Project HSE PLAN

I- Introduction
1- Scope of work
2- References
3- Objectives
II- Health and safety Policies
1- HSE policy
2- Environment policy
3- Drugs and alcohol policy
4- Workplace theft policy
5- …
III- HSE responsibilities
1- Project director
2- Project manager
3- Project HSE manager
4- Construction manager
5- Project HSE coordinator
6- HSE officers
7- Senior Supervisory Staff (Superintendent / Supervisor / Engineer /Senior Foreman)
8- Front Line Supervisors (Foreman / Supervisor)
9- First aiders
10- Fire wardens
11- Banksmen / Riggers / Slingers
12- General Workers / Labors
IV- HSE Programs
1- Site HSE induction and training
1.1- Site HSE induction
1.1.1- Staff
1.1.2- Workers
1.1.3- Visitors
1.2- Training
1.2.1- working at height
1.2.2- Scaffolder’s training
1.2.3- First aid
1.2.4- Fire awareness
1.2.5- Lifting Operations
1.2.6- Rigger/slinger

2- Method statements and Risk Assessment


3- Permit to work

3.1- release work permit

3.2- Working at height permit


Project HSE PLAN
3.3- hot work permit

3.4- confined Space Permit

3.5- lock out tag out permit

4- Inspection and Audit


5- HSE Communication

5.1- written Communication (risk assessment, SPA, Minutes of meetings, handbooks…)

5.2 Graphic communication (posters, signage, pictures,

5.3- broadcasting methods (TBT, Notice boards…)

6- PPE

6.1- PPE management and storage

6.2- Basic PPE

6.3- Specific PPE

7- Emergency procedures (procedures, Rescue team, evacuation plan, emergency numbers…)


8- Incident reporting
9- Performance statistics report
10- Safety awards programs
11- Disciplines
V- General health and welfares of workers
1. Welfares
1.1- Change rooms
1.2- Drinking water
1.3- Refectory and rest room
2. Health surveillances
2.1- Annual doctor visit
2.2- Physical test for specific work (aptitude physique)
VI- Safety standards and work practices
1- Manual handling
2- Housekeeping
3- Fire prevention
4- Working at height
5- Scaffolding
6- Ladders
7- Confined space
8- Lifting operations
9- Arc welding and gas cutting
10- Radio activities
11- Grinding
Project HSE PLAN
12- Electricity
13- Pressure testing
VII- Wastes generation and environmental control
VIII- Documentation and archiving
IX- Signage and terminology
X- Forms