REPLACEMENT PROJECT
NORTHERN CONSTRUCTION SERVICE, LLC
Public
Meeting
October 2, 2018
West Springfield Town
Hall
Bridge Replacement Br. No. A-05-002=W-21-014
Springfield Street (Route 147) over Westfield River
Project File No. 605384
AGENDA
!2
PROJECT TEAM
!3
PROJECT OVERVIEW !4
PROJECT LOCATION
Ri ial Av
e Morgan-Sullivan
r
mo
ve
rS
t Me 147)
(Rt
. Bridge
Carries Route 147
Wal
between West
St
Springfield St (R
t. 147)
We
stfi
eld
Springfield and
R
Ma
ive
r Agawam
in
S t
t.
t Ex
St
ut S
ield
Waln
Suff
!5
ENVIRONMENTAL PERMITTING
!6
BRIDGE EXISTING CONDITIONS
!7
ROADWAY EXISTING CONDITIONS
!8
PROJECT GOALS & BENEFITS !9
!10
PROJECT GOALS
Replace the Bridge| Meet current design standards and provide wider
structure to accommodate additional turning lanes and separated bike
lane.
Improve Traffic | Improve geometrics & provide for existing and
future traffic volumes across the bridge and at the 3 intersections.
Pedestrian Accommodation | Provide sidewalks on both sides of all
project roadways, and provide wider sidewalks where feasible.
Bicycle Accommodation | Provide “separated bike lanes” where
feasible.
Minimize Impacts to Abutters | Minimize permanent and temporary
impacts to abutters and business. Coordination with abutters through
Municipal Officials.
Coordinate Utility Relocations | Minimize construction schedule
impacts.
NEW BRIDGE CROSS SECTION & IMPROVEMENTS
Looking North
!11
Add picture - proposed complete
streets plan drawings - SLIDES 10,
11, and 12
COMPLETE
STREETS
IMPROVEMENTS
Separated two-way bike
lane & sidewalk
throughout most of the
project.
Extends to Doering
Middle School and
across the bridge to
the Big E.
Two designated bike
crossings provided at the
Route 147/75/159
intersection.
New sidewalks added in
several locations where
currently none exist.
!12
COMPLETE STREETS IMPROVEMENTS – ON BRIDGE
!13
COMPLETE STREETS IMPROVEMENTS – PROJECT EXTENTS
!14
TRAFFIC SIGNAL, ROADWAY & SAFETY IMPROVEMENTS
!15
INTERSECTION RECONSTRUCTION
e
Ri
ve ial Av
r
rS emo 7)
t M 14
.
(Rt
Wal
nu
t St
We
stfi
eld
Springfield St (R
t. 147) R ive
r
Ma
in
St !16
CONSTRUCTION SCHEDULE !17
OVERALL SCHEDULE
Restrictions for working in water – permitted to occur during low flow periods
Utility relocation requires coordination & contractor work access restraints
Pause work due to winter weather
Continuous access to businesses and abutting properties
!18
Any changes made to this slide
should be carried over to the website.
PHASED CONSTRUCTION SCHEDULE
Milestone Date
Preliminary Work October 2018
Road Work, Stage 1 October 2018 to November 2018
Bridge Work, Stage 1 November 2018 to Fall 2020
Road Work, Stage 2A – 2D
Complete West Side of Bridge, Open to Traffic Fall 2020
Bridge Work, Stage 2 Fall 2020 to Spring 2022
Road Work, Stage 3A – 4
Complete East Side of Bridge, Open Full Bridge Spring 2022
to Traffic
Full Beneficial Use Spring 2022
Project Completion Summer 2022
!19
CONSTRUCTION STAGING !20
PRELIMINARY WORK
!21
CONSTRUCTION STAGING – BRIDGE WORK STAGES 1 & 2
!23
CONSTRUCTION STAGING – ROAD WORK STAGE 2A
!25
CONSTRUCTION STAGING – ROAD WORK STAGE 2C
!26
CONSTRUCTION STAGING – ROAD WORK STAGE 2D
!27
CONSTRUCTION STAGING – ROAD WORK STAGE 3A
!29
CONSTRUCTION STAGING – ROAD WORK STAGE 4
!30
TRAFFIC MANAGEMENT !31
TRAFFIC MANAGEMENT
!32
TRAFFIC MITIGATION
!33
PUBLIC OUTREACH !34
PUBLIC OUTREACH
!35
CONTACT US
!36
Thank you for attending.
QUESTIONS? !37