PROJECT LOCATION:
Qty
Item No. Description OF Works
(A)
A. GENERAL REQUIREMENTS
1.0 General Requirements
Other work items not mentioned in item 1.0 but necessary to complete the General Requirements (Please identify
B BUILDING
2.00 EARTHWORKS
Other work items not mentioned in item 2.1 but necessary to complete the Earthworks (Please identify)
3.0 CONCRETE
Other work items not mentioned in item 3.0 but necessary to complete the Concrete (Please identify)
Other work items not mentioned in item 4.0 but necessary to complete the Masonry Works (Please identify)
5.0 METALS
Other work items not mentioned in item 5.0 but necessary to complete the Metals (Please identify)
Sub-total Cost, Item 5.0
7.1 Waterproofing
7.1.1 Waterproofing - Floor T&B Area, 5 fly Membrane
7.1.2 Waterproofing - Roof Deck Slab, 5 fly Membrane
7.3 Roofings
7.3.1 G.A. 22 Rib Type Long Span Metal Roofing
7.3.2 Stainless Steel Gutter Gauge 24
Other work items not mentioned in item 7.0 but necessary to complete the Thermal & Moisture Protection (Please
8.00 OPENINGS
8.5.9 W10 - Sliding Type Glass Window with Black Aluminum Frame Glass Window
8.5.11 W11- Sliding Type Glass Window with Black Aluminum Frame Glass Window
8.5.11 W12 - Fixed Type Glass Window with Black Aluminum Frame Glass Window
8.5.11 W13 - Fixed Type Glass Window with Black Aluminum Frame Glass Window
8.5.11 W14- Stainless Steel Air Vent Window Louver Type Window
Other work items not mentioned in item 8.0 but necessary to complete the Openings (Please identify)
9.00 FINISHES
9.20 Plaster
9.20.1 20mm thk Cement Plaster for 150mm CHB
9.20.1.1 Cement
9.20.1.2 Sand
9.20.2 20mm thk Cement Plaster for 100mm CHB
9.20.2.1 Cement
9.20.2.2 Sand
9.50 Ceilings
9.50.1 Hardiflex ceiling on metal furring
9.50.2 Exposed Slab
9.60 Floorings
400mm x 400mm Stain Proof Homogeous Anti-Slip Porcelain Tiles w/ Anti-
9.60.1
Microbial, Anti-Stain Grout
200mm x 200mm Stain Proof Homogeous Anti-Slip Porcelain Tiles w/ Anti-
9.60.1
Microbial, Anti-Stain Grout
9.60.2 300 x 300mm Non Skid Ceramic Tiles
9.60.3 Plain Cement Finish
Other work items not mentioned in item 9.0 but necessary to complete the Finishes (Please identify)
10.00 SPECIALTIES
Other work items not mentioned in item 10.0 but necessary to complete the Specialties (Please identify)
Other work items not mentioned in item 5.1 but necessary to complete the Heating Ventilation and Air Conditionin
Other work items not mentioned in item 5.2 but necessary to complete the Air Conditioning Pipimg Works (Please
Other work items not mentioned in item 5.3 but necessary to complete the Testing, Adjusting and Balancing (Plea
Other work items not mentioned in item 5.4 but necessary to complete the Ventilating units and Accessories (Plea
Other work items not mentioned in item 5.5 but necessary to complete the Grilles and Other Related Works (Plea
6.1.1 LPAD
Main :
40AT, 3PCB, 400V, BO
Branches :
22-20AT, 1PCB, 230V, BO
6.1.2 PPAD
Main :
40AT, 3PCB, 400V, BO
Branches :
16-20AT, 1PCB, 230V, BO
6.1.3 DPAD
Main :
100AT, 3PCB, 400V, BO
Branches :
2-20AT, 3PCB, 400V, BO
3-40AT, 3PCB, 400V, BO
1-50AT, 3PCB, 400V, BO
6.1.4 FPS
Main :
150AT, 3PCB, 400V, BO
Branches :
1-150AT, 3PCB, 400V, BO
1-20AT, 3PCB, 400V, BO
6.1.5 LVSG
Main :
800AT, 3PCB, 400V, BO
Branches :
1-100AT, 3PCB, 400V, BO
2-150AT, 3PCB, 400V, BO
2-175AT, 3PCB, 400V, BO
