PARKING LOT(23)
AND CT-07
E.P.S
9m

LOCAL ARCHITECTS
UP
CAR RAMP MOTOR-BIKE RAMP#3
L=5.

CAR ENT. HANOI CONSTRUCTION CONSULTANT


DN CAR PARKING LOT(28) IN AND URBAN DEVELOPMENT INVESTMENT JSC

m
L=5.1 m

.6
L=4.
L =5
TN18 L L =
OIL TANK

L=4.
=8
430 1

11
L=1 1.0
1 .1 m L=5.8 m .0 m
MOTOR-BIKE

.4 m

L=
MOTOR-BIKE
m PARKING LOT ( 26 )
L=15.5 m

9m
PARKING LOT(36)
L=13.5 m L=15.5 m

9m
GAS HOUSE
L=5.9 m L=6.6 m L=12.8 m
TN17 L=17.9 m TN16 TN15 TN14 TN13 TN12 TN11
TN11'
CONTRACTOR
MAIN ENT. MAIN ENT.
LEGEND VILAI VIET CONSTRUCTION JOINT STOCK COMPANY
HUME CONCRETE 300, L=21.0 m
MANHOLE SEWAGE, 2 NOS
DRAWN
DRAWN TITLE
CONNECTION TO EXISTING
DRAINAGE SYSTEM LAYOUT
STAGE FOR CONTRUCTION
SCALE DATE DRAWING NO.
A3 1/
FC - MS - F.03B
A1 1/
FOR contrUction
SEWAGE / DRAINAGE SYSTEM CONSTRUCTION SEQUENCE 2/2
STEP 2: PIPE LINE INSTALLATION:
- Construction pipe bedding
- Install pipe line by Excavator
- Pipe jointing REVISION
REV DATE ISSUE
- Backfill surround pipe line 01
02
- Connection pipe to Manhole 03
04
05
06
MANHOLD DETAIL 07
08
START ZONE 1 ZONE 4 ZONE 2 09
A 10
TN3 L=5.9 L=6.6 m 11
HG1 TN1 L=8.3 mTN2 L=10.9 m m TN4 TN5 L=14 m TN6 L=14.4 mTN7 TN8 L=13.6 m TN9 12
m 13
6
3. L=17.1 m HG3
PIPE LINE INSTALLATION DIRECTION 14
L= m PIPE HUME D300, L=113,8 m
15
6 .0
L=10.1 m

TN20 L=
L= PIPE HUME D450, L = 29.0 m
6.
2 PIPE UPVCD300, L=192,6 m
m
DEVELOPER
STEEL PIPE, L=38,7 m BOOYOUNG VINA
DEVELOPMENT CO.,LTD
PERFORATED DRAINPIPE
L=6.9 m
TN19 D100, L=155.5 m
PIPE UPVC D250, L=18,5 m
m HG2
3 .0
L= PROJECT TITLE
L=4.9 m
L=31.9 m

L=5.4 m BOOYOUNG INTERNATIONAL

L=10.0 m
APARTMENTS IN MO LAO
URBAN AREA, VIETNAM

L=10.5 m
B

L=10.5 m
LOCAL
MOLAO NEW URBAN AREA,
HA DONG, HANOI, VIETNAM
9m

CT-02,CT-03,CT-04,CT-05,CT-06
TN10 AND CT-07
L=5.

