You are on page 1of 9

KELOMPOK 5

PLTU KALTIM - 3 2X100 MW

PEMBAGIAN TUGAS PLTT

KOMPONEN PENANGGUNG JAWAB SEPT


1
GC SYSTEM
BOILER FURNACE
ECONOMIZER
SUPERHEATER
REHEATER
STEAM DRUM
AIR PREHEATER
COAL BURNER
PA FAN
ELECTROSTATIC PRECIPITATOR
ID FAN
FD FAN
SOOT BLOWER
DEAERATOR
BFPT
BURNER
SA FAN
BOILER RELIEF VALVE
STACKER
TURBIN HP TURBIN
IP TURBIN
LP TURBIN
BOP SU
COAL YARD
MILL
CONVEYOR
COAL BUNKER
COAL FEEDER
BTM ASH SILO
HOPPER
FLY ASH SILO
ASH YARD
SEA WATER PUMP
DESALINATION PLANT
RAW WATER TANK
WATER TREATMENT PLANT
DEMIN WATER TANK
GENERATOR TRANSFORMATOR
UAT
CONDENSER VACUUM PUMP
CWP
CPD
LPH
BFWP
HPH
TRASH RACK CLEANER
TRAVELLING BRANCH SCREEN
BACK WASH PUMP
CWP
CCWP
WATER HEAT EXCH
CWBP
MED
DWT
DWP
MAKE UP WATER TANK
CONDENSATE MAKE UP PUMP
STATOR COIL COOLING WATER PUMP
HSD TANK
HSD PUMP
HOTWELL
GSC
JADWAL
SEPTEMBER OKTOBER NOVEM
2 3 4 5 1 2 3 4 5 1
DWAL
NOVEMBER DESEMBER
2 3 4 5 1 2 3 4 5
NO KOMPONEN PENANGGUNG JAWAB SEPTEM
1
Informasi Lokasi
GC PLTU
1 Boiler Water Cooler
Boiler Water
Circulating Pump
Steam Drum
Piping Boiler, Valve
Superheater
Reheater
Superheater & Reheater
Spray
Main Stop Valve
Economizer
APH Primary &
Secondary System
Steam Coil APH
2 Coal Preparation Raw Coal Chute &
Bunker Shut Off
Raw Coal Feeder
Coal Pulverizer
PA Fan
SA Fan (Seal Air Fan)
Coal Pulverizer Piping
3 Fuel Oil System Heavy Fuel Oil System
Light Fuel Oil System
4 Balance Draft System Force Draft Fan
Induced Draft Fan
Penthouse Ventilation /
Cooling Fan
5 Air & Gas Duct Work Isolating
Regulating
Hand Operated
Dampers
Spindles
Operating Gear
Linkage
Actuator Assemblies
Pressure Reducing &
6
Desuperheating Station High Capacity PRDS
Low Capacity PRDS
7 Blowdown
8 Soot Blowers System
9 Furnace Safe Guard
10 Electrostatic Precipitator
11 Hydraulic Test Pump
12 Supporting Steel Work
Galleries, Walkways,
13 Platforms, Hand Rails,
Ladder, etc.

Steam Turbine
JADWAL
SEPTEMBER OKTOBER
2 3 4 5 1 2 3 4 5
JADWAL
NOVEMBER DESEMBER
1 2 3 4 5 1 2 3 4
R
5