Professional Documents
Culture Documents
BukitAsam
THE PROJECT
BACKGROUND AND OBJECTIVES
GENERAL INFORMATION OF AIR LAYA
SCOPE OF WORK
WORK FOR DGMCG/PTBA
WORK FOR NEDO
PROPOSED SCHEDULE
PROJECT PLAN
CLOSING
BukitAsam
THE PROJECT
Background :
• Air Laya Open Pit Mineable Reserves for export quality
are limited (105 million ton with Geological Reserves 256
million ton)
• Potential of High Wall mining and and U/G Mining of
deep seated coal in Air Laya to increase mining recovery
Objective :
• To conduct Coal Reserves Exploration and to prepare a
Pre Feasibility Study of High Wall Mining & U/G Mining
in Air Laya mine to maintain and increase PTBA’s coal
export (especially to Japan).
LOCATION OF THE PROJECT
Muara Enim
Tg. Enim
Air Laya
Lahat
PROJECT AREA
SUMATRA ISLAND +/- 3,000 Ha
Project Area
Palembang Tg. Agung
Tg Enim
Tarahan
N
River
JAVA ISLAND
Road
Railway
MUARA ENIM
SUBAN JERIJI UTARA
Regional Stratigraphic
Banjarsari N
Arahan Utara
Anticline
Anticline
BANJARSARI
Column of Tanjung Enim
ARAHAN UTARA
SUBAN JERIJI TIMUR
AIR LAYA
Niru seam
MTBU
Arahan Selatan
Anticline
Jelawatan seam
ARAHAN SELATAN
MTBS
TANJUNG ENIM
Enim seam
KUNGKILAN
BANKO BARAT Kebon seam
AIR SERELO Benuang seam
LAHAT
BUKIT KENDI
BANKO TENGAH
Burung seam
BUKIT BUNIAN
LEGENDS :
Mangus seam
VOLCANIC BRECCIA BANKO TENGAH
BANKO TENGGARA Suban seam
ANDESITE INTRUSION
M4 Petai seam
M3
BANKO SELATAN
M2
M1
FAULT
Merapi seam
SYNCLINE
ANTICLINE
Kladi seam
SAMUDRA
SAMUDRA TARAHAN
INDONESIA
Laut Jawa
Selat SURALAYA
BUKIT ASAM Air Laya MUARA
BUKIT Muara Tiga Syncline Klawas Anticline ENIM
Sunda
TOWN
KENDI
Suban Jeriji
Liling Anticline
Banko Barat ? Utara
Enim River
Bukit Asam
M4
0 1 2 3 km
M3
M2
Regional Geology Map of
M1
Tanjung Enim - South Sumatera
BukitAsam
GENERAL INFORMATION OF AIRLAYA
Geological Map
of AIRLAYA
COAL QUALITY
The coal rank is Sub-Bituminous to Anthracite
TM : 2.50 - 26.11 %
IM : 0.97 - 15.37 %
VM : 11.51 - 43.17 %
FC : 39.64 - 83.45 %
Ash : 2.19 - 9.33 %
TS : 0.08 - 1.99 %
CV : 5,567 - 8,314 Kcal/Kg (ADB)
BukitAsam SCOPE OF WORKS (1)
Year
1st Year Plan 2nd Year Plan 3rd Year Plan 4th Year Plan 5th Year Plan Total
ACTIVITIES
2010/2011 2011/2012 2012/2013 2013/2014 2014/2015 Volume
Air Laya Air Laya Air Laya Air Laya Air Laya