SECTION VIII.

BILL OF QUANTITIES

PROJECT : REHABILITATION OF COMFORT ROOMS IN U.P. CEBU


(Administration, High School & A.S. Building)

LOCATION: GORORDO AVENUE, LAHUG, CEBU CITY


OWNER: UNIVERSITY OF THE PHILIPPINES CEBU

I ADMINISTRATION BUILDING
DIV CODE DESCRIPTION UNIT QTY DIRECT COST INDIRECT COST UNIT COST TOTAL

01 GENERAL REQUIREMENTS
Mobilization/Demobilization
006 Temporary Facilities lot 1.00 15,000.00 0.00 15,000.00 15,000.00
Housekeeping and garbage disposal lot 1.00 15,000.00 0.00 15,000.00 15,000.00
Safety Requirements lot 1.00 35,000.00 0.00 35,000.00 35,000.00
Temporary Electrical and Water Consumption lot 1.00 20,000.00 0.00 20,000.00 20,000.00
Chipping/ Disposal lot 1.00 50,000.00 0.00 50,000.00 50,000.00
2 135,000.00

ARCHITECTURAL WORKS AND FINISHES


TILE WORKS
300mm x 600mm wall tiles pcs 760.00 125.00 87.50 212.50 161,500.00
600mm x 600mm floor tiles pcs 130.00 225.00 157.50 382.50 49,725.00
Portland Cement bags 90.00 235.00 164.50 399.50 35,955.00
Tile Adhesives bags 60.00 350.00 245.00 595.00 35,700.00
Tile trim L 40.00 35.00 24.50 59.50 2,380.00

Granite countertop set 4.00 6,500.00 4,550.00 11,050.00 44,200.00


150mmx600mm wall tiles(lavatory) pcs 40.00 125.00 87.50 212.50 8,500.00
337,960.00

CONCRETING AND MASONRY WORKS Lot 1.00 35,000.00 24,500.00 59,500.00 59,500.00
MASONRY WORKS Lot 1.00 30,000.00 21,000.00 51,000.00 51,000.00

CARPENTRY WORKS

Cubicle door Partition, Melamine board sets 8.00 5,000.00 2,500.00 7,500.00 60,000.00
Urinal Partition, Melamine board sets 3.00 5,000.00 2,500.00 7,500.00 22,500.00
Cabinet for countertop lavatory including accessories sets 4.00 10,000.00 7,000.00 17,000.00 68,000.00
150,500.00
CEILING WORKS lot 1.00 30,000.00 21,000.00 51,000.00 51,000.00

SANITARY AND DRAINAGE


Plumbing pipes and fittings lot 1.00 40,000.00 28,000.00 68,000.00 68,000.00

Water Line lot 1.00 15,000.00 10,500.00 25,500.00 25,500.00


Plumbing Fixtures
Water Closet tank type dual flush ( Kohler Panache,
2.6/4L soft close) w/ complete accessories
sets 6.00 22,000.00 11,000.00 33,000.00 198,000.00

Urinal fixture, Kohler- Patio 0.50L P-trap w/ Pozzi


Sensor flush valve w/ complete accessories sets 3.00 32,500.00 16,250.00 48,750.00 146,250.00
Stainless Faucet with sensor, Pozzi w/ complete
accessories sets 4.00 8,000.00 4,000.00 12,000.00 48,000.00
Mirror same width with lavatory w/ wood frame w/
lights all around the sides set 2.00 6,500.00 4,550.00 11,050.00 22,100.00
414,350.00
Electrical lot 1.00 50,000.00 35,000.00 85,000.00 85,000.00

Painting lot 1.00 20,000.00 13,000.00 33,000.00 33,000.00

Metal sun screen louvers lot 1.00 10,000.00 5,000.00 15,000.00 15,000.00

ARTS AND SCIENCE BUILDING 4 Cr's


II ( 2 male and 2 female )

