GAC-FLUOR-MA'ADEN-CIV-RFI-0006

mALCQA I ~·~
\l a 'od an Al u m i n u m Proj e ct
O NETEAM

Ma'aden Aluminum Complex 000 509 F00501


Contract A6PM 30 Sep 2010
Ras AI Khair, KSA Page 1 of 1

REQUEST FOR INFORMATION (RFI)

IIp·MA'ADEN AlUMINIUM PROJECT I: INTEGRATED DATE: 17-Juty.2012 RFI. : GA-FLUOR-


INFRASTRUCTURE. MA'ADEN-CIV-RFI-D006

was (Work Breakdown Structure):


NlA.
I WORK
PACKAGE
TURNOVE~STARTUPSYSTEM DISCIPLINE: ClvlVArch

REQUESTTO(RESPONDEN~
: RESPONDENTS COMPANY/LOCATION PHONE/EMAIL

SUBJECT: Temporary wooden doors for Are Stallon (Phase-I. Arst Hot Metal)

SPECIFICATIONSIDOCUMENTSJDWGS REFERENCED OR IMPACTED: MD-405-1OBF-EG-AR-DAL-10003/1. MD-405-10BF·EG-AR-DRD-


10005/1 1000B/1. 10007/1 •• ~ .ftP 'ftft~-EG-AR-DRD-1OO12J0."~ .ft~ 'ftft~-EG-AR-DRD-10009J1 ,.~ ,ftft 'ftftft-EG-AR.DRD-10010J1
MD-405-10BF-EG-AR-DRD-10011/O.

QUESTlONSJDESCRIPTlON OF CONFUCT: The Temporery wooden door schedule Is attached for your approval to place the purchase order.
Please confirm. shall GACC follow drawing No. MD-405-10BF-EG-AR-DRD-1oo09/1 . 1001011.10011/0 for door types. The door schedule Is
prepared based on the drawing No. MD-405-10BF·EG-AR-DRD-10005/1. 1000B/1. 10007/1

Please clarify the requIrement of windows . In drawing No. MD-405-10BF-EG-AR-DAL·10000/4 windowW/1-3Nos.• WI2-2Nos . are shown but not
shown In drawing No. MD-405-10BF-EG -AR-DAL-10003/1. If windows required, shall GACC follow drawing No. MD-405-10BF-EG-AR-DRD-10001/5
for windows schedule and specification .

ORIGINATOR'S RECOMMENDED SOLUTION:

\ \\
:WV::, T~ // -
DATE: APPROVED (Sign) TITLE DATE

KATHI VA FIELD ENGINEER. 17 .07.12 ~,. ,. '~ECTMANAGER 17.07.12.

ORIGINATOR'S (SUB) CONTRACTOR COMPANY NAME: GACC ORl~INATOR'S (SUB) CONTRACT #: K042 (KOO3-PCA067)
REPLY REQUIRED BY:

RESPONSE:
see comments below and resubmit

RESPONDENT (Sign) TITLE DATE APPROVED (Sign) TITLE DATE


By Mark Welch (mark.welch@fluor.com) at 4:17 pm, Jul 27, 2012

By Andy Rahman (andy.rahman@fluor.com) at 2:49 pm, Aug 05, 2012


ARE THE QUESTION AND RESPONSE ADEQUATE FOR CLOSURE IS THERE A COST IMPACT DUE TO THIS RFI? 0 YES ONO
OF THIS RFI? n YES 0 NO D IF YES SITE INSTRUCTION TO BE ISSUED
IS THERE A SCHEDULE IMPACT DUE TO THIS RFI? 0 YES 0 NO THE WORK WAS COMPLETED AS NOTED ON THIS CLOSED
o IF YES. SITE INSTRUCT ION TO BE ISSUED RFI AND VERIFIED BY DATE:

DISTRIBUTION: I I
The response to this RFI Is NOT an authorization to perform a change to the contract Work may proceed In accord with the response only If such
work Involves NO change in cost or schedule. If the response Involves change In cost or schedule. a Site Instruction or similar document must be
received before the response can be executed. Where no Site Instruclion Is Indicated. acllon must be taken In accordance with Article 15.0 of Part III.
Section 15.2 and subject work must not proceed In accordance with Section 15.3 or 15.4 of Part III, General Terms of the Fluor Standard Contract

*P1/1*

1 of 11
GAC-FLUOR-MA'ADEN-CIV-RFI-0006

GULF ASIA CONTRACTING COMPANY LLC
RAS AZ ZAWR ALUMINIUM SMELTER PROJECT
Review Door FIRE STATION BUILDING 
elevations & types TEMPORARY WOODEN DOOR SCHEDULE
AS PER DRAWING 
No. OF  MATERIAL DOOR DIMENSION DETAIL
DOOR  DOOR  ROUGH OPENING VISION  HARDWARE  DOOR 
DOOR ROOM NAME FIRE RATED
NO TYPE PANEL SET NO ACTION
S DOOR DOOR FINISH DOOR COLOR FRAME FRAME FINISH FRAME COLOR WIDTH HEIGHT WIDTH HEIGHT HEAD JAMB

