You are on page 1of 5

Job No. Doc. No. Rev.

RGX-S-61-1340-201 10
Project Specification Date : May.27,05 Sheet 1 of 5
Ras Laffan Onshore Expansion Project Prp'd : J. Kuwabara
Chk'd : T.Yoshida
Plumbing and Piping for Buildings App'd : F. Tachihara

CONTENTS
Page

1. Scope .........................................................................................................................................................................2

2. References ................................................................................................................................................................2

3. Plumbing System......................................................................................................................................................2

4. Piping Material ..........................................................................................................................................................3

5. Attachment ................................................................................................................................................................4

For Information For Review For Approval For Construction X As Built

Rev Date Page Description Prpd Chkd. Appd


A Jun.13,01 All First Issue for Approval JK TY FT
0 Jul.16,01 All Issue for Construction JK TY FT
1 Jul.07,03 All Re-Issue for Approval JK TY FT
2 Sep.02,03 All Issue for Construction JK TY FT
3 Oct.07,03 All AS-BUILT – TRAIN 3 JK TY FT

4 Oct.20,03 All Issue for Approval – AKG 1 JK TY FT

5 Nov.14,03 All Issue for Construction – AKG 1 JK TY FT

6 Mar.08,04 All Issue for Approval – Train 4, NGL Extraction Unit JK TY FT


7 Apr.01,04 All Issue for Construction – Train 4, NGL Extraction Unit TY TY FT
8 Aug.28,04 All Issue for Approval – Train 5 TY TY FT
9 Sep.06,04 All Issue for Construction – Train 5 TY TY HE
10 May.27,05 All AS-BUILT – T4/LT/AG/PD TY TY FT
1. SCOPE

This specification defines the requirements of detail design and construction for Plumbing and
Piping for Building for RAS LAFFAN ONSHORE EXPANSION PROJECT.

2. REFERENCES

The work shall be performed in accordance with this specification and the following documents,
codes, specifications, and industry standards. Their latest editions at time of contract award shall
be used. Local codes shall govern where they have more stringent requirements than this
specification. Where a conflict exists between the various documents, the conflict shall be
resolved by COMPANY in writing.

2.1 Project Specification

RGX-S-00-1221-001 Basic Engineering and Site Data


RGX-S-00-1221-002 Specification for Units of Measurement

RGX-S-00-1130-004 Document Numbering Procedure


RGX-S-00-1130-005 Equipment Numbering Procedure
RGX-S-61-1340-001 Buildings – General Requirements
RGX-S-61-1340-002 Building - Architectural Specification
RGX-S-61-1340-101 General Specification for Heating, Ventilating and Air Conditioning of
Buildings
RGX-S-61-1340-001 Building – Structural and Architectural Design
RGX-S-83-1222-001 Loss Prevention General Specification
RGX-S-83-1222-002 Fire and Gas Detection System

2.2 Code and Standard

International Association of Plumbing Uniform Plumbing Code (UPC) and Mechanical Officials
(IAPMO)

2.3 M.E.W

Ministry of Electricity and Water State of Qatar plumbing regulations.

2.4 Q.N.B.S.

Qatar National Building Specification Sect 16 plumbing installations.

3. PLUMBING SYSTEM

3.1 General

Plumbing system shall be designed, constructed and tested in accordance with Uniform Plumbing
Code (UPC).

3.2 Plumbing Equipment and Fixtures

(1) Plumbing equipment and fixtures shall be provided in accordance with Table 1.

(2) Kitchen unit shall consist of kitchen sink, microwave oven, refrigerator and cabinet.

(3) Emergency eye washer and floor drain shall be provided in Battery Room. Where sealed
type batteries are used, emergency eye washer is not required.

(4) Sanitary accessories shall be provided in stainless steel finish as shown in Table 3.
3.3 Water Distribution

(1) Drinking water & service water shall be distributed to buildings from plant main system as
shown in Table 2.

(2) Drinking water shall be distributed to the following equipment and fixtures unless otherwise
specified.

Lavatory W.H. Basin


Kitchen Sink
Shower
Water Heater
Water Cooler
Emergency Shower
Emergency Eye Washer
HVAC Chilled water make up

(3) Service water shall be distributed to the following fixtures unless otherwise specified.

Water Closet
Urinal
Service Sink
Hose Bibcock
Hose Connection

(4) Hose connection for cleaning and washing shall be provided as follows:

A/C Mechanical Room Service Water (except for SS-55/SIH-55)


XK-85 Service Water

(5) Electric water heater shall distribute hot water to the following equipment and fixtures.

