UNI/14/030/MCW 2/1R

SHOW HOUSE PHASE 8A1


Item BILL NO. 2 Unit Rate Qty Amount (RM) Amount (RM)
P.C. AND PROVISIONALSUMS

P.C. SUMS

Notes

A Profit on P.C. Items will be adjusted prorata to the


percentage inserted below on the actual nett cost
of item concerned.

B The words "allow for the attendance" where used in


the bill shall mean as described in Bill No. 1

Landscaping Works

Provide the P.C. sum of RM390,000.00 - 390,000.00


(Ringgit Malaysia: Three Hundred Ninety Thousand
Only) for Landscaping Works.

1 Add for profit Item % -

2 Add for attendance Item % -

Interior Design Works for Show Units

Provide the P.C. sum of RM250,000.00 250,000.00 -


(Ringgit Malaysia: Two Hundred Fifty Thousand
Only) for Interior Design Works for Show Units

3 Add for profit Item % -

4 Add for attendance Item % -

PROVISIONAL SUMS

Notes:-

A All Provisional Sums are to be expended or used


upon instruction in writing by the S.O. who may
decide that the sum may be expended or used in
whole or in part in favour of any person or not at all.

Barrier Gate

5 Provide the Provisional sum of RM25,000.00 - 25,000.00


(Ringgit Malaysia: Twenty Five Thousand Only) for
Barrier Gate.

BILL NO. 2
P.C. AND PROVISIONALSUMS RM
(Total Carried to Final Summary)

UNITECH QS CONSULTANCY SDN. BHD.


UNI/14/030/MCW 2/2R

UNITECH QS CONSULTANCY SDN. BHD.