You are on page 1of 1

www.facebook.

com//mecengineeringsolutions

LOCATION

156' - 7"
L= 2' - 8"; Ø =3"

"
1 1/4
Ø=
7";
= 7' -
L

L= 3' - 8"; Ø =3"


WVD 2 158' - 0"
Fd
AHU-5
Ø =2"
Rd 3 Roo
f
CAPTION
157Plan
'-0
Cw " Height Over Finish

L= 6' - 9"; Ø =2"

L= 2' - 10"; Ø =3"


Fixtures Floor Level.
WS HWS
Lv : Lavatory 1'-9" 1'-9"
L= L=
12' 8' - Wct : Water Closet Tank 0'-9" -
- 3";
158' - 0" 4"; Ø
GVD 1 Ø =1
=3 1/4 Wcv : Water Closet Valve 1'-9" -
Ø =1 1/4" " "

L= 3' - 11"; Ø =3"


WVD 3 Htr: Heater 0'-8" 3'-4"
Fd " AHU-4 Ø =3"
158' - 0" 1/4 Shw : Overhead Shower 8'-0" 8'-0"
Ø =1 158' - 0"
Rd 6 4"; Fd
3' - Fd Ksn : Kitchen Sink 1'-10" 1'-10"
WVD 1 L= C
L= 1' - 5"; Ø =1 1/4" Rd 4 L= 4' - 3"; Ø =3"

L= 7' - 7"; Ø =1 1/4"


Ø =2" Dsw : DischWasher 1'-10" 1'-10"
Rd 2
an Bth
o o f Pl 1/8" / 1'-0" Firs Ssn : Service Sink 2'-8" 2'-8"
R ' - 0" L= 1' - 5"; Ø =1 1/4" Lv tF
157 Wct
GVD 3 147 loor Bth : Bathtub 1'-10" 1'-10"
L= '-6
" Fd 5' - Ø =2" "
1/4 L= 3' - 4"; Ø =3" 0"; Uri : Urinal 2'-8" 2'-8"
Rd 5

L= 11' - 1"; Ø =3"


1 Ø=
"; Ø= L=
6' - 11 GVD 4
L= 0' - 6"; Ø =1 1/4"
- 10 /2"

L= 20' - 0"; Ø =3"


4' 7"; 158' - 0" Wmc : Washing machine 2'-8" 2'-8"
L= Ø= Ø =2"
Lv 3"

L= 7' - 10"; Ø =3"


L= 9' - 10"; Ø =1 1/4" Gt : Grease Trap -0 3" -
Fd
WVD 1 Ltr : Laundry Try 2'-3" 2'-3"
L= 3' - 1"; Ø =1 1/4" Fd
Wmc GVD 2

L= 11' - 2"; Ø =2"


Fd: Floor Drain Invert -
L= 3' - 8"; Ø =2" Rd 1

L= 8' - 9"; Ø =2"


Ø =2"
L= 1' - 10"; Ø =1 1/4" C: Cleanout - -

L= 19' - 3"; Ø =3"


L= 18' - 1"; Ø =2"

Cw Cw: Wall Cleanout - -


Ø =2"
9";
= 6' - Skw: Soakaway - -
L

L= 9' - 7"; Ø =2"


Spt: Septic Tank - -
or
t Fl o

L= 15' - 2"; Ø =3"


Cw
i rs
F '-6 "
AHU-3 Gro MH: Manhole - -
147

L= 11' - 10"; Ø =2"

L= 12' - 11"; Ø =3"


L= 1' - 3"; Ø =3" Lv un dL

L= 13' - 9"; Ø =1 1/2"


Roof
137 evel Rd: Roof Drain
Level
Rd 7 '-6
Fd L= 1' - 0"; Ø =3" Lv "

L= 17' - 9"; Ø =3"


Wct
L= 24' - 1"; Ø =3"

WVD 4 C
Ø =2"
1/8
Bth
NOTES
" / 1' L=
Fc
-0" 4' -
L= 0' - 10"; Ø =2" L= 17' - 6"; Ø =4" L= 3";
Fc 9' - Ø
7"; =1
Ø =2" 1/2
L= 2' - 0"; Ø =2" L= 1' - 0"; Ø =2" "
SD L= 7' - 1"; Ø =3" L= 1' - 7"; Ø =3"
L= 22' - 3"; Ø =2"
L= 6' - 11"; Ø =3" ;Ø =2"
' - 1"
1/8" / 1'-0" Ksn L= 4

L= 17' - 9"; Ø =3"


L= 10' - 6"; Ø =2"

3" L= 1' - 8"; Ø =3" Fd


; Ø= ;Ø=
2"
- 9" ' - 1"

L= 2' - 5"; Ø =2"


24' L= 2' - 1"; Ø =2" L= 4
L= 2' - 7"; Ø =1 1/4" L= 1/4
" L= 1' - 9"; Ø =3"
1 L=
el L= 1' - 7"; Ø =2" Ø= 6' -
Lev 10"
; 7";
und 2' - Ø L= 7' - 10"; Ø =3"
Gro' - 6" L= 1' - 11"; Ø =1 1/4" Lv L=
2 =2
" 00
137 Wct Cw Bas
em
156' - 6" 127 ent
L= 5' - 8"; Ø =3" '-5
0" "

L= 2' - 11"; Ø =3"


" / 1'- L= 0' - 11"; Ø =2" MH-1

L=
L= 1' - 5"; Ø =1 1/4"
1/8
"

2
L=
=3

'-
5' -

L= 8' - 10"; Ø =3"

3";
Ø

9"; L= 1' - 11"; Ø =3"

L= 5' - 6"; Ø =2"


Ø =4" REVIEWS
5";

