1. Instruction Reference No. INS/SS/LRUT-001
2. Company: Intertek – Inspec.
3. Purpose: The purpose of this Instruction Sheet is to provide step by step guidance for detection of
volumetric type discontinuities e.g. corrosion in general and associated metal loss in excess of 9% pipe
cross sectional area.
4. Personnel Qualification: All personnel collecting the LRUT data in accordance with this Instruction
Sheet shall be qualified to at least CSWIP Level 1. Additionally the prson must have his eye vision test
carried out and valid during the test to at least Jaeger no. 2 (Near vision) and shall have no color
blindness. Eye test shall be conducted annually.
5. Equipment
5.2. Software
The laptop PC is supplied with Teletest® Version 2 ‘WaveScan™’ data acquisition and processing software.
Laptop PC specification for Teletest WaveScan™:
Processor: 2 Ghz Centrino equivalent or better
Memory: 2GB Recommended (1GB minimum)
Hard Disk: 1 GB Free (500 MB minimum)
Screen: 1024x768
Operating System: Windows XP/ Vista/7.
6. Component Identification:
Component: Pipe
Material: Carbon Steel
Size: 10 inch Sch 40 (Pipe OD: 273mm; thk: 9.27mm)
Coating condition: paint coated.
Pipe length to be tested: 1000 meters
Line ID: xxxx-xx-xxxx-xxx
Service: Fuel Oil
Age: 30 years
Area of inspection for each set up: Depending on the pipe conditions and coating, 30 meters on each side of the
tool can be tested at one set up.
9. Post Test cleaning: Whenever required e. g. in cases where insulation have been removed for the test, proper
arrangements shall be made to restore the insulation or other protective coating fater the test is over.
12. Recording and classifying results: All preliminary analysis and reposring of all inspected locations shall be
carried out at site. All indiactions that are recorded which cannot be related to any known and identified features
such as supports, welds, connections, bends etc. identified during visual inspection and from data collected from
client, shall be reported and interpretd as being originated from corrosion losses. For all corrosion loses, an
estimation of percentage of Cross Section Loss (CSL) shall be provided. The datum point for all such features
shall be noted such as a valve or flange etc.
14. Non Complians: In case, where the instructions provided in this procedure cannot be followed in part or full, the
operator shall not procedd with the test. He shall contact with the supervisor and report the problem and discuss.
Further test shall only be carried out after he get the permission and approval to do so from the appropriate
authority/ supervisor.
Name: name: