You are on page 1of 12

BBS SUMMARY OF TRANSFER HOUSE-TH10

PROJECT RAKESH RESIDENCE AT GREEN MEADOWS COLONY DOC. NO.


-
TITLE PRELIMINARY BOQ PREPARED CHECKED
DRG. NO. - RP JTP

1 18" DIA-30'0" LENGTH PILE 12 NOS

2 18" DIA-40'0" LENGTH PILE 14 NOS

3 TOTAL PCC - M10 351 CFT

4 TOTAL CONCRETE-M20 6044 CFT

5 TOTAL SHUTTERING AREA 19489 SFT

6 TOTAL REINFORCEMENT QTY 777289 kg


BBS SUMMARY OF TRANSFER HOUSE-TH10

DOC. NO.
-
CHECKED
JTP

###

###

###

###

###
CONCRETE BOQ OF TRANSFER HOUSE-TH10

DOC. NO. REV.0


PROJECT RAKESH RESIDENCE AT GREEN MEADOWS COLONY
TITLE CONCRETE QUANTITY DESIGN CHECKED
DRG. NO.
TOTAL
LENGTH WIDTH HEIGHT VOLUME OF NO. OF
ITEM NO DESCRIPTION VOLUME
(F) (F) (F) ITEM (CFT) PCE.
(CFT)
PLAIN CEMENT CONCRETE-(1:5:10)
PCC FOR PILE CAP 7.50 3.00 0.250 5.625 13 73.13
PCC FOR BASEMENT SLAB 43.00 25.88 0.250 278.156 1 278.16

PILE CAP CONCRETE


PC1 7.00 2.500 2.000 35.000 13 455.00
BASEMENT LEVEL
BB1 25.13 1.00 2.000 50.260 1 50.26
BB2 25.13 1.00 2.000 50.260 1 50.26
BB3 24.25 1.00 1.000 24.250 1 24.25

WALL
24.38 0.75 8.500 155.391 1 155.39
24.58 0.75 8.500 156.717 2 313.43
7.33 0.75 8.500 46.748 1 46.75
3.25 0.75 8.500 20.719 1 20.72
8.25 0.75 8.500 52.594 1 52.59
14.13 0.75 8.500 90.047 1 90.05
12.58 0.75 8.500 80.217 1 80.22
DEDUCTION FOR OPENINGS 5.00 0.75 2.000 7.500 -2 -15.00
DEDUCTION FOR OPENINGS 3.00 0.75 2.000 4.500 -3 -13.50

SLABS 24.38 13.88 0.500 169.102 1 169.10


24.38 13.13 0.500 159.994 1 159.99
24.38 12.58 0.500 153.350 1 153.35

GROUND FLOOR
BEAMS
GB1 24.37 1.00 1.500 36.555 1 36.56
GB2 7.08 0.75 1.000 5.310 1 5.31
GB3 24.37 1.00 1.500 36.555 2 73.11
GB4 24.37 1.00 1.500 36.555 1 36.56
GB5 12.75 1.00 1.500 19.125 1 19.13
GB6 15.00 0.75 1.500 16.875 2 33.75
GB7 23.67 0.75 1.500 26.629 1 26.63
GB8 20.37 0.75 1.000 15.278 1 15.28
GB9 13.13 0.75 1.500 14.771 1 14.77
GB10 3.63 0.75 1.250 3.403 2 6.81
GB11 12.58 0.75 1.000 9.435 1 9.44
GB12 15.00 0.75 1.500 16.875 1 16.88
SLABS
STORE ROOM 4.25 4.50 0.375 7.172 1 7.17
LOBBY 8.88 3.17 0.375 10.546 1 10.55
CONCRETE BOQ OF TRANSFER HOUSE-TH10

