You are on page 1of 16

PROJECT TITLE :

CONDENSATE FRACTIONATION PLANT & ASSOCIATED FACILITIES


CAPACITY 4000 BBL/DAY
AT RASHIDPUR, BAHUBOL, HABIGANJ, BANGLADESH
EMPLOYER :

SYLHET GAS FIELDS LIMITED


DOCUMENT TITLE :

INSPECTION AND TEST PLAN


FOR PIPE SPOOL
INSTRUMENT AIR COMPRESSOR PACKAGE
DOCUMENT STATUS
Approved
:

Approved
: as Noted

Not Approved

C DEC 30, 2016 ISSUED FOR CONSTRUCTION EK RDH DA


B DEC 22, 2016 ISSUED FOR APPROVAL EK RDH DA
A DEC 15, 2016 ISSUED FOR REVIEW EK RDH DA
ENG EM
REV. DATE DESCRIPTION PREPARED
CHECKED

TOTAL OR PARTIAL REPRODUCTION AND / OR UTILIZATION OF THIS DOCUMENT ARE FORBIDDEN


WITHOUT PRIOR WRITTEN AUTHORIZATION OF THE OWNER

VENDOR : Contractor Job No. : C - 222 / 2015 CONTRACTOR :


Contractor Document No. : 222-Q-PL-3000-02 CONSORTIUM
Employer Document No. :
Vendor Document No. : R057-AC-IT-002
PT. ROTEQ Page No. : 1 OF 8
ACILITIES

SH

HH
HH
HH
PM
APPROVED

ORBIDDEN

NSORTIUM
VENDOR : CONTRACTOR :
CONDENSATE FRACTIONATION PLANT & ASSOCIATED FACILITIES CONSORTIUM
CAPACITY 4000 BBL/DAY
AT RASHIDPUR, BAHUBOL, HABIGANJ, BANGLADESH PT. ISTANA KARANG LAUT

PT. ROTEQ ENERGYPAC POWER GENERATION LTD


INSPECTION AND TEST PLAN

TABULATION OF REVISED SHEETS


Revision Revision
Sheet Sheet
A B C

1 X X 41
2 X X 42
3 X X 43
4 X 44
5 X 45
6 X X 46
7 X 47
8 X X 48
9 49
10 50
11 51
12 52
13 53
14 54
15 55
16 56
17 57
18 58
19 59
20 60
21 61
22 62
23 63
24 64
25 65
26 66
27 67
28 68
29 69
30 70
31 71
32 72
33 73
34 74
35 75
36 76
37 77
38 78
39 79
40 80 Sheet Number :
Employer Document Number : Contractor Document Number: Fabricator Document Number: 2 Sheet
OF Number
2 :
222-Q-PL-3000-02 R057-AC-IT-002 2 of 8
NSORTIUM
RANG LAUT

OWER GENERATION LTD

eet Number :
2 Sheet
OF Number
2 :
2 of 8
PROJECT TITLE : CONDENSATE FRACTIONATION PLANT & ASSOCIATED FACILITIES Inspection Parties Involved Doc. No. : R057-AC-IT-002
CAPACITY 4000 BBL/DAY AT RASHIDPUR, BAHUBOL, HABIGANJ, INF : PT. INOFAB Rev. No. : C
BANGLADESH RTQ : PT. ROTEQ Date : 30-Dec-16
PROJECT NO. : R-057 IKL : PT. ISTANA KARANG LAUT
USER : SYLHET GAS FIELDS LIMITED
CLIENT : PT. ISTANA KARANG LAUT & ENERGYPAC POWER GENERATION LTD
PACKAGER : PT. ROTEQ
FABRICATOR : PT. INOFAB
DESCRIPTION : PIPE SPOOL - INSTRUMENT AIR COMPRESSOR PACKAGE
TAG NO. : -

INSPECTION AND TEST PLAN


CERTIFYING DOCUMENTS INSPECTION PARTIES
ITEM
PROCESS / ACTIVITY DESCRIPTION ACCEPTANCE CRITERIA VERIFYING TO BE INCLUDED
NO. INF/RTQ IKL
DOCUMENTS IN MDR
Act & Sign Act & Sign

