GT-5 21:44 - 220.7 - M/c remained standby, synchronized & remained in operation as per NPCC load demand.
10:26
GT-6 -
28-09-10
47.3 - M/c remained standby as per NPCC load demand. (Due to critical fuel oil stock position at KAPCO complex)
M/c remained standby as per NPCC load demand.
10:36
STG-11 -
28-09-10
N/A - Service air compressor # 2 (00CSAP201CO) was taken in service but air leakage was observed from discharge line filter.
M/c synchronized as per NPCC load demand at 00:55 hrs dated:- 01-10-2010.
08:38 M/c remained standby as per NPCC load demand. (Due to critical fuel oil stock position at KAPCO complex)
GT-7 - - -
25-09-2010 M/c declared unavailable for commercial operation in combined cycle mode for scheduled combustion inspection from 00:01 hrs dated:- 01-10-2010.
00:02
GT-8 -
21-09-2010
- - M/c remained under approved scheduled outage for M.O.H.
GROSS GEN (MWH) 8029 5088 0 13117 4= 0.0 1= 1.3 10= 0.3 12= 1.3 18= 11.6 PREV. BALANCE
NET GEN (MWH) 7831 4938 0 12769 5= 2.1 2= 0.0 21= 0.0 13= 9.3 19= 0.3 OIL RECEIVED
PPA HR (KJ/KWH) 7589 8329 Gen: Nil 7,876 6= 2.5 3= 0.0 22= 0.0 14= 4.7 25= 1.7 CONSUMPTION
ACT. HR (KJ/KWH) 7746 9078 8261 11= 0.1 7= 1.9 23= 1.2 15= 3.9 26= 1.5 BAL.STOCK
G/TH EFF. % 47.7% 40.9% 44.8% 20= 0.2 8= 0.0 24= 0.2 16= 5.8 27= 0.0 MAX. AMB TEMPERATURE =
N/TH EFF. % 46.5% 39.7% 43.6% 9= 2.1 17= 5.7 MIN. AMB TEMPERATURE =
PPA Efficiency % 47.4 43.2 Gen: Nil 45.7 1143 683 478 MAX. DECLARED CAPACITY =
2,935Tons
FO Treated by FOTP =
LSFO/HSD Pumping from lal pir remained in stop position. 80 LSFO tank lorries were decanted at 00:00 hrs.
DAILY GENERATION AND FUEL CONSUMPTION DATA Dated 30/09/2010
LOAD AT 05:00 hrs.
REMARKS
Dated 01.10.2010
M/c remained in operation as per NPCC load demand. 111 HRSG-13 & 14
M/c remained standby, synchronized & remained in operation as per NPCC load demand. 80 LSFO
M/c remained standby as per NPCC load demand. (Due to critical fuel oil stock position at KAPCO complex) S/B
Under Scheduled
M/c remained under approved scheduled outage for M.O.H. M.O.H
M/c remained under approved scheduled outage for C.I. and synchronised for commissioning activities.
95 LSFO
M/c declared available for commercial operation after scheduled CI outage from 19:50 hrs dated 30-09-2010.
M/c remained under approved scheduled outage and synchronised for commissioning activities.
47 HRSG-2
M/c declared available for commercial operation after scheduled outage from 19:50 hrs dated 30-09-2010.
M/c remained Stand by as per NPCC load demand. (Due to critical HSD stock/Unavailability of Gas) Under Scheduled
M/c declared unavailable for commercial operation in combined cycle mode for scheduled combustion inspection from 00:01 hrs dated:- 01-10-2010. C.I.
Principal Engineer
(Shift-D)
KAPCO DAILY PERFORMANCE
DATE 30/09/2010
ENERGY UNITS FUEL CONSUMPTION GENERATION(MWH) GROSS NET AUX. GROSS NET GROSS NET
BLOCK HSD FO GAS ON GEN. GEN CONS. HR HR TH.EFF. TH.EFF.
