Consultancy Services for Design Review and Construction Supervision of Monthly Progress Report

Extension of Southern Expressway Project from Mattala to Hambantota via Andarawewa March 2018

Contents
1.1 Project Background .................................................................................................................................... 1
1.2 Objectives of the Consultancy Services ..................................................................................................... 1
1.3 Scope of the Civil Works Contract ............................................................................................................ 2
1.4 Supervision Consultancy Services ............................................................................................................. 4
1.5 Contract Management Framework............................................................................................................. 4
1.5.1 Summary of Civil Contract ................................................................................................................ 4
1.6.1 Details of the Insurance & Bond ........................................................................................................ 5
1.7 Contractor’s Monthly Statements / Interim Payment Applications ........................................................... 6
1.8 FINANCIAL PROGRESS ................................................................................................................................. 9
1.9 PHYSICAL PROGRESS ................................................................................................................................. 10
PART 2 – CONSULTANCY SERVICES .......................................................................................................... 11
2.1 Consultancy Services ............................................................................................................................... 11
2.1.1 General ............................................................................................................................................. 11
2.1.2 Contractor’s program ....................................................................................................................... 16
2.1.3 Cash Flow Projections ...................................................................................................................... 16
2.1.4 Materials and Workmanship ............................................................................................................ 16
2.1.5 Permits and Licenses ........................................................................................................................ 16
2.1.6 Measurement and Payment .............................................................................................................. 16
2.1.7 Variations, Extension of Time and Fixing Rates.............................................................................. 16
2.1.8 Design............................................................................................................................................... 16
2.1.9 Contractor’s Claims.......................................................................................................................... 17
2.1.10 Health, Safety and Environment (HSE) ........................................................................................... 17
2.1.11 Social Aspects .................................................................................................................................. 18
2.2 Handing over of Land for the Construction Works. ................................................................................ 18
2.3 Contractor’s Organization ........................................................................................................................ 19
2.4 Utility Diversions ..................................................................................................................................... 19
2.5 Details of Utility Diversions at the End of February 2018 ...................................................................... 20
2.5.1 Utilities ............................................................................................................................................. 20
PART 3 – CIVIL WORKS ................................................................................................................................. 20
3.1 Salient Features and Project Particulars ................................................................................................... 20
3.1.1 Salient Features ................................................................................................................................ 20
3.2 Establishment ........................................................................................................................................... 21
3.2.1 Quarries ............................................................................................................................................ 21
3.2.2 Crusher Plants for Concrete Aggregate and ABC ............................................................................ 21
3.2.3 Asphalt Plants ................................................................................................................................... 22

1
Consultancy Services for Design Review and Construction Supervision of Monthly Progress Report
Extension of Southern Expressway Project from Mattala to Hambantota via Andarawewa March 2018

3.2.4 Concrete Batching Plant ................................................................................................................... 22


3.3 Borrow Sites............................................................................................................................................. 22
3.4 Unsuitable Material disposal Yard ........................................................................................................... 25
3.5 Facilities. .................................................................................................................................................. 27
3.6 Quality Control ........................................................................................................................................ 27
3.6.1 Quality Management ........................................................................................................................ 27
3.6.2 Material Testing Reviews................................................................................................................. 27
3.6.3 Details of Approved Materials by the End of February 2018 ........................................................... 28
3.7 Environmental, Social Aspects and Health & Safety............................................................................... 31
3.7.1 Environmental Aspects..................................................................................................................... 31
3.6.2 Social Aspects .................................................................................................................................. 31
3.6.2.1 Public Complain ............................................................................................................................... 31
3.6.3 Health & Safety ................................................................................................................................ 31
3.8 Operations ................................................................................................................................................ 32
3.8.1 Surveying ......................................................................................................................................... 32
3.8.2 Design............................................................................................................................................... 32
Design Items........................................................................................................................................................ 32
Total .................................................................................................................................................................... 32
Submission .......................................................................................................................................................... 32
Approval.............................................................................................................................................................. 32
Approved % (w.r.t total) ..................................................................................................................................... 32
3.9 Status of Variation Orders ....................................................................................................................... 32
3.10 Status of Claims ....................................................................................................................................... 33
3.11 Progress in Detail ..................................................................................................................................... 33
3.11.1 Viaduct 1 & Viaduct 2...................................................................................................................... 33
3.11.2 Bridges ............................................................................................................................................. 33
3.11.3 Progress of Key Activities & Culvert Progress ................................................................................ 33
3.11.4 Progress of Culvert & Bridges ......................................................................................................... 33
3.12 Contractor’s Resources ............................................................................................................................ 34
3.13 Progress Photographs ................................................................................................................................ 34
3.15 Progress update ........................................................................................................................................ 34
3.16 Weather Report ........................................................................................................................................ 34
ANNEXURE 01: ENGINEER’S ORGANIZATION CHART ...................................................................................... 35
ANNEXURE 02: CONTRACTOR'S ORGANIZATION CHART ................................................................................ 36
ANNEXURE 03: NON-CONFORMANCE REPORT............................................................................................ 37
ANNEXURE 04: SUMMARY OF QUALITY CONTROL TESTS CARRIED OUT ....................................................... 38

2
Consultancy Services for Design Review and Construction Supervision of Monthly Progress Report
Extension of Southern Expressway Project from Mattala to Hambantota via Andarawewa March 2018

ANNEXURE 05: SUMMARY OF SURVEYING WORKS ........................................................................................ 42


ANNEXURE 06: CONTRACTOR'S CLAIM SUMMARY ........................................................................................ 43
ANNEXURE 07: CONTRACTOR’S VARIATION ORDERS ..................................................................................... 50
ANNEXURE 08: PROGRESS OF KEY ACTIVITY ................................................................................................... 52
ANNEXURE 09: PROGRESS OF CULVERTS & BRIDGES. .................................................................................... 62
ANNEXURE 10: CONTRACTOR’S KEY STAFF IN FEBRUARY 2018. .................................................................. 104
ANNEXURE 11: CONTRCTOR’S FOREIGN STAFF & LABOUR RETURN IN FEBRUARY 2018............................. 105
ANNEXURE 12: CONTRCTOR’S LOCAL STAFF & LABOUR RETURN IN FEBRUARY 2018. ................................ 106
ANNEXURE 13: CONTRCTOR’S MACHINERY & EQUIPMENTS IN FEBRUARY 2018. ....................................... 107
ANNEXURE 14: PROGRESS PICTURES OF KEY ACTIVITIES. ............................................................................ 108
ANNEXURE 15: UPDATED MASTER PROGRAMME. ....................................................................................... 113
ANNEXURE 16: WEATHER REPORTS. ............................................................................................................. 116

Prepared By: Checked By:


N.G Eranga T.J.Bandula
(Programming Engineer) (Deputy Team Leader)

3
Consultancy Services for Design Review and Construction Supervision of Monthly Progress Report
Extension of Southern Expressway Project from Mattala to Hambantota via Andarawewa March 2018

PART 1 – GENERAL

1.1 Project Background

The objective of this project is mainly to have a link between the commercial city, (Colombo) and the
newly constructed sea port, (Hambantota) & International Airport (Mattala) by extending the already
functioning Sothern Expressway [Colombo-Matara] from Matara to Hambantota.

The Government of the Democratic Socialist Republic of Sri Lanka (GOSL) has applied for a long term
loan from the EXIM bank of China for the Extension of Southern Expressway Project from Mattala to
Hambantota via Andarawewa – Length is approximately 25.0 km. At the request of the GOSL, the Exim
Bank of China has agreed to provide credit facilities to finance, inter alia, infrastructure development
projects with great significance to economic development.

One such project is the Extension of the Southern Expressway from Matara to Hambantota including
expressway link to Mattala. The Exim Bank of China has agreed to finance this project which would
involve the Construction of 96 km long four lanes Expressway split into four sections namely Matara to
Beliatta, Beliatta to Wetiya, Wetiya to Andarawewa, Mattala to Hambantota via Andarawewa.

The Construction would include associated structures such as interchanges, intersections flyovers,
underpasses, overpasses, viaducts etc. It is envisaged that there would be extensive soft ground treatment
where deemed necessary as the trace traverse through marshy areas and flood plains. The construction also
envisages future widening at the outside to six lanes. The construction would entail facilities for tolling at
appropriate locations. The Executing Agency of this Project is the Road Development Authority (RDA)
under the Ministry of Higher Education and Highways.

ESEP Project will be implemented on the basis of a BOQ, measure and pay type contract. The RDA, the
Employer has decided to employ a suitably qualified, national / international consultant to supervise and
monitor the project under FIDIC Conditions of Contract (Regulated Document, First Edition 1999-Red
Book). The cost of the civil works as well as the Consultancy Services will be funded by EXIM Bank of
China.

1.2 Objectives of the Consultancy Services

China Railway First Survey and Design Institute Group Company Limited (FSDI) has been appointed by
the Road Development Authority as Supervision Consultants for the Section 4 (Mattala to Hambantota via
Andarawewa) to provide Consultancy Services and assist in various aspects of project implementation in
accordance with the objectives detailed in the Terms of Reference (TOR) and as summarized in the
Preamble to this report.

1
Consultancy Services for Design Review and Construction Supervision of Monthly Progress Report
Extension of Southern Expressway Project from Mattala to Hambantota via Andarawewa March 2018

These services include administering the civil works contract as the Engineer, as defined in the contract
documents which is under FIDIC Conditions of Contract (Regulated Document, First Edition 1999-Red
Book).

Mr. Dong Wei has been appointed as the team leader for the Engineer’s Representative with delegated
authorities.

The Deputy Team Leader is the overall in charge of day to day supervision of Contractor’s work under the
guidance and direction of the Team Leader. He will cause action to ensure that the Resident Engineers, Site
Engineers and inspectors exercise supervisory control over the quality of materials and workmanship on a
daily basis.

The contents of this progress report are as follows:

 Review of the scope of services to be provided by the Consultant in relation to those


indicated in the TOR and the Consultant’s proposals for the supervision of the Contract
including the time schedule for personnel.
 Definition of work supervision procedures to be adopted by the consultant as established
under tasks outlined in the TOR.
 Review and assess Contractor’s work program and site organization to identify those
areas requiring close monitoring during construction.
 Review of Contract Documents , drawings and specifications
 Submission of Reports.

1.3 Scope of the Civil Works Contract

The major items of work to be carried out by the Contractor include but not limited to the following:
detailed engineering designs for structures, soft soil treatment, if any, treatment and toll system including
all related facilities, and construction of the entire 25 km long new 4 lanes expressway with provision for
expansion of 6 lanes in future.

Initial outer 4 lane expressway comprises of each 3.6 m wide lanes, 2.5 m wide outer hard shoulder, 0.75 m
wide inner hard shoulder and 0.75 m verge on either side with 2.0 m wide center median. Construction of
embankments, cuttings and sub structures of bridges, viaducts etc. where 6 lane facilities is required in
future, will be with the provision for expanding to 6 lanes and an inter change at Andarawewa. All cut area
will have provision of six lane.

Following are the major items involved in the construction of the 4 lane facility with the provision for
expanding to 6 lane facilities in future

2
Consultancy Services for Design Review and Construction Supervision of Monthly Progress Report
Extension of Southern Expressway Project from Mattala to Hambantota via Andarawewa March 2018

Structures

Table 1.3.i –Summary of Structures by the End of March 2018

Total/ Completed up to end


Structure Work In progress Work not started
(Nos) of March 2018
Culvert [D/I] 61 55 06 00
Culvert [UP] 10 09 01 00
Viaducts 02 01 01 00
Bridges [BRI] 05 00 05 00
Bridges [BRO] 02 00 02 00
Bridges [BRU] 02 00 02 00
Bridges [BR] 01 00 01 00

Where

D/I - Drainage/Irrigation UP - Under pass

BRI - Bridge in Interchange BRO - Overpass Bridge

BRU - Underpass Bridge BR - Main Bridge

i. Pavements

Construction of all road pavements comprising of sub base course, aggregate base course, asphalt
concrete binder course and asphalt concrete wearing course.

ii. Drainage

Construction of the entire drainage system as per design based on hydrology data.

iii. Toll Collection System

Construction of suitable toll collection system including all related facilities for all four section.

iv. Interchanges

Construction of one System Interchange.

v. Sign Board Road Marking

Fixing and marking as per design.

vi. Incidental Works

Construction of all incidental works such as road signs, lighting systems at interchanges, elephants
fencing, right of way fencing, guard rails etc.

3
Consultancy Services for Design Review and Construction Supervision of Monthly Progress Report
Extension of Southern Expressway Project from Mattala to Hambantota via Andarawewa March 2018

1.4 Supervision Consultancy Services

The Consultants will provide comprehensive day to day construction supervision of the Work in
accordance with the Conditions of Contract, FIDIC Conditions of Contract (Regulated Document, First
Edition 1999-Red Book) on which the Contract has been entered into between the Employer, Road
Development Authority and the Contractor, China Harbour Engineering Company Ltd.The Team leader
will function as the Engineer’s Representative to the Contract.

1.5 Contract Management Framework

The Project is being executed and managed within the Contract Management Framework (CMF) described
in the Contract agreement, which defines the organizational structure and levels of responsibility. The main
features of the Contract Management Framework are,

1.5.1 Summary of Civil Contract

Table 1.5.1 –Summary of Civil Contract by the End of March 2018

The Employer & Consultant


Contract Package No RDA/SEEP/CONT-S4
Extension of Southern Expressway - Section 4 (from Mattala to Hambantota
Contract Name
via Andarawewa)
Employer Name Road Development Authority (RDA)
Project Director Mr.A.P.K.Abeydeera
Office (PD) In front of Botanical Garden, Sooriyawewa Road, Katuwewa, Hambantota.
Contact No. 071-8399790
The Consultant China Railway First Survey and Design Institute (FSDI)
Team Leader Mr.Dong Wei
Office In front of Botanical Garden, Sooriyawewa Road, Katuwewa, Hambantota.
Contact No. 0769366188
Executing Agency Ministry of Higher Education and Highways
Details of the Road
Road Name Extension of Southern Expressway – Section 4
CH 0+000 to CH 13+900 (Arabokka – Andarawewa), CH 71+000 to CH
Main Roads & Interchanges 77+640 (Andarawewa – Mattala), CH 0+000 to CH 3+000 (4 Ramps to
Andarawewa IC)
Road Length Main Road - 20.54 km : Ramp Length - 7.91km
Details of the Contractor
Name China Harbour Engineering Company
Project Manager Mr. Yang Senyan
Address Project Office, Pahala Andarawewa
Contact Details 077-7285619

4
Consultancy Services for Design Review and Construction Supervision of Monthly Progress Report
Extension of Southern Expressway Project from Mattala to Hambantota via Andarawewa March 2018

Details of Contractor China Harbor Engineering Company Ltd. Level 32, East tower, World Trade
Centre, Echelonssquare, Colombo
VAT Reg. No. 409255051-7000
Details of the Contract
Accepted Contract Amount Rs. 52,156,184,936.52
Date of Agreement 19th November 2013
Date of Commencement 19th January 2016
Date of Completion 19th January 2019
Performance Security Submitted on 27th November 2015
Contract Period 36 Months
Funding Agency EXIM Bank of China
Performance Bond Details
Name of the Bank EXIM Bank of China
Bond Amount SLRs. 1,695,076,010.43 ( USD 7,217,564.73)
Bond Validity Period 15th December 2019
Mobilization Advance
Name of the Bank EXIM Bank of China
Amount of Advance Payment SL Rs. 10,431,236,987.30
Bond Validity Period up to 15th December 2018
1st Instalment SL Rs. 5,215,618,493.65
2nd Instalment SL Rs. 2,607,809,246.83
3rd Instalment SL Rs 2,607,809,246.83
Cumulative Progress at the end of March 2018
Physical Progress Target – 82.45 % Achieved – 65.61 %
Financial Progress Target – 77.02 % Achieved – 41.30 %

1.6.1 Details of the Insurance & Bond

Table 1.6.1 – Details of the Insurance & Bond by the End of March 2018

Bond/Insurance Bond/Insurance Validity


No Bond/ Insurance Remarks
Provider No From To
The Export-Import
1 Performance Bond BKD2015LG00264 02-Dec-15 15-Dec-19
Bank of China
1st Advance The Export-Import
2 BKD2015LG00263 02-Dec-15 15-Dec-18
Payment Bond Bank of China
2nd Advance The Export-Import
3 BKD2015LG00261 18-May-16 18-Jan-19
Payment Bond Bank of China

3rd Advance The Export-Import


4 BKD2017LG00136 31-Aug-17 18-Jan-19
Payment Bond Bank of China

5
Consultancy Services for Design Review and Construction Supervision of Monthly Progress Report
Extension of Southern Expressway Project from Mattala to Hambantota via Andarawewa March 2018

Bond/Insurance Bond/Insurance Validity


No Bond/ Insurance Remarks
Provider No From To
Insurance policy is
Contractor’s All
covered 36 month of
Risks Insurance &
5 Sri Lanka Insurance F/010/FCR/46888 19-Jan-16 18-Jan-20 construction period
Third part Liability
and maintenance
Insurance
period of 12 month
Personal Accident Ceylinco General Extended on 16th Jan
6 ML0016AP0000094 19-Jan-18 19-Jan-19
Insurance Policy Insurance Limited 2017
Workmen’s
Ceylinco General Extended on 16th Jan
7 Compensation ML0016EL0000305 19-Jan-18 19-Jan-19
Insurance Limited 2017
policy
Contractor’s plant
8 & Machinery Continental insurance ECPM160101000056 19-Jan-16 18-Jan-19
Insurance Policy

1.7 Contractor’s Monthly Statements / Interim Payment Applications

Details of the Contractor’s monthly statements and the interim payment applications certified by the
Engineer up to end of February 2018 are shown in following table.

Table 1.7.1 – Summary of Interim Payment Applications by the End of March 2018

Period Date Amounts Amounts IPC Issue


IPA No IPC No Letter Ref.
Ending Received Claimed (Rs) Certified (Rs) Date
FSDIS4-RDA-
1st Advance (10%) 03-Dec-15 IPC 01 03-Dec-15 016
5,215,618,493.65
IPA 01 29-Feb-16 16-Mar-16 FSDIS4-RDA-
IPC 02 17-Jun-16 196
IPA 02 30-Apr-16 18-May-16 863,474,323.12 863,474,323.12
FSDIS4-RDA-
2nd Advance (5%) 22-Jun-16 IPC 03 09-Aug-16 270
2,607,809,246.83
IPA 03 31-May-16 28-Jun-16
539,717,498.34
Combined IPC FSDIS4-RDA-
IPA 04 30-Jun-16 23-Jul-16 28-Oct-16 380
561,815,357.08 04 299,616,572.90
IPA 05 31-Jul-16 15-Sep-16
437,115,296.96
FSDIS4-RDA-
IPA 06 31-Aug-16 16-Sep-16 IPC 05 18-Nov-16 422
837,953,767.06 456,603,331.38
FSDIS4-RDA-
IPA 07 30-Sep-16 19-Oct-16 IPC 06 04-Dec-16 454
712,151,503.13 594,845,346.52
FSDIS4-RDA-
IPA 08 31-Oct-16 18-Nov-16 IPC 07 27-Dec-16 492
666,799,808.89 413,388,226.30
FSDIS4-RDA-
IPA 09 30-Nov-16 15-Dec-16 IPC 08 13-Jan-17 516
1,047,935,863.93 844,120,194.37
FSDIS4-RDA-
IPA10 31-Dec-16 19-Jan-17 IPC 09 16-Feb-17 563
1,186,753,427.83 1,268,061,160.42
FSDIS4-RDA-
IPA 11 31-Jan-17 23-Feb-17 IPC 10 22-Mar-17 630
593,310,779.34 1,007,550,531.00

6
Consultancy Services for Design Review and Construction Supervision of Monthly Progress Report
Extension of Southern Expressway Project from Mattala to Hambantota via Andarawewa March 2018

Period Date Amounts Amounts IPC Issue


IPA No IPC No Letter Ref.
Ending Received Claimed (Rs) Certified (Rs) Date
FSDIS4-RDA-
IPA 12 28-Feb-17 21-Mar-17 IPC 11 18-Apr-17 662
1,095,234,834.94 945,323,550.73
FSDIS4-RDA-
IPA 13 31-Mar-17 17-Apr-17 IPC 12 15-May-17 707
1,415,603,114.73 1,133,364,212.90
FSDIS4-RDA-
IPA 14 30-Apr-17 22-May-17 IPC 13 20-Jun-17 788
1,176,787,364.06 1,017,355,319.65
FSDIS4-RDA-
IPA 15 31-May-17 23-Jun-17 IPC 14 21-Jul-17 847
1,577,619,555.89 1,109,975,597.50
FSDIS4-RDA-
IPA 16 30-Jun-17 25-Jul-17 IPC 15 22-Aug-17 901
2,077,908,889.10 1,886,786,474.36
No Certificate FSDIS4-
IPA 17 31-Jul-17 26-Aug-17 27-Sep-17 CHEC-2084
1,316,017,349.23 issued -
FSDIS4-RDA-
3rd Advance (5%) 11-Sep-17 IPC 16 22-Sep-17 970
2,607,809,246.83
IPA 17 31-Jul-17 26-Aug-17
1,316,017,349.23 Combined IPC FSDIS4-RDA-
25-Oct-17 1031
17 3,105,858,975.75
IPA 18 31-Aug-17 29-Sep-17
1,634,610,751.47
FSDIS4-
IPA 19 30-Sep-17 31-Oct-17 IPC 18 2,337,101,694.79 27-Nov-17
2,191,852,990.93 RDA-1080
27-Nov- FSDIS4-
IPA 20 31-Oct-17 IPC 19 1,262,075,895.47 22-Dec-17
RDA-1122
17 859,781,757.68
30-Nov- FSDIS4-RDA-
IPA 21 02-Jan-18 939,260,995.52 IPC 20 30-Jan-18 1171
17 228,572,224.21
31-Dec- FSDIS4-RDA-
IPA 22 22-Jan-18 796,321,682.73 IPC 21 19-Feb-18 1195
17 770,485,041.01
28-Mar- FSDIS4-
IPA 23 31-Jan-18 27-Feb-18 939,660,913.10 IPC 22
922,765,449.00 18 RDA-1241
06-Apr-
IPA 24 28-Feb-18 IPC 23
18 943,852,588.08

Total excluding Advance 24,411,540,413.14


20,467,324,121.38
Payment

Organization

The organization structure of the Construction supervision services and staff is indicated in t Annexure 1.

7
Consultancy Services for Design Review and Construction Supervision of Monthly Progress Report
Extension of Southern Expressway Project from Mattala to Hambantota via Andarawewa March 2018

Table 1.7.2 Details of Advance payment & Recovery details.

Percentage
Cumulative work
IPC Valuve of Advance Recovery of IPC Cumulative Recovery Advance Recovery of Advance to be
done + Price
No. Cumulative work Y=(X-0.2)*Z/(0.8-0.2) of IPC (SLR) Current IPC (SLR) Recovered (SLR)
Escalation
done (X)
1 - - -
2 850,660,995.29 0.016 - - - 10,431,236,987.31
3 - - - - 10,431,236,987.31
4 1,172,523,122.86 0.022 - - - 10,431,236,987.31
5 1,619,104,186.66 0.031 - - - 10,431,236,987.31
6 2,239,965,899.98 0.043 - - - 10,431,236,987.31
7 2,708,894,318.17 0.052 - - - 10,431,236,987.31
8 3,606,940,771.07 0.069 - - - 10,431,236,987.31
9 4,936,581,587.86 0.095 - - - 10,431,236,987.31
10 5,986,219,385.66 0.115 - - - 10,431,236,987.31
11 7,029,916,996.79 0.135 - - - 10,431,236,987.31
12 8,200,632,728.91 0.157 - - - 10,431,236,987.31
13 9,243,176,100.10 0.177 - - - 10,431,236,987.31
14 10,351,507,778.75 0.198 - - - 10,431,236,987.31
15 12,355,025,689.73 0.237 - - 10,431,236,987.31
16 - 10,431,236,987.31
17 15,766,605,207.77 0.302 1,773,310,287.84 1,773,310,287.84 1,773,310,287.84 8,657,926,699.47
18 18,208,057,451.58 0.349 2,590,423,851.85 2,590,423,851.85 817,113,564.01 7,840,813,135.46
19 19,532,359,323.36 0.374 3,025,058,726.32 3,025,058,726.32 434,634,874.47 7,406,178,260.99
20 19,789,904,971.24 0.379 3,111,985,701.21 3,111,985,701.21 86,926,974.89 7,319,251,286.10
21 20,548,259,450.62 0.394 3,372,766,625.90 3,372,766,625.90 260,780,924.68 7,058,470,361.41
22 21,540,691,735.94 0.413 3,703,089,130.50 3,703,089,130.50 330,322,504.60 6,728,147,856.81
23 21,540,691,735.94 0.413 3,703,089,130.50 3,703,089,130.50 330,322,504.60 6,728,147,856.81
Cumulative Recovered Advance Payment in SLR 3,703,089,130.50

8
Consultancy Services for Design Review and Construction Supervision of Monthly Progress Report
Extension of Southern Expressway Project from Mattala to Hambantota via Andarawewa March 2018

1.8 FINANCIAL PROGRESS


Southern Expressway Extension Project Mattala to Hambantota via Andarawewa

May-16

36.79 May-17

83.81 May-18
Aug-16

Nov-16

Aug-17

Nov-17

Aug-18

Nov-18
Mar-16

Mar-17

Mar-18
Dec-15

Dec-16

Dec-17

Dec-18
Apr-16

Apr-17

Apr-18
Feb-16

Sep-16

Feb-17

Sep-17

Feb-18

Sep-18

100.00 Feb-19
Oct-16

Oct-17

Oct-18
Jun-16

Jun-17

Jun-18
Jan-16

Jan-17

Jan-18

Jan-19
Jul-16

Jul-17

Jul-18
Month

11.80

14.17

16.54

21.41

24.26

27.02

30.19

33.37

40.56

44.33

48.21

51.82

56.22

60.11

64.36

68.73

72.90

77.02

80.57

86.48

89.38

91.84

94.41

95.95

97.06

98.17

99.24
0.41

1.76

2.62

3.96

5.74

7.62

9.64

18.9
Financial Planned/
0
Progress (%)

35.08

37.45

37.94

39.40

41.30
11.53

13.54

15.80

17.81

19.95

23.81

25.27

30.38
Actual /

1.64

1.64

1.64

1.64

2.26

3.12

5.22

6.95

9.47
-

-
(%)

100.00
98.17 99.24
100 97.06
95.95
94.41
95 91.84
89.38
90 86.48
83.81
85
80.57
80 77.02

75 72.90
68.73
70
64.36
65
60.11
60 56.22
Percentage (%)

55 51.82
48.21
50 Planned/ (%)
44.33
45
40.56
40 36.79
Actual / (%)
41.30
33.37 39.40
35 37.45 37.94
30.19
35.08
30 27.02
24.26 30.38
25 21.41
18.9 25.27
20 23.81
16.54
14.17 19.95
15 11.80 17.81
9.64 15.80
10 7.62 13.54
5.74 11.53
3.96 9.47
5 1.76 2.62 6.95
0 0.41
5.22
0 1.64 3.12
-
-
- - - 1.64 1.64 1.64 2.26
-

Duration in Months

9
Consultancy Services for Design Review and Construction Supervision of Monthly Progress Report
Extension of Southern Expressway Project from Mattala to Hambantota via Andarawewa March 2018

1.9 PHYSICAL PROGRESS


Southern Expressway Extension Project Mattala to Hambantota via Andarawewa

May-16

29.26 33.25 May-17

88.45 May-18
Aug-16

Nov-16

43.55 49.95 Aug-17

60.64 65.55 Nov-17

Aug-18

Nov-18
Mar-16

21.76 23.75 Mar-17

65.61 82.45 Mar-18


Dec-16

Dec-17

Dec-18
Apr-16

Apr-17

Apr-18
Feb-16

Sep-16

Feb-17

Sep-17

Feb-18

Sep-18

100.00 Feb-19
Oct-16

Oct-17

Oct-18
Jun-16

Jun-17

Jun-18
Jan-16

Jan-17

Jan-18

Jan-19
Jul-16

Jul-17

Jul-18
Month

10.75

13.25

16.25

19.75

25.08 28.25

33.53 38.75

37.77 44.35

53.05 55.35

59.19 60.55

62.07 70.35

64.07 74.85

64.81 78.85

85.65

90.85

92.95

94.75

96.25

97.50

98.50

99.25

99.75
0.10

0.50

1.00

2.00

3.25

4.75

6.50

8.50
Planned/

-
Physical (%)

10.74

14.22

16.70

19.25
Progress Actual /

0.19

0.42

0.49

0.62

1.04

2.13

6.49

8.46
-

-
(%)

99.25 99.75 100.00


100.00 97.50 98.50
96.25
94.75
92.95
95.00 90.85
88.45
90.00 85.65
85.00 82.45
78.85
80.00
74.85
75.00
70.35
70.00 65.55
65.00 60.55
65.61
60.00 64.07 64.81
55.35 62.07
60.64
55.00 59.19
Planned/ (%)
49.95
50.00 53.05
Percentage (%)

44.35 Actual / (%)


45.00
38.75
40.00 43.55
33.25
35.00 37.77
28.25
30.00 33.53
23.75 29.26
25.00
19.75
25.08
20.00 16.25 21.76
13.25 19.25
15.00 10.75 16.70
8.50 14.22
10.00 6.50
0.50 4.75 10.74
3.25
5.00
- - 0.10 1.00 2.00 6.49
8.46

- 0.19 0.42 0.49 0.62 1.04


2.13
-

Duration in Months

10
Consultancy Services for Design Review and Construction Supervision of Monthly Progress Report
Extension of Southern Expressway Project from Mattala to Hambantota via Andarawewa March 2018

PART 2 – CONSULTANCY SERVICES


2.1 Consultancy Services
2.1.1 General

China Railway First Survey and Design Institute Group Company Limited has been appointed by the
Road Development Authority as Supervision Consultants for the Section 4 (Mattala to Hambantota via
Andarawewa) to provide Consultancy Services and assist in various aspects of project implementation
in accordance with the objectives detailed in the Terms of Reference and as summarized in the
Preamble to this report.

These services include administering the civil works contract as the Engineer, as defined in the contract
documents which is under FIDIC Conditions of Contract (Regulated Document, First Edition 1999-Red
Book).

The Consultant shall act as the Engineer with delegated Authorities defined in the FIDIC Conditions of
Contract and supervise the construction works according to the Contract Documents.

The services to be provided by the Engineer are:

1) Administration of Civil Works Contract and ensure that the works are constructed in accordance
with its provisions requirements.
2) Performing the following services of construction supervision

i. Control of Works

a) Conformance with Plans and Specifications

 Checking and approving the Contractor’s detailed Engineering designs for structures,
toll system including all related facilities and soft ground treatment
 Considering possible reducing the cost of the works, enhancing safety by making such
adjustments to the designs
 Checking and approving Contractor’s all working drawings
 Checking that performed work and furnished materials meet Contract requirements &
specification.
 Checking that materials and workmanship meet the required quantities, plan
dimensions and Contract requirements

b) Supervision / monitoring of the followings during construction

 Supervision of the maintenance of existing access roads


 Supervision of the implementation of mitigation measures as per the contractual during
construction
11
Consultancy Services for Design Review and Construction Supervision of Monthly Progress Report
Extension of Southern Expressway Project from Mattala to Hambantota via Andarawewa March 2018

 Monitoring the progress


 Monitoring the implementation of Environmental Monitoring Plan and Resettlement
Implementation Plan

c) Acceptance of Contractor’s Work Programmes / Plans

 Checking, evaluating and agreeing with the Contractor’s work plans and progress
schedules for the most effective and expeditious methods of carrying out the work

d) Corporation with Utility Agencies

 Providing assistance to prepare comprehensive schedule and sequence of work for the
utility diversion
 Providing assistance to coordinate activities with utility agencies
 Incorporating the designs of utility agencies in relevant construction drawings
 Checking whether the Contractor cooperates with the utility owners to remove and
rearrange underground or overhead utilities to avoid service interruption or duplicate
work by the utility owner
 Checking whether the Contractor protects existing utilities that remain in place during
construction

e) Datum Points and Benchmarks

 Provide the Contractor with necessary datum points and benchmarks for setting out
the works

f) Ensure on site and off site safety


g) Instructing the Contractor for further soil investigations to reduce the Employer’s risk of
encountering unforeseen conditions during construction
h) Attending to the all problems in roadside drains within the right of way
i) Checking legal road restrictions when hauling equipment or materials on public roads beyond
project limits
j) Examination of Contractor’s installations, accommodation, first aid services, construction
equipment and laboratories to see that they are conform to the Conditions of Contract
k) Maintenance during construction

 Checking whether the Contractor’s maintenance work is satisfactory


 Immediately notifying the Contractor any failure of complying with these requirement.

l) Opening project sections to traffic

 Ordering the Contractor that certain sections of project be opened to traffic before the
work is completed or accepted, with the Employer’s concurrence

12
Consultancy Services for Design Review and Construction Supervision of Monthly Progress Report
Extension of Southern Expressway Project from Mattala to Hambantota via Andarawewa March 2018

m) Project acceptance

 Conducting a partial final inspection, if required


 When the work is completed, make recommendations to RDA on their acceptance

n) Claims

 Reviewing, evaluating and resolving claims and avoiding further claims


 Instructing the Contractor to provide sufficient information and follow the claims
procedure
 Recording the measurements of the quantities for provisional and final accounting on
the proper forms
 Preparation of variation orders and submitting to RDA for approval
 Assisting to the RDA in negotiation with the Contractor on price or unit rate changes
 Assisting to the RDA in any dispute with the Contractor and giving firm opinion on
any claim

o) Instructing the Contractor to complete As-built drawings in time is the acceptable manner.

ii. Control of Materials

a) Supply Sources and Quality Management

 Inspection of proposed sources of materials prior to their delivery


 Instructing the Contractor to collect and remove unacceptable materials from the site.

3) Training :

Overseas training / workshops for at least 10 RDA Engineers and on-the job training for at least 5
Engineers and 5 Technical Officers.

4) Preparation of Operation and Maintenance (O&M) Manual :

Preparing a complete Operation and Maintenance (O&M) manual for Section 4 Mattala to
Hambantota via Andarawewa under the Project.

5) Consultation and Review Meetings :

Arranging or attending the consultations and meetings listed in the Consultant’s agreement,
preparing minutes of the meetings and forwarding them to the Project Director within 5 days,
with copies to all participants.

13
Consultancy Services for Design Review and Construction Supervision of Monthly Progress Report
Extension of Southern Expressway Project from Mattala to Hambantota via Andarawewa March 2018

Table 2.1.1.1 Mobilization of Consultant’s International Professional and Technical Staff


By the End of March 2018

Date of Date of
No Name Designation
Mobilization Demobilization
1 Mr.Dong Wei Team Leader (E1) 14-Dec-2015
Senior Structural Design Engineer
2 Mr.Wang Liming 26-Sep-2015
(E2)
3 Mr.JiangWangang Claim / Contract Specialist (E6) 17-Nov-2015
Mr.Wang Yong
4 Senior Highway Design Engineer(E9) 3-Dec-2015 26-Sep-2016
Dong
5 Mr.WangLiquan Pavement Specialist (E8) 1-Mar-2016
6 Mr.WangShuchen Material Specialist (E7) 24-Mar-2016 21- June 2016
7 Mr.Zhang Tao Senior Quantity Surveyor(E16) 24-Mar-2016 21- June 2016
Mr. Zhang Senior Geotechnical Engineer
8 24-Mar-2016 21- June 2016
Zhendong (Investigations & Design) (E4)
Health, Safety & Environmental
9 Mr.WangDayu 18-Aug-2016
Manager (E21)
10 Mr.LiuEnji Structural Design Engineer (E18) 29-Aug-2016 28-Nov-2016
Senior Highway Construction
11 Mr.BaiXiande 31-Aug-2016
Engineer (E10)
12 Mr.Gu Cheng Peng QA/QC Manager(E22) 31-Aug-2016
Senior Geotechnical Engineer
13 Mr.ZhangHui (Construction Quality Control & 03-Sep-2016
Monitoring) (E5)
14 Mr.WangFeng Material Specialist (E7) 06-Sep-2016
15 Mr.Xu Zhan Lei Highway Design Engineer(E15) 26-Oct-2016 20-Nov-2017
Senior Structural Engineer
16 Mr.PanGuotao 23-Nov-2016
(Construction) (E3)
17 Mr Zhu Dadong Resident Engineer (E14) 28-Mar-2017
18 Toh Teck Boon Senior Quantity Surveyor 31-Mar-2017
19 Ma Xialong Translator 17-July-2017

Table 2.1.1.2 Mobilization of Consultant’s Local Professional and Technical Staff by the End of
March 2018.
Date of Date of
No Name Designation
Mobilization Demobilization
1 Mr. T.J. Bandula Resident Engineer (L2) 01-Dec-2015 20-Feb-2018

2 Dr. R.L.H.L. Rajapakse Senior Hydrologist (L8) 17-Feb-2016

3 Mr. H.J.D.Karunarathna Site Engineer (L13) 01-Jan-2016

4 Mr. J.C. Gamage Senior Surveyor (L11) 12-Jan-2016 13-Aug-2016

14
Consultancy Services for Design Review and Construction Supervision of Monthly Progress Report
Extension of Southern Expressway Project from Mattala to Hambantota via Andarawewa March 2018

Date of Date of
No Name Designation
Mobilization Demobilization
5 Mr. W.M.SarathWijesinghe Environmental Specialist (L14) 01-Mar-2016

6 Mr. K.A. Deshapriya Site Engineer (L13) 14-Mar-2016

7 Mr. S.Murugendran Soil / Materials Engineer (L7) 16-Mar-2016

8 Mr. B.M.Asanka Jayarathna Material Technician (L21) 28-Mar-2016


Highway Construction
9 Mr. T.D.N. Gunasekara 19-Apr-2016 31-Oct-2016
Engineer(L4)
10 Mr. R.P.Priyantha Technical Officer (L20) 2-May-2016

11 Mr. M.Priyanthan Material Technician (L21) 9-May-2016

12 Mr. D.S.Ratiyala Highway Design Engineer (L3) 16-May-2016 28- July-2016


Mr.
13 Quantity Surveyor (L10) 19-May-2016 30 -Nov -2016
K.M.R.ChinthanaDharmadasa
14 Mr. P.M.H.S.Senevirathne Technical Officer(L20) 01-June-016
Mr. Thuraisamy 1-Feb-2018
15 Deputy Team Leader (L1) 02-June-2016
Thawasilingam
16 Mr. M.D.K.N. Mathugamage Site Engineer (L13) 21-July-2016 1-Nov-2017

17 Mr. M.A. Thawfeek Geo - Technical Engineer (L17) 25-July-2016 31-Oct-2017

18 Mr. U.A. Kithulgoda Technical Officer(L20) 05-Aug-2016

19 Mr. W.M.S. Gunathunga Surveyor (L12) 08-Aug-2016

20 Mr. L.P.R. Srimal Site Engineer (L13) 01-Sept-2016

21 Mr. H.A. Harsha Kumara Material Technician (L21) 23-Sept-2016


Highway Construction 15-Jan-2018
22 Mr. M. Kirupaharan 01-Nov-2016
Engineer (L4)
23 Mr. R.M.S.K. Bandara Material Technician (L21) 07-Nov-2016

24 Mr. U.R.G.M. Thilakarathna Technical Officer (L20) 15-Nov-2016

25 Mr. M.M.Y. Bandara Quantity Surveyor (L10) 14-Dec-2016

26 Mr.E.G.C. Amarasiri Drainage Engineer (L9) 04-Jan-2017

27 Mr.U.D. Deeman Technical Officer (L20) 24-Jan-2017

28 Mr N.G Eranga Programming Engineer (L19) 1-Mar-2017

29 Mr Mohamed Riyaldeen Senior Surveyor 19-June-2017

30 Mr. A.P Sahabandu Technical Officer (L20) 01-June-2017

31 Mr.S.R.W.H.S. Bandara Technical Officer (L20) 15-June-2017 30-Nov-2017

32 Mr. K. Mithunan Site Engineer (L13) 30-Oct-2017


15
Consultancy Services for Design Review and Construction Supervision of Monthly Progress Report
Extension of Southern Expressway Project from Mattala to Hambantota via Andarawewa March 2018

Date of Date of
No Name Designation
Mobilization Demobilization
33 Mr. T.J. Bandula Deputy Team Leader (L1) 20-Feb-2018

34 Mr. W.A Samarasinghe Resident Engineer (L2) 22-Feb-2018

2.1.2 Contractor’s program

Progress is being monitored based on the latest approved, contractor’s master programmer (Rev 03)
dated 22nd June 2016.

2.1.3 Cash Flow Projections

The Contractor has submitted their Cash Flow Projection.

2.1.4 Materials and Workmanship

The material approval process is in progress as required

2.1.5 Permits and Licenses

The process of obtaining Permits and Licenses is in progress as required

2.1.6 Measurement and Payment

The Engineer is responsible for checking and approving Contractor’s work measurement and payment
claims and certify to the Employer in accordance with the civil works Contract. He will maintain
records of as built drawings with reference to measurement sheets, quantifies and record any deviations
or approved variations to Contract drawings with reasons for such changes. He will administer the
completion of the contract including all activities in relation to issue of the Taking over Certificate and
Defects Notification Certificates. He will take action to check and submit As-Built-Drawings; all detail
records pertaining to the contracts and maintenance manuals to the Employer.

2.1.7 Variations, Extension of Time and Fixing Rates

The Engineer has to obtain Employer’s prior approval for ordering variations to Contract above the
limits stated in the Contract, determine extension of time, approving sub-contractors and fixing new
rates and prices. The Engineer will evaluate claims for extension of time and additional payment in
accordance with Sub Clause 8.4 and Sub Clause 3.5 of the Conditions of Contract.

2.1.8 Design
2.1.8.1 Review of Geometric Designs

The Senior Highway Design Engineer, Pavement Specialist & other Design Engineers in association
with the RDA design office review the geometric designs prepared by the Contractor and approve the
designs & working drawings.

16
Consultancy Services for Design Review and Construction Supervision of Monthly Progress Report
Extension of Southern Expressway Project from Mattala to Hambantota via Andarawewa March 2018

2.1.8.2 Structural Designs

The structural designs for four lane widening of structures are done by the Contractor. The Senior
Structural Design Engineer and Structural Design Engineers review all structural designs of bridges,
underpasses and culverts that need to be widened or constructed, check the setting out and supervise
construction of structures in accordance with the approved designs and drawings.

The Consultant will ensure that the design assumptions, conditions and specifications set for
construction is strictly followed by the Contractor.

2.1.8.3 Pavement Engineering

The Consultant’s Pavement Specialist reviews the pavement designs for adequacy of pavement layers
thickness and material specifications. He will supervise the pavement construction for conformance to
Contract specifications and drawings. Further he will review the design of pavement structure for local
roads listed for improvement to provide economical pavement design.

2.1.8.4 Geotechnical Engineering

The Consultant’s Senior Geotechnical Engineer and the Geotechnical Engineer review the design
documents of engineering geological and hydrogeological conditions of project site and along the line,
check whether they can meet the preliminary design and construction goals of the project. They also
supervise the Contractor to make technical disclosure for engineering, geological conditions of
construction area or surrounding area and make a summary of technical disclosure.

2.1.8.5 Hydrology and Drainage

The Consultant’s Drainage Engineer in association with hydrologist will cheek the submission of
contractor design economical and feasible drainage facilities to mitigate flooding, inundation, siltation
or erosion problems associated with the site condition. He will liaise with the Irrigation Department,
Central Environmental Authority, Mahaweli Authority and Sri Lanka Land Reclamation and
Development Corporation when providing design solutions to these problems.

2.1.9 Contractor’s Claims

Contractor’s and Employer’s claims are evaluated by Engineer with assistance of Claims Specialist
subject to the provisions of the Contract agreement. In consultation with contractor and Engineer if
necessary.

2.1.10 Health, Safety and Environment (HSE)

The Consultant’s Health, Safety and Environmental Manager and the Environmental Specialist have to
ensure that, the Contractor complies with the environmental and safety standards and guidelines, effects
on ground water levels and water quality in the project area. Theyguide the Contractor to conduct
awareness programmes/tool box meeting for all employees in health, safety and environmental
procedures to be followed at the place of work. The Engineer examines the Contractor’s site offices,
staff accommodations, laboratories and construction equipment to ensure they comply with contract
requirements. The Contractor carry out periodic checks on air quality, water quality and noise and
17
Consultancy Services for Design Review and Construction Supervision of Monthly Progress Report
Extension of Southern Expressway Project from Mattala to Hambantota via Andarawewa March 2018

vibration levels due to construction activities and rock blasting in accordance with CEA and GSMB
requirements.

The Contractor takes action to mitigate all environmental impacts due to construction activities in
accordance with the Environmental Management Action Plan (EMAP) of the project and the relevant
legislation. The Contractor is responsible for compensating damages due to environmental impacts as a
result of his construction activities and compensation in lieu of environmental mitigation measures.

Contractor has to fulfill the requirement of the Environmental Monitoring Plan (EMP) as well. The
contractor submits a separate monthly environmental report in addition to the monthly progress report.
Inspection and meeting on monthly basis are held.

2.1.11 Social Aspects

The Employer and the Contractor engaged with the other agencies for the implementation of the Social
Impact Management Plan.

Land acquisition for six lanes facility will be made, if any additional land acquisition and resettlement
activities are required in the future. The consultant will assist the RDA and report the progress in
monthly progress meeting and reports.

2.2 Handing over of Land for the Construction Works.

Table 2.2.1 –Handing over of Land & Taking Over of office & accommodation building by the End
of March 2018

Location Date Remarks


Office & Accommodation for
13.02.2016 Land Handed Over
Engineer and Employer
- Do - 26.02.2016 Construction Started
- Do - 01.11.2016 Building taken over

Table 2.2.1 – Land Handing Over for the expressway construction by the End of March 2018

Length Date of Land


Section Location
(km) Handed Over
1st CH 08+500 – 12+500 4.00 km 01st March 2016
CH 06+250 – 07+450 1.20 km
2nd CH 07+600 – 08+250 0.65 km 30th March 2016
CH12+500 – 13+620 1.12 km
CH 06+000 – 06+250 0.25km
3rd CH13+620–14+500 0.88km 02nd April 2016
CH 73+300 – 75+250 1.95km
CH 04+000 – 04+400 0.40km
4th 04th April 2016
CH 04+650 – 05+200 0.55km
5th CH 05+200 – 06+000 0.80km 29th April 2016
6th CH72+300 – 73+300 1.00km 06th May 2016
7th CH 71+000 – 71+800 0.80km 13th May 2016

18
Consultancy Services for Design Review and Construction Supervision of Monthly Progress Report
Extension of Southern Expressway Project from Mattala to Hambantota via Andarawewa March 2018

Length Date of Land


Section Location
(km) Handed Over
CH 07+450 – 07+600 0.15 km
8th 23rd May 2016
CH 08+250 – 08+500 0.25 km
CH 71+800 – 72+300 0.50km
9th 24th June 2016
CH 14+500 – 15+000 0.50km
10th CH 04+400 – 04+650 0.25 km 07th July 2016
11th CH 75+250 – 76+800 1.55 km 30th July 2016
CH 00+700 – 00+900 0.20 km
CH 01+200 – 01+780 0.58 km
CH 01+920 – 02+040 0.12 km
CH 02+290 – 02+400 0.11 km
12th 13thAugust 2016
CH 02+440 – 02+700 0.26 km
CH 02+740 – 03+350 0.61 km
CH03+400 – 03+850 0.45 km
CH03+900 – 04+000 0.10 km
13th CH76+850 – 77+000 0.15km 30th Sept.2016
CH00+600 – 00+700 0.10km
CH00+920 – 01+200 0.28km
CH01+780 – 01+980 0.20km
CH02+100 – 02+290 0.19km 03rd Oct.2016
14th
CH02+400 – 02+440 0.04km
CH02+700 – 02+740 0.04km
CH03+350 – 03+400 0.05km
CH03+850 – 03+900 0.05km
15th CH00+000 – 00+600 0.6km 26th July 2017
16th CH77+000 – 77+660 0.66km 31st August 2017

Total Length handed over = 21.66 Km

2.3 Contractor’s Organization

The Contractor’s site organization structure is shown in Annexure 2.

2.4 Utility Diversions

The Contractor has to coordinate activities with utility agencies for the smooth implementation of
utility diversions without obstruction to the Contractor’s program of work. The relocated utility
services will be shown on the drawings for future identifications. The Engineer will obtain approval
from the Employer before incurring expenditure for utility diversion by the Contractor. The Employer
has decided to coordinate the utility relocation work and make arrangement to pay the cost directly to
the utility agencies, if there is any delay in payment by the contractor.

19
Consultancy Services for Design Review and Construction Supervision of Monthly Progress Report
Extension of Southern Expressway Project from Mattala to Hambantota via Andarawewa March 2018

2.5 Details of Utility Diversions at the End of February 2018


2.5.1 Utilities
Existing services lines are being relocated where necessary at site.

Table 2.5.1 – Utility Diversion by the End of March 2018

No Type of Utility Chainage Authority Status Remarks


01 Shifting of power line Ch03+090 CEB Completed
02 Shifting of Power line Ch04+950 CEB Completed
03 Shifting of Power line Ch9+200 CEB Completed

04 Power line underground Ch72+000 CEB Not Yet Started


Crossing
05 Shifting of Power line Ch77+000 CEB Completed

Ch77+650
06 Shifting of water line Ch00+600 NWS&DB Chlorination, flushing
– and final connection are
Ch01+660 outstanding
07 Shifting of water line Ch01+960 NWS&DB Chlorination, flushing
– and final connection are
Ch03+160 outstanding
08 Shifting of water line Ch3+940 - NWS&DB Completed
Ch4+500
09 Shifting of SLT Line Ch77+000 SLT Completed

Ch77+650

PART 3 – CIVIL WORKS


3.1 Salient Features and Project Particulars
3.1.1 Salient Features

Table 3.1.1.1 – Salient Features

Southern Expressway Extension Project


Length Chainage
(Section – 04)
CH 0 + 000 to 13 + 900
Main line 20.54 km
CH 71+000 to 77 + 640
Ramp A A0+000 to A2+538
Ramp B B0+000 to B1+582
7.9 Km
Ramp C C0+000 to C2+518
Ramp D D0+000 to D1+269

20
Consultancy Services for Design Review and Construction Supervision of Monthly Progress Report
Extension of Southern Expressway Project from Mattala to Hambantota via Andarawewa March 2018

Table 3.1.1.2 – Salient Features

Chainage Features

2 no. of 3.6 m wide lanes on each side


2.0 m wide center median
CH 0+000 to 13+900
& 0.75 m wide inner hard shoulder on each side
CH 71+000 to 77+640
2.5 m wide outer hard shoulder on each side

0.75 m wide verge on each side

 Pavement Design

Pavement design has been approved.


 Interchanges

There are only one System Interchange at Andarawewa for the Expressway segments -
Mattala – Matara & Andarawewa- Hambantota.
 Viaducts

There are two Viaducts

 Other Structures

Culverts, Bridges, Underpasses

3.2 Establishment
3.2.1 Quarries

Before commissioning a quarry, the Contractor has to obtain Industrial Mining License and Transport
License from Geological Survey and Mines Bureau (GSMB), Environment Protection License (EPL)
from Central Environmental Authority (CEA) and other local authorities (if any). Permission from the
Wild Life Conservation Department (WLCD) is required when the quarry is within the Managed
Elephant Range (MER).

3.2.2 Crusher Plants for Concrete Aggregate and ABC

The status of the Crusher Plants/Quarries Approved / Pending Approval is as follows.