Lavatory W.H. Basin


Kitchen Unit

3.4 Sewer System

(1) Building sewer shall be connected to outside sewer line without any treatment.

(2) Sewer from emergency eye washer and floor drain in Battery Room shall be connected to
sanitary sewer or soakaway where sanitary sewer is not available.

(3) A/C condensate and drain shall be connected to rain water sewer or soakaway where
sanitary sewer is not available.

4. PIPING MATERIAL

Piping materials shall be as follows:


Item Material Standard
Drinking water pipe Copper pipe (Type K) ASTM B88
Service water pipe Copper pipe (Type K) ASTM B88
Hot water pipe Copper pipe (Type K) ASTM B88

Sanitary sewer pipe PVC pipe ASTM D 2665


Ventilating pipe PVC pipe ASTM D 2665
Oily sewer pipe Ductile iron pipe AWWA C 151
Chemical sewer pipe PVC pipe ASTM D2729
A/C condensate pipe PVC pipe ASTM D 2665
Chilled water pipe Carbon steel pipe ASTM A 106 B
Refrigerant pipe Copper pipe ASTM B 280

The materials for the following services which are applied to this project shall be as specified in
Attachment-1, “Piping Material Specification”.

- Drinking water, service water and hot water pipe


- Sanitary sewer and ventilating pipe
- A/C Condensate pipe
- Refrigerant pipe

5. ATTACHMENT

Attachment-1 : Piping Material Specification

TABLE 1 PLUMBING EQUIPMENT / FIXTURES LIST

Building Name Water Urinal Lavatory Kitchen Service Water Water Emergency Outdoor
Closet W.H. Basin Unit Sink Heater Cooler Eye Hose
Wash *1
Bibb

Satellite Instrument House Yes Yes Yes No No Yes No No No


(SIH-51 & SIH-56)
Satellite Instrument House Yes No Yes No No Yes No No No
(SIH-53, SIH-54, SIH-61 &
SIH-62)
Local Control Building No No No No No No No No No
(LCS-51)
Local Control Building Yes No Yes No No Yes No No No
(LCS-58 & LCS-59)
Operator House (XK-51) Yes No Yes No No Yes No No No
Main Substation (SS-2) No No No No No No No No No

132 KV Substation (SS-A) Yes No Yes No No Yes No No No

Substations No No No No No No No No No
(SS-51, SS-52, SS-61, SS-
72, SS-73, SS-53, SS-54,
SS-102, SS-56, SS-75 )
Substation (SS-74) Yes No Yes No No Yes No No No
SS-55 / SIH-55 No No No No No No No No No
Main Building Yes Yes Yes Yes Yes Yes Yes Yes*1 Yes
Decontamination Building No No No No No No No No No
(XK-85)

Note : *1 For Battery Room (Where sealed batteries are used, emergency eye washer is not required.)
TABLE 2 PLUMBING APPLICATION LIST
Water Sewer
Building Name Drinking Service Hot Sanitary HVAC Drain/
Water Water Water Sewer Condensate

Satellite Instrument Houses Yes Yes Yes Yes Yes


(SIH-51SIH-56, SIH-61)

Satellite Instrument Houses No Yes*2 Yes Yes Yes


(SIH-54 & SIH-62)
Satellite Instrument Houses Yes*1 No Yes Yes Yes
(SIH-53)
Local Control Building (LCS-51) No No No No Yes
Local Control Building (LCS-58) Yes*1 No Yes Yes Yes
Local Control Building (LCS-59) No Yes*2 Yes Yes Yes
Operator House (XK-51) Yes*1 No Yes Yes Yes
Main Substation No No No No Yes
132 KV Substation (SS-A) Yes Yes Yes Yes Yes
Substations No No No No Yes
(SS-51, SS-52, SS-61, SS-72,
SS-73, SS-53, SS-54, SS-102,
SS-56 & SS-75)
Substation (SS-74) No Yes*2 Yes Yes Yes
SS-55/SIH-55 Yes No No No Yes
Decontamination Building (XK-85) No Yes No No No
Main Building Yes Yes Yes Yes Yes
Note :
*1 : Drinking Water is distributed to lavatory, water closet, water heater and flexible spray.
*2 : Service water is distributed to lavatory, water closet, flexible spray, hose connection, water heater and humidifier.
A health safety sign is required for lavatory sink where service water is used.

TABLE 3 SANITARY ACCESSORIES LIST

W. C. Lavatory Kitchen Service


W. H. Basin Unit Sink

Flexible Spray
a

Toilet Roll Holder


a

Clothes Hook and


Door Bumper a

Liquid Soap
Dispenser a a a

Paper Towel
Dispenser a a a

Waste Paper
Receptacle a a a