Professional Documents
Culture Documents
Operating Instruction
Distribution List
MA C&T PR ECE SR P&L PPIC ME MV LV QC FI SDCI GOGC
AIN
√ √ √ √ √ √ √ √
FSS GA HR IT LE QEHS COMMS
IDE
√
MA
SSE
A 10-Jun-11 Initialization UH UH AG
PT. SCHNEIDER INDONESIA : Jalan Pulo Buaran Raya Blok III EE Kav. 2-3-6 Kawasan Industri Pulogadung, Jakarta 13920, Indonesia
Total or partial reproduction and/or utilization of this document are forbidden without prior written authorization of the owner.
Affectivity of paper copy should be checked prior to use. Think before print, as your responsibility and commitment with the ENVIRONMENT.
Operating Instruction Title : PiX Installation Guideline Doc. No: D-QC-I-028, Rev. A Page : 1/21
PT SCHNEIDER INDONESIA
Tujuan : Purpose :
Prosedur ini memberi panduan untuk memasang This procedure gives guideline to install panel in
panel dengan cara yang benar dan aman. correct and safe way.
- Sebelum melakukan penyambungan panel, - Before do the panel installation, screen in the
screen yang ada pada kabel kompartmen di cable compartment should be taken out by
keluarkan dengan cara membuka 3 buah baut release the 3 bolts M8 in front if the support.
M8 yang terdapat di depan support.
- Screen yang telah di keluarkan dari panel, - Screen which has been taken out from panel
harus tersimpan dengan benar, agar terhindar should be kept properly, to prevent from
dari kerusakan (patah, tergores, permukaan damage (broken, scratch, dirty surface).
menjadi kotor).
Operating Instruction Title : PiX Installation Guideline Doc. No: D-QC-I-028, Rev. A Page : 2/21
PT SCHNEIDER INDONESIA
Proses penempatan panel pertama sebagai berikut: Placement process of the first panel :
1. Apabila jumlah panel kurang dari 8 unit panel, 1. If panel less than 8 units, start from left or right.
dimulai dari sebelah kiri atau kanan.
2. Apabila jumlah panel lebih dari 8 unit panel, di 2. If panel more than 8 units, start from the middle.
mulai dari tengah- tengah.
- Apabila panel pertama sudah dalam kondisi - If first panel is already in the good condition (flat
lurus dan rata (horizontal dan vertikal), langkah and straight – horizontal and vertical), the next
selanjutnya proses pembautan panel pada step is jointing panel to the foundation.
pondasi.
Operating Instruction Title : PiX Installation Guideline Doc. No: D-QC-I-028, Rev. A Page : 3/21
PT SCHNEIDER INDONESIA
- Penempatan panel selanjutnya mengikuti - The next positioning of panel to follow the
panel sebelumnya. panel before.
- Untuk mempermudah merapatkan, gunakan - Use clamp to easy tie up the panel closely.
tang clamp.
- Kerapatan panel sangat di perlukan untuk - Tied up panel is mandatory to prevent
menghindari kecelakaan apabila terjadi accident if there is Internal-Arc (fire spark will
Internal-Arc (sehingga percikan api tidak not comes out) and to prevent animals/insect
keluar) dan binatang masuk ke dalam. get inside the panel.
- Pemasangan angkur pada panel yang - Anchor installation at the first panel have 4
pertama terdapat 4 titik (2 di depan dan 2 di points (2 in front and 2 at the back side of
bagian belakang panel). panel)
- Panel berikutnya minimum 3 titik (2 di depan - The next panel minimum has 3 points (2 in
dan 1 di bagian belakang panel). front and 1 at the back side of panel)
Pemasangan sambungan antar panel dengan Installation of connection between panel use bolt
menggunakan baut M8x20. M8x20.
Terdapat 7 titik penyambungan sebagai berikut : There are 7 points of installation as below :
1. Dua titik pada kabel kompartmen 1. Two points at cable compartment
2. Tiga titik pada CB kompartmen 2. Three points at CB compartment
3. Dua titik pada LV box 3. Two points at LV box
Operating Instruction Title : PiX Installation Guideline Doc. No: D-QC-I-028, Rev. A Page : 4/21
PT SCHNEIDER INDONESIA
Pemasangan connection link di bagian belakang atas Installation of connection link at the top back side of
panel. panel
Connection link tersebut harus terpasang guna The connection link should be installed to get tied up
mendapatkan kerapatan panel pada bagian atas. panel at the top side.
Setelah panel tersambung dengan benar dan tidak After panel connect properly and there is no gap
terdapat celah (gap). between.
Langkah selanjutnya pemasangan koneksi main Next step is installation of main busbar connection for
busbar untuk earthing. earthing.
Operating Instruction Title : PiX Installation Guideline Doc. No: D-QC-I-028, Rev. A Page : 5/21
PT SCHNEIDER INDONESIA
Contoh panel yang telah selesai proses Example of panel finishes the connection process.
penyambungan. Tidak ada celah (gap) pada tampak There is no gap in front and the back.
depan dan belakang.
- Lepaskan cover bagian atas, dengan - Uninstall top cover, use proper tools.
menggunakan peralatan yang sesuai - This is to easy the access into the
- Hal tersebut untuk mempermudah akses compartment.
kedalam kompartmen
Operating Instruction Title : PiX Installation Guideline Doc. No: D-QC-I-028, Rev. A Page : 6/21
PT SCHNEIDER INDONESIA
Pasang busbar sesuai dengan susunan sbb: Install the busbar as per this step :
1. Busbar 1. Busbar
2. Feeder bar 2. Feeder bar
3. Busbar clamp 3. Busbar clamp
Pastikan permukaan sambungan busbar bersih dari Make sure that the connection surface of busbar is
segala macam kotoran. clean from all dirt.