Table 3.2.2.1 – Status of the Crusher Plants by the End of March 2018

CEA GS&MB Source Engineer


No. Material Type Location Status
Approval Approval Testing Approval
Coarse Aggregate
for concrete, CHEC, Kurudana, Accepted
1 Approved Approved Operating Completed
Asphalt concrete Andarawewa and using
and ABC
Fine Aggregate Maxstone Eng. Accepted
2 Approved Approved Operating Completed
for concrete Pvt.Ltd. and using

21
Consultancy Services for Design Review and Construction Supervision of Monthly Progress Report
Extension of Southern Expressway Project from Mattala to Hambantota via Andarawewa March 2018

CEA GS&MB Source Engineer


No. Material Type Location Status
Approval Approval Testing Approval
Southern Crusher
Test
plant,
3 Coarse Aggregate Approved Approved Operating Completed failed-Not
Kudaindiwewa,
for concrete Accepted
Elalla
Rathna Metal
Crushed
Crusher, Accepted
4 Aggregate Base Approved Approved Operating Completed
Mayurapura Unit- and using
Coarse (ABC)
09, Hambantota
Sandali Metal
Crushed Test
Crusher,
5 Aggregate Base Approved Approved Operating Completed failed-Not
Mayurapura,
Coarse (ABC) Accepted
Hambantota
S&S Metal
Crushed Crusher,
Accepted
6 Aggregate Base Liyanagasthota Approved Approved Operating Completed
and using
Coarse (ABC) Haravagalamulle
Hambantota

3.2.3 Asphalt Plants

Asphalt plant at Kurudana, Andarawewa is producing 120 tons per hour and 1.7 tons per batch.

3.2.4 Concrete Batching Plant

The status of the Concrete Batching Plants Approved / Pending Approval is as follows.

Table 3.2.4.1 – Status of the Concrete Batching Plants by the End of March 2018

Batching Capacity CEA Engineer


No. Location Status
Plant (M3/Hrs) Approval Approval
C.B.P.01 Plant Trial is
1 (1.0m3 60 Approved Operating satisfactory
Batching)
C.B.P.02
2 (1.0m3 60 CHEC Yard, Approved Operating Plant Trial is
Batching) Kurudana, satisfactory
C.B.P.03 Andarawewa
Plant Trial is
3 (0.5m3 30 Approved Operating
satisfactory
Batching)
C.B.P.04
Plant Trial is
4 (0.5m3 30 Approved Operating
satisfactory
Batching)

3.3 Borrow Sites

The Contractor shall obtain the permission before operating any borrow pits from relevant
authorities as well as the Engineer. Further to the approval the Contractor has to adhere to the
subjected conditions of the approvals and any instruction from Engineer from time to time.
Summary of the status of borrow pits has been tabulated as follows.

22
Consultancy Services for Design Review and Construction Supervision of Monthly Progress Report
Extension of Southern Expressway Project from Mattala to Hambantota via Andarawewa March 2018

Table 3.3.1 – Status of the Borrow Sites by the End of March 2018

Material CEA GSMB Source Current Engineer


No Land Name/ Supplier
Type Approval Approval Testing Status Approval
Padawgama, Waiting for
1 Embankment Pending Pending Completed Pending
Lunugamwehera approval
Walsapugala,
2 Embankment Approved Approved Completed Completed Completed
Sooriyawewa
MahaAndarawewa, Waiting for
3 Embankment Pending Pending Completed Pending
Sooriyawewa approval
Kurudana, Airport, Waiting for
4 Embankment Pending Pending Completed Pending
Andarawewa approval
Elalla, Pahala, Waiting for
5 Embankment Pending Pending Completed Pending
Andarawewa approval
HondawelPokunabadda Currently
6 Embankment Pending Pending Completed Approved
- pit 1 - Sky using
Completed/
Not
7 Ketanwewa Embankment Pending Pending Test Rejected
approved
Results Fail
Current
8 ArabokkaHambanthota Embankment Approved Approved Completed Approved
using
HondawelPokunabadda Currently
9 Embankment Pending Pending Completed Approved
- pit 2 using
HondawelPokunabadda
0 Embankment Pending Pending Completed Pending Pending
- pit 3
RUC3
11 RathnaMatel Crusher Approved Approved Completed Completed Completed
Embankment
Completed
Walsapugala (13+700- Not
12 Sub-Grade Pending Pending /Resample Rejected
LHS) approved
Test Failed
Chaminda Kumara
13 RUC 3 Approved Approved Completed Complete Complete
Dissanayake (Off 0+000)
CML-MTD Quarry near RUC3
14 Approved Approved Completed Complete Complete
CH:10+250 Embankment
MAGA Quarry near
15 RUC 3 Approved Approved Completed Abundant Approved
CH:11+100
Hondawel Pokunabadda- Pending Waiting for
16 Embankment Pending Pending Completed
pit 4 approval
Panwewa Borrow Pit (Re Approved Approved Current
17 Embankment Completed Approved
samples) using
Current
RUC3
CHEC, Kurudana, using
18 Approved Approved Completed Approved
Andarawewa
Embankment

19 GalwewaIdama Borrow Waiting for


Pending Pending Completed
Pit Embankment Pending approval

20 Kapapuwewa Borrow Pit Pending Pending Completed Currently


Embankment Approved
Using

23
Consultancy Services for Design Review and Construction Supervision of Monthly Progress Report
Extension of Southern Expressway Project from Mattala to Hambantota via Andarawewa March 2018

Material CEA GSMB Source Current Engineer


No Land Name/ Supplier
Type Approval Approval Testing Status Approval

21 Pahala Andarakala
Pending Pending Approved
Borrow Pit Embankment Completed Pending
22 CHEC, Kurudana, Waiting for
Pending Pending
AndarawewaBorrow Pit Embankment Completed Pending approval

23 Kurudanawatta Borrow Waiting for


Pending Pending
Pit Embankment Completed Pending approval

24 Kurudana kale Borrow Waiting for


Pending Pending
Pit Embankment Completed Pending approval

25 Welagawa landa Borrow Waiting for


Pending Pending
pit Embankment Completed Pending approval

26 Gonnnoruwabadda Waiting for


Pending Pending Completed
Borrow pit Embankment Pending approval

27 Gonnnoruwabadda Waiting for


Pending Pending Completed
Borrow pit-02 Embankment Pending approval

28 Galwewa Tank Bed - Currently


N/A N/A Completed
Borrow Pit Embankment Using Approved

29 Hamuduruwewa Tank
N/A N/A Completed Currently
Bed -Borrow Pit Embankment Approved
Using
30 Dasathawewa Tank Bed
N/A N/A Completed Sample
-Borrow Pit Embankment Rejected
Failed
31 Aluth Karametiya wewa
N/A N/A Completed Complete Complete
Tank Bed -Borrow Pit Embankment

32 Nidangala wewa Tank


N/A N/A Completed Not yet Approved
Bed -Borrow Pit Embankment
started
33 Jansawi wewa Tank Bed Not yet
N/A N/A Completed Approved
-Borrow Pit Embankment started

34 Ihala Appusingkno Tank


N/A N/A Completed
Bed -Borrow Pit Embankment Rejected Rejected
35 Ihala Beligalla Wewa
N/A N/A Completed Complete Complete
Tank Bed -Borrow Pit Embankment
36 Sokbas Wewa Tank
N/A N/A Completed Complete Complete
Bed -Borrow Pit Embankment
37 Jayasekara Wewa Tank
N/A N/A Completed Complete Complete
Bed -Borrow Pit Embankment
38 Galahitiya Wewa Tank Currently
N/A N/A Completed
Bed -Borrow Pit Embankment Using Approved
39 Dewagiri Wewa Tank Waiting for
N/A N/A In progress Pending
Bed -Borrow Pit Embankment approval

40 Jayanthi Wewa Tank Waiting for


N/A N/A In progress Pending
Bed -Borrow Pit Embankment approval

41 Dozer watta Wewa


N/A N/A Completed Complete Complete
Tank Bed -Borrow Pit Embankment
24
Consultancy Services for Design Review and Construction Supervision of Monthly Progress Report
Extension of Southern Expressway Project from Mattala to Hambantota via Andarawewa March 2018

Material CEA GSMB Source Current Engineer


No Land Name/ Supplier
Type Approval Approval Testing Status Approval

42 Currently
Nugawela Tank Embankment N/A N/A Completed Approved
Using

43 Not yet
Kapukinissa Tank Embankment N/A N/A Completed Approved
started

44 Not yet
Padawgama tank Embankment N/A N/A Completed Approved
started

45 Palugas wewa Embankment N/A N/A Completed Complete Complete

46 Nivn Punchihewa Embankment N/A N/A Completed Complete Complete


47 Currently
Weliwewa Embankment N/A N/A Completed Approved
Using
48 Currently
Samurdi Wewa Embankment N/A N/A Completed Approved
Using
49 Wala Kooggallawewa Embankment N/A N/A Completed Complete Complete
50 Currently
Madagamawewa Embankment N/A N/A Completed Approved
Using
51 Currently
Hodawel pokuna (Sky) Embankment Approved Approved Completed Approved
Using
52 Currently
I.M Jayasinghe ABC/RUC3 Approved Approved Completed Approved
Using
53 Currently
S & S Material Supplier RUC3 N/A Approved
Using
54 Waiting for
Sevenagala Embankment Approved Approved In progress Pending
approval
55 urrently
Heen Mallige Wewa Embankment N/A Approved
Using
56 Embankment urrently
Usgala Wewa N/A Approved
Using
57 Embankment urrently
Uda Wewa N/A Approved
Using

3.4 Unsuitable Material disposal Yard

Excavated unsuitable material shall be disposed properly to avoid unnecessary environmental issues
such as water logging, mosquito breeding, unexpected erosion and canal system silting etc. Hence,
according to the contract the Contractor shall obtain permission from CEA and other relevant local
authorities for disposal yard and dumping of unsuitable material.

25
Consultancy Services for Design Review and Construction Supervision of Monthly Progress Report
Extension of Southern Expressway Project from Mattala to Hambantota via Andarawewa March 2018

Picture 3.4.1 – Status of the Disposal Yards by the End of March 2018

Table 3.4.1 – Status of the Disposal Yards by the End of March 2018

CEA MASL Wild Life Engineer


No. Location
Approval Approval Approval Approval
1 8+550 (LHS) Approved Approved Approved Approved
2 10+300 (RHS) Approved Approved Approved Approved
3 76+500 (LHS) Approved Approved Approved Approved
4 Galahitiyawa wewa Approved Approved Approved Approved

Table 3.3.1 – Status of the Borrow Sites by the End of March 2018

26
Consultancy Services for Design Review and Construction Supervision of Monthly Progress Report
Extension of Southern Expressway Project from Mattala to Hambantota via Andarawewa March 2018

3.5 Facilities.
a) Laboratory for the Engineer & Contractor

The Construction works of main laboratory and secondary laboratory have been completed.
1000KN steel tensile machine has been calibrated and testing 32mm rebar sample is being
carried on.

b) The Engineer’s Office, Accommodation & Other Facilities

The Offices and Accommodations have been occupied by the Engineer. However, the contractor has
to attend to the minor defects and small extension work.

c) The Contractor’s Office & Accommodation

The Contractor’s office and accommodation have already been established at Pahala Andarawewa,
Mattala and presently is being used by them.

3.6 Quality Control


3.6.1 Quality Management

Quality Observation Reports (QOR) have been issued by the Engineer up to end of March 2018 as
follows.

The details of the Non-conformance reports (NCR) up to end of March 2018 are shown in
Annexure 3.

3.6.2 Material Testing Reviews

 During month of March 2018, all the soil, aggregate, reinforcement steel and concrete testing
have been carried out in the Engineer’s Main and Secondary laboratories.
 4 Material technicians, 10 Lab assistants, 15 Supporting Staff have been assigned to carry out
lab & field tests jointly.
 Quality confirmation tests such as Re-bar, Cement, Admixture and 7 wire Strands have been
carried out at Independent laboratories for each consignment lots / frequent basis. Material
sampling & testing for the month of March 2018 are shown in Annexure 4.

 Almost all Lab Equipment have already been purchased and handed over by the Contractor.

 Main Lab 01 in front of the Botanical Garden, Sooriyawewa Road, Katuwewa, Hambantota –
Testing works in operation.

 Secondary Lab 02 – CHEC yard, Kurudana, Andarawewa – Testing works are in progress.

 Asphalt binder Course design has been approved & the work is in progress.

 Asphalt Wearing Course design has been approved and trial was done.

27
Consultancy Services for Design Review and Construction Supervision of Monthly Progress Report
Extension of Southern Expressway Project from Mattala to Hambantota via Andarawewa March 2018

3.6.3 Details of Approved Materials by the End of March 2018

Table 3.6.3 – Status of Approved Materials by the End of March 2018

Material to be Date of Approval


No Type of Material Supplier / Source Remarks
used for Granted
Tokyo super 2016.01.09 Currently using
Holcim Ready Flow Concrete & Grout 2016.01.11 Currently using
01 Cement
works Currently using
2016.02.03
Ultratech for grout
Melwa&Lanwa 2016.01.19 Currently using
Steel Rebar Captain Structural 2016.01.19 Not use
02
(Reinforcement) concrete Works
GTB 2016.02.12 Not use
Permanent
03 Process Sand YB Enterprises 2016.01.25 Using for pile
Concrete Works
Permanent
04 Quarry Sand Maxstone Eng. Pvt.Ltd. 2016.01.25 Currently using
Concrete Works
CHEC, Kurudana Permanent 2016.01.11 Currently using
05 Coarse Aggregate
MAGA Eng.Pvt.Ltd Concrete Works 2016.02.12 Not use
Optima 100 – ChrysoLanka Concrete 2016.01.11 Currently using
06 Admixture
CP-J –Wuhan Harbour New &Masonry works 2016.01.19 stop using
Culvert Concrete
07 Water Stop H.E.EngineeringPvt.Ltd 2016.03.05 Currently using
works
Culvert Concrete
08 Joint Filler FincoPvt.Ltd 2016.04.07 Currently using
works
Haider Group 2016.03.05 Not use
Bridge
09 Bridge Bearing Pad
Construction
HesnshuiBaoli 2016.03.16 Not use

Jaingjin Fasten Steel Pre Stressed


2016.03.16 Not use
Pre-stressing Steel Products Co.Ltd. Concrete
10
Strand members
Tianjin 2016.03.05 Currently using

Concrete
11 Ice Cube Lanka Ice Com.Pvt.Ltd temperature 2016.04.28 Currently using
control
Pre
Chengdu XinzhuRoad& Stressed
12 Anchorage system 2016.04.02 With comments
Bridge Machinery Co. Ltd Concrete
members
Structural Steel
13 Coupler Splices CABR Technology Co. Ltd 2016.04.19 With comments
Works
Pre Stressed
Post-Tensioning
Liuzhou OVM Machinery Concrete
14 System 2016.05.04 Currently using
Co. Ltd members

BASE South East Asia Pte Concrete repair


15 Masterflow 810 2016.05.17 Currently using
Ltd works
Aluminums Doors, Windows
16 Alumex Company, 2016.05.19 Work Completed
Extrusions and Partitions
PVC plate material Office and
17 Sivilima 2016.05.17 Work Completed
(Ceiling Materials) Accommodation
Office and
18 Wall and Floor Tiles Rocell Company 2016.05.30 Work Completed
Accommodation

28
Consultancy Services for Design Review and Construction Supervision of Monthly Progress Report
Extension of Southern Expressway Project from Mattala to Hambantota via Andarawewa March 2018

Material to be Date of Approval


No Type of Material Supplier / Source Remarks
used for Granted
Fence for Office
Galvanized and PVC Macson Mesh Industies(Pvt)
19 and 2016.05.25 Work Completed
Coated Chain link. Ltd.
Accommodation
Roof for Office
Aluminum foil
20 Macbertan (private) Limited and 2016.05.25 Work Completed
laminated Mcfoil
Accommodation
GeoTextiles(TenCate TenCateGeosynthetics Asia Subsurface
21 2016.06.06 With comments
Polyfelt KET11) Snd Bhd. Drainage
Galvanized Steel Tianjin Port Bonded Pre Stressed
22 Strip/Coil for making 2016.06.15 Currently using
Shunxin Logistics Co. Ltd Concrete
ducts enclosures
LRPS 3000S Concrete &
23 Castech Middle East (FZE) 2016.06.17 Stop using
Concrete Admixture Masonry works
Pre Stressed
Pre-stressing Steel Silver Dragon Pre-stressed Concrete
24 2016.07.01 Currently using
Strand Material Co. Ltd. members

Barthwares and Office &


25 2016.07.21 Work Completed
Fittings Rocell (pvt) Ltd. accommodation
Office &
26 Ceiling Board Thai Aluminium Pvt Ltd. 2016.07.22 Work completed
accommodation
PCA-I Concret Jiangsu Subote new material Concrete &
27 2016.08.05 Not use
Admixture company ltd Masonry works
*Master Glenium
SKY 8735, High rang
Superplaster Admixture for
BASF Construction
28 *Masterlife SRA post tension
Chemicals/Finco 2016.08.24 Stop using
50(flocable grouting
Engineering pvt ltd
50),expanding
plasticising
admixture
*Adcrete, Water
Reducing/Set
Retarding Millenium Concrete Concrete &
29 2016.08.31 Stop using
*Supercrete, High Technologies (Pvt) Ltd Masonry works
Range Water
Reducing/Retarding
Liuzhou OVM Machinery Bridge
30 Bridge bearing 2016.11.26 Currently using
Co. Ltd construction
Liuzhou OVM Machinery Bridge
31 Expansion joints 2016.11.26 With comments
Co. Ltd construction
CastechcruingCompo Cure the concrete
32 Castech International 2016.09.28 With comments
unt K100 surface
Cement Marketing Lanka
HITEPOZZO R-34
33 (pvt) ltd. Source:Hi-Tech Concrete 2016.10.03 Using for pile cap
fly ash
Fly Ash (India) Pvt, Ltd.
Admixture for
Castech Grout Agent
34 Castech International post tension 2016.10.03 Currently using
PGA
grouting
HIT-RE 500 Injection Bonding Agent
35 Hilti 2016.10.06 With comments
adhesive with rebar for rebar
Admixture for
CHRYSO NS Grout 2016.10.21 Stop using –out of
36 Chryso Lanka (Pvt) Ltd. post tension
Additive expansion
grouting