DOC. NO. REV.0


PROJECT RAKESH RESIDENCE AT GREEN MEADOWS COLONY
TITLE CONCRETE QUANTITY DESIGN CHECKED
DRG. NO.
TOTAL
LENGTH WIDTH HEIGHT VOLUME OF NO. OF
ITEM NO DESCRIPTION VOLUME
(F) (F) (F) ITEM (CFT) PCE.
(CFT)
LOBBY 12.58 5.25 0.375 24.767 1 24.77
COURTYARD
LIVING 14.13 13.21 0.416 77.638 1 77.64
LIVING 9.50 13.21 0.416 52.206 1 52.21
BEDROOM1 11.63 9.50 0.416 45.962 1 45.96
BEDROOM2 12.00 9.50 0.416 47.424 1 47.42
TOILET 7.13 3.63 0.416 10.759 1 10.76
UTILITY 4.13 3.63 0.375 5.615 1 5.62
TOILET 7.50 3.63 0.416 11.326 1 11.33
BALCONY 3.38 3.63 0.375 4.594 1 4.59
FIRST FLOOR
BEAMS
FB1 24.32 1.00 1.500 36.473 1 36.47
FB2 6.00 0.75 1.000 4.500 1 4.50
FB3 22.38 0.75 1.500 25.172 1 25.17
FB4 8.88 0.75 1.000 6.656 1 6.66
FB5 7.50 0.75 1.000 5.625 1 5.63
FB6 24.32 1.00 1.500 36.473 1 36.47
FB6 25.32 1.00 1.500 37.973 1 37.97
FB7 25.32 1.00 1.500 37.980 1 37.98
FB8 25.32 0.75 1.000 18.990 1 18.99
FB9 53.80 0.75 1.500 60.525 1 60.53
FB10 8.25 0.75 1.000 6.188 1 6.19
FB11 16.00 0.75 1.500 18.000 1 18.00
FB12 11.83 0.75 1.500 13.309 1 13.31
FB13 16.88 0.75 1.500 18.984 1 18.98
FB14 12.58 0.75 1.000 9.435 1 9.44
FB15 37.34 0.75 1.500 42.008 1 42.01
FB16 16.88 0.75 1.500 18.984 1 18.98
SLABS
BALCONY 17.63 4.00 0.500 35.260 1 35.26
BEDROOM 16.13 16.00 0.500 129.000 1 129.00
UTILITY 7.50 8.75 0.375 24.609 1 24.61
TOILET 7.50 6.50 0.416 20.280 1 20.28
STORE ROOM 4.25 4.50 0.375 7.172 1 7.17
LOBBY 8.88 3.16 0.375 10.517 1 10.52
LOBBY 4.50 12.58 0.375 21.229 1 21.23
LIVING 24.38 13.13 0.500 159.961 1 159.96
BEDROOM 12.63 13.13 0.416 68.933 1 68.93
BEDROOM 12.00 13.13 0.416 65.520 1 65.52
UTILITY 12.00 4.00 0.375 18.000 1 18.00
TOILET 7.13 4.00 0.416 11.856 1 11.86
UTILITY 4.50 4.00 0.375 6.750 1 6.75
SECOND FLOOR
CONCRETE BOQ OF TRANSFER HOUSE-TH10

DOC. NO. REV.0


PROJECT RAKESH RESIDENCE AT GREEN MEADOWS COLONY
TITLE CONCRETE QUANTITY DESIGN CHECKED
DRG. NO.
TOTAL
LENGTH WIDTH HEIGHT VOLUME OF NO. OF
ITEM NO DESCRIPTION VOLUME
(F) (F) (F) ITEM (CFT) PCE.
(CFT)
BEAMS
SB1 24.32 1.00 1.500 36.473 1 36.47
SB2 6.00 0.75 1.000 4.500 1 4.50
SB3 22.38 0.75 1.500 25.172 1 25.17
SB4 8.88 0.75 1.000 6.656 1 6.66
SB5 7.50 0.75 1.000 5.625 1 5.63
SB6 24.32 1.00 1.500 36.473 1 36.47
SB7 25.32 1.00 1.500 37.973 1 37.97
SB8 25.32 1.00 1.500 37.980 1 37.98
SB9 53.80 0.75 1.000 40.350 1 40.35
SB10 4.50 0.75 1.000 3.375 1 3.38
SB11 16.00 0.75 1.500 18.000 1 18.00
SB12 41.84 0.75 1.500 47.064 1 47.06
SB13 12.58 0.75 1.000 9.435 1 9.44
SB14 37.34 0.75 1.500 42.008 1 42.01
SB15 16.88 0.75 1.500 18.984 1 18.98
SLABS
BALCONY 17.63 4.00 0.500 35.260 1 35.26
BEDROOM 16.13 16.00 0.500 129.000 1 129.00
UTILITY 7.50 8.75 0.375 24.609 1 24.61
TOILET 7.50 6.50 0.416 20.280 1 20.28
STORE ROOM 4.25 4.50 0.375 7.172 1 7.17
LOBBY 8.88 3.16 0.375 10.517 1 10.52
LOBBY 4.50 12.58 0.375 21.229 1 21.23
BEDROOM 14.13 13.13 0.416 77.152 1 77.15
UTILITY 9.50 8.92 0.416 35.236 1 35.24
TOILET 4.63 3.38 0.375 5.854 1 5.85
BEDROOM 12.63 13.13 0.416 68.933 1 68.93
BEDROOM 12.00 13.13 0.416 65.520 1 65.52
UTILITY 9.50 4.00 0.416 15.808 1 15.81
TERRACE
BEAMS
RB1 24.32 0.75 1.500 27.354 1 27.35
RB2 6.00 0.75 1.000 4.500 1 4.50
RB3 8.88 0.75 1.000 6.656 1 6.66
RB4 7.50 0.75 1.000 5.625 1 5.63
RB5 24.32 0.75 1.500 27.354 1 27.35
RB6 24.32 0.75 1.500 27.354 1 27.35
SLABS
16.13 16.00 0.416 107.328 1 107.33
9.50 16.25 0.416 64.220 1 64.22
STORE ROOM 4.25 4.50 0.375 7.172 1 7.17
LOBBY 8.88 3.16 0.375 10.517 1 10.52
LOBBY 4.50 12.58 0.375 21.229 1 21.23
CONCRETE BOQ OF TRANSFER HOUSE-TH10

