You are on page 1of 3

MUZAFFAR ALI MEMON

B.E Civil Engineer, API 936


E-mail: muzaffarqatar@gmail.com, muzaffarsindh@yahoo.com
 +966-559411894 (KSA)
 +92-300-2585320 (PAK)

Experience Summary
More than 17 years of professional experience of operations, project management & execution, quality
management for reputed companies of KSA, QATAR, UAE and PAKISTAN. Experienced in operations,
construction of Oil & Gas, Petrochemical, Cement factory, Bridges/underpasses, road works and sub-
stations, commercial/residential buildings.
Expertise: Civil Designs & design reviews, technical & engineering queries (turbine foundations, heat
exchanger foundations, Fire heater foundations, Compressor foundations, Boiler foundations, etc.),
Vendor prequalification, Heaters/furnaces/stacks Refractory lining inspection export, all aspects of quality
matters & inspections, audits.

PROFESIONAL QUALIFICATION
B.E Civil (1st Division) in 2000 from Mehran University of Engineering and Tech, Jamshoro, Pakistan.
AFFILIATION
Life time member of Pakistan Engineering Council. Registration No: CIVIL/22517.
Member of Saudi Council of Engineers No. 182750.
CERTIFICATION
API 936 certified Refractory Personnel. Certification No. 77921.

ACHIEVEMENTS/COST SAVING INITIATIVES


 Appreciation certificate from Aramco Chief Engineer on cost saving of $1.22MM.
 Re-evaluation on Saudi Aramco BRA cause cost saving of $1.60MM.
 Modified API & SWP pump foundations cause cost saving of $16.0K.
 Abstract paper on “RC Structure Integrity in coastal environment” accepted by MECC, Bahrain.

TRAINING COURSE:

 Project Management System training course in 12-March 2006 to 28-March 2006 organized by Descon
Engineering Qatar.
 Lead Auditor ISO 9001:2000 training attended from SGS Saudi Arabia in 2008. Certificate No.
SGS/SSCE/QMSLAC/508337/F/17038.
 Quality Management System (QMS) based on the ISO 9001:2000 Standard organized by Chiyoda
Technip Joint Venture (CTJV) Qatar.
 H2S and Breathing Apparatus Familiarization Course organized by Qatar Gas.
 Pipe cleaning and Flushing workshop organized by Fluor Arabia Ltd in 2007 at Yansab Project.
 Good documentation program GDP workshop by Fluor 2013.
__________________________________________________________________________________
17 YEARS INCLUDING 11 YEARS SAUDI ARAMCO EXPERIENCES:
Yanbu Refinery Department, KSA working as Engineer-II (April 2015 till today) (SMP Vendor Jatco)

Page 1 of 3
Yanbu Refinery consists of Process Area-I Crude Unit, Process Area-II NHT, Process Area-III DHT Unit,
Process Area-IV Sulfur Unit, Tank Farm of 74 tanks, LPG area, Utility, Marine Terminal to receive ships.
SADARA Chemicals Project at Jubail, KSA worked as Supervisor-I (June 2013 to Feb 2015)
Consists of 26 plants in one complex/boundary in a 25sq-m area with cast of more than USD 20 billion.
Saudi Aramco Projects worked as Group Leader (June 2009 till 2013) (SMP GIS ABS Group)
 Abu Ali Gas Plants (WOSEP & WIP), Abu Ali Island, Jubail KSA.
 Berri Gas Plant, Jubail, KSA
 Thrust anchor for 16” offshore pipeline, JIB crane foundation and scraper receiving area at Berri
Causeway, Jubail, KSA.
 Ras Tanura (RT) Refinery T & I Plant 15 (Shutdown), Refractory Inspections. (Scope includes
replacement of existing Cast-able Refractory, Fire Brick Refractory and Ceramic Fiber Refractory with
new one for Vacuum and Air Atmospheric Furnaces, etc), KSA.
 King Abdullah Sport City Jeddah included construction of 60,000 seat soccer stadium with mosque for
500 worshippers, central Royal plaza, Ceremonial and VVIP access road, multipurpose sports hall
(basketball, handball, volleyball and table tennis) seating for 10000 spectator, athletics stadium with
seating for 10000 spectator with other facilities, 7 practicing football pitches.
 King Abdullah Petroleum Studies and Research Centre (KAPSARC), Residential and Commercial Zone,
Riyadh, KSA.