6.1.6 (Metering)-1
Ckt. Breaker Gutter in
NEMA-1 w/ Bolt-on Breaker
11-50AT, 1PCB, 230V, BO
( 2.5m x 0.35m x 0.30m )
6.1.7 (Metering)-1
BusBar Gutter in NEMA-1
w/ 4-Bus Bar, Rated 150A
Main :
4-60 sq.mm Terminal Lugs
Branches :
22-8.0 sq.mm Terminal Lugs
( 2.5m x 0.35m x 0.30m )
6.1.8 (Metering)-2
Ckt. Breaker Gutter in
NEMA-1 w/ Bolt-on Breaker
13-50AT, 1PCB, 230V, BO
( 3.0m x 0.35m x 0.30m )
6.1.9 (Metering)-2
BusBar Gutter in NEMA-1
w/ 4-Bus Bar, Rated 175A
Main :
4-80 sq.mm Terminal Lugs
Branches :
26-8.0 sq.mm Terminal Lugs
( 3.0m x 0.35m x 0.30m )
Other work items not mentioned in item 6.1 but necessary to complete the Feeder and Sub-feeder (Please identif
6.2.2 Switches :
6.2.2.1 PANASONIC Wide Series Brand
6.2.2.2 Single Pole Switch
6.2.2.3 2-Gang Switch
6.2.2.4 3-Way Switch
6.2.2.5 Blank Plate Cover
Other work items not mentioned in item 6.2 but necessary to complete the Feeder and Sub-feeder (Please identif
Other work items not mentioned in item 6.3 but necessary to complete the Ligthing Fixtures (Please identify)
Other work items not mentioned in item 6.4 but necessary to complete the Telephone System (Please identify)
Other work items not mentioned in item 6.4 but necessary to complete the Telephone System (Please identify)
Other work items not mentioned in item 6.5 but necessary to complete the CCTV System (Please identify)
Sub-total Cost, Item 6.6
Other work items not mentioned in item 6.7 but necessary to complete the PA/BGM System (Please identify)
Other work items not mentioned in item 6.8 but necessary to complete the Grounding System (Please identify)
Other work items not mentioned in item 6.9 but necessary to complete the Conduits and Fittings (Please identify)
Other work items not mentioned in item 6.10 but necessary to complete the Wires and Cables (Please identify)
6.11 BOXES :
For All System
FUMACO Brand
6.11.1 J.Box (4" x 4" x 2-1/8")
6.11.2 J.Box Cover
6.11.3 U.Box (2" x 4" x 2-1/8")
6.11.4 Sq.Box (4" x 4" x 2-1/8")
6.11.5 Sq.Box (4 11/16" x 4 11/16")
6.11.6 Pull Box (6" x 6" x 4")
6.11.7 Pull Box (8" x 8" x 6")
6.11.8 Pull Box (10" x 10" x 8")
6.11.9 Pull Box (power)
6.11.10 Pull Box (gset)
Other work items not mentioned in item 6.11 but necessary to complete the Boxes (Please identify)
6.12 CONSUMABLES :
For All System :
6.12.1 PVC Tape
6.12.2 Hacksaw Blade
6.12.3 GI Wire, GA-#16
6.12.4 PVC Cement
6.12.5 Red Lead Paint
6.12.6 1/2" PVC Flexible Conduit
6.12.7 1/2" Straight Connector
6.12.8 Screws, Tox and Others
6.12.9 Hangers/Support
Other work items not mentioned in item 6.12 but necessary to complete the Consumables (Please identify)
Sub-total Cost, Item 6.12
Other work items not mentioned in item 7.0 but necessary to complete the Plumbing (Please identify)
8.2.1 4" (100mm) dia Automatic Alarm Check Valve including trim and accessories
Other work items not mentioned in item 8.2 but necessary to complete the Valves and Other Related Materials (P
Other work items not mentioned in item 8.3 but necessary to complete the Fire Protection Distribution Materials (P
9.3 RC Pipiline
Earthworks
9.3.1 RCP 600mmø inclusive of mortar and laying
9.3.2 RCP 375mmø inclusive of mortar and laying
Other work items not mentioned in item 9.0 but necessary to complete the Civil Development Works (Please iden
lot
lot
lot
lot
lot
lot
lot
lot
EXCLUDED
lot
lot
lot
lot
cu.m.
