Total : 280.00
Largo Ancho Alto Parcial
70.00 2.00 140.00
70.00 2.00 140.00
Total : 2.00
Largo Ancho Alto Parcial
2.00
Total : 1.00 GLB
Largo Ancho Alto Parcial
1.00
Total : 146.58
Largo Ancho Alto Parcial
70.00 70.00
76.58 76.58
Total : 186.61
A1 A2 Subtotal Parcial
1.40 1.55 59.38 186.61
1.59 1.73 127.23
Total : 44.29
A1 A2 Subtotal Parcial
1.40 1.55 44.29 44.29
Total : 4.10
DIAM PI VOL Parcial
1.60 3.14 4.10 4.10
Total : 92.36
Largo Ancho Alto Parcial
230.90 92.36
Total : 92.36
Largo Ancho Alto Parcial
230.90 92.36
Total : 146.80
70.22 70.22
76.58 76.58
Total : 146.80
70.22 70.22
76.58 76.58
Total : 75.60
Largo Ancho Alto Parcial
70.22 36.16
76.58 39.44
Total : 158.54
Largo Ancho Alto Parcial
70.22 75.84
76.58 82.71
Total : 158.54
Largo Ancho Alto Parcial
70.22 75.84
76.58 82.71
Total : 0.42
Largo Ancho Alto Parcial
0.20 0.42
Total : 1.46
Largo Ancho Alto Parcial
1.46 1.46
Total : 0.36
Largo Ancho Alto Parcial
0.20 0.36
Total : 6.79
Largo Ancho Alto Parcial
3.77 1.80 6.79
Total : 62.78
N° Piezas Long piezas Long. Total Parcial
18.00 2.20 39.60 62.78
9.00 4.60 41.40
Total : 0.14
Largo Ancho Alto Parcial
0.13 0.14
Total : 146.80
Largo Ancho Alto Parcial
70.22 70.22
76.58 76.58
Total : 2.00 und
Largo Ancho Alto Parcial
1.00
1.00
Total : 1.18
Largo Ancho Alto Parcial
0.40 2.00 1.18
Total : 1.00 GLB
Largo Ancho Alto Parcial
1.00
Total : 1.00 GLB
Largo Ancho Alto Parcial
1.00
Total : 1.00 GLB
Largo Ancho Alto Parcial
1.00
Total : 1.00 GLB
Largo Ancho Alto Parcial
1.00
Total : 8.00 MES
Largo Ancho Alto Parcial
8.00
Presupuesto
01 - Presupuesto
SubContrato Reubicacion de redes de Desague y buzon
CLIENTE Gobierno Regional de Arequipa -Gerencia Regional de Infraestructura
LUGAR VARIANTE DE UCHUMAYO - AREQUIPA
FECHA OCTUBRE 2018
REFERENCIAL
Item Descripcion Precio
Unid Metrado
Unitario
01 OBRAS PROVISIONALES
01.01 MOVILIZACION Y DESMOVILIZACION
01.01.01 MOVILIZACION Y DESMOVILIZACION DE EQUIPO Y/O MAQUINARIA GLB 1.00 500.00
01.02 TRAZO NIVELES Y REPLANTEO
01.02.01 TRAZO, NIVELACION M 146.58 3.24
02 REDES A REUBICAR
02.01 INSTALACION DE RED DE DESAGUE
02.01.01 MOVIMIENTO DE TIERRAS
02.01.01.01 EXCAVACION EN ZANJA EN TN Y TSR CON MAQUINARIA m3 186.61 36.00
02.01.01.01 EXCAVACION EN ZANJA EN TN MANUAL m3 44.29 45.00
02.01.01.02 EXCAVACION DE BUZONES D=1.60 m3 4.10 45.00
02.01.02 REFINE Y NIVELACION DE ZANJA
02.01.02.01 REFINE Y NIVELACION DE ZANJAS H<3.00 m m 146.80 4.72
02.01.03 CAMA DE APOYO
02.01.03.01 CAMA DE APOYO PARA TUBERIA ALCANTARILLADO ZANJA A=0.90 m 146.80 7.16
02.01.04 RELLENO PROTECTOR DE ZANJAS
02.01.04.01 RELLENO PROTECTOR DE ZANJA PARA TUBERIA ZANJA A=0.90 m3 75.60 21.68
02.01.05 TUBERIAS
02.01.05.01 INSTALACION DE TUBERIAS
02.01.05.01.01 INSTALACION DE TUBERIA PVC DN=200MM m 158.54 5.43
02.01.06 CONCRETO ARMADO BUZON
02.01.06.01 CONCRETO F´C 210 KG/CM2 P/LOSA DE FONDO M3 0.42 482.40
02.01.06.02 CONCRETO F´C 210 KG/CM2 P/FUSTE DE BUZON M3 1.46 482.40
02.01.06.03 CONCRETO F´C=210 KG/CM2 PARA TECHO DE BUZON M3 0.36 385.10
02.01.06.04 ENCOFRADO Y DESENCOFRADO METALICO EN FUSTE DE BUZON M2 6.79 78.74
02.01.06.05 ACERO CORRUGADO FY = 4200 kg/cm2 GRADO 60 KG 62.78 5.50
03.00 SEGURIDAD EN EL TRABAJO Y SALUD OCUPACIONAL
03.01 EQUIPOS DE PROTECCION PERSONAL GLB 1.00 600.00
04.00 VARIOS
04.01 PICADO DE BUZON PARA EMPALME UND 2.00 150.00
04.02 CONCRETO PARA DADOS EMPALME BUZONES Y TUBERIAS m3 0.64 316.22
04.03 REPOSICION DE TUBERIAS DE REDES DE AGUA Y DESAGUE GLB 1.00 200.00
COSTO DIRECTO
GASTOS GENERALES 5%
SUB TOTAL
IGV 18%
PRESUPUESTO TOTAL
REFERENCIAL
Parcial
500.00
474.19
6,717.96
1,993.05
184.57
692.90
1,051.58
1,638.76
860.89
203.62
704.30
138.57
534.30
345.31
600.00
300.00
202.38
200.00
17,342.38
867.12
18,209.50
3,277.71
21,487.21