APPENDIX A: BASIC DATA

Part 1 Volumes
Total volumes Amount Remarks
Landfilled 174.380
Recycled 18.388
Burned 88
Total annual waste tonnage 192.856 2010 figures

Part 2 Origin
Origin of landfilled waste Amount Remarks
Collected by Selikor: residential MSW 48.076
Collected by Selikor: commercial MSW 23.529
Collected by Residentials 102.744
Non-recyclables 31
Total annual waste tonnage (2010) 174.380

Part 3 Composition
Composition of recycled waste Amount Remarks
Batteries 0
Aluminum 2
Tires 22
Car wrecks 1.194
Asphalt 1.690
Construction Debris (C&D) 13.913
Electronic equipment 32
Glass 456
Metals 26
Plastics 8
White Goods 1.045
Total recycled 18.388

Composition of burned waste Amount Remarks


Medical 32
Documents 27
Chemical 15
Other 14
Total annual waste tonnage 88 Non-recyclable or to be landfilled

Composition of residential MSW % Remarks


Organic 35
Paper 26
Glass 10
Metals 6
Synthetics/plastics 17
Hazardous 1
Other 5
Total 100 Source: EAP 2003

Composition of commercial MSW % Remarks


Organic 25
Paper 38
Plastic 20
Glass 6
Metals 3
Textile 5
Non-combustibles and other 3
Total 100 Source: EAP 2003

Part 4 Landfill

Selikor NV (state-owned) operates the Malpais landfill, a 45 hectare area in the middle of
Curacao. Waste disposed of in the landfill is first compacted and then covered daily with soil in
compliance with international sanitation standards.

Koral Specht transfer station facilitates transportation process and increases efficiency. At the
transfer station all waste collected from the Banda Ariba (East) area of the island is compacted
and stored temporarily in silos. Afterwards, the silos are transported from Koral Specht to
Malpais. The waste is emptied out of the silos for final disposal in the landfill.

Basic information on collection schemes to be found at:


http://www.selikor.com/index.php?option=com_content&view=article&id=93&Itemid=29
Part 5 Electricity production

Item Remarks
Current base/peak load Curacao 100/135MW
Location Waste2energy plant Malpais Details to be determined
Type of production Baseload 24x7
Desired output 10-15MW
Point of connection 12/30kV substation To be built (30kV cable close by)
Contract type PPA + concession
Contract term 10-20 years

You might also like