LOCAL ARCHITECTS

m
L=5.1 m

1.6
L= 4
L=

L =5
TN18 L= HANOI CONSTRUCTION CONSULTANT

L= 4
L= 11 8.0 11.0
AND URBAN DEVELOPMENT INVESTMENT JSC
L=5.8 m

1
.1 m m

.4 m

.9 m
m

L=
L=5.9 m L=15.5 m L=13.5 m L=15.5 m

.9 m
L=17.9 m L=6.6 m L=12.8 m
TN17 TN16 TN15 TN14 TN13 TN12 TN11
TN11'
ZONE 3
CONTRACTOR
+6.424
FORMWORK SUPPORT SYSTEM
VILAI VIET CONSTRUCTION JOINT STOCK COMPANY
ground level ground level
BLACK FILL SOIL
+5.416
+5.266
DRAWN
DRAWN TITLE
SEWAGE / DRAINAGE SYSTEM
100MM CRUSHED STONE CONSTRUCTION SEQUENCE 2/2
CONCRETE SURROUDRCE
CRUSSHED STONE
STAGE FOR CONTRUCTION
SECTION A-A SECTION B-B CAST IN-SITU MANHOLE CONSTRUCTION DETAIL DETAIL OF CONNECTION PIPE TO MANHOLE SCALE DATE DRAWING NO.
A3 1/
FC - MS - F.04B
A1 1/
FOR contrUction
HUME CONCRETE PIPE INSTALLATION PROCEDURE
REVISION
REV DATE ISSUE
01
02
03
04
05
06
07
08
09
10
11
12
13
14
15
DEVELOPER
BOOYOUNG VINA
DEVELOPMENT CO.,LTD
PROJECT TITLE
BOOYOUNG INTERNATIONAL
APARTMENTS IN MO LAO
URBAN AREA, VIETNAM
LOCAL
MOLAO NEW URBAN AREA,
HA DONG, HANOI, VIETNAM
CT-02,CT-03,CT-04,CT-05,CT-06
AND CT-07
LOCAL ARCHITECTS
HANOI CONSTRUCTION CONSULTANT
AND URBAN DEVELOPMENT INVESTMENT JSC
CONTRACTOR
VILAI VIET CONSTRUCTION JOINT STOCK COMPANY
DRAWN
DRAWN TITLE
HUME CONCRETE PIPE INSTALLATION
PROCEDURE
STAGE FOR CONTRUCTION
SCALE DATE DRAWING NO.
A3 1/
FC - MS - F.04C
A1 1/
FOR contrUction
'U' SHAPE GUTTER CONSTRUCTION SEQUENCE
CONSTRUCTION SEQUENCE :
REVISION
REV DATE ISSUE
01
02
03
04
05
ZONE 1 06
07
08
09
10
11
12
13
14
ZONE 2
START ZONE 1 15
A
DEVELOPER
L= 6,8 m BOOYOUNG VINA
ZONE 3 DEVELOPMENT CO.,LTD
L= 21,2 m
ZONE 3
GUTTER INSTALLATION PROJECT TITLE
DIRECTION ZONE 2 BOOYOUNG INTERNATIONAL
APARTMENTS IN MO LAO
URBAN AREA, VIETNAM
TRENCH GUTTER - 80.2m LOCAL
MOLAO NEW URBAN AREA,
L= 26,3 m L= 25,9 m HA DONG, HANOI, VIETNAM
CT-02,CT-03,CT-04,CT-05,CT-06
AND CT-07
LOCAL ARCHITECTS
HANOI CONSTRUCTION CONSULTANT
AND URBAN DEVELOPMENT INVESTMENT JSC
Pavement level Grating cover
LEGEND
U SHAPE GUTTER, L=80.2 m
CONTRACTOR
CONCRETE FLOOR VILAI VIET CONSTRUCTION JOINT STOCK COMPANY
SECTION A-A
DRAWN
DRAWN TITLE
'U' SHAPE GUTTER CONSTRUCTION
SEQUENCE
STAGE FOR CONTRUCTION
SCALE DATE DRAWING NO.
A3 1/
FC - MS - F.05
A1 1/
FOR contrUction
STONE PAVING INSTALLATION 1/2
Step 1: Lay, spread & compacted crushed stone layer
CONSTRUCTION SEQUENCE: A=41,4 m2
D800 D800
4 S=240,8 m2
REVISION
REV DATE ISSUE
01
A 02
2

03
S=75,3 m

04
mixed stone (T=120) 05
06
07
Section A - A(4) 08
09
10
11
mixed stone (T=120) 12
13
14
Section B - B(1,2,3) 15
1
2 3 DEVELOPER
BOOYOUNG VINA
DEVELOPMENT CO.,LTD
B
PROJECT TITLE
Step 2: Install one layer of wire mesh and cast-insitu 100mm thick concrete paving BOOYOUNG INTERNATIONAL
APARTMENTS IN MO LAO
URBAN AREA, VIETNAM
CONSTRUCTION SEQUENCE:
A=41,4 m2 LOCAL
MOLAO NEW URBAN AREA,
D800 D800 HA DONG, HANOI, VIETNAM
CT-02,CT-03,CT-04,CT-05,CT-06
2 S=240,8 m2 AND CT-07
LOCAL ARCHITECTS
A stone TILE laying direction HANOI CONSTRUCTION CONSULTANT
AND URBAN DEVELOPMENT INVESTMENT JSC
2
S=75,3 m

concrete (T=100)
mixed stone (T=120)
Section A - A
CONTRACTOR
concrete (T=100)
mixed stone (T=120) VILAI VIET CONSTRUCTION JOINT STOCK COMPANY
1 Section B - B
B
DRAWN
DRAWN TITLE
STONE PAVING INSTALLATION 1/2
STAGE FOR CONTRUCTION
SCALE DATE DRAWING NO.
A3 1/
FC - MS - F.06A
A1 1/
FOR contrUction
STONE PAVING INSTALLATION 2/2
Step 3: Construction of 30mm cement & sand bedding layer, laying stone tile paving
CONSTRUCTION SEQUENCE: A=41,4 m2 REVISION
D800 D800 REV DATE ISSUE
2 S=240,8 m2 01
02
03
04
A 05
06
2

07
S=75,3 m

08
09
10
11
12
13
14
15
DEVELOPER
S=1343,2 m2 BOOYOUNG VINA
DEVELOPMENT CO.,LTD
1
PROJECT TITLE
BOOYOUNG INTERNATIONAL
B APARTMENTS IN MO LAO
URBAN AREA, VIETNAM
LOCAL
stone TILE laying direction MOLAO NEW URBAN AREA,
HA DONG, HANOI, VIETNAM
CT-02,CT-03,CT-04,CT-05,CT-06
AND CT-07
granite stone 400 x 400 x 20
sand + cement (T=30)
S=240,8 m2 LOCAL ARCHITECTS
concrete (T=100)
HANOI CONSTRUCTION CONSULTANT
AND URBAN DEVELOPMENT INVESTMENT JSC
mixed stone (T=150)
Section A - A
stone tile 100 x 100 x 50
sand + cement (T=30)
S=1343,2 m2
concrete (T=100) CONTRACTOR
mixed stone (T=120)
VILAI VIET CONSTRUCTION JOINT STOCK COMPANY
Section B - B
DRAWN
DRAWN TITLE
STONE PAVING INSTALLATION 2/2
STAGE FOR CONTRUCTION
SCALE DATE DRAWING NO.
A3 1/
A1 1/
FC - MS - F.06B
FOR contrUction
STONE PAVER INSTALLATION PROCEDURE
REVISION
REV DATE ISSUE
01
02
03
04
05
06
07
08
09
10
11
12
13
14
15
DEVELOPER
BOOYOUNG VINA
DEVELOPMENT CO.,LTD
PROJECT TITLE
BOOYOUNG INTERNATIONAL
APARTMENTS IN MO LAO
URBAN AREA, VIETNAM
LOCAL
MOLAO NEW URBAN AREA,
HA DONG, HANOI, VIETNAM
CT-02,CT-03,CT-04,CT-05,CT-06
AND CT-07
LOCAL ARCHITECTS
HANOI CONSTRUCTION CONSULTANT
AND URBAN DEVELOPMENT INVESTMENT JSC
CONTRACTOR
VILAI VIET CONSTRUCTION JOINT STOCK COMPANY
DRAWN
DRAWN TITLE
STONE PAVER INSTALLATION
PROCEDURE
STAGE FOR CONTRUCTION
SCALE DATE DRAWING NO.
A3 1/
FC - MS - F.6C
A1 1/
FOR contrUction
L=6,9 m
KERB CONSTRUCTION SEQUENCE
1. CONCRET KERB L=17,5 m
- Prepare subgrade L=23,3 m L=5,3 m L=5,3 m L=2,7 m
- Install pre - cast kerb by manual & excavator
- Jointing and finishing
L=6,2 m
L=6,2 m REVISION
REV DATE ISSUE
01
kerb 02
03
L=24,1 m 04
05
3 paving 06
07
L=23,5 m

08
09
10
11
12
13
L=7,8 m
L=7,8 m 14
15
L=2,0 m
L=2,0 m
crushed stone
L=38,4 m SECTION A - A
L=38,4 m
L=50,3 m
2
DEVELOPER
BOOYOUNG VINA
Construction direction
L=48,7 m 1 L=50,5 m
3 L=21,1 m DEVELOPMENT CO.,LTD
PROJECT TITLE
KERB CONCRETE : 18x20x100 cm, L= 144,4 m BOOYOUNG INTERNATIONAL
A APARTMENTS IN MO LAO
URBAN AREA, VIETNAM
L=6,9 m L=17,5 m LOCAL
MOLAO NEW URBAN AREA,
2. STONE KERB INSTALLATION SEQUENCE
L=23,3 m L=5,3 m 4 L=5,3 m L=2,7 m
HA DONG, HANOI, VIETNAM
CT-02,CT-03,CT-04,CT-05,CT-06
AND CT-07
- Stone kerb stockpilling MAIN ENT. SUB ENT
LOCAL ARCHITECTS
- Install kerb by Excavator D.A
D.A
D.A
OUT L=6,2 m D.A
DN
- Kerb jointing & finish COME
DN.
HANOI CONSTRUCTION CONSULTANT
AND URBAN DEVELOPMENT INVESTMENT JSC
L=6,2 m
D.A
CORRIDOR
Construction direction L=24,1 m SECURITY
HALL HALL
CORRIDOR
MOTOR-BIKE
PARKING LOT(8)

L=23,5 m
1
D.A
GARBAGE P.S D.A
GARBAGE
ROOM P.S P.S
ROOM
S.T S.T

L=46,2 m
E S.T S.T
.
P
.
S ELEV. ELEV.
DN HALL HALL
MAIN ENT. CONTRACTOR
MAIN ENT
DN
D.A
DN UP
UP
MOTOR-BIKE
DN PARKING LOT(23)
L=7,8 m
E.P.S
UP
CAR ENT.
L=2,0 m DN
CAR RAMP
CAR PARKING LOT(28) IN
MOTOR-BIKE RAMP#3
OIL TANK

