You are on page 1of 1

REPUBLIC OF THE PHILIPPINES

OFFICE OF THE BUILDING OFFICIAL

DISTRICT / CITY / MUNICIPALITY

LAND USE AND ZONING

LINE AND GRADE

ARCHITECTURAL

P E R S P E C T I V E
T A B L E O F C O N T E N T S
ARCHITECTURAL STRUCTURAL PLUMBING ELECTRICAL MECHANICAL
A-1 PERSPECTIVE S-1 GENERAL CONSTRUCTION NOTES, SPECIFICATIONS AND DESIGN CRITERIA P-1 GROUND FLOOR PLAN (SEWER & DRAINAGE LINE LAYOUT) E-1 GROUND FLOOR LIGHTING LAYOUT (OPTION -1) M-1 GROUND FLOOR VENTILATION AND CEILING FAN LAYOUT
TABLE OF CONTENTS S-2 GENERAL CONSTRUCTION NOTES, SPECIFICATIONS AND DESIGN CRITERIA SECOND FLOOR PLAN(SEWER & DRAINAGE LINE LAYOUT) SECOND FLOOR LIGHTING LAYOUT SECOND FLOOR VENTILATION AND CEILING FAN LAYOUT
A-2 GROUND FLOOR PLAN S-3 FOUNDATION PLAN (OPTION 1 - ADAPTABLE TO OPTION 3) E-2 ROOF DECK POWER LAYOUT SCHEDULE OF EQUIPMENT
SECOND FLOOR PLAN SECOND FLOOR FRAMING PLAN P-1a GROUND FLOOR PLAN (SEWER & DRAINAGE LINE LAYOUT) GROUND FLOOR POWER LAYOUT (OPTION - 1) MISCELLANEOUS DETAILS
SCHEDULE OF FLOOR FINISHES S-4 TYPICAL DETAIL OF FOOTINGS SECOND FLOOR PLAN(SEWER & DRAINAGE LINE LAYOUT) E-3 SCHEDULE OF LIGHTING FIXTURES AND LAMPS
SCHEDULE OF WALL FINISHES WALL TO TIE BEAM CONNECTION DETAILS (WITH HOME ECONOMICS ROOM - OPTION - 2) RISER DIAGRAM OPTION - 2
STRUCTURAL
A-2a GROUND FLOOR PLAN (WITH HOME ECONOMICS ROOM) DETAIL OF WALL FOOTING P-1b PLUMBING NOTES SECOND FLOOR POWER LAYOUT
GROUND FLOOR PLAN (WITH COMPUTER ROOM) SCHEDULE OF FOOTING TIE BEAMS (EXPOSURE D & B) ISOMETRIC DIAGRAM (WATER & FIRE LINE LAYOUT) E-4 GENERAL NOTES M-2 GENERAL NOTES
SCHEDULE OF FLOOR FINISHES SCHEDULE OF FOOTING (EXPOSURE D & B) P-1c PLUMBING LEGENDS ELECTRICAL SYMBOLS LEGEND
SCHEDULE OF WALL FINISHES DETAIL SECT. OF RC RAMP, DETAIL SECT. OF STAIR ON FILL ISOMETRIC DIAGRAM (SEWER LINE LAYOUT) SCHEDULE OF LOADS GROUND FLOOR VENTILATION AND CEILING FAN LAYOUT
A-2b GROUND FLOOR PLAN (WITH SCIENCE LABORATORY ROOM) DETAIL PLAN OF STF-1 P-1d GROUND FLOOR (SEWER LINE & DRAINAGE LAYOUT) E-5 GROUND FLOOR LIGHTING LAYOUT (WITH HOME ECONOMICS ROOM OPTION -2) SECOND FLOOR VENTILATION AND CEILING FAN LAYOUT
SCHEDULE OF FLOOR FINISHES S-5 SCHEDULE OF COLUMNS (EXPOSURE D & B) GROUND FLOOR (WATER & FIRE LINE LAYOUT) GROUND FLOOR POWER LAYOUT (WITH HOME ECONOMICS ROOM OPTION -2) M-3 SCHEDULE OF EQUIPMENT
SCHEDULE OF WALL FINISHES DETAILS OF HANDWASH (WITH SCIENCE LABORATORY ROOM - OPTION 4) E-6 GENERAL NOTES MISCELLANEOUS DETAILS
A-3 ROOF DECK FLOOR PLAN (SHOWING PARTIAL PLAN OF ROOF) DETAILS OF LAVATORY HANDWASH P-1e PLUMBING NOTES ELECTRICAL SYMBOLS
ROOF PLAN DETAIL OF CONC. SEATING ISOMETRIC DIAGRAM (WATER LINE LAYOUT) SCHEDULE OF LIGHTING FIXTURES AND LAMPS OPTION - 3
A-4 GROUND FLOOR REFLECTED CEILING PLAN (ADAPTABLE TO OPTION 2 & 3) DETAIL SECTION OF CANOPY P-1f PLUMBING NOTES ELECTRICAL RISER DIAGRAM
SECOND FLOOR REFLECTED CEILING PLAN TYPICAL GIRDER /BEAM DETAILS ISOMETRIC DIAGRAM (SEWER LINE LAYOUT) E-7 GROUND FLOOR LIGHTING LAYOUT (WITH COMPUTER LABORATORY ROOM OPTION -3) M-4 GENERAL NOTES
SCHEDULE OF CEILING FINISHES S-6 SCHEDULE OF BEAMS AND GIRDERS (EXPOSURE D) P-2 ROOF PLAN(DRAINAGE LAYOUT) GROUND FLOOR POWER LAYOUT (WITH COMPUTER LABORATORY ROOM OPTION -3 ) LEGEND
A-4a GROUND FLOOR REFLECTED CEILING PLAN (OPTION - 4) SCHEDULE OF BEAMS AND GIRDERS (EXPOSURE B) ROOF DECK FLOOR PLAN (SEWER & DRAINAGE LINE LAYOUT) E-8 GENERAL NOTES GROUND FLOOR VENTILATION AND CEILING FAN LAYOUT
DETAIL OF CEILING AIR - VENT S-7 END WALL DETAIL P-3 GROUND FLOOR PLAN (WATER & FIRE LINE LAYOUT) ELECTRICAL SYMBOLS SECOND FLOOR VENTILATION AND CEILING FAN LAYOUT
A-5 FRONT ELEVATION ROOF FRAMING DETAIL SECOND FLOOR PLAN(WATER FIRE LINE LAYOUT) SCHEDULE OF LOADS M-5 SCHEDULE OF EQUIPMENT
REAR ELEVATION DETAIL OF R.C. GUTTER P-4 ROOF DECK FLOOR PLAN (WATER & FIRE LINE LAYOUT) SCHEDULE OF LIGHTING FIXTURES AND LAMPS MISCELLANEOUS DETAILS
