You are on page 1of 1

PLINTH NEEDED

8mx12m FOR 60m³ OIL

OIL
TAN
KS
PLINTH NEEDED
3.5mx2.5m
FIR
E
CO FIG
NT HTI
AIN NG PLINTH NEEDED 12.2mx12.2m
ER
FOR 500m³ WATER

WATER
89055 TANK

10500

5200
Steel fire escape stair case

X Y WORKSHOP Risers = 27@ 185mm


Treads = 28 @ 280mm
FULL UTILITY BUILDING WIDTH

200
up AS CLOSE TO THE FENCE AS
POSSIBLE
GENERATOR

6300
EM
HOIST TO
MANUFACTURER
5175

SPECS

200
5,000

EXTRUDER

6300
COMPRESSED AIR &
5175

4950
NITROGEN
PACKAGING
FINISHED PRODUCTS
20700

200
28250
INGREDIENT
859sm

DUMPING

4950
5175

7800
WATER
DUMPING

ILLUSTRATION
STEAM SUPPLY
STATION Bridge to carry load
of approx 800kg per

4950
running meter

AIR LOCK

200
Reinforced

2000
W Steel structure bridge
concrete wall
ANDRITZ MCC
EM

30000
to str eng details.
10925

CABLE DUCT
CFAM MCC MISCELLENIOUS

7350
EM

4950
RAW
DD KITCHEN CABLE DUCT STORAGE AREA
MATERIAL
MEETING CONTROL DUMPING DISTRIBUTION BOARD
ROOM ROOM shw

200
DD wc KITCHEN

4950
RAW MATERIAL OFFICE KITCHENETTE Cabinets to Fridge

100
manufacturer's
/ F
17250

specs
STORE
5750

stair case
Risers = 27@ 185mm up External
shoes Shoe
freezer CANTEEN
680sm Treads = 28 @ 280mm covers
cabinet

9050
Hair/beard
Rack for
clean clothes Hand-gloves CLEANING STEAM
HOIST TO
MANUFACTURER
nets cabinet
Waste
bin
Used
clothes Stepover
bench
cabinet
Clean
shoes
PROCESSING
AIR LOCK
z
SPECS
GOWNING

4950
Desinfection
Mirror BEANS FOR FINISHED PRODUCTS
Paper towelSink

3,700
Soap holder Soap holder
5750

RAW MATERIAL DELIVERY TO DD & CFAM P6 P7

200
2,750 5100 5100 5100 5100 5100 5100
224sm 10300
30,600

BLOW DOWN PIT

11000
5200 5200 5200 5200 5200 5200 5200 5200 5200 5200 5200 5200 5200 5200 5200 5200
P1 P2 P3 P4 P5
41,600 41,600
H J
83,200
ENTRANCE

REST

RECEPTION MEETING

4950
EXAMINATION

ROOM
RECEPTION

STORE

STATIONARY
&
PRINTING

4950
RAW MATERIAL
PLINTH NEEDED 1.6MX1.0M (WEIGHT WARE HOUSE up stair case

19800
EXISTING FAFFA WARE HOUSE Risers = 21@ 185mm
Treads = 22 @ 280mm

2580 KG) PROVIDE 1M ALL AROUND


THE LENGTH/WIDTH. FINISHED PRODUCT

4950
LABORATORY Septic tank to eng
details & specs
TRANSFORMER

4950
GENTS
LADIES
MICRO BIOLOGY

OFFICE

5000 5000 5000 5000 5000 5000 5000 5000 5000 5000 5000 5000 5000

35000 30000

GROUND FLOOR

CLIENT: REVISIONS DESIGNER:


APPROVED BY: HG Date: AUGUST 2018 PROJECT NAME FAFFA FOOD PLANT ADDIS ABABA (AI FOODS PLC)
DATE DESCRIPTION
FAFFA FOOD PLANT CHECKED BY: HG Date: AUGUST 2018 DRAWING TITLE DRG. NO.
ADDIS ABABA
(AI FOODS PLC) HP GAUFF INGENIEURE DESIGNED BY: HG Date: AUGUST 2018
GENERAL LAYOUT AIF/E&M/BBUF/001

DRAWN BY: MW Date: AUGUST 2018 SCALE NTS DATE AUGUST 2018