1.0 PROJECT QUALITY & CONSTRUCTION PROCEDURE

1.1 Pre-Inspection Meeting Confirmed PO - - H H

1.2 Approval of Piping Isometric Drawings 222-L-SP-001 Rev. B2 & ASME B31.3 Drawings As Built Drawings H R

Approved WPS &


1.3 Approval of WPS & PQR 222-Q-PR-006A Rev. A & ASME IX WPS & PQR H R
PQR

1.4 Approval of Welders/Welding Operators 222-Q-PR-006A Rev. A & ASME IX Welder Certs. Welder Certs. H R

Approved
1.5 Approval of NDE Procedures 222-Q-PR-006A Rev. A & ASME V NDE Procedures H R
NDE Procedures
Approved NDE
222-Q-PR-006A Rev. A, SNT-TC-1A NDE Personnel's
1.6 Approval of NDE Personnel Personnel's H R
& ASME V Certificates
Certificates

Hydro Test Approved Hydro Test


1.7 Approval of Hydro Test Procedure 222-L-SP-005 Rev. A & ASME B31.3 H R
Procedure Procedure

Page 3 of 8
PROJECT TITLE : CONDENSATE FRACTIONATION PLANT & ASSOCIATED FACILITIES Inspection Parties Involved Doc. No. : R057-AC-IT-002
CAPACITY 4000 BBL/DAY AT RASHIDPUR, BAHUBOL, HABIGANJ, INF : PT. INOFAB Rev. No. : C
BANGLADESH RTQ : PT. ROTEQ Date : 30-Dec-16
PROJECT NO. : R-057 IKL : PT. ISTANA KARANG LAUT
USER : SYLHET GAS FIELDS LIMITED
CLIENT : PT. ISTANA KARANG LAUT & ENERGYPAC POWER GENERATION LTD
PACKAGER : PT. ROTEQ
FABRICATOR : PT. INOFAB
DESCRIPTION : PIPE SPOOL - INSTRUMENT AIR COMPRESSOR PACKAGE
TAG NO. : -

INSPECTION AND TEST PLAN


CERTIFYING DOCUMENTS INSPECTION PARTIES
ITEM
PROCESS / ACTIVITY DESCRIPTION ACCEPTANCE CRITERIA VERIFYING TO BE INCLUDED
NO. INF/RTQ IKL
DOCUMENTS IN MDR
Act & Sign Act & Sign
Blasting & Blasting &
1.8 Approval of Blasting & Painting Procedure 222-L-SP-004 Rev. B H R
Painting Procedure Painting Procedure

2.0 MATERIAL INSPECTION AND TRACEABILITY

2.1 Review of Mill Certificates ASME II Part A Mill Certificates Mill Certificates H R

2.2 Visual Inspection of Materials ASME II Part A Mill Certificates Mill Certificates H M

2.3 Dimensional Check of Material ASME II Part A Mill Certificates Mill Certificates H M

3.0 FABRICATION, WELDING AND INSTALLATION


222-L-SP-005 Rev. A & Approved
3.1 Marking and Lay Out of Pipe Spools - - H M
Construction Drawing
222-L-SP-005 Rev. A & Approved
3.4 Pipe to Pipe Joint Fit Up (Piping) - - H M
Construction Drawing

222-L-SP-005 Rev. A & Approved


3.5 Pipe to Fittings/Flanges Joint Fit Up - - H M
Construction Drawing

Page 4 of 8
PROJECT TITLE : CONDENSATE FRACTIONATION PLANT & ASSOCIATED FACILITIES Inspection Parties Involved Doc. No. : R057-AC-IT-002
CAPACITY 4000 BBL/DAY AT RASHIDPUR, BAHUBOL, HABIGANJ, INF : PT. INOFAB Rev. No. : C
BANGLADESH RTQ : PT. ROTEQ Date : 30-Dec-16
PROJECT NO. : R-057 IKL : PT. ISTANA KARANG LAUT
USER : SYLHET GAS FIELDS LIMITED
CLIENT : PT. ISTANA KARANG LAUT & ENERGYPAC POWER GENERATION LTD
PACKAGER : PT. ROTEQ
FABRICATOR : PT. INOFAB
DESCRIPTION : PIPE SPOOL - INSTRUMENT AIR COMPRESSOR PACKAGE
TAG NO. : -

INSPECTION AND TEST PLAN


CERTIFYING DOCUMENTS INSPECTION PARTIES
ITEM
PROCESS / ACTIVITY DESCRIPTION ACCEPTANCE CRITERIA VERIFYING TO BE INCLUDED
NO. INF/RTQ IKL
DOCUMENTS IN MDR
Act & Sign Act & Sign

