You are on page 1of 3

CIVIL WORKS  SITE HANDLING & IDENTIFICATION STRUCTURAL MATERIALS

 STRUCTURAL DEMOLITION
 STRUCTURAL FABRICATION
 STRUCTURAL INSTALLATION
 SITE HANDLING AND IDENTIFICATION OF CIVIL MATERIALS
 SURVEYING
 SITE PREPARATION
 CIVIL DEMOLITION
 DISPOSAL OF WASTE MATERIALS
 EXCAVATION
 DEWATERING
 BACKFILLING
 FORMWORK
 CONCRETE REINFORCEMENT
 CONCRETE POURING
 CONCRETE CURING
 GROUTING
 CONCRETE REPAIR
 ASPHALTING
 CONCRETE FLOOR CONSTRUCTION
 BUILDING MASONRY WALL CONSTRUCTION
 DRY WALL CONSTRUCTION
 BUILDING ROOF CONSTRUCTION
 BUILDING CEILING CONSTRUCTION
 DOORS AND WINDOWS INSTALLATION
 BUILDING INSULATION
 WATERPROOFING
 WALL AND FLOOR FINISHES
 RAISED FLOORING INSTALLATION
 PRE CAST BUILDING CONSTRUCTION

MECHANICAL WORKS  PROTECTION, PRESERVATION. & MAINTENANCE OF EQUIP.


 BOLTING
 COLD-CUTTING & PREPARATION FOR HOT WORK
 SCAFFOLDING
 CAR-SEALING OF VALVES
 RIGGING
 GAS RELEASE PROCEDURE
 SITE HANDLING & IDENTIFICATION OF PIPING MATERIAL
 PIPING DEMOLITION
 PIPING FABRICATION
 PIPING INSTALLATION
 PRESSURE TESTING OF PIPING
 PRESERVATION OF EQUIPMENT
 HOT-TAPS
 TIE-INS
 FLUSHING OF HYDRAULIC OIL CONTROL SYSTEM
 SPACER INSERTS SOCKET WELDS
 SITE HANDLING & IDENTIFICATION
 PRE-INSTALLATION OF MECHANICAL EQUIPMENT
 INSTALLATION OF MECHANICAL EQUIPMENT
 ROTATING EQUIPMENT ALIGNMENT
 ROTATING EQUIPMENT ALIGNMENT
 PREPARATION OF ROTATING EQUIPMENT FOR OPERATION
 TUBE ROLLING PROCEDURE
 CONTROL OF SITE WELDING
 PREHEAT AND INTERPASS HEATING
 HEAT TREATMENT
 POST WELD TREATMENT (UNDER AND ABOVE GROUND PIPING)
 DEMOLITION OF ELECTRICAL EQUIPMENT
 CONDUIT INSTALLATION

ELECTRICAL WORKS  DEMOLITION OF ELECTRICAL EQUIPMENT


 STORAGE, HANDLING & IDENTIFICATION OF ELECTR. MAT
 CONDUIT INSTALLATION-
 CATHODIC PROTECTION INSTALLATION
 CABLE PULLING
 GROUNDING SYSTEM INSTALLATION
 DUCT BANK INSTALLATION
 ELECTRIC MOTOR INSTALLATION
 GENERATOR INSTALLATION
 SWITCHGEAR INSTALLATION
 TRANSFORMER INSTALLATION
 BATTERY UPS SYSTEM INSTALLATION
 JUNCTION BOX INSTALLATION
 MOTOR CONTROL INSTALLATION
 LIGHTING SYSTEM INSTALLATION
 CONTROL PANEL INSTALLATION
 RELAY INSTALLATION
 BREAKER INSTALLATION
 CABLE TESTING
 GROUNDING SYSTEM TESTING
 MOTOR TESTING
 SWITCHGEAR TESTING
 TRANSFORMER TESTING
 BATTERY TESTING
 CONDUIT SEAL POURING
 MULTI WAY SWITCH INSTALLATION
 TERMINATION & SPLICING HV CABLES
 IN-PLANT COMMUNICATION SYST INSTALLATION

INSTRUMENTATION PROCEDURE  SITE HANDLING & IDENTIFICATION OF INSTRUMENTATION


 DEMOLITION OF INSTRUMENT
 INSTRUMENT PREINSTALLATION CALIBRATION
 INSTRUMENT INSTALLATION TRANSMITTER TRANSDUCERS
 INSTRUMENT INSTALLATION CONTROL VALVES
 INSTRUMENT INSTALLATION SWITCHES
 INSTALLATION OF SAFETY RELIEF VALVES
 INSTRUMENT INSTALLATION ANALYZERS
 INSTRUMENT INSTALLATION INDICATORS
 MISCELLANEOUS INSTRUMENT INSTALLATION
 FIELD PRESSURE TESTING OF INSTRUMENT PIPING
 INSTRUMENT LOOP CHECK
 FIRE ALARM SYSTEM INSTALLATION TESTING
COATING PROCEDURES  SITE HANDLING & IDENTIFICATION OF COATING MAT
 COATING
 TAPE WRAPPING (PIPING)
 HEAT SHRINK SLEEVE (PIPING)
 SURFACE PREPARATION FOR INSULATION
 CLADDING
 CONCRETE FIRE PROOFING

You might also like