DOC. NO. REV.0


PROJECT RAKESH RESIDENCE AT GREEN MEADOWS COLONY
TITLE CONCRETE QUANTITY DESIGN CHECKED
DRG. NO.
TOTAL
LENGTH WIDTH HEIGHT VOLUME OF NO. OF
ITEM NO DESCRIPTION VOLUME
(F) (F) (F) ITEM (CFT) PCE.
(CFT)
BEDROOM 12.63 13.13 0.416 68.933 1 68.93
BEDROOM 12.00 13.13 0.416 65.520 1 65.52
HEAD ROOM
BEAMS
HB1 26.25 0.75 1.500 29.531 1 29.53
HB2 11.83 0.75 1.500 13.309 2 26.62

SLABS
9.50 4.50 0.500 21.375 1 21.38
9.50 7.33 0.416 28.968 1 28.97

WATER TANK BASE SLAB


BEAMS
WB1 18.25 0.75 1.500 20.531 1 20.53
WB2 15.41 0.75 1.500 17.336 1 17.34

SLBS
9.50 7.30 0.416 28.850 1 28.85
WATER TANK ROOF SLAB
BEAMS
WB1 9.50 0.75 1.500 10.688 2 21.38
WB2 6.50 0.75 1.500 7.313 2 14.63
LB1 8.00 0.75 1.000 6.000 1 6.00
LB2 4.50 0.75 1.000 3.375 2 6.75
SLBS
9.50 7.30 0.416 28.850 1 28.85
9.50 4.50 0.416 17.784 1 17.78

COLUMNS
UPTO GROUND 0.75 2.00 9.500 14.250 13 185.25
UPTO 2ND FLOOR 0.75 2.00 23.000 34.500 11 379.50
UPTO 2ND FLOOR 0.75 1.50 23.000 25.875 2 51.75
UPTO TERRACE 0.75 2.00 11.500 17.250 9 155.25
UPTO TERRACE 0.75 1.50 11.500 12.938 2 25.88
UPTO HEAD ROOM 0.75 1.50 10.000 11.250 6 67.50
UPTO WATER TANK 0.75 1.50 3.000 3.375 2 6.75
UPTO ROOF 0.75 1.50 8.500 9.563 4 38.25
STAIRCASE
MID LANDING BEAM 7.33 0.75 1.500 8.250 3 24.75
LANDING SLAB 7.33 2.50 0.500 9.166 4 36.66
FLIGHT SLAB 69.00 3.25 0.500 112.125 1 112.13

DESCRIPTION CONCRETSTEEL/UNIT VOL


PCC 351.28 CFT
CONCRETE BOQ OF TRANSFER HOUSE-TH10

DOC. NO. REV.0


PROJECT RAKESH RESIDENCE AT GREEN MEADOWS COLONY
TITLE CONCRETE QUANTITY DESIGN CHECKED
DRG. NO.
TOTAL
LENGTH WIDTH HEIGHT VOLUME OF NO. OF
ITEM NO DESCRIPTION VOLUME
(F) (F) (F) ITEM (CFT) PCE.
(CFT)

