1500
Light fixture
3.0 MM THICK
190 3.0 MM THICK
MILD STEEL 190
MILD STEEL
BRACKET CAP
BRACKET CAP
11 m PSC pole 11 m PSC pole
3.0 MM THICK
MILD STEEL 190
BRACKET CAP
10 m PSC pole
10000
8000
11000
11000
9000
9000
1200
1200
o
Go
Concrete tile ( 300X450X8mm ) Earthing lug Concrete tile ( 300X450X8mm ) Earthing lug Concrete tile ( 300X450X8mm ) Earthing lug
plate plate plate
(0.000 M)
450
450
450
Street lighting cable ( direct Street lighting cable ( direct Street lighting cable ( direct
buried in ground at - 0.6m FGL buried in ground at - 0.6m FGL buried in ground at - 0.6m FGL
300
300
300
150
150
150
2000
CLIENT
River sand HDPE pipe Earth wire from Coil Earth River sand HDPE pipe Earth wire from Coil Earth River sand HDPE pipe P.C.C
bedding and 2nos P.C.C bedding and 2nos bedding and 2nos (C-25)
P.C.C Earth wire from Coil Earth
cushion (150mm 40mm.DIA, (C-25) cushion (150mm 40mm.DIA, (C-25) cushion (150mm 40mm.DIA,
+ 150mm ) 1.8m long + 150mm ) 1.8m long + 150mm ) 1.8m long Federal Democratic Republic of Ethiopia
100
FGL
C.C (C-25)
The replacement of soil shall be done to a minimum depth of 500mm from the astronomical timer and dusk dawn sensor.
C.C (C-25) Integrated Agro Industrial Park (IAIP)
bottom of foundation. Relatively inert and non-expansive soil shall be used for
Ø320 Baeker - Western Tigray
replacement. The percentage of fines (grain size less than 0.075mm) in soil shall
2000
2. Feeder pillar box should be made out of 2.0mm thick DWG TITLE
not exceed 20%. The liquid limit shall not exceed 30% and the plasticity index shall mild steel suitable for outdoor operation, IP 65
P.C.C - ( C7 )
procedure)
750
paint.
Elevation Filling should be done in layers not more than 200mm thickness. Each layer shall 3. Street light feeder pillars are envisaged at strategic Planning Checked Approved
750
be well compacted at the optimum moisture content of the fill soil. The compaction locations with auto / manual control with provision for RS KG AR
C.C (C-25) of fill material shall be carried out using vibratory plate or an earth rammer. SCADA system control.
Scale : Date : Drawn :
NTS 12.06.2017 GGK
750