TENDER
JALANADDENDUM
THAMRIN JAKARTA,
NO.1DOCINDONESIAMECHANICAL
E.3: SECTION NO.3 - SOUTH
INSTALLATION
TOWER WORKSELEMENT
WORKS SUB-CONTRACT
A - PLUMBING AND SANITARY WORKS
SOUTH TOWER
MAIN EQUIPMENT
PIPE INSTALLATIONS
Supply and install GSP (Galvanized Steel Pipe) Sch 40, ASTM 53,
complete with hanger, support, connection and necessary
accessories as described in the drawing and specification
E 65 mm diameter, pipes 20 m - -
0
F 50 mm diameter, pipes and fittings 1,716 m - -
0
G 40 mm diameter, pipes and fittings 153 m - -
0
H 32 mm diameter, pipes and fittings 197 m - -
0
I 25 mm diameter, pipes and fittings 1,869 m - -
0
J 20 mm diameter, pipes and fittings 1,310 m - -
0
K 15 mm diameter, pipes and fittings 3,419 m - -
0
Extra over pipe 0
0
L 65 mm diameter, fittings 8 no - -
PIPE INSTALLATIONS
Supply and install uPVC class AW pipe, complete with hangers and
supporting material and all necessary accessories, all as described
and shown in the drawing and technical specification
PIPE INSTALLATIONS
Supply and install uPVC class AW pipe, complete with hangers and
supporting material and all necessary accessories, all as described
and shown in the drawing and technical specification
PIPE INSTALLATIONS
Supply and install CIP (Cast Iron Pipe), complete with hangers and
supporting material and all necessary accessories, all as described
and shown in the drawing and technical specification
Supply and install CIP (Cast Iron Pipe), complete with hangers and
supporting material and all necessary accessories, all as described
and shown in the drawing and technical specification
Supply and install uPVC class D pipe, complete with hangers and
supporting material and all necessary accessories, all as described
and shown in the drawing and technical specification
Supply and install uPVC class AW pipe, complete with hangers and
supporting material and all necessary accessories, all as described
and shown in the drawing and technical specification
Note :
a) ...................................
b) ...................................
c) ...................................
COLLECTION
Doc E.3A/1 - -
Doc E.3A/2 - -
Doc E.3A/3 - -
Doc E.3A/4 - -
Doc E.3A/5 - -