LTRS. LT /KWH LTRS. LT /KWH M³ M³ /KWH HSD FO GAS STEAM (MWH) (MWH) (KWH) KJ/KWH KJ/KWH % %
GT-13 865,000 0.33 2,650 2,650 2,554 84,200 11,465 11896 31.4% 30.3%
GT-14 862,000 0.33 2,636 2,636 2,547 79,400 11,486 11887 31.3% 30.3%
EB-I STG-15 0 2,743 0 2,743 2,743 2,730 0 0
TOTAL 0 1727000 0 0 8,029 0 2,743 8,029 7,831 163,600 7,555 7,746 47.7% 46.5%
GT-1 836,000 0.35 2,421 2,421 2,325 77,500 12,128 12629 29.7% 28.5%
GT-2 8,000 0.57 396,000 0.39 14 1,017 1,031 978 39,700 13,772 14519 26.1% 24.8%
GT-5 2,000 0.67 34,000 0.47 3 72 75 74 5,000 16,891 17119 21.3% 21.0%
EB-II GT-6 0
GT-7 0
GT-8 0
STG-9 0 1,138 0 1,138 1,138 1,138 0 0
STG-10 6 417 0 423 423 423 0 0
STG-11 0
STG-12 0
TOTAL 10000 1266000 0 23 5,065 0 1,561 5,088 4,938 122,200 8,811 9,078 40.9% 39.7%
GT-3 0
EB-III GT-4 0
STG-9 0
STG10 0
TOTAL 0 0 0 0 0 0 0 0
KAPCO G/TOTAL 10000 2993000 0 23 13,094 0 4,304 13,117 12,769 285,800 8,042 8,261 44.8% 43.6%
FUEL CONSUMPTION OUT PUT ENERGY IMPORT/EXPORT Kap-87 87,000
FOTP#1 1315 2560 132 KV IMPORT EXPORT 220 KV IMPORT EXPORT Kap-88 56,000
FOTP#2 920 2510 FEEDERS (MWH) (MWH) FEEDERS (MWH) (MWH) T/AUX. 428800
FOTP#3 % AUX. 3.27%
AUX. FOTP#4 1100 2200
FOTP#5 KAP-4 1,201 NMN-1 950
ST.BLR(1-2) 8,000 KAP-5 1,069 NMN-2 10
ST. BLR(3-4) KAP-6 965 NMN-3 940
BLR.(15) KAP-7 205 NMN-4 930
TOH (5-8) 280 KAP-8 1,586 Vehari-5 1,730
TOH (13-14) 3,925 KAP-9 1,409 NMN-6 1,770 Principal Engineer
TOTAL 12205 3335 7,270 0 TOTAL 0 6435 0 6330 (Shift-D)
G/TOTAL 22205 3335 3000270 0 NET DAILY EXPORT 12765
K Ltrs/Tons/MMCF 22.21 2935.2 2641.08 0.00 NET MONTHLY EXPORT 477145
KOT ADDU POWER COMPANY
GTPS KOT ADDU
HOURLY STATUS SHEET DATE 30/12/18
A MODULE-1 MODULE-2 MODULE-3 MODULE-4 MODULE-5
t W S
S S
m e GT-1 GT-3 STG-9 GT-2 GT-4 STG-10 GT-5 GT-6 STG-11 GT-7 GT-8 STG-12 GT-13 GT-14 STG-15 T
y T
o t A
A s A
s T
m 1 2 t N
H . B E E E E E E E E E E I
b 3 2 e .
O u X X X X X X X X X X O
V V V V V 2 0 m L
U P l T T T T T T T T T T N
T A A A A A O
R r b . . . . . . . . . .