29
Consultancy Services for Design Review and Construction Supervision of Monthly Progress Report
Extension of Southern Expressway Project from Mattala to Hambantota via Andarawewa March 2018

Material to be Date of Approval


No Type of Material Supplier / Source Remarks
used for Granted
Pre Stressed
Liuzhou OVM Machinery
37 Anchorage devices Concrete 2016.11.18 Currently using
Co. Ltd
members
Concure WB, Water FosrocChemical(India) Pvt.
38 based concrete curing Ltd/ N ChandrarathnePvt. Concrete Curing 2016.12.06 Currently using
compound Ltd
X-Roc Ultra Pach,
X-Calibur International
Low shrinkage high
39 FZC/Airow Solutions Pvt. Concrete repair 2016.12.21 Currently using
build concrete repair
Ltd.
mortar
Shandong Qiangli
Pruritic Water
39 DI Pipes & Fittings Normalizer 2016.12.27 With comments
Supply Pipe Line
MannufactoringCo.,Ltd
SushouHaider New Material Bridge
40 Steel Bearing Plate 2016.12.26 Currently using
Technology Co.Ltd. construction
Bridge
41 Bridge Catch Pit Upali Metal Industries 2017.01.02 With comments
construction
Bituminous
60/70 Bitumen, Road Coating International
42 Pavement 2017.01.18 With comments
CRS-1, MC-30 Private Ltd
Construction
Bituminous
60/70 Bitumen,
43 Bitumix Private Ltd Pavement 2017.01.18 Currently using
CRS-1, MC-30
Construction
Supplyg& Laying
UPVC Pipes Fittings,
44 Maga Engineering Pvt Ltd of Purific Water 2017.01.18 With comments
Joint Rings, Flanges
Pipe Line
Bridge Expansion Suzhou Haide New Material Bridge
45 2017.01.26 With comments
joints TecknologyCo.,Ltd construction
Bridge Expansion
46 Dramix 3D65/35 BG Finco(Pvt) Ltd 2017.02.08 With comments
joint construction

None Pressure Hume For Permanent


47 ELS Construction Pvt.Ltd 2017.04.18 With comments
Pipe Drainage Work

For using in the


48 PVC Pipe S-Lon Lanka Pvt. Ltd Bridge 2017.04.18 With comments
Construction

PCA-VIII, Concrete Subote New Material For Mixing


49 2017.04.25 Currently using
Admixture Company Ltd. Concrete

50 Mechanical coupler Chongqing EH Reinforcing For 32mm/25mm 2017.06.30 Approved With


splices Steel Bar Engineering rebar comments
Limitted
51 C30 Precast curbs ELS Construction (PVT) for Bridges and 2017.12.19 Approved
LTD. Highway

52 Chain Link fence Mascon Mesh Industries for Bridges 2017.12.18 Approved With
(PVT) LTD comments
53 Geotess-270 TESSILBRENTA S.R.L For embankment 2017.12.19 Approved With
Geotextiles comments
54 110 mm UPVC PIPE S-LON LANKA (PVT) UTILITY 2018.1.29 Approved With
LTD DUCTS comments

30
Consultancy Services for Design Review and Construction Supervision of Monthly Progress Report
Extension of Southern Expressway Project from Mattala to Hambantota via Andarawewa March 2018

Material to be Date of Approval


No Type of Material Supplier / Source Remarks
used for Granted
55 Highway Guard JIANGSU HUAXIA For Bridges and 2018.2.28 Approved With
Rail TRAFFIC Highway comments
ENGINEERING LTD
56 160 mm PVC Tube S-LON LANKA (PVT) For Bridges 2018.2.27 Approved With
LTD Drainage comments
57 LED Luminar Supplier Access For road 2018.3.25 Approved
international (pvt) Ltd lighting works With
Manufactory Faelluce comments
58 Concrete Fence ELS Construction (Pvt) For ROW 2018.3.22 Approved
Post Ltd Fence With
comments
59 Pull Box Wuhan Iron & Steel For Rpad 2018.3.22 Approved
Company Limited Lighting With
comments

3.7 Environmental, Social Aspects and Health & Safety


3.7.1 Environmental Aspects
The Engineer’s Health, Safety and Environmental Manager and Environmental Specialist have to
ensure that, the Contractor complies with the environmental standards and guidelines. The Engineer
will monitor all the Contractor’s activities to ensure that they comply with the Contract
requirements& specifications.
Site Specific Environmental Management Action Plan [SEMAP] which was submitted by the
Contractor, has been approved by the Engineer and the copies of the same have also been forwarded
to the Employer as well as the Contractor for further actions.

The Contractor shall take action to mitigate all environmental impacts due to construction activities
in accordance with the Environmental Management Action Plan of the (EMAP) project and the
relevant legislation. The Contractor is responsible for compensating damages due to environmental
impacts on the construction activities and compensation in lieu of environmental mitigation
measures.

The contractor has to fulfill the requirements of the Environmental Monitoring Plan (EMP) as well.

3.6.2 Social Aspects


Social issues will be identified and action will be taken to resolve them when & wherever
necessary with the guidance of Employer.

3.6.2.1 Public Complain


The contractor is required to remedy any damages to the public property enhanced by construction
activities.

3.6.3 Health & Safety


The Engineer’s Health, Safety and Environmental Manager has to ensure that, the Contractor
complies with the health and safety standards and guidelines. The personal protective equipment
[PPE] has been provided to the employees of Employer, Engineer and Contractor. Excavated pits
along the trace and all dangerous areas have been barricaded. Caution boards are displayed with
warning signs. The contractor has been advised to make further improvements. The Monthly joint
Health, safety and Environmental inspection is carried out in addition to the frequent monitoring by
the Engineer

31
Consultancy Services for Design Review and Construction Supervision of Monthly Progress Report
Extension of Southern Expressway Project from Mattala to Hambantota via Andarawewa March 2018

3.8 Operations
3.8.1 Surveying
The progress of surveying work is shown in Annexure 5.

3.8.2 Design

The progress of Deign Works is as follows.

Table 3.8.2.1 – Progress of Design Works by the End of March 2018

Item No Activity Total Submitted Approved


1. Alignment And Design Cross Sections including ramp area
1 Plan & Profile 28.45 km 28.45 km 28.45 km
2 Design Cross Sections 28.45 km 28.45 km 27.33 km
2. Structure Drawings
1 Culverts 61 61 61
2 Viaducts 02 02 02
3 Bridges 08 07 07
4 Over passes 02 02 02
5 Under passes 10 10 10

Table 3.8.2.2 – Progress of Drainage Design Works by the End of March 2018

Design Items Total Submission Approval Approved % (w.r.t


total)
Diversion Cannel / (No’s) 20.00 20.00 20.00 100.00%
Toe Drain / (Km) 37.29 36.09 31.55 85.00%
Cut Side Drain / (Km) 10.09 9.97 8.19 81.16%
Median Drain / (Km) 6.3 6.3 6.3 100.00%
Berm Drain / (Km) 6.5 5.98 5.98 92.00%
Cutoff Drain/ (Km) 2.3 0 0 -
Cascades / (No’s) 37.0 37.0 37.0 100.00%
Lead away / (No’s) 72.0 67.0 67.0 93.05%
Catch pits / (No’s) 144.0 134.0 142.0 93.05%
Cross Drain / (No’s) 51.00 51.00 51.00 100.00%
Diversion Cannel Cross Section / (No’) 20.00 20.00 19.00 95.00%

3.9 Status of Variation Orders

The variation orders summary is shown in Annexure 6.


32
Consultancy Services for Design Review and Construction Supervision of Monthly Progress Report
Extension of Southern Expressway Project from Mattala to Hambantota via Andarawewa March 2018

3.10 Status of Claims

The details of claims summary is shown in Annexure 7.

3.11 Progress in Detail


3.11.1 Viaduct 1 & Viaduct 2

i. Construction of Viaduct 2 was started on 25th July 2016 and the work in progress.
ii. Construction of Viaduct 1 was started on 24th August 2016 and the work in progress.

3.11.2 Bridges

i. Construction of Bridge (BR-1) at CH 2+800 was started on 06th November 2016 and the work
in progress.
ii. Construction of Bridge (BRU-2) at CH 77+015 was started on 19thDecember 2016 and the work
in progress.
iii. Construction of Bridge (BRO-2) at CH 2+072 was started on 22nd December 2016 and the work
in progress.
iv. Construction of Bridge (BRU-1) at CH 5+200 was started on 19th December 2016 and the work
in progress.
v. Construction of Bridge (BRI-6) at CH 73+269 was started on 30th January 2017 and the work in
progress
vi. Construction of Bridge (BRI-5) at CH 73+217 was started on 1st of February 2017 and the work
in progress
vii. Construction of Bridge (BRI-1) at CH 73+217 was started on 20th of April 2017 and the work in
progress
viii. Construction of Bridge (BRI-2) at CH 73+217 was started on 18th of April 2017 and the work in
progress
ix. Construction of Bridge (BRI-4) at A0+859 was started on 02nd May 2017 and work in progress
x. Construction of Bridge (BR0-1) at CH0+280 was started on 07th of July 2017 and work in
progress

3.11.3 Progress of Key Activities & Culvert Progress

The progress of key activities progress up to end of March 2018 is shown in Annexure 8.

3.11.4 Progress of Culvert & Bridges

The progress of culvert & Bridges up to end of March 2018 is shown in annexure 9.

33
Consultancy Services for Design Review and Construction Supervision of Monthly Progress Report
Extension of Southern Expressway Project from Mattala to Hambantota via Andarawewa March 2018

3.12 Contractor’s Resources

i. The Contractor’s Key Staff for the month of March 2018 is shown in Annexure 10.
ii. The Contractor’s Labor Return for the month of March 2018 is shown in Annexure 11 &
Annexure 12.
iii. The Contractor’s Machinery & Equipment for the month of March 2018 is shown in Annexure 13.

3.13 Progress Photographs

i. The Progress Photographs for the month of March 2018 is given in Annexure 14.

3.15 Progress update

Progress update on Master Program for the month of March 2018 is shown in Annexure 15.

3.16 Weather Report

Weather Report for the month of February 2018 available from the Dept. of Meteorology is shown in
Annexure 16.

34
Consultancy Services for Design Review and Construction Supervision of Monthly Progress Report
Extension of Southern Expressway Project from Mattala to Hambantota via Andarawewa March 2018

ANNEXURE 01: ENGINEER’S ORGANIZATION CHART

Team Leader(E1)
Mr. Dong Wei

Deputy Team Leader(L1)


Mr.T.J. Bandula

Team Leader Design Review Office Construction Laboratory Resident Resident Engineer
Office Supervision Office Engineer Office No.2
Office No.1

Office Manager Claim/Contract Office Manager Soil/Materials Engineer Resident Resident Engineer
Specialist (E6) (TBA) Engineer (L2) (E14)
Mr.Ma xiaolong (L7)
Mr.Zeng Biao Mr Jiang Office Manager Mr. S.Murugendran Mr W.A Mr Zhu Dadong
Wangang (TBA) Samarasinghe
Senior Hydrologist (L8)
Dr. R.L.H.L. Rajapakse
Secretary Senior Geotechnical Engineer
Ms.P.M.Nadeeka (E5) Mr Zhang
Claim/Contract Senior Geotechnical
Ms.K.L.Nilupa Senior Geotechnical
Specialist (L18) Engineer
Lakrani Engineer Material Technician (L21) Geotechnical Engineer (L17)
(TBA) (Investigations and (Construction quality
4 PPL (TBA)
Design) (E4) control and
Mr.B.M.Asanka Jayarathna
monitoring) (E5)
Administrator Mr.M.Priyanthan
Geotechnical Engineer Mr.Zhang Hui Highway Construction
/Clerk Mr. H.A. Harsha Kumara
Accounting (Design) (E19) Engineer (L4)
Mr. R.M.S.K. Bandara
Manager (E20) (TBA) (TBA)
Office Assistants Ms.Deng Hui
5 PPL Geotechnical Structural Engineer
Senior Highway Design Engineer Construction (L6)
Mis H.A.K.P Gawri
Engineer (E9) (Construction quality (TBA)
Mr Udara Shashimal
(TBA) control and
Mr K. Asantha Health,Safety Lab Assistant (L22)
Kumara monitoring) (L17) Site Engineer (L13)
& Environment 10 PPL
Mr. Sandaruwan Manager (E21) 4 PPL
Highway Design Mr.W.M.P.S.B.Widanageadara
Sudusinghe Mr. Wang da Mr. H.J.D. Karunarathna
Engineer (E15) Mr.H.R.K.T.Senanayake
Mr Sadun Asela yu Mr. K.A. Deshapriya
(TBA) Mr.B.W.Sarath Kumara
Mr. K.Mithunan
Mr.S.A.R.N. Kumara
Mr. L.P.R. Srimal
Draughtman Mr. A. Prabath Ranaweera
Material Specialist Mr. D.J.N.G. Witharana
Mis Y.G.S Suvini Quality (E7) Senior Quantity Surveyor (E16)
Mis.U.P.Dissanayaka Mr. J.P.S. Pemasiri
Assurance/Qua Highway Design Mr.Wang Feng Mr. Toh Teck Boon
Mr.K.K.D.A.P. Kumara
lity Control Engineer (L3)
Mr. A.N.L. Dayarathne
Manager (E22) (TBA)
Mr.L.D. Iresh Rangana Quantity Surveyor (L10)
Mr. Gu Cheng
Senior Highway Mr R Dinesh Kumara Mr. M.M.Y. Bandara
Peng
Construction Engineer Mr P.G Nadeesh Anuruddha
Senior Structural Mr Kelum Galappthi
(E10) Technical Officer (L20)
Design Engineer (E2) Mr Omila Thusantha 8 PPL
Mr.Bai Xian de
Mr.Wang Liming Mr Dileep Kumara Mr. R.P.Priyantha
Environmental Mr H.N Janaka Mr. P.M.H.S.Senevirathne
Specialist (L14) Senior Structural Mr Chamath Prabodh Mr. K.L.Piyathilaka
Mr. W.M. Engineer Construction Mr D.D.P.H Sajith Udayanga Mr. U.A. Kithulgoda
Sarath Structural Design Mr M.A.R.R Desappriya
Engineer (E18) (E3) Mr. U.R.G.M. Thilakarathna
Wijesinghe Mr.Pan Guotao Mr Sampath Kumara Mr. U.D. Deeman
(TBA)
Mr. Anil Prasann

Senior Traffic/Road Senior Surveyor (L11)


Labourers 15 PPL Structural Design Mr. Mohamed Riyaldeen
Social Safety Engineer (E13)
W.A.B.Sureka Engineer (L5)
Specialist (L15) (TBA)
K.G.Nirosha Kumari (TBA) (TBA)
T.W.Pushpakumara Surveyor (L12)
Mr.W.M.S. Gunathunga
Senior Toll System
Design and Installation Survey Assistant 7 PPL
Engineer (E11) Mr.M.T.S.Sampath
(TBA) Mr.R.W.V.G.D.Madushanka
Programming Mr.A.M.A.M.Weerawanse
Engineer (L19) Mr.M.D. Ruwan Chathuranga
Mr N.G Eranga Senior Toll Facility Mr R.M Chaturanga
Design and Installation Mr Thusitha Gunasena
Engineer (E12) (TBA) Mr. D.M.C Mahesh

Safety officer Survey Helper


Mr N.P.A Pavement Specialist Mr.H.G.C.Tharanga
Gayan (E8) Mr.S.G.L.C. Sampath
Mr.Wang Liquan Mr N.A.P Priyadarshana
Mr A.P Lahiru
Drainage Engineer (L9) Mr Chamith lakshan
Mr. E.G.C. Amarasiri
Work Supervisor
Mr.W.G.V. Nilanka Kumara
Mr. S.K. Wijesiriwardhana
Mr. S.K.W Subasinghe
Mr Sampath Kumara
Mr Pramith Ranjith
Mr Asanka Lakmal
Mr Dulan Sameera

35
Consultancy Services for Design Review and Construction Supervision of Monthly Progress Report
Extension of Southern Expressway Project from Mattala to Hambantota via Andarawewa March 2018

ANNEXURE 02: CONTRACTOR'S ORGANIZATION CHART

36
Consultancy Services for Design Review and Construction Supervision of Monthly Progress Report
Extension of Southern Expressway Project from Mattala to Hambantota via Andarawewa March 2018

ANNEXURE 03: NON-CONFORMANCE REPORT

NCR No. Items Status


1 Culvert at CH 11+695 Closed

2 Culvert at CH 4+900 Closed

3 Culvert at CH 7+660 Closed

4 Culvert at CH 4+900 Closed

5 Culvert at CH 9+650 Closed

6 Viaduct 02 ,P4 (R1 , R2) Closed

7 PC Yard, Beam Grouting Closed

8 PC Yard, Beam Cracking Closed

9 Viaduct 02 , Structural Backfilling (P1, P7) Closed

10 P10-2 of V-1-Lifting of rebar cage during concrete Closed

11 V-1, Struc. Backfilling Closed

12 Culvert at CH 72+800 Closed

13 Culvert at CH 72+800 Closed

14 BRI/P4/G3/C5 Duct Grouting Closed

15 BRI-04 P-24/Stem-03 Inclined Error Closed

16 Transport of girder No 07 at BRU 02, P1-P2 spam Closed

37
Consultancy Services for Design Review and Construction Supervision of Monthly Progress Report
Extension of Southern Expressway Project from Mattala to Hambantota via Andarawewa March 2018