cu.m.
cu.m.
cu.m.
sq.m.
lot
ks (Please identify)
sq.m
sq.m
sq.m
sq.m
sq.m
sq.m
sq.m
sq.m
sq.m
sq.m
sq.m
sq.m
sq.m
sq.m
kgs
kgs
kgs
kgs
kgs
kgs
kgs
kgs
kgs
kgs
kgs
kgs
kgs
kgs
cu.m
cu.m
cu.m
cu.m
cu.m
cu.m
cu.m
cu.m
cu.m
cu.m
cu.m
cu.m
cu.m
cu.m
(Please identify)
pcs
bags
cu.m
kgs
pcs
bags
cu.m
kgs
pcs
pcs
pcs
pcs
pcs
pcs
pcs
lot
lm
sq.m
pcs
lm
sq.m
lot
lm
lm
lm
lm
lm
lm
ease identify)
sq.m
sq.m
sq.m
sq.m
sq.m
lm
lot
lot
lot
lot
lot
lm
lm
lot
sq.m
sq.m
sq.m
sq.m
sq.m
sq.m
sq.m
sq.m
sq.m
sq.m
sq.m
sq.m
sq.m
sq.m
sq.m
sq.m
sq.m
sq.m
sq.m
(Please identify)
bags
cu.m.
bags
cu.m.
sq.m
sq.m
sq.m
sq.m
sq.m
sq.m
sq.m
sq.m
sq.m
sq.m
sq.m
lm
Please identify)
sets
sq.m
sq.m
set
sq.m
set
set
es (Please identify)
Unit
Unit
lot
lot
lot
Lm
Lm
Lm
Lm
Lm
Lm
lot
lot
lot
lot
lot
Unit
Unit
Unit
Unit
Unit
Unit
Unit
Unit
Unit
Unit
Unit
Unit
Unit
Unit
Unit
Unit
lot
lot
lot
sqm
lot
assy
assy
assy
assy
assy
assy
assy
assy
assy
lms
assy
assy
assy
assy
assy
assy
assy
sets
sets
sets
sets
sets
sets
sets
sets
sets
sets
sets
sets
sets
sets
assy
assy
assy
sets
sets
sets
sets
sets
sets
sets
sets
sets
sets
sets
assy
sets
sets
lghts
sets
sets
sets
sets
lghts
sets
sets
sets
sets
lghts
sets
sets
sets
sets
sets
lghts
sets
sets
sets
sets
lghts
sets
sets
sets
lghts
sets
sets
sets
lms
lms
lms
lms
lms
lms
lms
lms
rls.
rls.
rls.
lms
rls.
lms
rls.
lms
lms
pcs.
pcs.
pcs.
pcs.
pcs.
pcs.
pcs.
pcs.
pcs.
pcs.
Please identify)
rls.
pcs.
lms.
cans
gals.
lms.
pcs.