e M M M C M M M C M M M C M M M C M M M C K K F A
S e T T T T T T T T T T M
m W W W U W W W U W W W U W W W U W W W U V V r D
s T E E E E E E E E E E V
p U U U U U e
s e M M M M M M M M M M A
M M M M M q M
u m P P P P P P P P P P R
. W
r p . . . . . . . . . . S
e
1:00 28.0 993 26.0 92 493 45 0.081 80 511 39 -0.92 109 512 109 511 112 -0.88 136 237 49.3 153 586
2:00 28.0 994 26.0 93 493 45 0.081 82 509 80 509 84 -0.89 110 512 110 511 112 -0.88 137 237 49.6 106 716
3:00 27.8 994 25.5 93 493 46 0.084 82 510 81 509 84 -0.89 110 512 110 511 112 -0.88 137 237 49.7 122 718
4:00 27.6 994 25.0 94 493 45 0.082 83 511 81 509 84 -0.90 111 512 111 511 113 -0.88 136 237 49.1 139 722
5:00 27.3 994 25.0 94 493 45 0.084 82 511 81 510 83 -0.90 111 512 111 511 113 -0.88 136 236 49.7 142 720
6:00 27.0 994 24.7 94 493 45 0.081 82 509 81 510 83 -0.90 111 512 111 511 111 -0.88 137 236 49.4 107 718
7:00 27.0 994 24.7 95 493 46 0.080 82 508 81 509 84 -0.90 111 512 111 511 111 -0.88 138 237 49.5 109 721
8:00 27.0 994 24.7 95 493 46 0.078 83 508 82 508 85 -0.90 111 512 111 511 113 -0.88 138 237 49.5 55 726
9:00 29.0 994 25.0 93 493 45 0.080 82 510 81 511 84 -0.90 109 512 109 511 111 -0.88 138 239 48.9 87 714
10:00 30.5 994 25.5 91 493 43 0.081 80 512 79 511 84 -0.89 107 512 107 511 111 -0.88 137 238 48.9 106 702
11:00 32.5 994 26.0 88 493 43 0.082 78 510 77 515 83 -0.89 107 512 107 511 111 -0.88 137 238 48.9 133 694
12:00 34.0 994 26.5 88 493 44 0.084 77 511 76 514 83 -0.89 105 512 105 511 110 -0.88 136 238 48.8 139 688
13:00 36.0 994 26.8 88 493 45 0.084 77 512 76 512 82 -0.89 105 512 105 511 112 -0.88 137 236 48.9 106 690
14:00 37.0 993 27.0 87 493 45 0.084 76 513 75 512 81 -0.89 105 512 105 511 112 -0.88 134 236 49.7 205 686
15:00 37.0 993 27.0 86 493 45 0.082 76 516 75 512 81 -0.89 104 512 104 511 112 -0.88 135 234 49.8 216 683
16:00 36.8 992 26.0 87 493 45 0.083 76 516 75 512 81 -0.89 104 512 104 511 112 -0.88 135 233 48.2 217 684
17:00 35.4 992 26.0 88 493 45 0.085 76 513 75 514 83 -0.89 105 512 105 511 111 -0.88 136 235 49.4 181 688
18:00 34.0 992 26.0 89 493 46 0.085 78 516 77 513 83 -0.89 108 512 108 511 112 -0.88 135 235 50.0 151 701
19:00 31.4 993 27.5 91 493 45 0.088 79 511 78 513 83 -0.89 110 512 111 511 111 -0.87 135 234 50.0 195 708
20:00 30.4 993 27.0 92 493 45 0.085 79 511 78 510 82 -0.89 110 512 111 511 112 -0.87 135 236 49.6 182 709
21:00 30.0 993 27.0 92 493 45 0.081 79 511 78 511 82 -0.89 110 512 111 511 112 -0.88 135 235 49.5 158 709
22:00 29.2 993 27.0 92 493 45 0.080 79 512 78 512 84 -0.89 110 512 111 511 110 -0.88 135 231 49.5 181 709
23:00 28.0 993 27 92 493 45 0.080 82 509 81 511 85 -0.89 110 512 111 511 110 -0.88 136 232 49.5 128 716
24.00 27.0 993 26 93 493 45 0.079 82 509 81 510 85 -0.89 110 512 111 511 110 -0.88 137 235 49.5 132 717
30/12/1899
N
P
C
C
D
E
M
A
N
D
560
690
690
690
690
690
690
690
690
690
690
670
670
670
670
670
670
670
670
690
690
690
690
690
Date 30-09-2010
Fax Message # 15-10-D-01A
Notification
Time (hr) Event
5:00
KAPCO complex & running units’ availability increased to 970MW & 490MW respectively from 05:00 hrs at ambient
temperature of 26°C.
10:15
KAPCO complex & running units’ availability decreased to 940MW & 470MW respectively from 10:15 hrs at ambient
temperature of 30°C.
After scheduled outage for combustion inspection, GT-2 started on HSD (due to unavailability of Gas quota) in
10:15 combined cycle mode along with HRSG-2/STG-10 for commissioning activities. GT-2 synchronized at 10:18 hrs.
Load is not managed on other running units and its generation is in WAPDA account as per NPCC.
STG-10 synchronized at 13:53 hrs with HRSG-2 for commissioning activities. Its generation is in WAPDA account
13:53
as per NPCC demand.
KAPCO unit’s GT-2, GT-4 and STG10 are declared available for commercial operation from 19:50 hrs after
scheduled outage. (GT-2 and STG10 are already on bar and were running for commissioning activities with
19:50 generation in WAPDA account.)