3.6 Welding of Butt Welds 222-L-SP-005 Rev. A & Approved WPS - - H M

3.7 Welding of Socket Welds 222-L-SP-005 Rev. A & Approved WPS - - H M

3.8 Welding of Fillet Welds 222-L-SP-005 Rev. A & Approved WPS - - H M

3.9 Welding of Pipe Supports 222-L-SP-005 Rev. A & Approved WPS - - H M

3.11 Welding of Weld Repair Joints 222-L-SP-005 Rev. A & Approved WPS - - H M

4.0 INSPECTION & TESTING

4.1 100% Visual Inspection of All Joints ASME B31.3 (Normal) Inspection Report Inspection Report H R

4.2 10 % RT as per Approved Weld Map ASME B31.3 (Normal) RT Report RT Report H R

4.3 MT as per Approved Weld Map (if any) ASME B31.3 MT Report MT Report H R

Page 5 of 8
PROJECT TITLE : CONDENSATE FRACTIONATION PLANT & ASSOCIATED FACILITIES Inspection Parties Involved Doc. No. : R057-AC-IT-002
CAPACITY 4000 BBL/DAY AT RASHIDPUR, BAHUBOL, HABIGANJ, INF : PT. INOFAB Rev. No. : C
BANGLADESH RTQ : PT. ROTEQ Date : 30-Dec-16
PROJECT NO. : R-057 IKL : PT. ISTANA KARANG LAUT
USER : SYLHET GAS FIELDS LIMITED
CLIENT : PT. ISTANA KARANG LAUT & ENERGYPAC POWER GENERATION LTD
PACKAGER : PT. ROTEQ
FABRICATOR : PT. INOFAB
DESCRIPTION : PIPE SPOOL - INSTRUMENT AIR COMPRESSOR PACKAGE
TAG NO. : -

INSPECTION AND TEST PLAN


CERTIFYING DOCUMENTS INSPECTION PARTIES
ITEM
PROCESS / ACTIVITY DESCRIPTION ACCEPTANCE CRITERIA VERIFYING TO BE INCLUDED
NO. INF/RTQ IKL
DOCUMENTS IN MDR
Act & Sign Act & Sign

4.4 Re-NDE After Weld Repair ASME B31.3 NDE Report NDE Report H R

5.0 DIMENSIONAL CONTROL

222-L-SP-005 Rev. A & Approved


5.1 Pre-Weld Dimensional Check - - H M
Construction Drawing

222-L-SP-005 Rev. A & Approved


5.2 Post-Weld Dimensional Check Inspection Report Inspection Report H M
Construction Drawing

6.0 PRESSURE TESTING FOR PIPING


Calibration Calibration
6.1 Calibration of Gauges and Equipment Hydro Test Procedure H R
Certificates Certificates
Hydro Test
6.2 Hydro Test Operation Hydro Test Procedure Hydro Test Report H W
Report

6.3 Flushing and Drying Hydro Test Procedure - - H R

6.4 Records Hydro Test Procedure Hydro Test Chart Hydro Test Chart H R

Page 6 of 8
PROJECT TITLE : CONDENSATE FRACTIONATION PLANT & ASSOCIATED FACILITIES Inspection Parties Involved Doc. No. : R057-AC-IT-002
CAPACITY 4000 BBL/DAY AT RASHIDPUR, BAHUBOL, HABIGANJ, INF : PT. INOFAB Rev. No. : C
BANGLADESH RTQ : PT. ROTEQ Date : 30-Dec-16
PROJECT NO. : R-057 IKL : PT. ISTANA KARANG LAUT
USER : SYLHET GAS FIELDS LIMITED
CLIENT : PT. ISTANA KARANG LAUT & ENERGYPAC POWER GENERATION LTD
PACKAGER : PT. ROTEQ
FABRICATOR : PT. INOFAB
DESCRIPTION : PIPE SPOOL - INSTRUMENT AIR COMPRESSOR PACKAGE
TAG NO. : -

INSPECTION AND TEST PLAN


CERTIFYING DOCUMENTS INSPECTION PARTIES
ITEM
PROCESS / ACTIVITY DESCRIPTION ACCEPTANCE CRITERIA VERIFYING TO BE INCLUDED
NO. INF/RTQ IKL
DOCUMENTS IN MDR
Act & Sign Act & Sign