lot
lot
lgth
lght
lght
lght
lght
units
pcs
pcs
pcs
pcs
pcs
lot
lot
lot
lgth
lgth
lgth
pcs
pcs
lot
lot
lot
lgth
lgth
lgth
lgth
lgth
lot
lot
lot
pcs
pcs
pcs
pcs
pcs
pcs
pcs
pcs
pcs
pcs
pcs
pcs
pcs
pcs
pc
pc
pc
pc
lot
sets
sets
sets
pcs
lot
set
set
lot
(Please identify)
set
set
lot
p Equipments (Please identify)
pc
pc
pcs
pcs
pc
pcs
pcs
pcs
pcs
pcs
pcs
pcs
pcs
pc
pc
pcs
pc
pcs
pcs
lot
lgth
lgth
lgth
lgth
lgth
lgth
lot
pcs
pcs
pcs
pcs
lot
lot
cu.m
kgs
sq.m
cu.m
kgs
l.m
kgs
sq.m
cu.,
cu.m
l.m
l.m
GRA
COST TOTAL COST
VALUE ADDED TAX
TOTAL MARK-UP TOTAL DIRECT & UNIT BID COST
VALUE INDIRECT VALUE
(H=DxG) (I=D+H) (J) (K=IxJ) (M=L/A)
GRAND TOTAL COST OF THE PROJECT
TOTAL BID COST (TOTAL COST X
REMARKS
VAT)
(L=I+K) (N)
xxxxxx
xxxxxxx
xxxxxx
xxxxxxx
xxxxxxx
xxxxxx
xxxxxx
xxxxxxx
xxxxxxxx
xxxxxxx
xxxxxxx
xxxxxxx
xxxxxxx
xxxxxxx
xxxxxxx
xxxxxxx
xxxxxx
xxxxxx
xxxxxx
xxxxxx
xxxxxx
xxxxxxx
xxxxxxx
xxxxxxx
xxxxxx
xxxxxx
xxxxx
xxxxx
xxxxxx
xxxxxx
xxxxxx
xxxxxx
xxxxxx
xxxxx
xxxxxx
xxxxxx
Qty
Item No. Description OF Works
(A)
B BUILDING
2.00 EARTHWORKS
Other work items not mentioned in item 2.1 but necessary to complete the Earthworks (Please identify)
TOT
Note: *This BOQ is for budgetary puposes only
BILL OF QUANTITIES
INDIRECT COST
TOTAL DIRECT
Unit Direct Unit Cost MARK-UP IN PERCENT TOTAL MARK-UP
COST
OCM % PROFIT % %
(B) (C) (D=AxC) (E) (F) (G=E+F)
cu.m.
cu.m.
cu.m.
cu.m.
sq.m.
lot
ks (Please identify)
xxxxxxx
xxxxxxxxx
Qty
Item No. Description OF Works
(A)
B BUILDING
3.0 CONCRETE
Other work items not mentioned in item 3.0 but necessary to complete the Concrete (Please identify)
sq.m
sq.m
sq.m
sq.m
sq.m
sq.m
sq.m
sq.m
sq.m
sq.m
sq.m
sq.m
sq.m
sq.m
kgs
kgs
kgs
kgs
kgs
kgs
kgs
kgs
kgs
kgs
kgs
kgs
kgs
kgs
cu.m
cu.m
cu.m
cu.m
cu.m
cu.m
cu.m
cu.m
cu.m
cu.m
cu.m
cu.m
cu.m
cu.m
(Please identify)
(L=I+K) (N)
xxxxxxxxxxx
xxxxxxxxxx
Qty
Item No. Description OF Works
(A)
B BUILDING
4.0 MASONRY WORKS
Other work items not mentioned in item 4.0 but necessary to complete the Masonry Works (Please identify)
5.0 METALS
Other work items not mentioned in item 5.0 but necessary to complete the Metals (Please identify)
7.1 Waterproofing
7.1.1 Waterproofing - Floor T&B Area, 5 fly Membrane
7.1.2 Waterproofing - Roof Deck Slab, 5 fly Membrane
7.3 Roofings
7.3.1 G.A. 22 Rib Type Long Span Metal Roofing
7.3.2 Stainless Steel Gutter Gauge 24
Other work items not mentioned in item 7.0 but necessary to complete the Thermal & Moisture Protection (Please
8.00 OPENINGS
8.5.9 W10 - Sliding Type Glass Window with Black Aluminum Frame Glass Window
8.5.11 W11- Sliding Type Glass Window with Black Aluminum Frame Glass Window