D‐21 1 C ELECTRICAL ROOM (SCC) SOLID CORE WD PAINTED RAL 1000 WOOD PAINTED RAL 1000 1360 2180 1200 2100 DH1 DJ1 17 LH 1 HR
ELECTRICAL ROOM 
D‐24 1 C SOLID CORE WD PAINTED RAL 1000 WOOD PAINTED RAL 1000 1075 2180 915 2100 DH1 DJ1 17 LH 1 HR
(FIRE/CLINIC)
D‐29 1 C TELECOM ROOM SOLID CORE WD PAINTED RAL 1000 WOOD PAINTED RAL 1000 1075 2180 915 2100 DH1 DJ1 17 LH 1 HR

D‐49 1 F CORRIDOR SOLID CORE WD PAINTED RAL 1000 WOOD PAINTED RAL 1000 1960 2180 900(2) 2100 DH1 DJ1 150X700 28 RHRA

D‐50 1 C CONTROL RM SOLID CORE WD PAINTED RAL 1000 WOOD PAINTED RAL 1000 1360 2180 1200 2100 DH1 DJ1 17 LH 1 HR

D‐51 1 E WORK SHOP SOLID CORE WD PAINTED RAL 1000 WOOD PAINTED RAL 1000 1960 2180 900(2) 2100 DH1 DJ1 150X700 28 LHA

D‐58 1 E WORK SHOP SOLID CORE WD PAINTED RAL 1000 WOOD PAINTED RAL 1000 1960 2180 900(2) 2100 DH1 DJ1 8 RHRA

D‐64 1 A TOILET SOLID CORE WD PAINTED RAL 1000 WOOD PAINTED RAL 1000 1075 2180 915 2100 DH1 DJ1 23 RH

D‐66 1 A TEA ROOM SOLID CORE WD PAINTED RAL 1000 WOOD PAINTED RAL 1000 1075 2180 915 2100 DH1 DJ1 21 LH
External Door
D‐67 1 C INCIDENT CONTROL RM SOLID CORE WD PAINTED RAL 1000 WOOD PAINTED RAL 1000 1360 2180 1200 2100 DH1 DJ1 17 RHR 1 HR

D‐68 1 B OFFICE‐03 SOLID CORE WD PAINTED RAL 1000 WOOD PAINTED RAL 1000 1075 2180 915 2100 DH1 DJ1 21 RH

D‐69 1 C SECURITY CONTROL RM SOLID CORE WD PAINTED RAL 1000 WOOD PAINTED RAL 1000 1360 2180 1200 2100 DH1 DJ1 17 LH 1 HR

D‐70 1 F EQUIPMENT ROOM SOLID CORE WD PAINTED RAL 1000 WOOD PAINTED RAL 1000 1960 2180 900 (2) 2100 DH1 DJ1 28 RHRA

D‐71 1 B OFFICE‐04 SOLID CORE WD PAINTED RAL 1000 WOOD PAINTED RAL 1000 1075 2180 915 2100 DH1 DJ1 21 LH
Add
D‐72 1 F HALL SOLID CORE WD PAINTED RAL 1000 WOOD PAINTED RAL 1000 1960 2180 900 (2) 2100 DH1 DJ1 24 LHA 150x700 VP
D‐73 1 B FILE ROOM SOLID CORE WD PAINTED RAL 1000 WOOD PAINTED RAL 1000 1075 2180 915 2100 DH1 DJ1 15 RH

D‐74 1 F HALL SOLID CORE WD PAINTED RAL 1000 WOOD PAINTED RAL 1000 1960 2180 900 (2) 2100 DH1 DJ1 24 LHA

D‐75 1 B STORE SOLID CORE WD PAINTED RAL 1000 WOOD PAINTED RAL 1000 1075 2180 915 2100 DH1 DJ1 15 LH

D‐76 1 C ENTRANCE LOBBY SOLID CORE WD PAINTED RAL 1000 WOOD PAINTED RAL 1000 1360 2180 1200 2100 DH1 DJ1 25 LHR 1 HR

D‐78 1 E MATERIAL WARE HOUSE SOLID CORE WD PAINTED RAL 1000 WOOD PAINTED RAL 1000 1960 2180 900 (2) 2100 DH1 DJ1 28 RHRA

D‐79 1 C OFFICE‐02 SOLID CORE WD PAINTED RAL 1000 WOOD PAINTED RAL 1000 1075 2180 915 2100 DH1 DJ1 30 LH

D‐80 1 C OFFICE‐01 SOLID CORE WD PAINTED RAL 1000 WOOD PAINTED RAL 1000 1075 2180 915 2100 DH1 DJ1 30 RH

Add D65 -Janitor


In Stud Wall
Rm. in Stud wall. Review all H/W Sets
Colour of Door and
Frames to match the Rough opening All Internal Doors to have
Add New Door No. Al Kuhaimi - Blast Wall they sit in. 2250 from SSL. 3 Hinges per Leaf, Door
- to new ups rm. Door - PLSA closer, Lockset. Lever or
similar to D21 quotation received Pull/push.
with Details- Gasketing For smoke and
Air transmission. External
and doors between
2 of 11
finishes to have threshold
GAC-FLUOR-MA'ADEN-CIV-RFI-0006