7.0 SURFACE PREPARATION AND PAINTING


Paint Material Paint Material
7.1 Check Paint Material (Batch Cert.) Approved Blasting & Painting Procedure H R
Certificates Certificates

7.2 Check Surface Preparation Approved Blasting & Painting Procedure Inspection Report Inspection Report H M

7.3 Painting Application Approved Blasting & Painting Procedure Inspection Report Inspection Report H M

7.4 Check DFT of Primer Coat Approved Blasting & Painting Procedure Inspection Report Inspection Report H M

7.5 Check DFT of Intermediate Coat Approved Blasting & Painting Procedure Inspection Report Inspection Report H M

7.6 Check DFT of Top/Final Coat Approved Blasting & Painting Procedure Inspection Report Inspection Report H M

7.7 Records Approved Blasting & Painting Procedure Inspection Report Inspection Report H R

7.8 Pre-Shipment Inspection Approved Blasting & Painting Procedure Inspection Report Inspection Report H H

Page 7 of 8
PROJECT TITLE : CONDENSATE FRACTIONATION PLANT & ASSOCIATED FACILITIES Inspection Parties Involved Doc. No. : R057-AC-IT-002
CAPACITY 4000 BBL/DAY AT RASHIDPUR, BAHUBOL, HABIGANJ, INF : PT. INOFAB Rev. No. : C
BANGLADESH RTQ : PT. ROTEQ Date : 30-Dec-16
PROJECT NO. : R-057 IKL : PT. ISTANA KARANG LAUT
USER : SYLHET GAS FIELDS LIMITED
CLIENT : PT. ISTANA KARANG LAUT & ENERGYPAC POWER GENERATION LTD
PACKAGER : PT. ROTEQ
FABRICATOR : PT. INOFAB
DESCRIPTION : PIPE SPOOL - INSTRUMENT AIR COMPRESSOR PACKAGE
TAG NO. : -

INSPECTION AND TEST PLAN


CERTIFYING DOCUMENTS INSPECTION PARTIES
ITEM
PROCESS / ACTIVITY DESCRIPTION ACCEPTANCE CRITERIA VERIFYING TO BE INCLUDED
NO. INF/RTQ IKL
DOCUMENTS IN MDR
Act & Sign Act & Sign

8.0 MANUFACTURING DATA RECORD (MDR)

8.1 Final Review and Certification of MDR Approved MDR Table of Contents MDR MDR H R

Legend:
Hold Point ( H ) : An inspection, test, non-destructive examination or fabrication operation that must be witnessed by a specified party prior to subsequent fabrication. Operation sequences at the requ
point shall not be continued prior to having been examined and released by a specified party

Witness Point ( W ) : An inspection, test, non destructive examination or fabrication operation that is designated to be witnessed by a specified party unless otherwise permitted in writing by the specified party to p
the activity. The specified party must be notified sufficiently in advance prior to performing the designated operation

Monitor Point ( M ) : Monitor the Inspection which on random/sampling nature. Notification may not be required

Review Point ( R ) : An inspection which is conducted by reviewing as system or document related to i.e. reviewing RT films, reviewing ITP or reviewing of quality system

Page 8 of 8
: R057-AC-IT-002

: 30-Dec-16

AND TEST PLAN


INSPECTION PARTIES

Page 9 of 8
: R057-AC-IT-002

: 30-Dec-16

AND TEST PLAN


INSPECTION PARTIES

Page 10 of 8
: R057-AC-IT-002

: 30-Dec-16

AND TEST PLAN


INSPECTION PARTIES

Page 11 of 8
: R057-AC-IT-002

: 30-Dec-16

AND TEST PLAN


INSPECTION PARTIES

Page 12 of 8
: R057-AC-IT-002

: 30-Dec-16

AND TEST PLAN


INSPECTION PARTIES

Page 13 of 8
: R057-AC-IT-002

: 30-Dec-16

AND TEST PLAN


INSPECTION PARTIES

ust be witnessed by a specified party prior to subsequent fabrication. Operation sequences at the required hold
a specified party

designated to be witnessed by a specified party unless otherwise permitted in writing by the specified party to proceed
performing the designated operation

y not be required

lated to i.e. reviewing RT films, reviewing ITP or reviewing of quality system

Page 14 of 8