Method of Construction
As first, the excavation should be speedup and initiate.
Then the earth extends after a length of 6 m to 10 m.
The battery cover is placed in the same direction for the other batteries along with the entire
battery as it belongs to a full cover. The dimensions will be extended by 30m width and
60m length.
Concrete 40 degree will be thrown to the top and the top of the top.
The ground floor will be located on the ground floor on the ground floor in a manner similar
to the adjacent buildings on both sides.
Starters columns and wall must be built up and work with Rebar done before casting of
concrete punchers and shear walls etc.
The reinforcement work of the ramp and concrete work with G30 concrete of ground floor
either.
When after casting the ramps, the remaining columns and beams to transfer to the first
floor.
So the plate on first floor will be cast by the concrete with elevator and separating walls.
The upstairs columns and beams should be reinforced and cast with concrete with
intermediate columns.
So the slab should be marked and located with the same level of the beams fixing and to
be concrete.
And the finishing work to be start and speedup according to the client preferences and
architectural systems.
Structural Solution 02 – Design of Composite concrete floor with a coated steel section
columns
With reference to this structural solution, composite concrete floor with a coated steel section
columns. With the dynamic loads which coming out via the structure can be resist itself. The
basement should be implement and rigid because of loads must act on beams, columns and shear
walls via lateral and vertical loads.
When concern, the base of selected structure, stack of the base is not much resist and necessary. A
raft basement can be modified and it can be bear the living loads which coming via columns. And
the water table also resist at the below of 6m of the ground structure, so the water table will not
effect to the structure much more. So the composite structure could be reliable and effective.
Elements of structure
Main columns – Implement with 3 columns with concrete and steel.
Slab – Concrete will be cast with a steel mesh in G30 including layer wise concrete
Beam – Concrete will be casted with attached to the column.
Method of Construction
As first, the excavation should be speedup and initiate.
Then the earth extends after a length of 6 m to 10 m.
The battery cover is placed in the same direction for the other batteries along with the
entire battery as it belongs to a full cover. The dimensions will be extended by 30m width
and 60m length.
Concrete 40 degree will be thrown to the top and the top of the top.
The ground floor will be located on the ground floor on the ground floor in a manner
similar to the adjacent buildings on both sides.
Starters columns and wall must be built up and work with Rebar done before casting of
concrete punchers and shear walls etc.
The reinforcement work of the ramp and concrete work with G30 concrete of ground
floor either.
When after casting the ramps, the remaining columns and beams to transfer to the first
floor.
So the plate on first floor will be cast by the concrete with elevator and separating walls.
The upstairs columns and beams should be reinforced and cast with concrete with
intermediate columns.
So the slab should be marked and located with the same level of the beams fixing and to
be concrete.
And the finishing work to be start and speedup according to the client preferences and
architectural systems.
Structural Solution 02 - Concrete flooring bonded with coated steel columns for the specified
building.
Reinforcement specification
1.5 A method description for a safe building procedure for the building.
1.6 A statement about the building's robustness to avoid a disproportionate
collapse
1.7 Modifications necessary letter to the client
DC/SS/LT/CLIENT/O01
08.11.2017
Project Manager.
Colombo Kandy Service center project.
Dear Sir,
Yours sincerely,
-------------------------------
Project Manager for Colombo Kandy Service center project.
Diligence Construction Pvt Ltd.
2.0 Design Calculations
Slab Design
Beam Design
Column Design
3.0 Drawings selected on Scheme superstructure
Section Drawing