REFER TO MD-405-10BA-EG-AR-DAL-10008
FOR TYPICAL COMMENTS

CMU & PARTITION SETTING OUT


DIMENSIONS REQUIRED

D – REVIEWED FOR INFORMATION ONLY ®

Authorization to proceed does not relieve Contractor/Supplier of its responsibility


or liability under the Contract and or Purchase Order.
By Mark Welch (mark.welch@fluor.com) at 9:44 am, 21 May 2012

USE THE LATEST


LAYOUT / REVISE
TO RMI DESIGN

3 of 11
GAC-FLUOR-MA'ADEN-CIV-RFI-0006

Check clear
opening width for For Access control
automatic opening coordinate with K010
doors

For Vision Panels - To be


ADA Compliant

Provide details

MAADEN
COMMENTS D – REVIEWED FOR INFORMATION ONLY ®

4 of 11 Authorization to proceed does not relieve Contractor/Supplier of its responsibility


or liability under the Contract and or Purchase Order.
By Mark Welch (mark.welch@fluor.com) at 6:21 pm, 12 May 2012
GAC-FLUOR-MA'ADEN-CIV-RFI-0006

Refer to MD-405-10BF-EG-AR-DRD-10005 provide details


FOR TYPICAL COMMENTS

D – REVIEWED FOR INFORMATION ONLY ®

Authorization to proceed does not relieve Contractor/Supplier of its responsibility


or liability under the Contract and or Purchase Order.
By Mark Welch (mark.welch@fluor.com) at 9:54 am, 18 May 2012

maaden
comments
5 of 11
GAC-FLUOR-MA'ADEN-CIV-RFI-0006

Refer to MD-405-10BF-EG-AR-DRD-10005
FOR TYPICAL COMMENTS

Provide Details showing


external Wall and
insulation

maaden comments

D – REVIEWED FOR INFORMATION ONLY ®

Authorization to proceed does not relieve Contractor/Supplier of its responsibility


or liability under the Contract and or Purchase Order.
By Mark Welch (mark.welch@fluor.com) at 9:55 am, 18 May 2012

6 of 11
GAC-FLUOR-MA'ADEN-CIV-RFI-0006

COORDINATE WITH
K010 FOR ACCESS
CONTROL AND DOOR
CONTACTS

FIRE DOORS TO HAVE


SMOKE GASKETING

D – REVIEWED FOR INFORMATION ONLY ®

Authorization to proceed does not relieve Contractor/Supplier of its responsibility


or liability under the Contract and or Purchase Order.
By Mark Welch (mark.welch@fluor.com) at 10:03 am, 18 May 2012

MAADEN
7 of 11
COMMENTS
GAC-FLUOR-MA'ADEN-CIV-RFI-0006

Refer to MD-405-10BA-EG-AR-DRD-10026 FOR


GENERAL COMMENTS

B – PROCEED, CHANGE AS NOTED ®


AND RESUBMIT
Authorization to proceed does not relieve Contractor/Supplier of its responsibility
or liability under the Contract and or Purchase Order.
By Larry (lawrence.troxell@fluor.com) at 5:09 pm, 29 May 2012

MAADEN
COMMENTS
8 of 11
GAC-FLUOR-MA'ADEN-CIV-RFI-0006

Door No.

Shutter No. Door No Door No.

D – REVIEWED FOR INFORMATION ONLY ®

Authorization to proceed does not relieve Contractor/Supplier of its responsibility


or liability under the Contract and or Purchase Order.
By Mark Welch (mark.welch@fluor.com) at 6:29 pm, 12 May 2012

MAADEN
COMMENTS
9 of 11
GAC-FLUOR-MA'ADEN-CIV-RFI-0006

REFER TO MD-405-10BA-EG-AR-DRD-10025 FOR TYPICAL


COMMENTS

D – REVIEWED FOR INFORMATION ONLY ®

MAADEN Authorization to proceed does not relieve Contractor/Supplier of its responsibility


or liability under the Contract and or Purchase Order.

COMMENTS By Mark Welch (mark.welch@fluor.com) at 10:02 am, 18 May 2012

10 of 11
GAC-FLUOR-MA'ADEN-CIV-RFI-0006

D – REVIEWED FOR INFORMATION ONLY ®

Authorization to proceed does not relieve Contractor/Supplier of its responsibility


or liability under the Contract and or Purchase Order.
By Mark Welch (mark.welch@fluor.com) at 6:46 pm, 21 Apr 2012

11 of 11