8.5.11 W12 - Fixed Type Glass Window with Black Aluminum Frame Glass Window
8.5.11 W13 - Fixed Type Glass Window with Black Aluminum Frame Glass Window
8.5.11 W14- Stainless Steel Air Vent Window Louver Type Window
Other work items not mentioned in item 8.0 but necessary to complete the Openings (Please identify)
9.00 FINISHES
9.20 Plaster
9.20.1 20mm thk Cement Plaster for 150mm CHB
9.20.1.1 Cement
9.20.1.2 Sand
9.20.2 20mm thk Cement Plaster for 100mm CHB
9.20.2.1 Cement
9.20.2.2 Sand
9.50 Ceilings
9.50.1 Hardiflex ceiling on metal furring
9.50.2 Exposed Slab
9.60 Floorings
400mm x 400mm Stain Proof Homogeous Anti-Slip Porcelain Tiles w/ Anti-
9.60.1
Microbial, Anti-Stain Grout
200mm x 200mm Stain Proof Homogeous Anti-Slip Porcelain Tiles w/ Anti-
9.60.1
Microbial, Anti-Stain Grout
9.60.2 300 x 300mm Non Skid Ceramic Tiles
9.60.3 Plain Cement Finish
Other work items not mentioned in item 9.0 but necessary to complete the Finishes (Please identify)
10.00 SPECIALTIES
Other work items not mentioned in item 10.0 but necessary to complete the Specialties (Please identify)
T
Note: *This BOQ is for budgetary puposes only
BILL OF QUANTITIES
INDIRECT COST
TOTAL DIRECT MARK-UP IN PERCENT TOTAL MARK-UP
Unit Direct Unit Cost
COST
OCM % PROFIT % %
(B) (C) (D=AxC) (E) (F) (G=E+F)
pcs
bags
cu.m
kgs
pcs
bags
cu.m
kgs
sq.m
sq.m
sq.m
sq.m
sq.m
lm
lot
lot
lot
lot
lot
lm
lm
lot
sq.m
sq.m
sq.m
sq.m
sq.m
sq.m
sq.m
sq.m
sq.m
sq.m
sq.m
sq.m
sq.m
sq.m
sq.m
sq.m
sq.m
sq.m
sq.m
(Please identify)
bags
cu.m.
bags
cu.m.
sq.m
sq.m
sq.m
sq.m
sq.m
sq.m
sq.m
sq.m
sq.m
sq.m
sq.m
lm
Please identify)
sets
sq.m
sq.m
set
sq.m
set
set
es (Please identify)
(L=I+K) (N)
xxxxxx
xxxxxxx
xxxxxxx
xxxxxxx
xxxxxxx
xxxxxxx
xxxxxxx
Item No. Description OF Works
B BUILDING
Other work items not mentioned in item 23.0 but necessary to complete the Heating Ventilation and Air Condition
Other work items not mentioned in item 23.2 but necessary to complete the Air Conditioning Pipimg Works (Pleas
Sub-total Cost, Item 23.2
Other work items not mentioned in item 23.3 but necessary to complete the Testing, Adjusting and Balancing (Ple
Other work items not mentioned in item 23.4 but necessary to complete the Ventilating units and Accessories (Ple
All standard accessories needed for installation such as vibration isolator, angle
5.5.9
corner, duct clip, dasket, bolt, nut and washer
Other work items not mentioned in item 23.5 but necessary to complete the Grilles and Other Related Works (Ple
Sub-total Cost, Item 23.5
TOT
BILL OF QUANTITIES
INDIRECT COST
TOTAL DIRECT MARK-UP IN PERCENT
Qty Unit Direct Unit Cost
COST
OCM % PROFIT %
(A) (B) (C) (D=AxC) (E) (F)
Unit
Unit
lot
lot
lot
Lm
Lm