Group Five Construction UK Base at Dubai, UAE as QAQC Manager (A) (June 2008 - June 2009)
Comprehensive Improvement of the Parallel Roads R881/3B (5 Bridges and 3 Underpasses).

Abdullah Faleh Al Dossary at Yanbu, Saudi Arabia as QAQC Manager (Mar 2007 to May 2008)
Propane pipe line from Saudi Aramco NGL to Yansab Petrochemical Complex U&O Project Sea Port
Substation, Road and culverts.

Descon Engineering Qatar L.L.C. as QAQC In-charge (Sept 2005 to March 2007)
Qatar Gas-II LNG Development Project (QGX) and Qatar Gas 3 & 4 (QCS) Onshore Project at Ras Laffan
Industrial City, Qatar.

AH Construction Limited as Project Engineer (July 2000 to Sept 2005)


Project Pioneer Cement Factory at Khushab, Punjab, Pakistan.

Responsibilities handled
 Involved in designing of foundations, technical queries, engineering solutions, proposals, redlined
& as-built drawings.
 Involved in scope development for capital and expense project for Yanbu Refinery.
 Design reviews of packages 30%, 60% and 90% at level of DBSP, FEL-2 and detail design for Aramco
Projects.
 Fire Heater/furnaces/boiler/stacks/ refractory inspections and material expertise.
 Review, analysis and approve the quality plans, work procedures, etc.
 Review, analysis and to approve the project quality plan (PQP), material submittals, ITPs,
Checklists, FDT and concrete compressive test results, hydro-test packages for RTR piping,
technical quarries, etc.
 Review and approve pre-qualification of supplier and sub-contractor.
 Review, evaluate and approve vendors/suppliers inspection assignment packages (IAPs).
 Conduct shop visits prior to fabrication and suppliers approval.

Page 2 of 3
 Reviewing supplier’s material submittal and forward to onward liaison with consultant and client.
 Responsible to verifying the inspection reports related civil works, mechanical work such as
underground HDPE piping, hydro-test, punch list, etc which are carried out by the QC inspectors.
 Verification of contractor’s QMS procedures through periodic assessments.
 Prepare & evaluate the contractor’s PQI score, etc.
 Prepare focus assessment.
 Preparing daily, weekly and monthly quality reports to submit Field Supervisor / Project Quality
Manager (PQM).
 Attend weekly QA/QC and construction meetings and discuss issues, solutions.
 Review Aramco and contractor internal NCRs and review the contractor reply for root causes,
corrective actions and preventive actions.
 Performe surveillance at site and enter logbook entries through QMIS (Quality Management
Information System) as Proactive Notification / Violation after the Fact / For Information.
 Prepare highlights and conference call sheets for daily and weekly conference call.
 Prepare company monthly invoices as per work progress.
 Perform rate analysis and prepare extra claims as per extra work.
 Monitor work progress according to contract schedule.
 Attend weekly Progress meetings with consultants and subcontractors.
 Support to Project Manager in coordination with other concerned departments.
 Maintain progress records, inspection records etc.
 Manage the third party agency for WPS & PQR for Saudi Aramco approval.
 Review the Hydro test packages (CS, HDPE, RTR) and reviewing the weld tracking records.

Personal Details
Date of Birth: 8th April 1977
Nationality: Pakistani
Passport No: AD0206432
Driving License Valid driving licenses of KSA and Pakistan

Page 3 of 3