ANNEXURE 04: SUMMARY OF QUALITY CONTROL TESTS CARRIED OUT

TESTS CARRIED OUT FROM 27/02/2018 to


26/03/2018
Monthly Testing Report TEST TAKEN TO TEST RESULTS TO
DATE DATE Spec
No Pass Fail Mean Min Max
EMBANKMENT (site sampling)
Gradation 118 118 - - - -
CBR (%) 353 352 1 12.9 4.5 44.0 ≥ 5
Maximum Dry Density (kg/m3) 510 510 - 2030 1796 2120 ≥ 1600
Liquid Limit (%) 313 313 - 31.0 22 41 ≤ 55
Plasticity Index (%) 313 313 - 14.7 8 23 ≤ 25
EMBANKMENT (Material acceptance) 1607 1606 1
EMBANKMENT (Field Test) 691 554 137 Remarks: 40 failed tests
EMBANKMENT (Re-Test) 123 97 26 should be carried out in next period
Degree of Compaction (%) 691 554 137 96.2 90.0 102.0 ≥ 95
Re-Test After Re-Compaction (%) 123 97 26 95.9 90.1 100.4 ≥ 95
EMBANKMENT (borrow pit)
Gradation - - - - - -
CBR (%) - - - - - - ≥ 5
Maximum Dry Density (kg/m3) - - - - - - ≥ 1600
Liquid Limit (%) - - - - - - ≤ 55
Plasticity Index (%) - - - - - - ≤ 25
BACK FILLING
BACK FILLING (Field Test) 116 83 33 Remarks: 12 failed tests
BACK FILLING (Re-Test) 27 21 6 should be carried out in next period
SUBGRADE
Gradation 8 8 - - - -
CBR (%) 4 4 - 35.3 23.0 63.0 ≥ 15
Maximum Dry Density (kg/m3) 15 15 - 2146 2112 2187 ≥ 1650
Liquid Limit (%) 4 4 - Non Plastic ≤ 40
Plasticity Index (%) 4 4 - Non Plastic ≤ 15
SUBGRADE (Material acceptance) 35 35 0
SUBGRADE (Field Test) 70 34 36 Remarks: 20 failed tests
SUBGRADE (Re-Test) 33 16 17 should be carried out in next period
SUB-BASE
Gradation 24 24 - - - -
CBR (%) 5 5 - 56.5 36.5 85.0 ≥ 30
Maximum Dry Density (kg/m3) 17 17 - 2213 2124 2278 ≥ 1750
Liquid Limit (%) 9 9 - Non Plastic ≤ 25
Plasticity Index (%) 9 9 - Non Plastic ≤ 6
SUB-BASE (Material acceptance) 64 64 0
SUB-BASE (Field Test) 73 66 7 Remarks: 2 failed tests
SUB-BASE (Re-Test) 5 5 - should be carried out in next period

38
Consultancy Services for Design Review and Construction Supervision of Monthly Progress Report
Extension of Southern Expressway Project from Mattala to Hambantota via Andarawewa March 2018

TESTS CARRIED OUT FROM 27/02/2018 to


26/03/2018
Monthly Testing Report TEST TAKEN TO TEST RESULTS TO
DATE DATE Spec
No Pass Fail Mean Min Max
BASE COURSE
Gradation 41 41 - - - -
CBR (%) 4 4 - 248 228 262 ≥ 80
Maximum Dry Density (kg/m3) 21 21 - 2434 2428 2452
Los Angeles Abrasion value (%) 32 32 - 30.5 27 40 ≤ 50
Aggregate Impact Value (AIV) (%) 38 38 - 26.0 23 29 ≤ 30
Flakiness Index (%) 12 12 - 22.0 16 26 ≤ 35
Liquid Limit (%) 8 8 - Non Plastic ≤ 25
Plasticity Index (%) 8 8 - Non Plastic ≤ 6
BASE COURSE (Material acceptance) 164 164 0
BASE COURSE (Field Test) 39 34 5 98.6 92.1 99.9 ≥ 98
BASE COURSE (Re-Test) 13 11 2 98.2 93.1 99.6 ≥ 98
MATERIAL ACCEPTANCE TEST(Concrete)
Los Angeles Abrasion value (%) 2 2 - 27.0 25 29 ≤ 40
Aggregate Impact Value (AIV) (%) 4 4 - 26.3 25 28 ≤ 30
Flakiness Index (%) 4 4 - 15.5 11 24 ≤ 40
Elongation (%) 4 4 - 23.3 14 28
Clay lumps & fiberparticle(Course - - - - - -
Aggregate) (%)
Organic imparities (%) - - - - - -
Concrete Aggregate (Material 14 14 0
acceptance)
CONCRETE TESTS (Compressive Tests Carried out for Cubes)
Grade 15/20 (cyl) 5 5 - 29.5 25.6 32.6 ≥ 19
Grade 20/20(cyl) - - - - - - ≥ 25
Grade 25/20 (cyl) 9 9 - 38.3 36.2 41.0 ≥ 30
Grade 30/20(cyl) 27 27 - 42.8 40.0 44.7 ≥ 37
Grade 35/20(cyl) - - - - - - ≥ 45
Grade 40/20(cyl) 15 15 - 53.5 50.0 56.7 ≥ 50
Grade 45/20(cyl) - - - - - - ≥ 55
Grade 50/20(cyl) - - - - - - ≥ 60
Concrete (Compressive Strength) 56 56 0
POST TENSION GROUT
- - - - - - ≤25 sec,≥11
Fluidity (IN) Sec
- - - - - - ≤25 sec,≥11
Fluidity (OUT) Sec
POST TENSION GROUT (Fluidity) 0 0 0
Bleeding (%) - - - - - - < 2
Expansion (%) - - - - - - -1% to 5%
POST TENSION GROUT 0 0 0 - - -
(Bleeding/Expansion)
39
Consultancy Services for Design Review and Construction Supervision of Monthly Progress Report
Extension of Southern Expressway Project from Mattala to Hambantota via Andarawewa March 2018

TESTS CARRIED OUT FROM 27/02/2018 to


26/03/2018
Monthly Testing Report TEST TAKEN TO TEST RESULTS TO
DATE DATE Spec
No Pass Fail Mean Min Max
07 Days Cube Strength - - -
28 Days Cube Strength - - - - - - ≥ 50
POST TENSION GROUT (Cube 0 0 0
Strength)
AGGREGATE FOR ASPHALT
Partical Size Sieve Analysis (Fine 10 10 - - - -
40
Aggregate) ≤
Partical Size Sieve Analysis (Course 16 16 - - - -
Aggregate)
Los Angeles Abrasion value (%) - - - - - -
Flakiness Index (%) 5 5 - 15.0 8.0 24.0 ≤ 30
Clay and Silt Content - - - - - - ≤ 3
Soundness - - - - - - ≤ 12
Sand Equivalent Value - - - - - -
Aggregate Impact Value (AIV) (%) 4 4 - 21.5 19.0 24.0 ≤ 30
Bitumen Coating and Stripping - - - - - - ≥ 95
ASPHALT AGGREGATE(Material 35 35 0
acceptance )
ASPHALT PAVEMENT(Binder
Course)
Prime Coat Application Rate (1/m2) 12 12 - 0.9 0.8 0.9 0.5-1.5
Tack Coat Application (1/m2) - - - - - - 0.25-0.55
12 12 - - - - Job mix
Hot bin Gradation tolerance
Water Absorption 5 5 - 0.5 0.2 0.8 ≤ 2
20 20 - - - - Job mix
Extraction Grading tolerance
Bitumen Content 20 20 - 4.3 4.3 4.4 4.0-4.6
Air Voids in Mix (VIM), Binder Course 17 17 - 5.1 4.9 5.5
4-6
(%)
Marshall Stability Binder Course (kN) 17 17 - 16.9 14.5 19.6 ≥ 8
Marshall Flow Binder Course (mm) 17 17 - 2.3 2.1 2.8 2-4
Voids in Mineral Aggregate (VMA) 17 17 - 14.5 14.2 15.0 ≥ 14
Maximum Theoretical Specific 17 17 - 2.567 2.557 2.575
(g/cm3)
Gravity(Gmm)
Core Degree of Compaction (%) 45 45 - 93.9 92.0 96.0 92-96
Core Thickness(mm) 45 45 - 77.6 69.0 89.0 69-81
Re Test for Re core
Maximum Theoretical Specific - - - - - -
(g/cm3)
Gravity(Gmm)
Re-Test for Re-Coring Compaction 0 0 0 - - - 92-96
Re-Test for Re-Coring Thickness(mm) 0 0 0 - - - 69-81
BITUMEN(60/70)
Panetration @ 250C,100g,5Sec,mm 14 14 - 66.6 65 69 60-70
40
Consultancy Services for Design Review and Construction Supervision of Monthly Progress Report
Extension of Southern Expressway Project from Mattala to Hambantota via Andarawewa March 2018

TESTS CARRIED OUT FROM 27/02/2018 to


26/03/2018
Monthly Testing Report TEST TAKEN TO TEST RESULTS TO
DATE DATE Spec
No Pass Fail Mean Min Max
6 6 - 322.3 316 330 Minimum
Flash Point 0C 232
Softing Point 0C 9 9 - 50.0 49 51 48-56
Loss on Heating for 5 hrs.at 163 0C 3 3 - 0.20 0.00 0.04 < 1%
Ductility (25c)5cm/min.,cm - - - - - - > 100cm
BITUMEN(60/70) Material acceptance 32 32 0
BITUMEN-MC30
Flash Point 0C 2 2 - 54.0 52 56 Minimum 38

Specific Gravity @15.6/15.6 0C 1 1 - 0.924 0.924 0.924


BITUMEN(MC30) Material acceptance 3 3 0
REINFORCEMENT STEEL BARS
Yield Strength (N/mm2) - - - - - - 485-650
Tensile Strength (N/mm2) - - - - - -
REINFORCEMENT(Strength) 0 0 0
RE-TEST REINFORCEMENT 0 0 0
(Strength)
Minimum
Elongation at fracture(%) - - - - - - 14%
REINFORCEMENT(Elongation ) 0 0 0
Mass(kg/m)
- - - - - - 0.589-
Steel 10 mm 0.645
- - - - - - 0.848-
Steel 12 mm 0.928
- - - - - - 1.509-
Steel 16 mm 1.651
- - - - - - 2.359-
Steel 20 mm 2.581
- - - - - - 3.677-
Steel 25 mm 4.023
- - - - - - 6.026-
Steel 32 mm 6.594
REINFORCEMENT (Mass Test) 0 0 0
SHOULDER
Gradation - - - - - -
CBR (%) - - - - - - ≥ 15
Maximum Dry Density (kg/m3) - - - - - - ≥ 1750
Liquid Limit (%) - - - - - - ≤ 55
Plasticity Index (%) - - - - - - 6-25
SHOULDER (Material acceptance) 0 0 0
SHOULDER (Field Test) 0 0 0
SHOULDER (Field Test)Re-Test 0 0 0
Degree of Compaction (%) - - - - - - ≥ 95
Re-Test After Re-Compaction (%) - - - - - - ≥ 95

41
Consultancy Services for Design Review and Construction Supervision of Monthly Progress Report
Extension of Southern Expressway Project from Mattala to Hambantota via Andarawewa March 2018

ANNEXURE 05: SUMMARY OF SURVEYING WORKS

From Arabokka to Andarawewa Interchange (IC)

10+000

11+000

12+000

13+000

13+900
0+000

1+000

2+000

3+000

4+000

5+000

6+000

7+000

8+000

9+000
Est. GPS Con. Points
Traversing(N,E,Z)
CL Setting out
TOPO SURVEY
Cross Sections

From Andarawewa to Mattala end


71+000

72+000

73+000

74+000

75+000

76+000

77+000

77+640
Est. GPS Con. Points Work Completed
Traversing(N,E,Z)
CL Setting out Work in Progress
TOPO SURVEY
Cross Sections NA

In the Ramps of Andarawewa Interchange (IC)


1+000

2+000

3+000

4+000

5+000

Est. GPS Con. Points Work Completed


Traversing(N,E,Z)
CL Setting out Work in Progress
TOPO SURVEY
Cross Sections NA

42
Consultancy Services for Design Review and Construction Supervision of Monthly Progress Report
Extension of Southern Expressway Project from Mattala to Hambantota via Andarawewa March 2018

ANNEXURE 06: CONTRACTOR'S CLAIM SUMMARY

Clai Descriptuion Date Date of Acknowledge Contractor's EOT Cost Contractor's Contractor's Engineer's Whether EOT Cost Remarks
m of Claim ment of view Claimed Claimed Substantiatio Substantiatio Determination Claim is Approved Approved
No. Claim Notice Claim Notice (days) (LKR) n requested n Received Accepted or (days) (LKR)
Event on on Rejected by
Employer
Cl Additional Cost due to Tax 6/11/20 10/12/2015 10/12/2015 Claim for 0 996,763,731. No No Rejected(2)
001 of mines 15 Cost 70

Cl Omission of Works 2/12/20 25/12/2015 26/12/2015 No Claim No No


002 between ChO+700 to 15 Particulars
CH3+000
Cl The loss in exchange of 29/12/2 30/12/2015 30/12/2015 Claim for 0 135,426,763. No No The claim was To DAB
003 Advance payment 015 Cost 57 accepted and
reported to the
Employer
Cl Adjustments for Changes in 30/12/2 05/01/2016 07/01/2016 Withdrawal No No
004 Legislation 015

Cl Failure by the Employer to 19/1/20 20/01/2016 20/01/2016 No Claims 0 0 No No Not replied


005 give Right of Access to and 16
Possession of Site

Cl Failure by the Employer to 19/01/2 25/01/2016 27/01/2016 extension of 46 446,969.91 No No Rejected


006 Provide the Land for 016 time and
Construction of Office additional
Laboratory and payment
Accommodation to the
Employer and Engineer
Cl Additional Cost and time 24/03/2 20/04/2016 21/04/2016 additional 0 1,314,566.50 No No Rejected
007 due to enactment of 016 payment
Budgetary Relief
Allowance
Cl Additional Cost and Time 09/05/2 16/05/2016 16/05/2016 No Claims 0 0 No No Not replied
008 as a result of the Omission 016
of the Railway Crossing

Cl Additional Cost and Time 11/05/2 30/05/2016 30/05/2016 extension of 3 0 10/26/2017 10/26/2017 The claim was Approval 3
009 as a result of the 016 time accepted and
Exceptionally Adverse reported to the
Climatic Conditions Employer
Cl Additional Cost as a result 12/05/2 04/06/2016 06/06/2016 additional 0 125,374.02 9/9/2016 No Request
010 of the Delayed Tax 016 payment supplementary
Exemption for Bamboo evidence
Plywood.

43
Consultancy Services for Design Review and Construction Supervision of Monthly Progress Report
Extension of Southern Expressway Project from Mattala to Hambantota via Andarawewa March 2018

Clai Descriptuion Date Date of Acknowledge Contractor's EOT Cost Contractor's Contractor's Engineer's Whether EOT Cost Remarks
m of Claim ment of view Claimed Claimed Substantiatio Substantiatio Determination Claim is Approved Approved
No. Claim Notice Claim Notice (days) (LKR) n requested n Received Accepted or (days) (LKR)
Event on on Rejected by
Employer
Cl Additional Cost and Time 23/05/2 07/06/2016 07/06/2016 extension of 12.79 0 No No Rejected
011 as a result of the Potential 016 time
loss due to Operations of
Quarry at Ch.8+250 to
Ch.8+500
Cl Losses due to Bridge 27/05/2 08/06/2016 09/06/2016 Withdrawal No No
012 Design Amendments 016
Cl Potential Loss due to 09/06/2 23/06/2016 24/06/2016 No Claims 0 0 No No Rejected
013 Laboratory Test 016
Cl Losses due to Stockpile 01/06/2 28/06/2016 28/06/2016 No Claim No No
014 016 Particulars
Cl Losses due to Aluminum 17/06/2 06/07/2016 07/07/2016 No Claims 0 0 No No Rejected
015 Partitions in Engineer's and 016
Employer's Office
Cl Losses due to Rejection of 07/07/2 20/07/2016 21/07/2016 additional 0 353,088.00 No No Rejected
016 C20 Concrete in Engineer's 016 payment
and Employer's Office
Cl Losses. due to 40 mm 05/07/2 01/08/2016 02/08/2016 No Claims 0 0 No No Rejected
017 Asphalt Concrete layer on 016
Internal Roads in
Engineer's and Employer's
Office
Cl Losses due to the 29/07/2 04/08/2016 06/08/2016 additional 0 323,787.42 No No Rejected To DAB
018 Deductions of Provisional 016 payment
Sums in Issued IPC3
Cl Losses due to Withholding 22/08/2 29/08/2016 05/09/2016 additional 0 2,731,767.72 No No Rejected To DAB
019 of IPC4 016 payment
Cl Losses due to Public 01/09/2 06/09/2016 08/09/2016 extension of 3.2 0 No No Rejected
020 Protest at CH71+000 to 016 time
CH73+300
Cl Loss due to Delayed 11/08/2 10/09/2016 13/09/2016 No Claim No No
021 drawing instruction(CDS 016 Particulars
235,237)
Cl Losses due to Adjustment 02/08/2 14/09/2016 14/09/2016 No Claim No No
022 of Sight Distance 016 Particulars

Cl Losses due to Proposed 26/08/2 22/09/2016 22/09/2016 No claims 0 0 No No Not replied


023 Managed Elephant Range 016
(MER)
Cl Losses due to Newly 04/10/2 11/10/2016 12/10/2016 No Claim No No
024 Proposed Culverts 016 Particulars
Cl Losses due to Exceptionally 04/10/2 31/10/2016 07/11/2016 No Claim No No
025 Adverse Climatic 016 Particulars
Conditions in October 2016

44
Consultancy Services for Design Review and Construction Supervision of Monthly Progress Report
Extension of Southern Expressway Project from Mattala to Hambantota via Andarawewa March 2018