WALL FINISH SCHEDULE DETAIL OF PLANTED COLUMN (PC-1) PLUMBING NOTES ELECTRICAL RISER DIAGRAM SANITARY
A-6 LONGITUDINAL SECTION S-8 DETAIL ELEVATION OF TRUSS-1 PLUMBING LEGENDS E-9 GROUND FLOOR LIGHTING LAYOUT (WITH SCIENCE LABORATORY ROOM OPTION -4) OPTION - 4
LEFT SIDE ELEVATION DETAIL OF ROOF BEAM ALONG GRIDLINE 1&13 P-5 ISOMETRIC DIAGRAM (SEWER LINE LAYOUT) GROUND FLOOR POWER LAYOUT (WITH SCIENCE LABORATORY ROOM OPTION -4)
RIGHT SIDE ELEVATION REFERENCE WELD DETAIL P-6 ISOMETRIC DIAGRAM (DRAINAGE LINE LAYOUT) E-10 GENERAL NOTES M-6 GENERAL NOTES
CROSS SECTION SCHEDULE OF MEMBERS AND WELDS P-7 ISOMETRIC DIAGRAM (WATER & FIRE LINE LAYOUT) ELECTRICAL SYMBOLS LEGEND
SCHEDULE OF WALL FINISHES SPOT DETAIL (MEDIA AGUA) P-8 PLAN & DETAIL OF CATCH BASIN SCHEDULE OF LOADS GROUND FLOOR VENTILATION AND CEILING FAN LAYOUT
A-7 DETAIL BAY ELEVATION S-9 DETAIL SECTIONS, CONNECTIONS AND ANCHORAGES OF TRUSS MEMBERS PLAN & DETAIL OF SEPTIC TANK SCHEDULE OF LIGHTING FIXTURES AND LAMPS SECOND FLOOR VENTILATION AND CEILING FAN LAYOUT
DETAIL BAY SECTION @FRONT S-10 DETAIL ELEVATION OF TRUSS 2 SCHEDULE OF SLAB REINFORCEMENT ELECTRICAL RISER DIAGRAM M-7 SCHEDULE OF EQUIPMENT
DETAIL BAY SECTION @REAR DETAIL CONNECTION AND SPACING OF J-BOLT P-9 DETAIL OF CISTERN TANK MISCELLANEOUS DETAILS
DETAIL SECTION (R.C. GUTTER) ISOMETRIC VIEW OF CONNECTION OF ROOFING TO PURLINS
DETAIL SECTION OF CORRIDOR RAILING S-11 FRAMING PLAN OF STAIR @ SECOND FLOOR LEVEL OPTION - 1
SPOT DETAIL (MEDIA AGUA) FRAMING PLAN OF STAIR @ ROOF DECK LEVEL
DETAIL SECTION OF CORRIDOR RAILING (GROUND) STAIR DETAIL FROM 2ND FLOOR TO ROOF DECK FP-1 GROUND FLOOR FE AND FHC LAYOUT
A-8 DETAIL OF MAIN ENTRANCE DETAIL PLAN OF LINTEL BEAM SECOND FLOOR FE AND FHC LAYOUT
DETAIL SECTION OF MAIN ENTRANCE DETAIL PLAN OF STAIRWAY COLUMN SCHEDULE OF EQUIPMENT
TYPICAL DETAIL SECTION OF SERVICE ENTRANCE DETAILED SLEVATION OF STAIR MISCELLANEOUS DETAILS
TYPICAL DETAIL SECTION OF SIDE ENTRANCE
TYPICAL SPOT DETAIL SECTION OF STAIR STEPS OPTION - 2 ELECTRICAL
A-9 TYPICAL DETAIL PLAN OS STAIRS
TYPICAL DETAIL PLAN OF STAIRS (TO DECK FLOOR) FP-2 GROUND FLOOR FE AND FHC LAYOUT
TYPICAL SECTION OF STAIRS SECOND FLOOR FE AND FHC LAYOUT
TYPICAL SECTION OF STAIRS (TO DECK FLOOR) SCHEDULE OF EQUIPMENT
DETAIL SECTION OF STAIR LANDING MISCELLANEOUS DETAILS
DETAIL SECTION OF STAIR LANDING (TO DECK ROOF)
TYPICAL SECTION OF STAIR STEPS OPTION - 3
A-9R TYPICAL DETAIL OF CORRIDOR RAILING ( FRONT RAILING).
TYPICAL DETAIL OF CORRIDOR RAILING ( SIDE RAILING). FP-3 GROUND FLOOR FE AND FHC LAYOUT
TYPICAL DETAIL SECTION OF STAIR. SECOND FLOOR FE AND FHC LAYOUT
TYPICAL DETAIL SECTION OF STAIR STEPS. SCHEDULE OF EQUIPMENT
DETAIL SECTION OF CONCRETE BENCH MISCELLANEOUS DETAILS
A-10 DETAIL OF ELEVATION OF RAMP
DETAIL SECTION OF RAMP OPTION - 4
DETAIL SECTION OF RAMP
SPOT DETAIL SECTION OF RAMP FLOORING FP-4 GROUND FLOOR FE AND FHC LAYOUT
TYPICAL DETAIL OF RAMP RAILINGS SECOND FLOOR FE AND FHC LAYOUT
TYPICAL DETAIL OF HAND WASHING COUNTER SCHEDULE OF EQUIPMENT MECHANICAL
TYPICAL SECTION DETAIL OF HAND WASHING COUNTER MISCELLANEOUS DETAILS
A-11 DOORS AND WINDOWS SCHEDULE
A-12 DETAIL OF CORRIDOR RAILINGS LOCATED ALONG GRID-1 & 13, GRID- A OF 2ND FLOOR OPTION - 1,2,3 & 4
DETAIL OF WINDOW GRILLE FOR W-2
A-13 DETAIL PLAN OF FEMALE & PWD TOILET @ GROUND WP-1 SCHEDULE OF EQUIPMENTS
FRONT, DET. PLAN OF MALE TOILET & PWD TOILET @ ISOMETRIC DIAGRAM OF WATER PUMPING SYSTEM
GROUND FLOOR, SCHEDULE OF FINISHES, MISCELLANEOUS DETAILS
DETAIL SECTIONS OF FEMALE & PWD TOILET,
DETAIL SECTIONS OF MALE & PWD TOILET
A-14 DETAIL PLAN OF FEMALE & PWD TOILET @ SECOND
FRONT, DET. PLAN OF MALE TOILET & PWD TOILET @
GROUND FLOOR, SCHEDULE OF FINISHES,
DETAIL SECTIONS OF FEMALE & PWD TOILET,
DETAIL SECTIONS OF MALE & PWD TOILET
A-15 DETAIL OF BLACKBOARD