KAPCO complex & running units’ availability increased to 1200MW & 610MW respectively from 19:50 hrs at ambient
temperature of 30.5°C.
GT-5 synchronised at 21:44 hrs dated 30-09-2010 and STG-11 synchronised at 00:55 hrs dated 01-10-2010 as per
21:20
NPCC load demand of 730 MW from 00:55 hrs.
Signed………
Page 6 of 13
KAPCO G.T.P.S. KOT ADDU
Dated 30/09/2010 15-10-D- 3
Fax Message No:-
Gross Generation Instantaneous Readings
TIME Gross Generation NPCC Demand MEGAVAR
(Hrs) (MW) (MW) (Export/Import)
01:00 586 560 153
02:00 716 690 106
03:00 718 690 122
04:00 722 690 139
05:00 720 690 142
06:00 718 690 107
07:00 721 690 109
08:00 726 690 55
09:00 714 690 87
10:00 702 690 106
11:00 694 690 133
12:00 688 670 139
13:00 690 670 106
14:00 686 670 205
15:00 683 670 216
16:00 684 670 217
17:00 688 670 181
17:45 615 615 113
18:00 701 670 151
18:15 624 624 99
18:30 623 623 99
18:45 619 619 98
19:00 708 670 195
19:15 621 621 115
19:30 620 620 123
19:45 619 619 115
20:00 709 690 182
20:15 623 610 111
20:30 624 610 113
21:00 709 690 158
22:00 709 690 181
23:00 716 690 128
24:00 717 690 132
General Manager
SNGPL Lahore
Fax:- 042 – 99201446
041 – 9210030
Tel.Ph.No. 041-9210017 & 9210073 Fax No. 15-10-D- 4
Dated: 01-10-2010
Furnace oil stock at 24:00 hrs including Dead stock: 20,753 Tonnes
Natural Gas Quota required for today as per WAPDA Estimated Energy demand = 180 MMCF
Signed ……………………
Principal Engineer
KAPCO Power Station
Kot Addu.
Kot Addu Power Company Limited
Kot Addu Gas Turbine Power Station
Government Of Pakistan, District Muzzafargarh (P.C# 34060)
Ministry of Water And Power, Tel: 061-544192-93 066 2301041
(Private Power And Infrastructure Board) Fax: 066 2301031
Name Of Plant & Location: Kot Addu Power Company Limited (Kot Addu)
Approved Scheduled
02:01 hrs, 24:00 hrs,
GT-1 Scheduled Outage for Combustion
dated 01-10-2010 dated 10-10-2010
Inspection
Approved Scheduled
00:01 hrs, 24:00 hrs,
GT-3 Scheduled Outage for Combustion
dated 01-10-2010 dated 10-10-2010
Inspection
Approved Scheduled
00:01 hrs, 24:00 hrs,
GT-7 Scheduled Outage for Combustion
dated 01-10-2010 dated 10-10-2010
Inspection
Approved Scheduled
00:02 hrs, 24:00 hrs,
GT-8 Scheduled Outage for Major
dated 21-09-2010 dated 10-11-2010
Overhauling
Fuel Consumed LSFO (Tonnes) HSD (K. Litres) Gas Consumed (MMCF)
(Till midnight yesterday)
2641 69 0.00
LSFO Received (through road tankers at KAPCO) 2996 Tonnes HSD received 0 K. Litres
LSFO (Tonnes) HSD (Kilo Liters)
Pumpable Stock at PSO Mehmood Kot/ Lal Pir Depot(Non pumpable due to flood) = 2101.0 Pumpable Stock at PSO Lal Pir Depot = 803.0
Available Gas Quota 0.00 MMCF (Not Confirmed)
LSFO Receipts
Gas Supplied Stock sufficient
Opening stock of LSFO Consumption Closing stock of LSFO Stock sufficient for day(s) at 60 %
for day(s) at 100 Ullage
useable LSFO Tonnes Tonnes useable LSFO Tonnes Load Factor
( MMCF) % Load Factor
Tonnes
Principal Engineer
KAPCO, KOT ADDU
Ambient Temperature Variation in 24 hours
50.0
Column B 995
Column D
Column C
45.0
40.0
35.0
30.0
Pressure
Temp ° C
25.0
20.0
15.0
10.0
5.0
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23
990