3 VILAI VIET CONSTRUCTION JOINT STOCK COMPANY


MOTOR-BIKE
GAS HOUSE
L=38,4 m MOTOR-BIKE
PARKING LOT(36)
PARKING LOT ( 26 )
L=50,3 m
L=48,7 m L=50,5 m L=21,1 m
MAIN ENT. MAIN ENT.
2 DRAWN
DRAWN TITLE
KERB CONSTRUCTION SEQUENCE
KERB STONE : 15x22x100 cm, L= 193,9 m
KERB STONE : 18x22x100 cm, L= 47.7 m STAGE
SCALE
FOR CONTRUCTION
DATE DRAWING NO.
A3 1/
FC - MS - F.07
A1 1/
FOR contrUction
INTERLOCKING CONCRETE PAVER INSTALLATION
Step 1:
- Prepare subgrade
- Laid, compacted 40mm thick sand bebding D800 D800
S=240,8 m2
REVISION
REV DATE ISSUE
01
Step 2: 02
- Laid interlocking concrete pawer 03
04
- Sand jointing & finish 05
06
07
08
09
1
10
Interlookiing tile laying direction 11
12
13
A 14
15
CONSTRUCTION SEQUENCE: B=1343,2 m2
DEVELOPER
BOOYOUNG VINA
DEVELOPMENT CO.,LTD
PROJECT TITLE
Interlooking (T = 60) BOOYOUNG INTERNATIONAL
APARTMENTS IN MO LAO
Sand beding (T= 40) 239,9 m2 URBAN AREA, VIETNAM
Existing base LOCAL
Step 1: MOLAO NEW URBAN AREA,
HA DONG, HANOI, VIETNAM
- Prepare subgrade Section A - A CT-02,CT-03,CT-04,CT-05,CT-06
AND CT-07
- Laid, compacted 40mm thick sand bebding LOCAL ARCHITECTS
D800 D800 HANOI CONSTRUCTION CONSULTANT
S=240,8 m2 AND URBAN DEVELOPMENT INVESTMENT JSC
Step 2:
- Laid interlocking concrete pawer
- Sand jointing & finish
Interlooking tile laying direction CONTRACTOR
VILAI VIET CONSTRUCTION JOINT STOCK COMPANY
B=1343,2 m2
DRAWN
DRAWN TITLE
INTERLOCKING CONCERETE PAVER
2 A INSTALLATION
STAGE FOR CONTRUCTION
SCALE DATE DRAWING NO.
A3 1/
FC - MS - F.08A
A1 1/
FOR contrUction
INTERLOOKING CONCRETE PAVER INSTALLATION PROCEDURE
REVISION
REV DATE ISSUE
01
02
03
04
05
06
07
08
09
10
11
12
13
14
15
DEVELOPER
BOOYOUNG VINA
DEVELOPMENT CO.,LTD
PROJECT TITLE
BOOYOUNG INTERNATIONAL
APARTMENTS IN MO LAO
URBAN AREA, VIETNAM
LOCAL
MOLAO NEW URBAN AREA,
HA DONG, HANOI, VIETNAM
CT-02,CT-03,CT-04,CT-05,CT-06
AND CT-07
LOCAL ARCHITECTS
HANOI CONSTRUCTION CONSULTANT
AND URBAN DEVELOPMENT INVESTMENT JSC
CONTRACTOR
VILAI VIET CONSTRUCTION JOINT STOCK COMPANY
DRAWN
DRAWN TITLE
INTERLOOKING CONCRETE PAVER
INSTALLATION PROCEDURE
STAGE FOR CONTRUCTION
SCALE DATE DRAWING NO.
A3 1/
FC - MS - F.08B
A1 1/
FOR contrUction
PAINT MAKING CONSTRUCTION SEQUENCE 1/2
CONSTRUCTION SEQUENCE:
3
REVISION
S.T
REV DATE ISSUE
LÊN
UP 01
02
3 2x4+3x2=14m 03
BÃI ĐỂ ÔTÔ (37) CAR PARKING LOT (37) 04
MOTOR-BIKE 05
BÃI ĐỂ XE MÁY (16)
PARKING LOT (16)
06
07
08
09
10
11
S.T S.T S.T
LÊN

P.S
E
ELEV.
2 P.S
S.T S.T

1 12
13
14
.
UP P
. HALL 15
S
CỐT-8,100 LÊN
UP
E.L -8,100
LÊN
UP
E.P.S
4
LÊN
UP
ĐƯỜNG DỐC
CAR RAMP DEVELOPER
SLOPE : 15.8% XUỐNG
DN BOOYOUNG VINA
DEVELOPMENT CO.,LTD
Paint making direction B2 FLOOR - PAINT PUFF
PROJECT TITLE
BOOYOUNG INTERNATIONAL
APARTMENTS IN MO LAO
URBAN AREA, VIETNAM
LOCAL
MOLAO NEW URBAN AREA,
HA DONG, HANOI, VIETNAM
CONSTRUCTION SEQUENCE: CT-02,CT-03,CT-04,CT-05,CT-06
AND CT-07
4 S.T
XUỐNG
DN

LÊN
UP LOCAL ARCHITECTS
HANOI CONSTRUCTION CONSULTANT
1
AND URBAN DEVELOPMENT INVESTMENT JSC
4
P.S
3 P.S
2
S.T S.T S.T
LÊN XUỐNG E
ELEV. S.T S.T
UP DN . HALL CONTRACTOR
P.
S
XUỐNG CỐT-4,400 XUỐNG
DN LÊN DN
E.L -4,400 UP
LÊN
UP
S.A

SLOPE(1%)
VILAI VIET CONSTRUCTION JOINT STOCK COMPANY
LÊN LÊN
UP UP
ĐƯỜNG DỐC
CAR RAMP SLOPE : 15.8%
XUỐNG XUỐNG
DN DN
B1 FLOOR - PAINT PUFF
DRAWN
DRAWN TITLE
PAINT MAKING CONSTRUCTION
SEQUENCE 1/2
STAGE FOR CONTRUCTION
SCALE DATE DRAWING NO.
A3 1/
FC - MS - F.09A
A1 1/
FOR contrUction
PAINT MAKING CONSTRUCTION SEQUENCE 2/2
CONSTRUCTION SEQUENCE:
REVISION
REV DATE ISSUE
01
02
03
04
05
06
07
08
09
10
11
12
13
14
15
3 1
DEVELOPER
BOOYOUNG VINA
2 DEVELOPMENT CO.,LTD
PROJECT TITLE
BOOYOUNG INTERNATIONAL
APARTMENTS IN MO LAO
URBAN AREA, VIETNAM
GROUND FLOOR - HOT CASTING LOCAL
MOLAO NEW URBAN AREA,
HA DONG, HANOI, VIETNAM
CT-02,CT-03,CT-04,CT-05,CT-06
CONSTRUCTION SEQUENCE: AND CT-07
LOCAL ARCHITECTS
HANOI CONSTRUCTION CONSULTANT
AND URBAN DEVELOPMENT INVESTMENT JSC
3 2
4