PILE CAP 455.00 150.00 kg 68250.000 kg


WALL 730.65 100.00 kg 73065.000 kg
BEAM 1452.67 175.00 kg 254217.775 kg
SLAB 2383.52 60.00 kg 143011.320 kg
COLUMN 910.13 250.00 kg 227532.000 kg
FLIGHT SLAB 112.13 100.00 kg 11212.500 kg
6044.10 CFT 777288.595 kg

PILE
P1 1.767(AREA) 28.000 49.476 12 593.71
P2 1.767(AREA) 38.000 67.146 14 940.04
CONCRETE BOQ OF TRANSFER HOUSE-TH10

DOC. NO. REV.0


PROJECT RAKESH RESIDENCE AT GREEN MEADOWS COLONY
TITLE CONCRETE QUANTITY DESIGN CHECKED
DRG. NO.
TOTAL
LENGTH WIDTH HEIGHT AREA OF NO. OF
ITEM NO DESCRIPTION AREA
(F) (F) (F) ITEM (SFT) PCE.
(SFT)

PILE CAP SHUTTERING


PC1 19.00 1.000 2.000 38.000 13 494.00
PILE
P1 4.71 1.00 28.000 131.880 12 1582.56
P2 4.71 1.00 38.000 178.980 14 2505.72

BASEMENT LEVEL
BB1 25.13 1.00 4.000 100.520 1 100.52
BB2 25.13 1.00 4.000 100.520 1 100.52
BB3 16.00 1.00 1.750 28.000 1 28.00

WALL
24.38 1.00 8.500 207.188 2 414.38
24.58 1.00 8.500 208.956 4 835.82
7.33 1.00 8.500 62.331 2 124.66
3.25 1.00 8.500 27.625 2 55.25
8.25 1.00 8.500 70.125 2 140.25
14.13 1.00 8.500 120.063 2 240.13
12.58 1.00 8.500 106.956 2 213.91
DEDUCTION FOR OPENINGS 5.00 1.00 2.000 10.000 -4 -40.00
DEDUCTION FOR OPENINGS 3.00 1.00 2.000 6.000 -6 -36.00
SIDES OF OPENINGS 14.00 0.75 1.000 10.500 2 21.00
10.00 0.75 1.000 7.500 3 22.50

SLABS 24.38 13.88 1.000 338.203 1 338.20


24.38 13.13 1.000 319.988 1 319.99
24.38 12.58 1.000 306.700 1 306.70

GROUND FLOOR
BEAMS
GB1 24.37 1.00 4.000 97.480 1 97.48
GB2 7.08 1.00 2.000 14.160 1 14.16
GB3 14.13 1.00 3.166 44.720 1 44.72
10.25 1.00 3.583 36.726 1 36.73
GB3 24.38 1.00 3.166 77.171 1 77.17

GB4 24.37 1.00 2.916 71.063 1 71.06


GB5 12.75 1.00 2.583 32.933 1 32.93
GB6 15.00 1.00 3.750 56.250 2 112.50
GB7 23.67 1.00 3.000 71.010 1 71.01
GB8 20.37 1.00 1.918 39.070 1 39.07
GB9 13.13 1.00 2.916 38.287 1 38.29
GB10 3.63 1.00 2.500 9.075 2 18.15
CONCRETE BOQ OF TRANSFER HOUSE-TH10

DOC. NO. REV.0


PROJECT RAKESH RESIDENCE AT GREEN MEADOWS COLONY
TITLE CONCRETE QUANTITY DESIGN CHECKED
DRG. NO.
TOTAL
LENGTH WIDTH HEIGHT AREA OF NO. OF
ITEM NO DESCRIPTION AREA
(F) (F) (F) ITEM (SFT) PCE.
(SFT)
GB11 12.58 1.00 2.000 25.160 1 25.16
GB12 15.00 1.00 3.000 45.000 1 45.00

SLABS
STORE ROOM 4.25 4.50 1.000 19.125 1 19.13
LOBBY 8.88 3.17 1.000 28.123 1 28.12
LOBBY 12.58 5.25 1.000 66.045 1 66.05
COURTYARD
LIVING 14.13 13.21 1.000 186.629 1 186.63
LIVING 9.50 13.21 1.000 125.495 1 125.50
BEDROOM1 11.63 9.50 1.000 110.485 1 110.49
BEDROOM2 12.00 9.50 1.000 114.000 1 114.00
TOILET 7.13 3.63 1.000 25.864 1 25.86
UTILITY 4.13 3.63 1.000 14.974 1 14.97
TOILET 7.50 3.63 1.000 27.225 1 27.23
BALCONY 3.38 3.63 1.000 12.251 1 12.25