Clai Descriptuion Date Date of Acknowledge Contractor's EOT Cost Contractor's Contractor's Engineer's Whether EOT Cost Remarks
m of Claim ment of view Claimed Claimed Substantiatio Substantiatio Determination Claim is Approved Approved
No. Claim Notice Claim Notice (days) (LKR) n requested n Received Accepted or (days) (LKR)
Event on on Rejected by
Employer
Cl Losses due to the Changes 08/10/2 19/10/2016 25/10/2016 No Claim No No
026 of the Design length of 016 Particulars
Piles at VD 01
Cl The loss in exchange of 14/10/2 24/10/2016 25/10/2016 Claim for cost 0 70,681,269.6 No No The claim was To DAB
027 Advance payment 016 7 accepted and
reported to the
Employer
Cl Additional Cost and Time 26/10/2 21/11/2016 21/11/2016 No Claim No No
028 Due to Design Instruction 016 Particulars
for Andarawewa
Interchange
Cl Additional Cost and Time 26/10/2 21/11/2016 24/11/2016 No Claim No No
029 due to Approval Delay of 016 Particulars
Pavement Design
Cl Losses due to the 18/11/2 09/12/2016 10/12/2016 Claim for cost 0 937,137.27 No No Rejected To DAB
030 Deductions of Provisional 016
Sums in Issued IPC5
Cl Losses Due to the Arbitrary 06/12/2 09/12/2016 10/12/2016 No Claim No No
031 Deduction of Unclassified 016 Particulars
Borrow Excavation on
Interim Application 7
Cl Losses due to the Changing 19/11/2 09/12/2016 14/12/2016 No claims 0 0 No No Not replied
032 Instruction of Approved 016
Alignment Design of
Diversion Road- 8 (CH6
+220 RHS)
Cl Suspension of Work as per 07/12/2 14/12/2016 15/12/2016 No claims 0 0 No No Not replied
033 the Engineer's letter 016
ref;FSDIS4-CHEC -1043
Cl Instruction for Design of 07/12/2 21/12/2016 22/12/2016 No claims 0 0 No No Not replied
034 Anderawewa Interchange 016
Variation
Cl Suspension of Walsapugala 07/12/2 28/12/2016 29/12/2016 No claims 0 0 No No Not replied
035 Barrow pit Material due to 016
Non Plastic Material as per
Engineer's Letter
ref.FSDIS4-CHEC-1095
Cl Losses due to the 05/12/2 29/12/2016 30/12/2016 Claim for cost 0 827,319.79 No No Rejected
036 Deductions of Provisional 016
Sums in Issued IPC6
Cl Suspension of Walsapugala 12/10/2 1/5/2017 1/6/2017 No Claim No No
037 Barrow pit Material due to 016 Particulars
Non Plastic Material as per
Engineer's letter ref;
FSDIS4-CHEC -1095

45
Consultancy Services for Design Review and Construction Supervision of Monthly Progress Report
Extension of Southern Expressway Project from Mattala to Hambantota via Andarawewa March 2018

Clai Descriptuion Date Date of Acknowledge Contractor's EOT Cost Contractor's Contractor's Engineer's Whether EOT Cost Remarks
m of Claim ment of view Claimed Claimed Substantiatio Substantiatio Determination Claim is Approved Approved
No. Claim Notice Claim Notice (days) (LKR) n requested n Received Accepted or (days) (LKR)
Event on on Rejected by
Employer
Cl Losses due to the 12/27/2 1/11/2017 1/13/2017 Claim for cost 0 47,930.97 No No Rejected To DAB
038 Deductions of Provisional 016
Sums in Issued IPC6

Cl Losses due to the 1/16/20 1/20/2017 1/20/2017 Claim for cost 0 63,548.68 No No Rejected To DAB
039 Deductions of Provisional 17
Sums in Issued IPC 8

Cl Discrepancies of Approval 1/19/20 1/23/2017 1/23/2017 No claims 0 0 No No Rejected


040 for Box Culvert Design at 17
CH 72+210

Cl Discrepancies of Approval 1/19/20 1/23/2017 1/23/2017 No claims 0 0 No No Rejected


041 for Box Culvert Design at 17
at CH 71+600

Cl Discrepancies of Approval 1/19/20 1/23/2017 1/23/2017 No claims 0 0 No No Not replied


042 on Box Culvert Design at 17
CH 72+800
Cl Discrepancies of Approval 1/11/20 1/23/2017 1/23/2017 No claims 0 0 No No Rejected
043 for Box Culvert Design at 17
CH 4+652
Cl Late Instruction for Box 1/11/20 1/23/2017 1/23/2017 No Claim No No
044 Culvert Design at CH 17 Particulars
8+040
Cl Losses due to the 2/17/20 3/8/2017 3/8/2017 No Claim No No Rejected To DAB
045 Deductions of Provisional 17 Particulars
Sums in Issued IPC 9
Cl Increase ofEal'th Work 2/21/20 3/2/2017 3/2/2017 No Claim No No
046 Quantity 17 Particulars
Cl Did not
047 submit
Cl Losses due to the 3/18/20 4/7/2017 4/8/2017 No Claim Rejected To DAB
048 Deductions of Provisional 17 Particulars
Sums
in Issued IPC 10
Cl Arabokka Design Variation 4/17/20 4/28/2017 5/15/2017 No Claim
049 due to the CEB towers 17 Particulars
Cl Disruption Due to Public 2/1/201 2/7/2017 2/7/2017 No claims 0 0 No No Not replied
050 Protest at CH 71+000 to 7
CH 73+300
Cl Imposition of nation 2/6/201 2/8/2017 2/9/2017 No Claim
051 building TAX by budget 7 Particulars
proposals 2017

46
Consultancy Services for Design Review and Construction Supervision of Monthly Progress Report
Extension of Southern Expressway Project from Mattala to Hambantota via Andarawewa March 2018

Clai Descriptuion Date Date of Acknowledge Contractor's EOT Cost Contractor's Contractor's Engineer's Whether EOT Cost Remarks
m of Claim ment of view Claimed Claimed Substantiatio Substantiatio Determination Claim is Approved Approved
No. Claim Notice Claim Notice (days) (LKR) n requested n Received Accepted or (days) (LKR)
Event on on Rejected by
Employer
Cl Extension to the Time for 3/31/2017 4/4/2017 does not 255 Rejected
T01 Completion No 1 comply with
the contract
Cl Losses due to the 4/17/20 5/5/2017 5/5/2017 No Claim Rejected To DAB
052 Deductions of Provisional 17 Particulars
Sums in Issued IPC 11
Cl Losses due to the 5/17/20 5/24/2017 5/24/2017 No Claim Rejected To DAB
053 Deductions of Provisional 17 Particulars
Sums in Issued IPC 12
Cl Diversion Road 01 Design 5/9/201 5/26/2017 5/26/2017 No Claim
054 Changes( 7 Particulars
Cl Delay by the NWS & DB 5/23/20 5/31/2017 6/5/2017 No Claim
055 for the Shifting of Purafic 17 Particulars
Water Pipe Line PVC/DI
along the Expressway
Cl Delay due Trial works for 5/31/20 6/2/2017 6/7/2017 No Claim
056 sub base 17 Particulars
Cl Diversion Canal 2 Design 6/7/201 7/4/2017 7/4/2017 No Claim
057 Changes CH3+ 440- 7 Particulars
CH3+866 RHS
Cl Diversion Canal 01 Design 6/7/201 7/4/2017 7/4/2017 No Claim
058 Changes At CH0+ 625- 7 Particulars
CH1+ 198 RHS
Cl Delay due Sub Base Layer 6/20/20 7/1/2017 7/2/2017 No Claim
059 Rejection at Ch 14+000- 17 Particulars
14+ 050
Cl Delay due to late 6/28/20 7/1/2017 7/2/2017 No Claim
060 Instruction of Road 17 Particulars
facilities
Cl Delay due to Design 6/17/20 7/6/2017 7/6/2017 No Claim
061 Revision of Box Culvert at 17 Particulars
CH0 +132 Arabokka
Cl Losses due to the 7/31/20 8/13/2017 8/15/2017 No Claim To DAB
062 Deduction of Provisional 17 Particulars
Sums in IPC 14
Cl Loss Due to the Deduction 6/19/20 7/14/2017 7/17/2017 additional 39,131,353.7 No No Rejected To DAB
063 of Provisional Sums in IPC 17 payment 5
13
Cl Delay Due to Late 6/30/20 7/24/2017 7/27/2017 No Claim
064 Instruction forCH8+ 340- 17 Particulars
CH8+500 Variation Works
Cl Additional Cost and Time 6/24/20 7/27/2017 7/27/2017 extension of 2 1,394,654.58 No No Rejected
065 due to the Public Strike of 17 time and
Ceylon Petroleum additional
Cooperation payment

47
Consultancy Services for Design Review and Construction Supervision of Monthly Progress Report
Extension of Southern Expressway Project from Mattala to Hambantota via Andarawewa March 2018

Clai Descriptuion Date Date of Acknowledge Contractor's EOT Cost Contractor's Contractor's Engineer's Whether EOT Cost Remarks
m of Claim ment of view Claimed Claimed Substantiatio Substantiatio Determination Claim is Approved Approved
No. Claim Notice Claim Notice (days) (LKR) n requested n Received Accepted or (days) (LKR)
Event on on Rejected by
Employer
Cl Additional Cost and Time 7/26/20 7/27/2017 7/27/2017 additional 6,048,196.52 No No Rejected
066 due to the Royalty Charges 17 payment
for Rock Excavated within
ROW by GSMB
067 Additional Cost and Time 9/13/20 10/9/2017 10/10/2017 No Claim
due to the Delayed 17 Particulars
Approval of Tax
Exemption
068 Losses caused due to the 9/13/20 10/24/2017 10/10/2017 No Claim
Implementation of changes 17 Particulars
to National Building Tax
069 Losses due to the 10/24/2 11/1/2017 11/2/2017 No Claim To DAB
Deduction of Provisional 017 Particulars
Sums in IPC 17
070 Losscs Caused due to 10/26/2 11/16/2017 11/17/2017 No Claim
Unfair Deduction of 017 Particulars
Advance Payment
071 Additional Time and Cost 11/17/2 11/18/2017 11/19/2017 No Claim
Caused due to the Location 017 Particulars
Change for Toll Gate at
Mattala End
072 Losses Caused due to the 11/30/2 12/8/2017 12/9/2017 extension of 1 0 1/3/2018 1/4/2018 The claim was Approval 1
Exceptionally Adverse 017 time accepted and
Climate Conditions in reported to the
November 2017 Employer
073 Losses due to the 11/27/2 12/13/2017 12/14/2017 additional 0 43,560,478.9 No No Rejected To DAB
Deduction of Provisional 017 payment 8
Sums in IPC 18
074 Losses Caused by the 12/26/2 12/27/2017 12/28/2017 No Claim
Protest at CH 77+084 due 017 Particulars
to the Delay of the
Compensation of Land by
the Employer
075 Additional Cost and Time 01/20/2 01/21/2018 01/22/2018 No Claim
due to the Delayed 018 Particulars
Instruction for Toll System
and Toll Booth
Clai Description Date of Date of Acknowledge Contractor's EOT Cost Claimed Contractor's Contractor's Engineer's Whether EOT Cost Remarks
m Claim Claim ment of view Claimed (LKR) Substantiation Substantiation Determination Claim is Approved Approved
No. Event Notice Claim Notice (days) requested on Received on Accepted or (days) (LKR)
Rejected by
Employer
076 Losses due to the 12/23/2 01/18/2018 01/21/2018 No Claim To DAB
Deduction of Provisional 017 Particulars
Sums in IPC19

48
Consultancy Services for Design Review and Construction Supervision of Monthly Progress Report
Extension of Southern Expressway Project from Mattala to Hambantota via Andarawewa March 2018

Clai Descriptuion Date Date of Acknowledge Contractor's EOT Cost Contractor's Contractor's Engineer's Whether EOT Cost Remarks
m of Claim ment of view Claimed Claimed Substantiatio Substantiatio Determination Claim is Approved Approved
No. Claim Notice Claim Notice (days) (LKR) n requested n Received Accepted or (days) (LKR)
Event on on Rejected by
Employer
077 Losses due to Employer's 1/4/201 01/19/2018 01/21/2018 No Claim
Failure to Compensate 8 Particulars
the Residence near
CH77+060-CH77+ 100
078 Additional Time and Cost 1/17/20 01/25/2018 01/26/2018 No Claim
Caused due to 18 Particulars
Engineer's Instruction for
Additional Weighing
Bridge for Toll Gate Area
079 Losses due to the 1/30/20 02/06/2018 02/07/2018 No Claim To DAB
Deduction of Design Cost 18 Particulars
of
Andarawewa Interchange
Design Variation in IPC20
080 Additional Time and Cost 2/08/20 02/22/2018 02/23/2018 No Claim
Caused due to 18 Particulars
Engineer's Instruction for
Additional Design and
Construction of the Ramp
at Mattala
Interchange
081 Additional Cost and Time 3/03/20 3/03/2018 3/04/2018 No Claim
due to Delayed 18 Particulars
Drawing/Instructions for
the Biological and Electric
Fencing for Elephants

49
Consultancy Services for Design Review and Construction Supervision of Monthly Progress Report
Extension of Southern Expressway Project from Mattala to Hambantota via Andarawewa March 2018

ANNEXURE 07: CONTRACTOR’S VARIATION ORDERS

No. Item Status

Omission of Works between Ch0+700Km to Ch3+000 variation was established, please


1
submit proposed variations
2 Addition Items Requested by the Engineer Awaiting comments of employer
Additional Amount for Temporary Vehicle for the please submit proposed
3
Engineer/Employer variations03
4 Additional Amount for Temporary House for the Engineer Does not constitute a variation
Relocation of Additional High Tension Line and Delaying
5 Does not constitute a variation
the construction of Office and Accommodation
6 Additional Steel Plate for Steel Truss for Engineer's Office Does not constitute a variation
the Expense of laboratory Equipment for the Employer and Variation order 01 Issued01
7
Engineer
Omission of Railway Crossing variation was established, please
8
submit proposed variations
Additional Work to the Office and Accommodation for the
9 Does not constitute a variation
Employer and Engineer
10 Huge Rock Encountered during the Surface Cleaning Does not constitute a variation
11 Additional Car Park for the Office for the Engineer Does not constitute a variation
12 Additional Tile for the Entrance Porch Does not constitute a variation
Additional Paint and Putty for the Office and
13 Does not constitute a variation
Accommodation for the Engineer and Employer
14 Air Conditioner Does not constitute a variation
Vehicle for Engineers and Employer (Jeep) Variation was established,
15
Awaiting comments of employer.
Request for Variation Order for Additional Retaining Wall
16 for Engineer's Accommodation and Office Does not constitute a variation

17 Anderawewa Interchange Variation Processing


18 Supplying and Laying ofPurafic Water Pipe Line Variation order 02 Issued02
Request for Variation Order for the Filling ofRajapaksa variation was established, please
19
Quarry Yard atCH8+ 340-CH8+500 submit proposed variations
20 Well near CH2+800 Does not constitute a variation
22 Updated locations of Culverts Approval
27 Additional PDA Tests variation was established, please
submit proposed variations
28 Investigation for New House at CH1+975 (LHS) And Does not constitute a variation
Additional Pre CrackSurvey and Monitoring for Vibration
and noise for the Houses at CH77+000 (LHS)
29 No submitting
30 Additional Tes t for Bearing Pads Does not constitute a variation
33 Request for Variation Order for Accessories for Overpass Does not constitute a variation
Bridges
34 No submitting
35 No submitting
36 No submitting
37 Varied Works for Additional Right Turn Bay on A2 Road variation was established, please
submit proposed variations
38 Varied Works for Additional Weighing Bridge at Toll Gate variation was established, please
submit proposed variations
50
Consultancy Services for Design Review and Construction Supervision of Monthly Progress Report
Extension of Southern Expressway Project from Mattala to Hambantota via Andarawewa March 2018

No. Item Status


39 Varied Works for Diamond Interchange at Mattala variation was established, please
submit proposed variations
40 Varied Works for Additional items for Electrical and variation was established, please
Roadway Lighting submit proposed variations
41 Varied Works for Bottom Formation of ROW .Fence Does not constitute a variation
42 Varied Works for Timber post Elephant Fence Does not constitute a variation

51
Consultancy Services for Design Review and Construction Supervision of Monthly Progress Report
Extension of Southern Expressway Project from Mattala to Hambantota via Andarawewa March 2018

ANNEXURE 08: PROGRESS OF KEY ACTIVITY

Work Completed Work in Progress N/A


Description Units
wearing Course tonne
Binder Course tonne
Prime Coat Litre
Aggregate Base Course Cu.m
Grannular Sub Base Cu.m
sq.m

LHS
Sub grade
Embankment filling(RUC3)/RUC4/Unclasified Cu.m
sub grade (Exsisting) Cu.m
Exavation Unclassified/Rock Cu.m
Cearing & Grabbing ha
Genaral Clearing ha
Site possession
0+000 - 1+000 1+000 - 2+000 2+000 - 3+000 3+000 - 4+000
Site possession
Genaral Clearing ha
Cearing & Grabbing ha
Exavation Unclassified/Rock Cu.m
sub grade (Exsisting) sq.m
Cu.m
RHS

Embankment filling(RUC3)/RUC4/Unclasified
Sub grade sq.m
Grannular Sub Base Cu.m
Aggregate Base Course Cu.m
Prime Coat Litre
Binder Course tonne
wearing Course tonne

wearing Course tonne


Binder Course tonne
Prime Coat Litre
Aggregate Base Course Cu.m
Grannular Sub Base Cu.m
sq.m
LHS

