You are on page 1of 1

ANNUAL EMERGENCY DRILL PLAN - 2013

FORM NO : SEHQ/SHE-02
NO TYPE OF DRILL JAN FEB MAR APR MAY JUN JUL AUG SEP OCT NOV DEC

A. EMERGENCY DRILL

1 Abandon ship x x x x x x x x x x x x
2 Fire in Port x x x
3 Fire and Explosion (Engine or Pump Room) x x x
4 Fire in Accommodation x x x
5 Cargo Fire on Deck x x x
Oil Pollution due to Tank Overflow, Pipe leak,
6 x
Hose Rupture or Connection Leak
7 Oil Pollution due to Hull Leakage x
8 Collision x x x x
9 Grounding/Stranding x x
10 Flooding - Cargo and Machinery Space x x
11 Emergency Towing/Salvage x x
12 Enclosed Space Rescue x x
13 Man Overboard x x
14 Serious Injury, Illness or Death x x
15 Hull Failure, Flooding and Excessive List x x
16 Uncontrolled Venting or Cargo Jettisoning x x
17 Toxic Release on Gas Tankers x x
18 Cargo Containment System Failure x x
19 Toxic Liquid Release at Sea or at Anchorage x x
20 Toxic Liquid Release at Sea or at Terminal x x
21 Loss of Stability during Cargo Operations x x
22 Accidents involving Dangerous Goods x x
23 Breakaway from Jetty while loading/discharging x x
24 Heavy weather damage x x
25 Main Engine Failure x x
26 Steering Failure x x x x
27 Power Failure - Blackout x x
28 Helicopter Operation x x
29 Epidemics x x
30 Excessive list x x
31 Failure of Critical Equipment x x
32 Emergency Assistance to the other ship x x
B. SHIP SECURITY DRILL

33 Piracy x x x x
34 Terrorists/Bomb threat* x x x x
35 Hijack x x x x
36 Stowaways x x x x

Master Chief Officer Chief Engineer Designated Person

You might also like