ĐƯỜNG DỐC XE MÁY


MOTOR-BIKE RAMP
1

ĐƯỜNG DỐC XE MÁY


P.S
P.S P.S CONTRACTOR

MOTOR-BIKE RAMP
S.T S.T
LOGIA

SLOPE : 15.6%
LÊN S.T S.T
UP
E
.
P
.
ELEV. ELEV.
XUỐNG S
DN
HALL HALL
CỐT +4,200 LÊN
OUT G.L +4,200 G.L +4,200
UP
XUỐNG
VILAI VIET CONSTRUCTION JOINT STOCK COMPANY
XUỐNG DN
DN
E.P.S
SLOPE : 13.9%
2ND FLOOR - PAINT PUFF DRAWN
DRAWN TITLE
PAINT MAKING CONSTRUCTION
SEQUENCE 2/2
Paint making direction STAGE FOR CONTRUCTION
SCALE DATE DRAWING NO.
A3 1/
FC - MS - F.09B
A1 1/
FOR contrUction
PLANTER WALL CONSTRUCTION SEQUENCE
B
CONSTRUCTION SEQUENCE
L=44,7 m LỐI VÀO CHÍNH L=38,6 m SUB ENT L=14,2 m L=6,2 m
MAIN ENT.
D.A

OUT
COME
DN.

D.A
D.A D.A
4 D.A D.A
SLOPE : 8.3%
SLOPE : 8.3%
S.T

XUỐNG
DN
STRAIGHT

REVISION
16.67%
SLOPE
Thẳng

REV DATE ISSUE


01
MOTOR-BIKE RAMP#2

1 02
L=68,3 m

Dốc xe máy #2

03
04
05
BÃI ĐỂ XE MÁY (8) 06
MOTOR-BIKE
PARKING LOT(8)
L=22,3 m 07
D.A
SLOPE : 8.3% 08
Độ dốc i=8.3%
S.T
SLOPE : 8.3%
09
Độ dốc i=8.3%
S.T 10
XUỐNG
DN
ĐƯỜNG DỐC CHO NGƯỜI TÀN TẬT L=7,7 m 11
WHEELCHAIR RAMP 12
DN
XUỐNG DN UP MAIN ENT.
XUỐNG LÊN MAIN ENT UP
DN LÊN 13
XUỐNG
D.A 14
L=2,8 m
E.P.S
LÊN
A
3
CỐT -600
UP ĐƯỜNG DỐC ÔTÔ 15
G.L: EL -600
LỐI VÀO ÔTÔ CAR RAMP #1
BÃI ĐỂ ÔTÔ (28)
CAR ENT. XUỐNG SLOPE : 15.8%
DN CAR PARKING LOT(28)
Độ dốc i=15.8%
CỐT -600
G.L: EL -600
P3
BÃI ĐỂ XE MÁY (42)
L=24,2 m
2
MOTOR-BIKE
PARKING LOT(42) DEVELOPER
STORAGE HOUSE
NHÀ KHO
BOOYOUNG VINA
DEVELOPMENT CO.,LTD
L=71,0 m L=70,0 m E
L=96,5 m
LỐI VÀO CHÍNH LỐI VÀO CHÍNH
MAIN ENT. MAIN ENT.
300
75 150 75
PROJECT TITLE
BOOYOUNG INTERNATIONAL
APARTMENTS IN MO LAO
URBAN AREA, VIETNAM
FORMWORK SUPPORT SYSTEM
CONSTRUCTION PROCEDURES: LOCAL
MOLAO NEW URBAN AREA,
CONCRETE 100MM THICK HA DONG, HANOI, VIETNAM
PLANTER WALL TYPE A CT-02,CT-03,CT-04,CT-05,CT-06
AND CT-07
- Cast insitu planter wall LOCAL ARCHITECTS
- Plastering external surface
- Marble paint finish HANOI CONSTRUCTION CONSULTANT
AND URBAN DEVELOPMENT INVESTMENT JSC
300
PLANTER WALL A = 57 m
STEP 1 STEP 2 STEP 3 STEP 4
50 100 100
CONTRACTOR
PLANTER WALL TYPE B STONE TILE
- Cast insitu planter wall VILAI VIET CONSTRUCTION JOINT STOCK COMPANY
FORMWORK SUPPORT SYSTEM FORMWORK SUPPORT SYSTEM
- Marble stone cladding on

450

450

450
external surface and top of wall

450

550

550

550
550
Kerb 150 Kerb 150
PLANTER WALL B = 347,5 m 100MM THICK CONCRETE 100MM THICK CONCRETE

150

150
100

100

100
100
DRAWN
200 200 200 200
DRAWN TITLE
PLANTER WALL CONTRUCTION
SEQUENCE
STAGE FOR CONTRUCTION
STEP 1 STEP 2 STEP 3 STEP 4 SCALE DATE DRAWING NO.
A3 1/
FC - MS - F.10
A1 1/
FOR contrUction
SOFTSCAPE WORKING SEQUENCE
STEP 1: IMPORTED PLANTING SOIL FILLING SEQUENCE
4 REVISION
REV
01

DATE ISSUE
LỐI VÀO CHÍNH
SUB ENT
MAIN ENT. 02
03
04
D.A D.A D.A
D.A D.A SLOPE : 8.3%
05
OUT SLOPE : 8.3%
XUỐNG
DN
COME 06
DN.
1
D.A
07
STRAIGHT

16.67%
SLOPE

08
Thẳng

09
MOTOR-BIKE RAMP#2

10
11
Dốc xe máy #2

12
13
BÃI ĐỂ XE MÁY (8) 14
MOTOR-BIKE
PARKING LOT(8) 15
D.A
SLOPE : 8.3%
Độ dốc i=8.3%
S.T
SLOPE : 8.3%
Độ dốc i=8.3%
S.T
XUỐNG
DN
ĐƯỜNG DỐC CHO NGƯỜI TÀN TẬT
3
WHEELCHAIR RAMP
DN
XUỐNG DN UP MAIN ENT.
XUỐNG LÊN MAIN ENT UP
LÊN
DN
XUỐNG DEVELOPER
D.A
LÊN
E.P.S
BOOYOUNG VINA
CỐT -600
UP ĐƯỜNG DỐC ÔTÔ
CAR RAMP #1
G.L: EL -600 DEVELOPMENT CO.,LTD
BÃI ĐỂ ÔTÔ (28)
XUỐNG SLOPE : 15.8%
DN CAR PARKING LOT(28)
Độ dốc i=15.8%
CỐT -600
G.L: EL -600
P3
Solil Filling Direction BÃI ĐỂ XE MÁY (42)
MOTOR-BIKE
PARKING LOT(42)
STORAGE HOUSE
NHÀ KHO
PROJECT TITLE
BOOYOUNG INTERNATIONAL
APARTMENTS IN MO LAO
MAIN ENT.
2 MAIN ENT.
URBAN AREA, VIETNAM
LOCAL
MOLAO NEW URBAN AREA,
HA DONG, HANOI, VIETNAM
CT-02,CT-03,CT-04,CT-05,CT-06
STEP 2: TREES PLANTING SEQUENCE 4 AND CT-07
LOCAL ARCHITECTS
LỐI VÀO CHÍNH SUB ENT
MAIN ENT.
HANOI CONSTRUCTION CONSULTANT
EXISTING AND URBAN DEVELOPMENT INVESTMENT JSC
TREE
D.A D.A D.A
D.A D.A SLOPE : 8.3%
OUT SLOPE : 8.3%
XUỐNG
DN
COME
D.A
DN.

STRAIGHT
EXISTING

16.67%
SLOPE
TREE

Thẳng
MOTOR-BIKE RAMP#2
1 EXISTING

Dốc xe máy #2
CHUỖI NGỌC CÂY NGÂU HOA DỪA CẠN TREE
14 12 13
S.T

SLOPE : 8.3%
Độ dốc i=8.3%

D.A

EXISTING
TREE 3 CONTRACTOR
SLOPE : 8.3%
Độ dốc i=8.3%
S.T
EXISTING
XUỐNG VILAI VIET CONSTRUCTION JOINT STOCK COMPANY
DN
ĐƯỜNG DỐC CHO NGƯỜI TÀN TẬT TREE
WHEELCHAIR RAMP
DN
XUỐNG DN UP MAIN ENT.
XUỐNG LÊN MAIN ENT UP
LÊN
DN
XUỐNG
D.A
E.P.S
LÊN
UP ĐƯỜNG DỐC ÔTÔ CỐT -600
G.L: EL -600 EXISTING
LỐI VÀO ÔTÔ CAR RAMP #1
BÃI ĐỂ ÔTÔ (28) TREE
CAR ENT. XUỐNG SLOPE : 15.8%
DN CAR PARKING LOT(28)
Độ dốc i=15.8%
CỐT -600
G.L: EL -600
P3
BÃI ĐỂ XE MÁY (42)
MOTOR-BIKE
PARKING LOT(42)
STORAGE HOUSE
NHÀ KHO
DRAWN
DRAWN TITLE
SOFTSCAPE WORKING SEQUENCE
2 STAGE
SCALE
A3
A1
1/
1/

FOR CONTRUCTION
DATE DRAWING NO.
FC - MS - F.11
FOR contrUction
PLANTS TREES
REVISION
REV DATE ISSUE
01
X1 X2 X3 X4 X5 X6 X7 X8 X9 X10 X11 X12 X13 X14 X15 X16 X17 X18 X19
02
03
04
TRANG THÁI HUỲNH ANH CAU CẢNH THÔNG THIÊN HỒNG LỘC CỌ CẢNH CÔ TÒNG cau vua
SẾN XANH THIÊN TUẾ 05
15 4 7 6 11 5 2 1 06
07
08
09
10
L=44,7 m LỐI VÀO CHÍNH L=38,6 m SUB ENT L=14,2 m L=6,2 m 11
MAIN ENT.
12
EXISTING
TREE 13
Y7 D.A D.A
D.A
D.A D.A SLOPE : 8.3% 14
VÀNG ANH OUT SLOPE : 8.3%
XUỐNG
DN
15
COME
S.T
DN.
3 D.A
EXISTING
STRAIGHT