FIRST FLOOR
BEAMS
FB1 24.32 1.00 3.584 87.145 1 87.15
FB2 6.00 1.00 2.000 12.000 1 12.00
FB3 22.38 1.00 3.000 67.125 1 67.13
FB4 8.88 1.00 2.375 21.078 1 21.08
FB5 7.50 1.00 2.750 20.625 1 20.63
FB6 24.32 1.00 3.500 85.103 1 85.10
FB6 25.32 1.00 3.168 80.198 1 80.20
FB7 25.32 1.00 3.168 80.214 1 80.21
FB8 25.32 1.00 2.375 60.135 1 60.14
FB9 53.80 1.00 2.918 156.988 1 156.99
FB10 8.25 1.00 2.375 19.594 1 19.59
FB11 16.00 1.00 2.918 46.688 1 46.69
FB12 11.83 1.00 3.375 39.926 1 39.93
FB13 16.88 1.00 2.918 49.241 1 49.24
FB14 12.58 1.00 2.375 29.878 1 29.88
FB15 37.34 1.00 3.334 124.492 1 124.49
FB16 16.88 1.00 3.334 56.261 1 56.26

SLABS
BALCONY 17.63 4.00 1.000 70.520 1 70.52
BEDROOM 16.13 16.00 1.000 258.000 1 258.00
UTILITY 7.50 8.75 1.000 65.625 1 65.63
TOILET 7.50 6.50 1.000 48.750 1 48.75
STORE ROOM 4.25 4.50 1.000 19.125 1 19.13
LOBBY 8.88 3.16 1.000 28.045 1 28.05
CONCRETE BOQ OF TRANSFER HOUSE-TH10

DOC. NO. REV.0


PROJECT RAKESH RESIDENCE AT GREEN MEADOWS COLONY
TITLE CONCRETE QUANTITY DESIGN CHECKED
DRG. NO.
TOTAL
LENGTH WIDTH HEIGHT AREA OF NO. OF
ITEM NO DESCRIPTION AREA
(F) (F) (F) ITEM (SFT) PCE.
(SFT)
LOBBY 4.50 12.58 1.000 56.610 1 56.61
LIVING 24.38 13.13 1.000 319.922 1 319.92
BEDROOM 12.63 13.13 1.000 165.703 1 165.70
BEDROOM 12.00 13.13 1.000 157.500 1 157.50
UTILITY 12.00 4.00 1.000 48.000 1 48.00
TOILET 7.13 4.00 1.000 28.500 1 28.50
UTILITY 4.50 4.00 1.000 18.000 1 18.00

SECOND FLOOR
BEAMS
SB1 24.32 1.00 3.584 87.145 1 87.15
SB2 6.00 1.00 2.000 12.000 1 12.00
SB3 22.38 1.00 3.000 67.125 1 67.13
SB4 8.88 1.00 2.375 21.078 1 21.08
SB5 7.50 1.00 2.750 20.625 1 20.63
SB6 24.32 1.00 3.500 85.103 1 85.10
SB6 25.32 1.00 3.168 80.198 1 80.20
SB7 25.32 1.00 3.168 80.198 1 80.20
SB8 25.32 1.00 2.375 60.135 1 60.14
SB9 53.80 1.00 2.918 156.988 1 156.99
SB10 4.50 1.00 2.375 10.688 1 10.69
SB11 16.00 1.00 2.918 46.688 1 46.69
SB12 41.84 1.00 3.375 141.193 1 141.19
SB13 12.58 1.00 2.375 29.878 1 29.88
SB14 37.34 1.00 3.334 124.492 1 124.49
SB15 16.88 1.00 3.334 56.261 1 56.26

SLABS
BALCONY 17.63 4.00 1.000 70.520 1 70.52
BEDROOM 16.13 16.00 1.000 258.000 1 258.00
UTILITY 7.50 8.75 1.000 65.625 1 65.63
TOILET 7.50 6.50 1.000 48.750 1 48.75
STORE ROOM 4.25 4.50 1.000 19.125 1 19.13
LOBBY 8.88 3.16 1.000 28.045 1 28.05
LOBBY 4.50 12.58 1.000 56.610 1 56.61
BEDROOM 14.13 13.13 1.000 185.461 1 185.46
UTILITY 9.50 8.92 1.000 84.702 1 84.70
TOILET 4.63 3.38 1.000 15.609 1 15.61
BEDROOM 12.63 13.13 1.000 165.703 1 165.70
BEDROOM 12.00 13.13 1.000 157.500 1 157.50
UTILITY 9.50 4.00 1.000 38.000 1 38.00