REPUBLIC OF THE PHILIPPINES PROJECT AND LOCATION: SHEET CONTENTS: ARCHITECTURAL CONCEPT: SUBMITTED: RECOMMENDING APPROVAL: APPROVED: CONCURRED: SET NO. SHEET NO.
ARCHITECTURAL SECTION
DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS PERSPECTIVE
MODIFIED STANDARD DPWH - DEPED TABLE OF CONTENTS CADD: SIGNED
BUREAU OF DESIGN TWO(2) STOREY, TEN(10) CLASSROOM LARK MAVERICK E. DE VERA
ARCHITECT II
APPROVED WITH SIGNATURE SEE COVER SHEET FOR SIGNATURE SEE COVER SHEET FOR SIGNATURE SEE COVER SHEET FOR SIGNATURE BOD
A-1
BUILDINGS DIVISION JOSEPHINE P. ISTURIS LEA N. DELFINADO GILBERTO S. REYES LEONOR M. BRIONES
SCHOOL BUILDING CHECKED: SIGNED B 19 67
OIC, UNDERSECRETARY FOR
BONIFACIO DRIVE PORT AREA, MANILA MARYLENE C. SISON CHIEF, BUILDINGS DIVISION OFFICER-IN-CHARGE,BOD SECRETARY, DEP ED
ARCHITECT IV TECHNICAL SERVICES, DPWH

You might also like