1 A Practical Completion Certificate for works included in this Section shall only be issued
when the Engineer is satisfied that all the requirements of this Section have been met.
1 The air conditioning services subcontractor shall be responsible for co-ordination with other
trades and services and shall provide all materials, labour and supervision, equipment, tools,
ST
appliances, services, etc. for the supply and installation of the following items or work:
EA
(b) insulated ductwork complete with air terminals, dampers, supports, etc.
(c) chilled water pipework complete with valves, fittings supports, etc.
LE
(d) controls and control panels
(e) motor control centres and starter panels complete with cabling from the panels to the
D
respective equipment. Power supply up to the panel shall be the responsibility of the
ID
electrical subcontractor
(f) insulated drain piping from each air handling unit fan coil unit to the nearest drain
M
point. The drainage subcontractor shall be responsible for provision of a floor drain in
each mechanical room location to be co-ordinated with air handling units (AHU).
G
2 The contractor shall also include all overheads at office and site, labour, sundries, plant,
IN
appliances and consumable both for the Works and for testing and commissioning, and
during the maintenance period.
LT
3 The air conditioning subcontractor shall be approved so as to meet all QGEWC regulations.
SU
2 Design Conditions
ER
o o
(a) external (Summer) : 46 C Dry Bulb, 30 C Wet Bulb
23 1 C Dry Bulb, 50 5 % RH
o
(b) Internal :
YD
3 Fresh air supply. One air change - minimum quantity as indicated on drawings.
H