You are on page 1of 4

UNITED CEMENTS PVT. LTD.

NAUBISE-4, DHADING, NEPAL


DPR
Sl.no. Date Location Description

Process.
1 Mixer machine shifted on burner platform
2 Kiln Kiln rotated in auxiliary for mech. Requirement
3 Kiln platform area bricks shifting
4 Preparation of pending job list (Mech,E&I).
1/14/2016

Hot meal sample collected, clay sample preparation,


5 Q C Lab physical compressing strength test and house keeping
inside Lab done

E&I
After modification trial taken from CCR, It is
Pre heater top fresh
1 working properly. Open and Close Feed backs
air damper
are getting in CCR.
2 LC 2, LC4 House keeping work was done.

3 LC 3 Cleaning work was Done


Kiln Platform- CCR- New cable glanding works were done for power
4
LC and control cables in LPBS and MCC panel
MCC 5 to RIO panel cable laid for damper and
5 CCR-LC glanding works were completed. But termination
is under progress
One body earthing rod removed from the place
so the soil was diged by manually and filled the
6 LC 3 Transformer earthing chemical Powder with water after that
the earthing rod was fixed into the ground. The
earth value is 8.3 ohms. Yesterday fixed earth
pit value is 44 ohms. The earth Value improving
Transformer neutral earthing resistance value
7 LC 3 Transformer checked by added earthing chemical powder
.and its value checked in mesh mode. Value is
3.24 ohms.so earth value improving process is
Tyre no.3 RTD- 9,10,11,12 Cable rerouting work
8 Kiln Platform is underprogress.cable tray removed and G.I
pipe used for RTD cable.
9 Kiln Platform Supply given to the Thruster Pump, pump is
125 KVA DG, 380 KVA DG, DG synchronizing
Near Admin panel, power distribution panel cables were
10
Building
disconnected and shifted from LT DG room to HT
DG shade.

Mechanical
500 TR1-Kiln thrust roller hydraulic jac mounted and bolts
fixed. Trial taken and pressure tested up to 60kg/cm²,
1 Kiln Platform
(operating pressure-70kg/cm².)kiln movement 15mm
upward for test.

Kiln third tyer supporting roller water pipe line main header
2 Kiln Platform
modification work is in progress.
1/14/2016 CCR emergency exit stair case hand railing 3 mtrs
3 CCR Biuding.
complete, work is in progress.
4 Coal belt conveyor. 1000BC1 and 3 ZSS modification work complete.
Cement mill building 2 nd floor hand railing work is in
5 CM area
progress, 4 mtrs. Complete.
6 CM area CM main gear box and HP pump cleaning
Blending silo stair case hand railling work 2 stage 3mtrs
7 Blending silo.
complte, work is in progress.

CIVIL
TS PVT. LTD.
DING, NEPAL
R
Manpower
Pending status Remakes
Engaged

full dept completed Mixer m/c to be serviced by Mech.


full dept completed
full dept completed
full dept completed

X-ray analyser room E&I all pending


work to be done & joint action plan
6 completed
& coordination b/w all dept. be
ensured.All HODs are responsible

Civil work for QC lab to be


completely immediately.

Mr. Mostkim completed

Mr. Mostkim,
completed
1 Helper
Mr. Mostkim,
completed
1 Helper
Mr. Raman
completed
Mr. Harendra

Mr. Raman
Under progress
Mr. Harendra

Mr. Maish
Yadav
Mr. Sathish Under progress
Mr. Vishal
1 Helper

Mr. Maish
Yadav
Under progress
Mr. Sathish
Mr. Vishal

Mr. Faizan Under progress


Mr. Faizan completed
Mr. Ram mano
Mr. Manish C
completed
Mr. Sanjeev

4 Completed

2 Completed

2 Completed

2 Completed
2 Completed
1 Completed

2 Completed

All doors & window pending work of all


building target to be given.