You are on page 1of 4

Jenis Shift Jam Kerja

N/S 07.30-15.30

A 07.30-15.30

B 15.30-23.30

C 23.30-07.30

jenis bahan baku

No. Jenis Kayu


1. Kayu Sengon
2. Kayu Jabon
3. Kayu Waru
4. Kayu Kejimas
5. Kayu Durian
6. Kayu Mendong
7. Kayu Karet
8. Kayu Kembang
9. Kayu Gamelina
10. Kayu Maesopsis
11. Kayu Mahoni Afrika
12. Kayu Sabrina
13. Kayu Kemiri
supply bahan baku

No. Kabupaten Kubikasi (m³) Persentase (%)


1. Lumajang 5.856,47 25.41%
2. Probolinggo 4.334,99 18.81%
3. Malang 20,83 0.09%
4. Jember 12.013,50 52.12%
5. Bondowoso 288,44 1.25%
6. Situbondo 165,63 0.72%
7. Buleleng 32,61 0.14%
8. Tabanan 19,13 0.08%
9. Jembrana 78,00 0.34%
10. Pamekasan 8,52 0.04%
11. Sampang 80,08 0.35%
12. Sumenep 11,04 0.05%
13. Bangli 54,78 0.24%
14. PT. SGS Unit Banyuwangi 84,40 0.37%
Total 23.048,42 100.00%

jenis kerusakan

Item Reject Afkir


Panjang PJ -
Pendek PDK PDK af
Pecah PC PC af
Lapuk LP LP af
Mata Kayu MK MK af
Bekas Cabang BC BC af
Berlubang BL BL af
Lubang Gerek - LG af
Bontos Ganda BG BG af
Bengkok BK BK af
Diameter Kecil - KCL
Potongan tidak rata TR -

diagram alir proses produksi


produk yang dihasilkan

Tempat Jenis log Produk Peruntukan


Produksi
Floor base 1 Ekspor

Floor base 2 Ekspor


Log 100
SC GP Ekspor, lokal
Jember 1
LC Ekspor, lokal

Face-Back Ekspor
Log 200
LC GP Ekspor
LC 1.0 Ekspor, lokal

UT Lokal
log 130
tebal 3.1 PJ Lokal

BBCC Ekspor

SP Ekspor
Log 130
Tebal 2.0 UT Lokal

PJ Lokal
Jember 2
UT Lokal

PJ Lokal
Log 130
Tebal 3.1 SP Ekspor

Long Core Join Ekspor

You might also like