You are on page 1of 2

01.10.

2012
Sr. Chainage
RFI No. Description of Work Side
No. From To
1 STR/12/1055 GIRDER-72 (CONCRETE) MAHANADI 7.200
2 RWS/12/1790 EMB TOP LAYING, FDD & LEVEL CHECKING 53.600 53.700 LHS
3 RWS/12/1792 SG TOP LAYING, FDD & LEVEL CHECKING 53.600 53.700 LHS
4 RWS/12/1793 SG TOP LAYING, FDD & LEVEL CHECKING 53.760 53.920 RHS

04.10.2012

Sr. Chainage
RFI No. Description of Work Side
No. From To
GIRDER-73 (PROFILE, STEEL & FORM WORK)
1 STR/12/1056 7.200
MAHANADI

2 STR/12/1057 BOX CULVERT WALL M-15 15.325 BOTH SIDE


3 STR/12/1062 BOX CULVERT WALL LIFT-1 M-25 27.925 BOTH SIDE
4 STR/12/1063 SLAB BOTTOM SHUTTERING CHECKING 33.760
5 MAT/12/101 HOT MIX PLANT CALIBRATION 14.000
6 MAT/12/102 WMM PLANT CALIBRATION 14.000

05.10.2012

Sr. Chainage
RFI No. Description of Work Side
No. From To
MEDIAN WALL CONCRETE A-1 FINAL LIFT
1 STR/12/1065 4.993
MINOR BRIDGE
MEDIAN WALL CONCRETE A-2 LIFT 5 MINOR
2 STR/12/1066 4.993 BOTH SIDE
BRIDGE
3 STR/12/1067 BOX CULVERT OF A-1 CASTING STATER M-25 5.538 BOTH SIDE
4 STR/12/1068 SLAB BOTTOM SHUTTERING CHECKING 33.760

06.10.2012

Sr. Chainage
RFI No. Description of Work Side
No. From To

1 STR/12/1069 VUP A-2 RETAING WALL PCC M-15 31.300 LHS

2 STR/12/1073 BOX CULVERT CASTING OF A-2 STARTER M-25 5.538


3 RWS/12/1794 DBM LAYING & LEVEL CHECKING 17.620 18.760 LHS
4 RWS/121797 CNG OF MAIN CARRIAGEWAY SERVICE ROAD 4.520 4.630 RHS
08.10.2012

Sr. Chainage
RFI No. Description of Work Side
No. From To
1 STR/12/1078 BOX CULVERT CASTING OF A-1, LIFT-1 M-25 5.538
2 STR/12/1078 SLAB CASTING M-25 17.605 LHS
WMM TOP LAYING, FDD & LEVEL CHECKING
3 RWS/121798 12.430 12.620 LHS
AND PRIME RE-CHECKING.
LAYING OF FILTER MEDIA & COMPACTION OF
4 RWS/12/1800 4.980 0.000
ADD JOINTING BACK FILL 5TH LAYER
LAYING OF FILTER MEDIA & COMPACTION OF
5 RWS/12/1801 5.010
ADD JOINTING BACK FILL 1ST LAYER

09.10.2012
Sr. Chainage
RFI No. Description of Work Side
No. From To
1 STR/12/1076 CONCRETE FOR WINGWALL LIFT-1 M-25 45.304 RHS
2 STR/12/1091 BOX CULVERT RAFT M-25 13.675
3 RWS/12/1803 DBM LAYING & LEVEL CHECKING 17.620 18.760 LHS
LAYING OF FILTER MEDIA 1 & COMPACTION OF
4 RWS/12/1805 4.980
ADD JOINTING BACK FILL 6TH
LAYING OF FILTER MEDIA 2 & COMPACTION OF
RWS/12/1806 5.010
ADD JOINTING BACK FILL 2ND

10.10.2012

Sr. Chainage
RFI No. Description of Work Side
No. From To
1 RLY/STR/12/102 ACC ROB PCC FOR A-2 M-15 46.600 LHS
MIX DESIGN OF DBM-1 WITH VG-30 SOURCE
2 RWS/12/1808 14.000
SHELL (QC LAB)
MIX DESIGN OF DBM-1 WITH RAP MATERIAL (QC
3 RWS/12/1809 80.000
LAB)