Fc =3

Ø
" ;Ø Spt
L= 1' - 1"; Ø =3" - 8"
-

=3
Ksn
14'
2'

"
L=
L=

L= 10' - 1"; Ø =3"


No. Description Date
C Gt
L= 14' - 11"; Ø =1 1/4" Cw
3"
Ø=

L= 3' - 3"; Ø =3"


L=

[No Slope]
1"; Cw
'-1 L= 3' - 3"; Ø =1 1/4" 4"
2

Tr e Lift Station
3 Ø= Lv Bth
'-

L= 9"; De nch L= 1' - 7"; Ø =2" Two L= L= 10' - 11"; Ø =2"


=3"
2";

L= 2' - 6"; Ø =1 1/2" 16


L= 5' - 1"; Ø =3" 4' - ad dra
Le in s Chambers '-
L= 2";
Ø

vel ys Wct
1'-0"
L= 4' - 7"; Ø

tem Ø / MH-2
=4

=3
1/8"

L= 3' - 6"; Ø =3"


nt Wa "
;Ø=
2"
eme
"

" tts . ' - 5"


s =4" 1/2
L= 16' - 10"; Ø =3"

a L= 0' - 9"; Ø =2" 10


00 B' - 5" "; Ø ;Ø
=1 Ksn L=
L= 16' - 6"; Ø =2"

147' - 0"
127 5'-3 - 11" L= 2' - 10"; Ø =3"
L= 1' - 8"; Ø =4" L= 12' Gt =3"
Skw
L= ;Ø
' - 8"
L= 2' - 7"; Ø =4"

L=
C
L=
L= 1' - 6"; Ø =2" 2' -
9"; L= 4 4"
6' Ø ;Ø= L=
L= - 1" =2" ' - 2" 5' -
16 ; Ø L= 5 4";
'- Fc =2
2"; =3" Ø =3
Ø " "; Ø
L= 9' - 4"; Ø =3"

L= 1' - 11"; Ø =2"


=4
" L= 8' - 7 AHU-1 "
DESIGNERS
1/8 L= 1' - 5"; Ø =4"
" /1
'-0" 2" Wmc L= 1' - 0"; Ø =2"
Ø= L= 3' - 4"; Ø
=2" " PROJECT MANAGER:
L= 0' - 11"; Ø =4" 8"; Ø= 2 1/2
9' - 3" ' - 1";
MH-3
L=
0" ;Ø= L= 11
ENG. ISAIHA NEWMAN
2' - 1
L= 3
L= L= 2" ENGINEER :
6' - 5' " ;Ø=
8"; - 5' - 5
Ø L= 1' - 1"; Ø =2" 3" L= 1
=2 ;Ø / 1'-0" Author
" Fd =2 1/8"
"
L= Bth DRAFTSMAN :
HWS : Hot Water Supply 6' - Lv
10
"; Ø Tr e
L= 3' - 10"; Ø =3"

Sanitary System : Hot Water Supply =4 Wct =2" De nch Author


" L= 6' - 2"; Ø =1 ;Ø ad dra
1/2" ' - 8" Le in s
Cw L= 5 AHU-2 vel yst 137' - 0"
SD: Storm Drain em
L= Wa
L= 4' - 4"; Ø =3"
4' -
5";
tts . PROJECT NAME
Ø =1
1/4
L= 5' - 0"; Ø =2"
" Proposed Dwelling House
L= 1' - 8"; Ø =3"
L= NOTES:
Nubian Greaux
L= 3' - 11"; Ø =3" 16
'-
10
"; Ø
=4 1. THE PIPE GOING HUNG, UNDERGROUND OR EMBED IN WALL.
"
2. THE PIPE ARE OF SANITARY P.V.C MATERIAL. THE DIMENSIONS ARE SPECIFIED IN PLANE, AND SLOPE WILL BE
L= 0' - 8"; Ø =3" 1/8"/1' OR 1/4"/1' IN ALL CASES. FOR DRAIN OF SPLITS MAY USE PVC PRESSURE PIPE OF PN-14, ∅ 1".
PLAN NAME
3. IN SHOWERS AND CLOTHES WASHER, PUT SIPHONS TRAP OF 2" SIZES.

4. EXTEND VENTILATION PIPE UP TO 11-3/4" ON COVER. EMBED PIPE IN WALL.


L= Isometric Sanitary System
10 5. IT IS THE RESPONSIBILITY OF THE PLUMBING CONTRACTOR, TO COMPLY WITH STATE COUNTRY LOCAL
'-
9"; PLUMBING CODES.
Ø =4
"

DESCRIPTION
AGREEMENTS:
MH-4
∅ : Piping Size ( " )
L : Pipe Length
Layouts and Isometrics
S: Slope per foot (1/8" : 1' and 1/4" : 1')
SVD : Storm Vertical Drain
V: Vent Vertical Drain.
WWS Isometric WVD: Waste Vertical Drain
1 GVD: Gray Vertical Drain.
Rd: Roof Drainage
CHECKED BY:
Checked by

Checked by

Scale:
1/4" = 1'-0"

P-08

September 2018

M.E.C. ENGINEERING SOLUTIONS, HEREBY EXPRESSLY RESERVES ITS COMMON LAW COPYRIGTH AND OTHER PROPERTY RIGHTS IN THESE PLANS. THESE PLANS AND DRAWINGS ARE NOT TO BE REPRODUCED, CHANGED OR COPIED IN ANY FORM MANNER WHATSOEVER WITHOUT FIRST OBTAINING THE EXPRESS WRITTEN PERMISSION OF ENGINEERING SOLUTIONS NOR ARE THEY TO BE ASSIGNED TO ANY THIRD PARTY WITHOUT FIRST OBTAINING WRITTEN PERMISSION AND
CONSENT.

You might also like