Lm
Lm
Lm
Lm
lot
lot
lot
lot
Unit
Unit
Unit
Unit
Unit
Unit
Unit
Unit
Unit
Unit
Unit
Unit
Unit
Unit
Unit
Unit
lot
lot
lot
pcs
pcs
pcs
pcs
pc
pcs
sqm
lot
(L=I+K) (N)
xxxxx
xxxxx
xxxxx
xxxxxx
xxxxxx
Item No. Description OF Works
B BUILDING
6.00 ELECTRICAL AND AUXILIARY
6.1.1 LPAD
Main :
40AT, 3PCB, 400V, BO
Branches :
22-20AT, 1PCB, 230V, BO
6.1.2 PPAD
Main :
40AT, 3PCB, 400V, BO
Branches :
16-20AT, 1PCB, 230V, BO
6.1.3 DPAD
Main :
100AT, 3PCB, 400V, BO
Branches :
2-20AT, 3PCB, 400V, BO
3-40AT, 3PCB, 400V, BO
1-50AT, 3PCB, 400V, BO
6.1.4 FPS
Main :
150AT, 3PCB, 400V, BO
Branches :
1-150AT, 3PCB, 400V, BO
1-20AT, 3PCB, 400V, BO
6.1.5 LVSG
Main :
800AT, 3PCB, 400V, BO
Branches :
1-100AT, 3PCB, 400V, BO
2-150AT, 3PCB, 400V, BO
2-175AT, 3PCB, 400V, BO
6.1.6 (Metering)-1
Ckt. Breaker Gutter in
NEMA-1 w/ Bolt-on Breaker
11-50AT, 1PCB, 230V, BO
( 2.5m x 0.35m x 0.30m )
6.1.7 (Metering)-1
BusBar Gutter in NEMA-1
w/ 4-Bus Bar, Rated 150A
Main :
4-60 sq.mm Terminal Lugs
Branches :
22-8.0 sq.mm Terminal Lugs
( 2.5m x 0.35m x 0.30m )
6.1.8 (Metering)-2
Ckt. Breaker Gutter in
NEMA-1 w/ Bolt-on Breaker
13-50AT, 1PCB, 230V, BO
( 3.0m x 0.35m x 0.30m )
6.1.9 (Metering)-2
BusBar Gutter in NEMA-1
w/ 4-Bus Bar, Rated 175A
Main :
4-80 sq.mm Terminal Lugs
Branches :
26-8.0 sq.mm Terminal Lugs
( 3.0m x 0.35m x 0.30m )
6.2.2 Switches :
6.2.2.1 PANASONIC Wide Series Brand
6.2.2.2 Single Pole Switch
6.2.2.3 2-Gang Switch
6.2.2.4 3-Way Switch
6.2.2.5 Blank Plate Cover
6.11 BOXES :
For All System
FUMACO Brand
6.11.1 J.Box (4" x 4" x 2-1/8")
6.11.2 J.Box Cover
6.11.3 U.Box (2" x 4" x 2-1/8")
6.11.4 Sq.Box (4" x 4" x 2-1/8")
6.11.5 Sq.Box (4 11/16" x 4 11/16")
6.11.6 Pull Box (6" x 6" x 4")
6.11.7 Pull Box (8" x 8" x 6")
6.11.8 Pull Box (10" x 10" x 8")
6.11.9 Pull Box (power)
6.11.10 Pull Box (gset)
6.12 CONSUMABLES :
For All System :
6.12.1 PVC Tape
6.12.2 Hacksaw Blade
6.12.3 GI Wire, GA-#16
6.12.4 PVC Cement
6.12.5 Red Lead Paint
6.12.6 1/2" PVC Flexible Conduit
6.12.7 1/2" Straight Connector
6.12.8 Screws, Tox and Others
6.12.9 Hangers/Support
TOTAL CO
BILL OF QUANTITIES
INDIRECT COST
TOTAL DIRECT MARK-UP IN PERCENT
Qty Unit Direct Unit Cost
COST
OCM % PROFIT %
(A) (B) (C) (D=AxC) (E) (F)
assy
assy
assy
assy
assy
assy
assy
assy
assy
lms
assy
assy
assy
assy
assy
assy
assy
sets
sets
sets
sets
sets
sets
sets
sets
sets
sets
sets
sets
sets
sets
assy
assy
assy
sets
sets
sets
sets
sets
sets
sets
sets
sets
sets
sets
assy
sets
sets
sets
sets
sets
sets
lghts
sets
sets
sets
sets
lghts
sets
sets
sets
sets
lghts
sets
sets
sets
sets
sets
lghts
sets
sets
sets
sets
lghts
sets
sets
sets
lghts
sets
sets
sets
lms
lms
lms
lms
lms
lms
lms
lms
rls.