TERRACE
BEAMS
CONCRETE BOQ OF TRANSFER HOUSE-TH10

DOC. NO. REV.0


PROJECT RAKESH RESIDENCE AT GREEN MEADOWS COLONY
TITLE CONCRETE QUANTITY DESIGN CHECKED
DRG. NO.
TOTAL
LENGTH WIDTH HEIGHT AREA OF NO. OF
ITEM NO DESCRIPTION AREA
(F) (F) (F) ITEM (SFT) PCE.
(SFT)
RB1 24.32 1.00 3.334 81.066 1 81.07
RB2 6.00 1.00 2.000 12.000 1 12.00
RB3 8.88 1.00 2.375 21.078 1 21.08
RB4 7.50 1.00 2.750 20.625 1 20.63
RB5 24.32 1.00 3.334 81.066 1 81.07
RB6 24.32 1.00 3.334 81.066 1 81.07

SLABS
16.13 16.00 1.000 258.000 1 258.00
9.50 16.25 1.000 154.375 1 154.38
STORE ROOM 4.25 4.50 1.000 19.125 1 19.13
LOBBY 8.88 3.16 1.000 28.045 1 28.05
LOBBY 4.50 12.58 1.000 56.610 1 56.61
BEDROOM 12.63 13.13 1.000 165.703 1 165.70
BEDROOM 12.00 13.13 1.000 157.500 1 157.50

HEAD ROOM
BEAMS
HB1 8.00 1.00 3.250 26.000 1 26.00
HB1 8.75 1.00 2.918 25.533 1 25.53
HB1 9.50 1.00 3.334 31.673 1 31.67
HB2 11.83 1.00 3.334 39.441 2 78.88

SLABS
9.50 4.50 1.000 42.750 1 42.75
9.50 7.33 1.000 69.635 1 69.64

WATER TANK BASE SLAB


BEAMS
WB1 18.25 1.00 3.250 59.313 1 59.31
WB2 15.41 1.00 3.250 50.083 1 50.08

SLBS
9.50 7.30 1.000 69.350 1 69.35
WATER TANK ROOF SLAB
BEAMS
WB1 9.50 1.00 2.918 27.721 2 55.44
WB1 9.50 1.00 3.334 31.673 2 63.35
WB2 6.50 1.00 3.334 21.671 2 43.34
LB1 8.00 1.00 2.334 18.672 1 18.67
LB2 4.50 1.00 2.334 10.503 2 21.01

9.50 7.30 1.000 69.350 1 69.35


9.50 4.50 1.000 42.750 1 42.75
CONCRETE BOQ OF TRANSFER HOUSE-TH10

DOC. NO. REV.0


PROJECT RAKESH RESIDENCE AT GREEN MEADOWS COLONY
TITLE CONCRETE QUANTITY DESIGN CHECKED
DRG. NO.
TOTAL
LENGTH WIDTH HEIGHT AREA OF NO. OF
ITEM NO DESCRIPTION AREA
(F) (F) (F) ITEM (SFT) PCE.
(SFT)
COLUMNS
UPTO GROUND 5.50 1.00 9.500 52.250 13 679.25
UPTO 2ND FLOOR 5.50 1.00 23.000 126.500 11 1391.50
UPTO 2ND FLOOR 4.50 1.00 23.000 103.500 2 207.00
UPTO TERRACE 5.50 1.00 11.500 63.250 9 569.25
UPTO TERRACE 4.50 1.00 11.500 51.750 2 103.50
UPTO HEAD ROOM 4.50 1.00 10.000 45.000 6 270.00
UPTO WATER TANK 4.50 1.00 3.000 13.500 2 27.00
UPTO ROOF 4.50 1.00 8.500 38.250 4 153.00

STAIRCASE
MID LANDING BEAM 7.33 1.00 3.250 23.832 3 71.50
LANDING SLAB 7.33 2.50 1.000 18.333 4 73.33
FLIGHT SLAB 69.00 3.25 1.000 224.250 1 224.25

TOTAL SHUTTERING 19489.16