You are on page 1of 1

ANAS

QATANANI
anassalqatanani@gmail.com

Address Phone number


Haneen st , Apartment 10 +962786789225
Amman, Alzhour Date of Birth
06.02.1996

EDUCATION
CIVIL ENGINEER 08.2014 - 08.2018
I am an Civil Engineer ( Fresh Graduate ) , I am self - Al-Balqa Applied University , Al-Salt, Jordan
motivated person with high ambitions . My main objective Bachelor Degree In Civil Engineering , GPA 3.2
is to be part of something big , great and exciting , apply
the knowledge gained through my study , and to fulfill 09.2012 - 06.2014
duties and tasks required by the job . Motivation , High School
inspiration and creativity in addition to hard work and Salah Al Deen , GPA 86.6
dedication are my main key drivers . I am seeking a
competitive and challenging position in an establishment SOFTWARE SKILLS
that would offer me a continuous career growth . Autodesk AutoCAD      
WORK EXPERIENCE primavira    
Holy Rock Engineering Office - HREO Etabs      
02.2018-05.2018 Prokon     

-Site Engineering ( Trainee ) LANGUAGES


main focus was on what conditions and criteria you
English     
should accept any structural component , and how to
tolerate with workers in addition to how to platform safety Arabic      
in site
- Office Engineering ( Trainee ) SKILLS
It was mostly about softwares like Staad pro, Etabs ,  Good communication
Prokon , Safe , AutoCad . Also on how to read project
 Teamwork
schemes as well as to know about the Jordanian code .
 Effective interpersonal skills
 Work under pressure
GRADUATION PROJECT  Driving licence
- Composite structure
The project was about a composite hotel with 12 floors
PERSONALITY
and an area of 1600 m² for each floor with no AutoCad
drawings sheets , so I had to draw them with my  Communicative
imagination .  Punctuality
The main problem that I face was the huge amount of  Creativity
loads in the project since it has a huge own weight due to
 Organized
its area and due to seismic and wind load .
In some cases I had to use Bracing system in order to
provide a proper strength in the first and second floor , as
well as shear walls were placed heavily all around the
hotel .

You might also like