Kencangkan sesuai torsi M12 = 70 Nm. Tight up as per torsi M12 = 70 Nm.
Setelah main busbar terpasang dengan benar, After main busbar installed properly, clean up the
bersihkan kompartmen tersebut dari segala kotoran compartment from all (dirt, tools, silica gel)
(debu, peralatan, silika gel)
Operating Instruction Title : PiX Installation Guideline Doc. No: D-QC-I-028, Rev. A Page : 7/21
PT SCHNEIDER INDONESIA
Setelah seluruh busbar kompartmen bersih, pasang After all busbar compartments clean, re-install the top
kembali tutup atas panel (tidak boleh ada celah). Hal cover of panel (no gap). This is to prevent outside
ini untuk menghindari benda asing masuk dari atas. thing get inside the panel.
Setelah seluruh proses pemasangan main busbar After all process of installation of main busbar finish,
selesai, papan kayu harus di turunkan dari atas panel wood block can be taken out from the top of panel.
2. Pengoperasian 2. Operation
2.1 Equipment Handling Table for Moving Part & 2.1 Equipment Handling Table for Moving Part &
Operating Accessories Operating Accessories
Handle untuk
menurunkan meja trolley
dari posisi tinggi ke
rendah
Operating Instruction Title : PiX Installation Guideline Doc. No: D-QC-I-028, Rev. A Page : 8/21
PT SCHNEIDER INDONESIA
Operating Instruction Title : PiX Installation Guideline Doc. No: D-QC-I-028, Rev. A Page : 9/21
PT SCHNEIDER INDONESIA
Pastikan LV Plug dalam keadaan terpasang dan Make sure LV Plug installed and lock at CB, before do
terkunci di CB, sebelum melakukan Rack In the Rack-in.
Plugging-in & Unplugging operation for the moving Plugging-in & Unplugging operation for the moving
part part
Operating Instruction Title : PiX Installation Guideline Doc. No: D-QC-I-028, Rev. A Page : 10/21
PT SCHNEIDER INDONESIA
Lepaskan engkol
Operating Instruction Title : PiX Installation Guideline Doc. No: D-QC-I-028, Rev. A Page : 11/21
PT SCHNEIDER INDONESIA
Dekatkan trolley ke CB
Bring the trolley close to the CB
Operating Instruction Title : PiX Installation Guideline Doc. No: D-QC-I-028, Rev. A Page : 12/21
PT SCHNEIDER INDONESIA
Operating Instruction Title : PiX Installation Guideline Doc. No: D-QC-I-028, Rev. A Page : 13/21
PT SCHNEIDER INDONESIA
Operating Instruction Title : PiX Installation Guideline Doc. No: D-QC-I-028, Rev. A Page : 14/21
PT SCHNEIDER INDONESIA
Operating Instruction Title : PiX Installation Guideline Doc. No: D-QC-I-028, Rev. A Page : 15/21
PT SCHNEIDER INDONESIA
Warning!!
Ensure that the low voltage auxiliaries are cut off
before connecting the low voltage plug
Masukkan handle, perhatikan posisi pin
Insert the handle, pay attention the pin position
Information!!
Operation that can be carried out with the circuit
breaker in the position ‘withdrawn/test”
CB closed manual
CB open manual
Operating Instruction Title : PiX Installation Guideline Doc. No: D-QC-I-028, Rev. A Page : 16/21
PT SCHNEIDER INDONESIA
CB mekanikal indicator
Operating Instruction Title : PiX Installation Guideline Doc. No: D-QC-I-028, Rev. A Page : 17/21
PT SCHNEIDER INDONESIA
Berikut adalah contoh kasus Do and Don’t. Following are sample case of Do and Don’t.
Harus dilakukan untuk keberhasilan instalati panel. It’s mandatory to be for succesfull panel installation.
Screen
DON’T
Cutting the screen
DO
Use screen properly
Cable Installation
DON’T
Old termination has corona due to tight
bending inside panel. Effect to corona and
noise
Operating Instruction Title : PiX Installation Guideline Doc. No: D-QC-I-028, Rev. A Page : 18/21
PT SCHNEIDER INDONESIA
Cable Installation
DON’T
Energize without screen between
phase, Cable 3 core inside cable
compartment, gland plate not proper
DO
Use screen between phase as per
standard
Panel Installation
DON’T
Hole between cable gallery and panel
DO
Fully closed
Heater
DON’T
Heater turn off, effect to humidity
DO
Turn on the Heater as per standard
temperature 30 – 40 degree C
Operating Instruction Title : PiX Installation Guideline Doc. No: D-QC-I-028, Rev. A Page : 19/21
PT SCHNEIDER INDONESIA
DON’T
Vice versa
DO
Install properly
VT Fuse Connection
DON’T
Connect the fuse not proper, cause to fuse
burnt
DO
Connect the fuse properly
DON’T
Gap between panel not as per standard IP
DO
No gap
Operating Instruction Title : PiX Installation Guideline Doc. No: D-QC-I-028, Rev. A Page : 20/21
PT SCHNEIDER INDONESIA
DON’T
Wire mesh broken and gap between panel
DO
No gap, to protect animal or insect to get
inside the panel
DON’T
Cable support use thin cable tie only
DO
Cable support use fixed termination
DON’T
Dirty
DO
Clean
Operating Instruction Title : PiX Installation Guideline Doc. No: D-QC-I-028, Rev. A Page : 21/21