Y6
16.67%
SLOPE

TREE
Thẳng
MOTOR-BIKE RAMP#2

DEVELOPER
L=68,3 m

EXISTING
Dốc xe máy #2

CHUỖI NGỌC CÂY NGÂU HOA DỪA CẠN TREE BOOYOUNG VINA
Y5 DEVELOPMENT CO.,LTD
14 12 13
BÃI ĐỂ XE MÁY (8)
Y4 MOTOR-BIKE
PARKING LOT(8)
L=22,3 m EXISTING
TREE
D.A
SLOPE : 8.3%
Y3-1 Độ dốc i=8.3%
S.T
SLOPE : 8.3%
Độ dốc i=8.3%
S.T
Y3 EXISTING PROJECT TITLE
XUỐNG
DN
ĐƯỜNG DỐC CHO NGƯỜI TÀN TẬT L=7,7 m TREE
WHEELCHAIR RAMP BOOYOUNG INTERNATIONAL
DN
MAIN ENT.
XUỐNG DN
XUỐNG
UP
LÊN MAIN ENT UP
LÊN
APARTMENTS IN MO LAO
DN
Y2 XUỐNG URBAN AREA, VIETNAM
D.A
LÊN
UP ĐƯỜNG DỐC ÔTÔ CỐT -600
E.P.S
L=2,8 m
G.L: EL -600 EXISTING
LỐI VÀO ÔTÔ CAR RAMP #1 LOCAL
BÃI ĐỂ ÔTÔ (28) TREE
CAR ENT. XUỐNG SLOPE : 15.8% CAR PARKING LOT(28)
DN
Độ dốc i=15.8% MOLAO NEW URBAN AREA,
CỐT -600
G.L: EL -600 HA DONG, HANOI, VIETNAM
Y1 CT-02,CT-03,CT-04,CT-05,CT-06
P3 AND CT-07
BÃI ĐỂ XE MÁY (42)
MOTOR-BIKE L=24,2 m LOCAL ARCHITECTS
PARKING LOT(42)
STORAGE HOUSE
NHÀ KHO
HANOI CONSTRUCTION CONSULTANT
AND URBAN DEVELOPMENT INVESTMENT JSC
L=71,0 m L=70,0 m E
L=96,5 m
LỐI VÀO CHÍNH LỐI VÀO CHÍNH
MAIN ENT. MAIN ENT.
HỒNG LỘC NGỌC BÚT TRÂM ỔI
10 8
9
CONTRACTOR
01 - CAU VUA
02 - THIÊN TUẾ
03 - VÀNG ANH VILAI VIET CONSTRUCTION JOINT STOCK COMPANY
04 - CAU CẢNH
05 -SẾN XANH
06 -CỌ CẢNH
07 -THÔNG THIÊN
08 -TRÂM ỔI
09 -NGỌC BÚT
10 -HỒNG LỘC
DRAWN
11 -CÔ TÒNG DRAWN TITLE
12 -CÂY NGÂU PLANTS TREES 1/3
13 -HOA DỪA CẠN
14 -CHUỖI NGỌC STAGE FOR CONTRUCTION
15 -TRANG THÁI SCALE DATE DRAWING NO.
A3 1/
FC - MS - F.12A
16 - CỎ TRE A1 1/
FOR contrUction
PLANTS TREES
S=211,5m2
S=170,5m2
REVISION
REV DATE ISSUE
01
X1 X2 X3 X4 X5 X6 X7 X8 X9 X10 X11 X12 X13 X14 X15 X16 X17 X18 X19
02
03
04
TRANG THÁI HUỲNH ANH CAU CẢNH THÔNG THIÊN HỒNG LỘC CỌ CẢNH CÔ TÒNG cau vua
SẾN XANH THIÊN TUẾ 05
15 4 7 6 11 5 2 1 06
07
08
09
10
LỐI VÀO CHÍNH SUB ENT 11
MAIN ENT.
12
EXISTING
13
TREE
Y7 D.A D.A D.A 14
S=100,3m2 D.A D.A SLOPE : 8.3%
OUT 15
VÀNG ANH SLOPE : 8.3%
XUỐNG
DN
COME
S.T
DN.
3 D.A
EXISTING
STRAIGHT

