You are on page 1of 6

1 2 3 4 5 6 7 8

A
A

B
B

C
B 01-Okt-2018 RE-ISSUED FOR APPROVAL

A 24-Aug-2018 ISSUED FOR APPROVAL

REV.

D
D
OWNER :
PT PLN (PERSERO)
UNIT INDUK PEMBANGUNAN PAPUA

PROJECT :

DATE : 21 Juni 2018


CONTRACTOR :

E
DRAWING TITLE :

POWER TRANSFORMER - FOUNDATION

F RD0014-TIM-CIV-CN-015 POWER TRANSFORMER - FOUNDATION B

F
FRH RBW EGY
RD0014-TIM-CIV-DRW-002 FOUNDATION LAYOUT A
DATE : DATE : DATE :

DRAWING NUMBER DESIGNATION REV. SIZE :


SHEET : 1 OF 6
- A3
REVISION : B
1

8
CONTRACTOR : PROJECT: DRAWING TITLE:
DRAWING CONTENT

CONSORTIUM DWG. NO: REV: SHT: SEE SHT:


CONTRACT NO. : RD0014-TIM-CIV-DRW-011
DATE : 21 Juni 2018 PLN DWG No. :
NOTES :
- ALL DIMENSION IN MILIMETER AND ELEVATION IN
METER UNLESS OTHERWISE NOTED
-COVER OF CONCRETE : 50mm
- MATERIAL SPECIFICATION :
CONCRETE FOR STRUCTURE : K-225
REINFORCEMENT : -Dia 13mm = BJTD 39
-Dia < 13mm = BJTP 24
-TYPICAL CHAMFER 30mm x 45

CONTRACTOR : PROJECT: DRAWING TITLE:


POWER TRANSFORMER - FOUNDATION
CONSORTIUM DWG. NO: REV: SHT: SEE SHT:
CONTRACT NO. : RD0014-TIM-CIV-DRW-011
DATE : 21 Juni 2018 PLN DWG. No. :
NOTES :
- ALL DIMENSION IN MILIMETER AND ELEVATION IN
METER UNLESS OTHERWISE NOTED
-COVER OF CONCRETE : 50mm
- MATERIAL SPECIFICATION :
CONCRETE FOR STRUCTURE : K-225
REINFORCEMENT : -Dia 13mm = BJTD 39
-Dia < 13mm = BJTP 24
-TYPICAL CHAMFER 30mm x 45

CONTRACTOR : PROJECT: DRAWING TITLE:


POWER TRANSFORMER - FOUNDATION
CONSORTIUM DWG. NO: REV: SHT: SEE SHT:
CONTRACT NO. : RD0014-TIM-CIV-DRW-011
DATE : 21 Juni 2018 PLN DWG. No. :
NOTES :
- ALL DIMENSION IN MILIMETER AND ELEVATION IN
METER UNLESS OTHERWISE NOTED
-COVER OF CONCRETE : 50mm
- MATERIAL SPECIFICATION :
CONCRETE FOR STRUCTURE : K-225
REINFORCEMENT : -Dia > 13mm = BJTD 40
-Dia < 13mm = BJTP 24

CONTRACTOR : PROJECT: DRAWING TITLE:


POWER TRANSFORMER - FOUNDATION
CONSORTIUM DWG. NO: REV: SHT: SEE SHT:
CONTRACT NO. : RD0014-TIM-CIV-DRW-011
DATE : 21 Juni 2018 PLN DWG. No. :
BAR BENDING SCHEDULE BAR BENDING SCHEDULE BORE PILE
A B C TOTAL QTY 16 11400 300 300 12000 48 LONGITUDINAL BOREPILE 1
NO. SKETCH REMARKS 12
(mm) (mm) (mm) (mm) CUTT (pcs)

16 4900 500 50 6000 18 PEDESTAL LONG BAR TOP 13 16 1550 - - 1550 48 LONGITUDINAL BOREPILE 2
1

16 4900 50 - 5500 18 PEDESTAL LONG BAR BOT


2 14 10 1880 300 150 11961 36 SPIRAL TIES

16 3400 500 50 4500 26 PEDESTAL LONG BAR TOP


3
15 10 1570 300 150 9989 6 SPIRAL TIES

16 3400 50 - 3500 26 PEDESTAL LONG BAR BOT


4

13 1460 480 50 1990 36 SLAB LONG BAR


5

13 1160 480 50 1690 50 SLAB LONG BAR


6

UNP 100x50x5x7.5
13 7520 480 50 8580 12 SLAB LONG BAR
7
LENGHT QTY
NO. MARKING
(mm) (pcs)
13 5420 480 50 6480 16 SLAB LONG BAR 1 L1 888 10
8
2 L2 1188 6

9
13 200 500 - 1600 6 SPACER BAR PLAT
DIMENTION QTY
NO. MARKING
(mm) (pcs)
13 7520 100 - 7720 6 WALL LONGBAR
10 1 EP 1 100x50x6 32

11
13 5420 100 - 5620 6 WALL LONGBAR DYNABOLT
DIMENTION QTY
NO. ( mm ) (pcs)
(mm)
1 12 75 32

NOTES :
- ALL DIMENSION IN MILIMETER AND ELEVATION IN
METER UNLESS OTHERWISE NOTED
-COVER OF CONCRETE : 50mm
- MATERIAL SPECIFICATION :
CONCRETE FOR STRUCTURE : K-225
REINFORCEMENT : -Dia > 13mm = BJTD 40
-Dia < 13mm = BJTP 24

CONTRACTOR : PROJECT: DRAWING TITLE:


POWER TRANSFORMER - FOUNDATION
CONSORTIUM DWG. NO: REV: SHT: SEE SHT:
CONTRACT NO. : RD0014-TIM-CIV-DRW-011
DATE : 21 Juni 2018 PLN DWG. No. :

You might also like