rls.
rls.
lms
rls.
lms
rls.
lms
lms
pcs.
pcs.
pcs.
pcs.
pcs.
pcs.
pcs.
pcs.
pcs.
pcs.
rls.
pcs.
lms.
cans
gals.
lms.
pcs.
lot
lot
(L=I+K) (N)
50,085.00
xxxxxx
xxxxx
xxxxx
xxxxx
xxxxx
xxxxx
xxxxx
xxxxx
xxxxx
xxxxxx
xxxxx
xxxxx
xxxxxxx
Qty
Item No. Description OF Works
(A)
B BUILDING
7.00 PLUMBING WORKS
PIPING SYSTEM
7.1 Storm Drainage Lines
7.1.1 PVC Pipes
7.1.1.1 75mm dia
7.1.1.2 100mm dia
7.1.1.3 150mm dia
7.1.1.4 200mm dia
Other work items not mentioned in item 7.0 but necessary to complete the Plumbing (Please identify)
sq.m
lgth
lgth
lgth
lgth
lgth
lght
lght
lght
lght
units
pcs
pcs
pcs
pcs
pcs
lot
lot
lot
lgth
lgth
lgth
pcs
pcs
lot
lot
lot
lgth
lgth
lgth
lgth
lgth
lot
lot
lot
pcs
pcs
pcs
pcs
pcs
pcs
pcs
pcs
pcs
pcs
pcs
pcs
pcs
pcs
pc
pc
pc
pc
lot
sets
sets
sets
pcs
lot
set
set
lot
(Please identify)
(L=I+K) (N)
59,193.79
51,583.90
66,984.35
167,548.16
32,079.77
xxxxxx
xxxxxx
xxxxxx
xxxxxxx
xxxxxxx
xxxxxx
xxxxxxx
Qty
Item No. Description OF Works
(A)
B BUILDING
8.00 FIRE PROTECTION SYSTEM
Other work items not mentioned in item 8.1 but necessary to complete the Fire Pump Equipments (Please identif
8.2.1 4" (100mm) dia Automatic Alarm Check Valve including trim and accessories
Other work items not mentioned in item 8.2 but necessary to complete the Valves and Other Related Materials (P
Other work items not mentioned in item 8.3 but necessary to complete the Fire Protection Distribution Materials (P
TOTAL C
Note: *This BOQ is for budgetary puposes only
BILL OF QUANTITIES
INDIRECT COST
TOTAL DIRECT MARK-UP IN PERCENT TOTAL MARK-UP
Unit Direct Unit Cost
COST
OCM % PROFIT % %
(B) (C) (D=AxC) (E) (F) (G=E+F)
set
set
lot
pc
pc
pcs
pcs
pc
pcs
pcs
pcs
pcs
pcs
pcs
pcs
pcs
pc
pc
pcs
pc
pcs
pcs
lot
lgth
lgth
lgth
lgth
lgth
lgth
lot
pcs
pcs
pcs
pcs
lot
lot
(L=I+K) (N)
xxxxxx
xxxxxx
xxxxx
xxxxxx
Qty
Item No. Description OF Works
(A)
B BUILDING
7.00 CIVIL DEVELOPMENT WORKS
7.30 RC Pipiline
Earthworks
7.3.1 RCP 600mmø inclusive of mortar and laying
7.3.2 RCP 375mmø inclusive of mortar and laying
cu.m
kgs
sq.m
cu.m
kgs
l.m
kgs
sq.m
cu.,
cu.m
l.m
l.m
COST TOTAL COST
VALUE ADDED TAX
TOTAL MARK-UP TOTAL DIRECT & UNIT BID COST
VALUE INDIRECT VALUE
(H=DxG) (I=D+H) (J) (K=IxJ) (M=L/A)
TOTAL BID COST (TOTAL COST X
REMARKS
VAT)
(L=I+K) (N)
xxxxxx