Y6
16.67%
SLOPE

TREE
Thẳng
MOTOR-BIKE RAMP#2

S=48,3m2 DEVELOPER
EXISTING
Dốc xe máy #2

CHUỖI NGỌC CÂY NGÂU HOA DỪA CẠN TREE


BOOYOUNG VINA
Y5 S=19,0m2 DEVELOPMENT CO.,LTD
14 12 13 S=42,8m2
BÃI ĐỂ XE MÁY (8)
Y4
MOTOR-BIKE
PARKING LOT(8) S=19,0m2 EXISTING
TREE
D.A
SLOPE : 8.3%
Y3-1 Độ dốc i=8.3%
S.T
SLOPE : 8.3%
Độ dốc i=8.3%
S.T
Y3 EXISTING PROJECT TITLE
XUỐNG
DN
ĐƯỜNG DỐC CHO NGƯỜI TÀN TẬT TREE
WHEELCHAIR RAMP
BOOYOUNG INTERNATIONAL
DN
XUỐNG DN
XUỐNG
UP
LÊN
MAIN ENT.
MAIN ENT UP
APARTMENTS IN MO LAO
Y2 DN
XUỐNG
LÊN
URBAN AREA, VIETNAM
D.A
E.P.S
LÊN CỐT -600
UP ĐƯỜNG DỐC ÔTÔ EXISTING
G.L: EL -600 LOCAL
LỐI VÀO ÔTÔ CAR RAMP #1
CAR ENT. XUỐNG
DN
SLOPE : 15.8%
BÃI ĐỂ ÔTÔ (28)
CAR PARKING LOT(28)
TREE
S=242,2m2 MOLAO NEW URBAN AREA,
Độ dốc i=15.8%
CỐT -600
G.L: EL -600
HA DONG, HANOI, VIETNAM
Y1 CT-02,CT-03,CT-04,CT-05,CT-06
AND CT-07
P3
BÃI ĐỂ XE MÁY (42)
MOTOR-BIKE LOCAL ARCHITECTS
PARKING LOT(42)
STORAGE HOUSE
NHÀ KHO
HANOI CONSTRUCTION CONSULTANT
AND URBAN DEVELOPMENT INVESTMENT JSC
E
LỐI VÀO CHÍNH
LỐI VÀO CHÍNH
MAIN ENT. MAIN ENT.
HỒNG LỘC NGỌC BÚT TRÂM ỔI
10 8
9
S=95,2m2
CONTRACTOR
S=69,1m2
1 MẶT BẰNG BỐ TRÍ CÂY TỶ LỆ A1 : 1/200
A3 : 1/400
A - SCALE A1 : 1/200
FINISHES PLANT A3 : 1/400
VILAI VIET CONSTRUCTION JOINT STOCK COMPANY
S=1017,9m2
DRAWN
DRAWN TITLE
PLANTS TREES 2/3
STAGE FOR CONTRUCTION
SCALE DATE DRAWING NO.
A3 1/
FC - MS - F.12B
A1 1/
FOR contrUction
SAFETY MANAGEMENT PLAN 1/2
REVISION
REV DATE ISSUE
01
02
03
04
05
06
07
08
09
10
11
12
13
14
15
DEVELOPER
BOOYOUNG VINA
DEVELOPMENT CO.,LTD
PROJECT TITLE
BOOYOUNG INTERNATIONAL
APARTMENTS IN MO LAO
URBAN AREA, VIETNAM
LOCAL
MOLAO NEW URBAN AREA,
HA DONG, HANOI, VIETNAM
CT-02,CT-03,CT-04,CT-05,CT-06
AND CT-07
LOCAL ARCHITECTS
HANOI CONSTRUCTION CONSULTANT
AND URBAN DEVELOPMENT INVESTMENT JSC
CONTRACTOR
VILAI VIET CONSTRUCTION JOINT STOCK COMPANY
DRAWN
DRAWN TITLE
SAFETY MANAGEMENT PLAN1/2
STAGE FOR CONTRUCTION
SCALE DATE DRAWING NO.
A3 1/
FC - MS - F.13A
A1 1/
FOR contrUction
SAFETY MANAGEMENT PLAN 1/2
REVISION
REV DATE ISSUE
01
02
03
04
05
06
07
08
09
10
11
12
13
14
15
DEVELOPER
BOOYOUNG VINA
DEVELOPMENT CO.,LTD
PROJECT TITLE
BOOYOUNG INTERNATIONAL
APARTMENTS IN MO LAO
URBAN AREA, VIETNAM
LOCAL
MOLAO NEW URBAN AREA,
HA DONG, HANOI, VIETNAM
CT-02,CT-03,CT-04,CT-05,CT-06
AND CT-07
LOCAL ARCHITECTS
HANOI CONSTRUCTION CONSULTANT
AND URBAN DEVELOPMENT INVESTMENT JSC
CONTRACTOR
VILAI VIET CONSTRUCTION JOINT STOCK COMPANY
DRAWN
DRAWN TITLE
STAGE FOR CONTRUCTION
SCALE DATE DRAWING NO.
A3 1/
A1 1/
FOR contrUction
SAFETY MANAGEMENT PLAN 2/2
REVISION
REV DATE ISSUE
01
02
03
04
05
06
07
08
09
10
11
12
13
14
15
DEVELOPER
BOOYOUNG VINA
DEVELOPMENT CO.,LTD
PROJECT TITLE
BOOYOUNG INTERNATIONAL
APARTMENTS IN MO LAO
URBAN AREA, VIETNAM
LOCAL
MOLAO NEW URBAN AREA,
HA DONG, HANOI, VIETNAM
CT-02,CT-03,CT-04,CT-05,CT-06
AND CT-07
LOCAL ARCHITECTS
HANOI CONSTRUCTION CONSULTANT
AND URBAN DEVELOPMENT INVESTMENT JSC
CONTRACTOR
VILAI VIET CONSTRUCTION JOINT STOCK COMPANY
DRAWN
DRAWN TITLE
STAGE FOR CONTRUCTION
SCALE DATE DRAWING NO.
A3 1/
FC - MS - F.13B