1 20 MVA Station Transformer 1 20 MVA Station Transformer foundation-GA & RCC Detail
2 ST oil collection pit-GA & RCC Detail
3 Cable trenches-GA drawinw
4 cable trenches-RCC detail
2 132 KV Switch yard 1 Tower foundations-GA of different type of tower
2 Tower foundation-RCC detail of different type of tower
3 Rail cum Road-GA & RCC detail
4 Fencing/Boundary Wall-GA & Masonry detail
5 Boundary drain-GA & Masonry/RCC detail
6 Road & Ballast Filling- GA & Section detail
3 1250 Amp SF6 Circuit Breaker-5 nos 1 Circuit breaker(5 No.)-Foundation GA and RCC detail
C) Aeration System
1 DM Bld. (existing bld. To be used) 1 RCC/Masonry Modification drawing for DM Bld.
2 RCC/Masonry Modification drawing for Nutralizing pit
3 Schedule & Archi. Detail of Doors & Windows
4 Archi. Details of Flooring & Tiling
5 Archi. Details of Acid lining
6 RCC details for bracket for instalation of Monorail
2 Equipment foundation 1 Raw water trasnfer pump(4No.)-GA & RCC details of
2 Pressure Filters-GA & RCC details
3 Activated Carbon Filters-GA & RCC details
4 SAC foundations- 3 nos.-GA & RCC details
5 WAC foundations( 3 nos).-GA & RCC details
6 SBA foundations-(3 nos.)-GA & RCC details
7 f MC foundations(3 nos.)-GA & RCC details
D) Softning Plant
1 Softning Bld.(Existing bld. To be used) 1 RCC/Masonry Modification drawing for Softning Bld.
2 Schedule & Archi. Detail of Doors & Windows
3 Archi. Details of Flooring & Tiling
2 Equipment foundation 1 Soft water pump foundation(4 No.)-GA & RCC details
2 Pressure filter foundation(6 No.)-GA & RCC details
3 Softning unit foundation(6 No.)-GA & RCC details
4 Brine injection pump foundation(2 No.)-GA & RCC details
5 Salt saturation tank foundation-GA & RCC details
6 Fresh Brine measurement tank foundation-GA & RCC details
7 Spent Brine tank foundation-GA & RCC details
E) CW Chlorination Plant
1 CW Chlorination Building 1 Foundation GA drawing
2 RCC details of foundation
3 RCC details of Plinth beam
4 RCC details of Columns
5 RCC details of Floor beams
6 RCC details of Foor & roof
7 RCC details of Grade slab
8 Archi. Detail & schedule of Doors & Window
9 Archi. Detail of Plinth protection, Chajja & parapet
10 Plumbing & down commer details
11 Sanitary fixture details
12 Septik tank and masonry drain details
13 Masonry B/W, Plaster & painting details
14 Roof treatment & protection details
15 Archi. Detail of False celling work
2 Equipment foundation
F) Ventilation System
1 Air Washer Room 1 RCC/Masonry Modification drawing of Room at EL-0.0m- 2 no.
2 RCC/Masonry Modification drawing of Room at EL-19.0m- 2 no.
3 Archi. Detail for plaster,painting,flooring,tiling etc.
4 Archi. Detail for opening at different levels
2 Equipment foundation 1 Centrifugal pump foundation(8 No.)-GA & RCC details
2 Centrifugal fan foundation(4 No.)-GA & RCC details
G) Air Compressor
1 Equipment foundation 1 Skid foundation(5 No.)-GA & RCC details
2 Air Compressor foundation(5 No.)-GA & RCC details
3 Air dryer foundation(3 No.)-GA & RCC details
4 Air receiver foundation(5 No.)-GA & RCC details
I) LP dosing System
1 Equipment foundation 1 Skid foundation(4 No.)-GA & RCC details