ARCHITECTURAL WORKS AND FINISHES


TILE WORKS
300mm x 600mm wall tiles pcs 1,400.00 125.00 87.50 212.50 297,500.00
600mm x 600mm floor tiles pcs 250.00 225.00 157.50 382.50 95,625.00
Portland Cement bags 120.00 235.00 164.50 399.50 47,940.00
Tile Adhesives bags 34.00 350.00 245.00 595.00 20,230.00
Tile trim L 60.00 34.00 23.80 57.80 3,468.00
Granite countertop set 4.00 6,500.00 4,550.00 11,050.00 44,200.00
150mmx600mm wall tiles (lavatory) 160.00 125.00 87.50 212.50 34,000.00
542,963.00
CONCRETING OF LAVATORY cu.m. 4.00 7,500.00 5,250.00 12,750.00 51,000.00
MASONRY WORKS Lot 1.00 45,000.00 31,500.00 76,500.00 76,500.00
CARPENTRY WORKS
Cubicle door Partition, Melamine board sets 12.00 5,000.00 2,500.00 7,500.00 90,000.00
Urinal Partition, Melamine board sets 4.00 5,000.00 2,500.00 7,500.00 30,000.00
Replacement of PVC door with Hard panel door 0.90
x 2.10 including accessories, Door closer, door sets 4.00 10,000.00 7,000.00 17,000.00 68,000.00
knob,hinges

Cabinet for countertop lavatory including accessories sets 4.00 8,000.00 5,600.00 13,600.00 54,400.00

242,400.00

CEILING WORKS lot 1.00 60,000.00 42,000.00 102,000.00 102,000.00

Plumbing Fixtures
Water Closet tank type dual flush ( Kohler Panache,
2.6/4L soft close) w/ complete accessories

sets 12.00 22,000.00 11,000.00 33,000.00 396,000.00

Urinal fixture, Kohler- Patio 0.50L P-trap w/ Pozzi


Sensor flush valve w/ complete accessories sets 4.00 32,500.00 16,250.00 48,750.00 195,000.00
Stainless Faucet with sensor, Pozzi w/ complete
accessories sets 8.00 8,000.00 4,000.00 12,000.00 96,000.00
Mirror same width with lavatory w/ wood frame w/
lights all around the sides set 4.00 6,500.00 4,550.00 11,050.00 44,200.00
731,200.00
ELECTRICAL WORKS lot 1.00 60,000.00 42,000.00 102,000.00 102,000.00

PAINTING WORKS lot 1.00 40,000.00 28,000.00 68,000.00 68,000.00

SANITARY ADN DRAINAGE


Plumbing pipes and fittings, series 1000 lot 1.00 70,000.00 49,000.00 119,000.00 119,000.00

Water Line using PPR lot 1.00 40,000.00 28,000.00 68,000.00 68,000.00

Metal sun screen louvers lot 1.00 10,000.00 5,000.00 15,000.00 15,000.00

III HIGH SCHOOL

ARCHITECTURAL WORKS AND FINISHES


TILE WORKS
300mm x 600mm wall tiles pcs 950.00 125.00 87.50 212.50 201,875.00
600mm x 600mm floor tiles pcs 170.00 225.00 157.50 382.50 65,025.00
Portland Cement bags 90.00 235.00 164.50 399.50 35,955.00
Tile Adhesives bags 50.00 350.00 245.00 595.00 29,750.00
Tile trim L 19.00 34.00 22.10 56.10 1,065.90
Granite countertop set 2.00 6,500.00 4,550.00 11,050.00 22,100.00
150mmx600mm wall tiles (lavatory) 60.00 125.00 87.50 212.50 12,750.00
368,520.90

CONCRETING OF LAVATORY cu.m. 2.00 7,500.00 5,250.00 12,750.00 25,500.00


MASONRY WORKS Lot 1.00 15,000.00 10,500.00 25,500.00 25,500.00
CARPENTRY WORKS
Cubicle door Partition, Melamine board sets 6.00 5,000.00 2,500.00 7,500.00 45,000.00
Urinal Partition, Melamine board sets 4.00 5,000.00 2,500.00 7,500.00 30,000.00
Replacement of PVC door with Hard panel door 0.90
x 2.10 including accessories, Door closer, door sets 3.00 10,000.00 7,000.00 17,000.00 51,000.00
knob,hinges

Cabinet for countertop lavatory including accessories sets 3.00 10,000.00 7,000.00 17,000.00 51,000.00

177,000.00
CEILING WORKS lot 1.00 34,000.00 23,800.00 57,800.00 57,800.00

Plumbing Fixtures
Water Closet tank type dual flush ( Kohler Panache,
2.6/4L soft close) w/ complete accessories
sets 6.00 22,000.00 11,000.00 33,000.00 198,000.00

Urinal fixture, Kohler- Patio 0.50L P-trap w/ Pozzi


Sensor flush valve w/ complete accessories sets 4.00 32,500.00 16,250.00 48,750.00 195,000.00
Stainless Faucet with sensor, Pozzi w/ complete
accessories sets 8.00 8,000.00 4,000.00 12,000.00 96,000.00
Mirror same width with lavatory w/ wood frame w/
lights all around the sides set 4.00 6,500.00 4,550.00 11,050.00 44,200.00
533,200.00
ELECTRICAL WORKS lot 1.00 24,000.00 16,800.00 40,800.00 40,800.00

PAINTING WORKS lot 1.00 42,000.00 29,400.00 71,400.00 71,400.00

SANITARY AND DRAINAGE


Plumbing pipes and fittings,series 1000 lot 1.00 36,000.00 25,200.00 61,200.00 61,200.00

Water Line using PPR lot 1.00 16,000.00 11,200.00 27,200.00 27,200.00

EXTERIOR CEILING AND FACIA lot 1.00 40,000.00 28,000.00 68,000.00 68,000.00

TOTAL PROJECT COST 5,000,000.00


NAME OF PROJECT: REHABILITATION OF UP CEBU COMFORT ROOMS

LOCATION: GORORDO AVENUE, LAHUG, CEBU CITY


OWNER: UNIVERSITY OF THE PHILIPPINES CEBU
SUBJECT: SCOPE OF WORK AND SPECIFICATION

I GENERAL GUIDELINES
A UNIVERSITY OF THE PHILIPPINES RESTROOM DESIGN GUIDELINES shall be followed.
Anything that is not shall be refered back to the owner's representative for approval.

II CHIPPING/REMOVAL AND DISPOSAL

1. Chipping of all existing tiles inside the comfort room.


2. Removal of all fixtures inside the comfort room.
3. Removal of ceiling .
4. Chipping, removal and disposal should be done at night or after office hours at 6 pm.
5. Contractor to coordinate with CMO for proper disposal of waste.

III ARCHITECTURAL WORKS AND FINISHES

A. TILE WORKS
1. Installation of 30cm x 60 cm semi gloss stone pattern wall tiles.
2. Installation of 60cm x 60 cm rustic or matt finish stone patern floor tiles
3. Use portland cement and heavy duty ABC tile adhesive during tile installation.
4. Contractor to submit samples of tiles for owner's approval before buying needed materials.
5. Provide tile trim for every corner of wall.

B. CONCRETING WORKS
1. Concreting of lavatory pedestal. Contractor to submit drawing plan before fabrication of
and installation.

C. CARPENTRY WORKS
1. Installation of melamine boards for urinal and cubcle partition including its accessories.
2. Contractor to submit sample of item for owner's approval before buying needed materials.
3. Fabrication of Countertop lavatory using the design in the UP Restroom Design Guidelines.

D. CEILING WORKS
1. Installation of light frame ceiling with complete accessories.Use hardiflex Fiber cement
board for ceiling panel. Please see attached plan and layout of ceiling .

E. SANITARY and WATERLINE


1. Installation of new water line system for all comfort rooms.
2. Use PPR Pipes including its accessories
3. Use Atlanta series 1000 for all pipes.

F. PLUMBING FIXTURES
1. Installation new water closet, Kohler brand , tank type with dual flush w/ bidet including
its accessories to make it functional. Use panache 2.4/4L soft close cover water closet
2. Installation of Urinal kohler 0.50L Patio with Pozzi sensor flush valve with complete
accessories.
3. Installation of faucet with sensor, Use Pozzi brand with complete accessories.
4. Installation of mirror glass same width with lavatory with wood frame all around. Mirror
glass shall have ligths installed at the back of the mirror all around. Contractor to submit
drawing of mirror glass before installation.

G. ELECTRICAL WORK S
1. Installation of new wiring system for all comfort rooms. Use PVC Pipes for all wire protection
2. Use THHN wire philflex brand.

H. PAINTING WORKS
1. Repainting of structures not installed with tiles using semi gloss paint. Color of paints shall
have owners' approval before painting. All paints should be sealed and new when
deliver to site.
2. Use Boysen or Island Brand for all paints including tinting colors if any.
135,000.00

337,960.00

59,500.00
51,000.00

150,500.00
51,000.00

68,000.00

25,500.00
414,350.00
85,000.00

33,000.00

15,000.00

542,963.00
51,000.00
76,500.00

242,400.00

102,000.00
731,200.00
102,000.00

68,000.00

119,000.00

68,000.00

15,000.00

368,520.90

25,500.00
25,500.00

177,000.00
57,800.00
533,200.00
40,800.00

71,400.00

61,200.00

27,200.00

68,000.00
5,000,000.00 5,000,000.00

5,000,000.00