Sub grade
Embankment filling(RUC3)/RUC4/Unclasified Cu.m
sub grade (Exsisting) sq.m
Exavation Unclassified/Rock Cu.m
Cearing & Grabbing ha
Genaral Clearing ha
Site possession
7+000 - 8+000 8+000 - 9+000 9+000 - 10+000 10+000 - 11+000
Site possession
Genaral Clearing ha
Cearing & Grabbing ha
Exavation Unclassified/Rock Cu.m
sub grade (Exsisting) sq.m
Cu.m
RHS

Embankment filling(RUC3)/RUC4/Unclasified
Sub grade sq.m
Grannular Sub Base Cu.m
Aggregate Base Course Cu.m
Prime Coat Litre
Binder Course tonne
wearing Course tonne

52
Consultancy Services for Design Review and Construction Supervision of Monthly Progress Report
Extension of Southern Expressway Project from Mattala to Hambantota via Andarawewa March 2018

Work Completed Work in Progress N/A


wearing Course tonne
Binder Course tonne
Prime Coat Litre
Aggregate Base Course Cu.m
Grannular Sub Base Cu.m
sq.m

LHS
Sub grade
Embankment filling(RUC3)/RUC4/Unclasified Cu.m
sub grade (Exsisting) Cu.m
Exavation Unclassified/Rock sq.m
Cearing & Grabbing ha
Genaral Clearing ha
Site possession
4+000 - 5+000 5+000 - 6+000 6+000 - 7+000
Site possession
Genaral Clearing ha
Cearing & Grabbing ha
Exavation Unclassified/Rock Cu.m
sub grade (Exsisting) sq.m
Cu.m
RHS

Embankment filling(RUC3)/RUC4/Unclasified
Sub grade sq.m
Grannular Sub Base Cu.m
Aggregate Base Course Cu.m
Prime Coat Litre
Binder Course tonne
wearing Course tonne

wearing Course tonne


Binder Course tonne
Prime Coat Litre
Aggregate Base Course Cu.m
Grannular Sub Base Cu.m
sq.m
LHS

Sub grade
Embankment filling(RUC3)/RUC4/Unclasified Cu.m
sub grade (Exsisting) sq.m
Exavation Unclassified/Rock Cu.m
Cearing & Grabbing ha
Genaral Clearing ha
Site possession
11+000 - 12+000 12+000 - 13+000 13+000 - 14+000
Site possession
Genaral Clearing ha
Cearing & Grabbing ha
Exavation Unclassified/Rock Cu.m
sub grade (Exsisting) sq.m
Cu.m
RHS

Embankment filling(RUC3)/RUC4/Unclasified
Sub grade sq.m
Grannular Sub Base Cu.m
Aggregate Base Course Cu.m
Prime Coat Litre
Binder Course tonne
wearing Course tonne

53
Consultancy Services for Design Review and Construction Supervision of Monthly Progress Report
Extension of Southern Expressway Project from Mattala to Hambantota via Andarawewa March 2018

Work Completed Work in Progress N/A

Description unit
wearing Course tonne
Binder Course tonne
Prime Coat Litre
Aggregate Base Course Cu.m
Grannular Sub Base Cu.m
sq.m

LHS
Sub grade
Embankment filling(RUC3)/RUC4/Unclasified Cu.m
sub grade (Exsisting) sq.m
Exavation Unsuitable/Unclassified/Rock Cu.m
Cearing & Grabbing ha
Genaral Clearing ha
Site possession
71+000-72+000 72+000 - 73+116
Site possession
Genaral Clearing ha
Cearing & Grabbing ha
Exavation Unsuitable/Unclassified/Rock Cu.m
sub grade (Exsisting) sq.m
Cu.m
RHS

Embankment filling(RUC3)/RUC4/Unclasified
Sub grade sq.m
Grannular Sub Base Cu.m
Aggregate Base Course Cu.m
Prime Coat Litre
Binder Course tonne
wearing Course tonne

54
Consultancy Services for Design Review and Construction Supervision of Monthly Progress Report
Extension of Southern Expressway Project from Mattala to Hambantota via Andarawewa March 2018

Work Completed Work in Progress N/A

Description unit RAMP L


wearing Course tonne
Binder Course tonne

Prime Coat Litre

Aggregate Base Course Cu.m

Grannular Sub Base Cu.m

Sub grade sq.m

LHS
Embankment filling(RUC3)/RUC4/Unclasified Cu.m

sub grade (Exsisting) sq.m

Exavation Unclassified/Rock Cu.m

Cearing & Grabbing ha

Genaral Clearing ha

Site possession
L73+116-L74+202
Site possession
Genaral Clearing ha

Cearing & Grabbing ha

Exavation Unclassified/Rock Cu.m

sub grade (Exsisting) sq.m

Embankment filling(RUC3)/RUC4/Unclasified Cu.m


RHS

Sub grade sq.m

Grannular Sub Base Cu.m

Aggregate Base Course Cu.m

Prime Coat Litre

Binder Course tonne

wearing Course tonne

55
Consultancy Services for Design Review and Construction Supervision of Monthly Progress Report
Extension of Southern Expressway Project from Mattala to Hambantota via Andarawewa March 2018

Work Completed Work in Progress N/A


Description unit RAMP R
wearing Course tonne
Binder Course tonne

Prime Coat Litre

Aggregate Base Course Cu.m

Grannular Sub Base Cu.m

Sub grade sq.m

LHS
Embankment filling(RUC3)/RUC4/UnclasifiedCu.m
sub grade (Exsisting) sq.m

ExavationUnclassified/Rock Cu.m

Cearing & Grabbing ha

Genaral Clearing ha

Site possession
R73+116-R74+202
Site possession
Genaral Clearing ha

Cearing & Grabbing ha

Exavation Unclassified/Rock Cu.m

sub grade (Exsisting) sq.m

Embankment filling(RUC3)/RUC4/UnclasifiedCu.m
RHS

Sub grade sq.m

Grannular Sub Base Cu.m

Aggregate Base Course Cu.m

Prime Coat Litre

Binder Course tonne

wearing Course tonne

56
Consultancy Services for Design Review and Construction Supervision of Monthly Progress Report
Extension of Southern Expressway Project from Mattala to Hambantota via Andarawewa March 2018

Work Completed Work in Progress N/A

Description unit
wearing Course tonne
Binder Course tonne
Prime Coat Litre
Aggregate Base Course Cu.m
Grannular Sub Base Cu.m
sq.m

LHS
Sub grade
Embankment filling(RUC3)/RUC4/Unclasified Cu.m
sub grade (Exsisting) sq.m
Exavation Unsuitable/Unclassified/Rock Cu.m VD I VD II
Cearing & Grabbing ha
Genaral Clearing ha
Site possession
74+202 -75+000 75+000-76+000 76+000 - 77+000
Site possession
Genaral Clearing ha
Cearing & Grabbing ha
Exavation Unsuitable/Unclassified/Rock Cu.m VD I VD II
sub grade (Exsisting) sq.m
Cu.m
RHS

Embankment filling(RUC3)/RUC4/Unclasified
Sub grade sq.m
Grannular Sub Base Cu.m
Aggregate Base Course Cu.m
Prime Coat Litre
Binder Course tonne
wearing Course tonne

57
Consultancy Services for Design Review and Construction Supervision of Monthly Progress Report
Extension of Southern Expressway Project from Mattala to Hambantota via Andarawewa March 2018

Work Completed Work in Progress N/A

Description Unit RAMP A


wearing Course tonne
Binder Course tonne
Prime Coat Litre
Aggregate Base Course Cu.m
Grannular Sub Base Cu.m
Sub grade sq.m

LHS
Embankment filling(RUC3)/RUC4/Unclasified Cu.m
sub grade (Exsisting) sq.m BRI 04
Exavation Unclassified/Rock Cu.m
Cearing & Grabbing ha
Genaral Clearing ha
Site possession
A0 + 000 - A1+000 A1+ 000 - A2+000 A2+000 - A2+708
Site possession
Genaral Clearing ha
Cearing & Grabbing ha
Exavation Unclassified/Rock Cu.m
sub grade (Exsisting) sq.m BRI 04
Embankment filling(RUC3)/RUC4/Unclasified Cu.m
RHS

Sub grade sq.m


Grannular Sub Base Cu.m
Aggregate Base Course Cu.m
Prime Coat Litre
Binder Course tonne
wearing Course tonne

58
Consultancy Services for Design Review and Construction Supervision of Monthly Progress Report
Extension of Southern Expressway Project from Mattala to Hambantota via Andarawewa March 2018

Work Completed Work in Progress N/A

Description Unit RAMP B


wearing Course tonne
Binder Course tonne
Prime Coat Litre
Aggregate Base Course Cu.m
Grannular Sub Base Cu.m
Sub grade sq.m

LHS
Embankment filling(RUC3)/RUC4/Unclasified Cu.m
sub grade (Exsisting) sq.m
Exavation Unclassified/Rock Cu.m
Cearing & Grabbing ha
Genaral Clearing ha
Site possession
B1+000 B2+000 B2+346
Site possession
Genaral Clearing ha
Cearing & Grabbing ha
Exavation Unclassified/Rock Cu.m
sub grade (Exsisting) sq.m
Embankment filling(RUC3)/RUC4/Unclasified Cu.m
RHS

Sub grade sq.m


Grannular Sub Base Cu.m
Aggregate Base Course Cu.m
Prime Coat Litre
Binder Course tonne
wearing Course tonne

59
Consultancy Services for Design Review and Construction Supervision of Monthly Progress Report
Extension of Southern Expressway Project from Mattala to Hambantota via Andarawewa March 2018

Work Completed Work in Progress N/A

Description Unit RAMP C


wearing Course tonne
Binder Course tonne
Prime Coat Litre
Aggregate Base Course Cu.m
Grannular Sub Base Cu.m
Sub grade sq.m

LHS
Embankment filling(RUC3)/RUC4/Unclasified Cu.m
sub grade (Exsisting) sq.m
Exavation Unclassified/Rock Cu.m
Cearing & Grabbing ha
Genaral Clearing ha
Site possession
C0+000 - C1 + 000 C1+000 - C2+000 C2+180
Site possession
Genaral Clearing ha
Cearing & Grabbing ha
Exavation Unclassified/Rock Cu.m
sub grade (Exsisting) sq.m
Embankment filling(RUC3)/RUC4/Unclasified Cu.m
RHS

Sub grade sq.m


Grannular Sub Base Cu.m
Aggregate Base Course Cu.m
Prime Coat Litre
Binder Course tonne
wearing Course tonne

60
Consultancy Services for Design Review and Construction Supervision of Monthly Progress Report
Extension of Southern Expressway Project from Mattala to Hambantota via Andarawewa March 2018

Work Completed Work in Progress N/A

Description Unit RAMP D


wearing Course tonne
Binder Course tonne
Prime Coat Litre
Aggregate Base Course Cu.m
Grannular Sub Base Cu.m
Sub grade sq.m

LHS
Embankment filling(RUC3)/RUC4/Unclasified Cu.m
sub grade (Exsisting) sq.m
Exavation Unclassified/Rock Cu.m
Cearing & Grabbing ha
Genaral Clearing ha
Site possession
D0+920
Site possession
Genaral Clearing ha
Cearing & Grabbing ha
Exavation rock ( to embankment ) Cu.m
Unclassified excavation Cu.m
Exavation Unclassified/Rock Cu.m
sub grade (Exsisting) sq.m

RHS
Embankment filling(RUC3)/RUC4/Unclasified Cu.m
Sub grade sq.m
Grannular Sub Base Cu.m
Aggregate Base Course Cu.m
Prime Coat Litre
Binder Course tonne
wearing Course tonne

61
Consultancy Services for Design Review and Construction Supervision of Monthly Progress Report
Extension of Southern Expressway Project from Mattala to Hambantota via Andarawewa March 2018

ANNEXURE 09: PROGRESS OF CULVERTS & BRIDGES.


Culvert Progress

Work Completed Work In Progress None Applicable


Section (L to R)
Cul.No Description
S1 S2 S3 S4 S5 S6 S7 S8 S9
Setting out
Excavation
Leveling Concrete
Base
Wall
Re bar work
Deck
WW
CH 0+024 Base
Wall
Form Work
Deck
WW
Base
Wall
Concreting
Deck
WW
Backfilling

Section (L to R)
Cul.No Description
S1 S2 S3 S4 S5 S6 S7 S8 S9
Setting out
Excavation
Leveling Concrete
Base
Wall
Re bar work
Deck
WW
CH 0+148 Base
Wall
Form Work
Deck
WW
Base
Wall
Concreting
Deck
WW
Backfilling

62
Consultancy Services for Design Review and Construction Supervision of Monthly Progress Report
Extension of Southern Expressway Project from Mattala to Hambantota via Andarawewa March 2018

Work Completed Work In Progress None Applicable

Section (L to R)
Cul.No Description
S1 S2 S3 S4 S5 S6 S7 S8 S9
Setting out
Excavation
Leveling Concrete
Base
Wall
Re bar work
Deck
WW
CH 1+428 Base
Wall
Form Work
Deck
WW
Base
Wall
Concreting
Deck
WW
Backfilling

Setting out
Excavation
Leveling Concrete
Base
Wall
Re bar work
Deck
WW
Base
CH 1+700
Wall
Form Work
Deck
WW
Base
Wall
Concreting
Deck
WW
Backfilling
Setting out
Excavation
Leveling Concrete
Base
Wall
Re bar work
Deck
WW
Base
CH 2+436
Wall
Form Work
Deck
WW
Base
Wall
Concreting
Deck
WW
Backfilling

63
Consultancy Services for Design Review and Construction Supervision of Monthly Progress Report
Extension of Southern Expressway Project from Mattala to Hambantota via Andarawewa March 2018

Work Completed Work In Progress None Applicable

Section (L to R)
Cul.No Description
S1 S2 S3 S4 S5 S6 S7 S8 S9
Setting out
Excavation
Leveling Concrete
Base
Wall
Re bar work
Deck
WW
Base
CH 2+640
Wall
Form Work
Deck
WW
Base
Wall
Concreting
Deck
WW
Backfilling

Setting out
Excavation
Leveling Concrete
Base
Wall
Re bar work
Deck
WW
Base
CH 3+143
Wall
Form Work
Deck
WW
Base
Wall
Concreting
Deck
WW
Backfilling

Setting out
Excavation
Leveling Concrete
Base
Wall
Re bar work
Deck
WW
Base
CH 3+660
Wall
Form Work
Deck
WW
Base
Wall
Concreting
Deck
WW
Backfilling

64
Consultancy Services for Design Review and Construction Supervision of Monthly Progress Report
Extension of Southern Expressway Project from Mattala to Hambantota via Andarawewa March 2018

Work Completed Work In Progress None Applicable

Section (L to R)
Cul.No Description
S1 S2 S3 S4 S5 S6 S7 S8 S9
Setting out
Excavation
Leveling Concrete
Base
Wall
Re bar work
Deck
WW
Base
CH 4+131
Wall
Form Work
Deck
WW
Base
Wall
Concreting
Deck
WW
Backfilling

Setting out
Excavation
Leveling Concrete
Base
Wall
Re bar work
Deck
WW
Base
CH 4+170
Wall
Form Work
Deck
WW
Base
Wall
Concreting
Deck
WW
Backfilling

Setting out
Excavation
Leveling Concrete
Base
Wall
Re bar work
Deck
WW
Base
CH 4+500
Wall
Form Work
Deck
WW
Base
Wall
Concreting
Deck
WW
Backfilling

65
Consultancy Services for Design Review and Construction Supervision of Monthly Progress Report
Extension of Southern Expressway Project from Mattala to Hambantota via Andarawewa March 2018

Work Completed Work In Progress None Applicable

Section (L to R)
Cul.No Description
S1 S2 S3 S4 S5 S6 S7 S8 S9
Setting out
Excavation
Leveling Concrete
Base
Wall
Re bar work
Deck
WW
Base
CH 4+580
Wall
Form Work
Deck
WW
Base
Wall
Concreting
Deck
WW
Backfilling

Setting out
Excavation
Leveling Concrete
Base
Wall
Re bar work
Deck
WW
Base
CH 4+652
Wall
Form Work
Deck
WW
Base
Wall
Concreting
Deck
WW
Backfilling

Setting out
Excavation
Leveling Concrete
Base
Wall
Re bar work
Deck
WW
Base
CH 4+900
Wall
Form Work
Deck
WW
Base
Wall
Concreting
Deck
WW
Backfilling

66
Consultancy Services for Design Review and Construction Supervision of Monthly Progress Report
Extension of Southern Expressway Project from Mattala to Hambantota via Andarawewa March 2018

Work Completed Work In Progress None Applicable

Section (L to R)
Cul.No Description
S1 S2 S3 S4 S5 S6 S7 S8 S9
Setting out
Excavation
Leveling Concrete
Base
Wall
Re bar work
Deck
WW
Base
CH 5+293
Wall
Form Work
Deck
WW
Base
Wall
Concreting
Deck
WW
Backfilling

Setting out
Excavation
Leveling Concrete
Base
Wall
Re bar work
Deck
WW
Base
CH 5+462
Wall
Form Work
Deck
WW
Base
Wall
Concreting
Deck
WW
Backfilling

Setting out
Excavation
Leveling Concrete
Base
Wall
Re bar work
Deck
WW
Base
CH 5+800
Wall
Form Work
Deck
WW
Base
Wall
Concreting
Deck
WW
Backfilling

67
Consultancy Services for Design Review and Construction Supervision of Monthly Progress Report
Extension of Southern Expressway Project from Mattala to Hambantota via Andarawewa March 2018

Work Completed Work In Progress None Applicable

Section (L to R)
Cul.No Description
S1 S2 S3 S4 S5 S6 S7 S8 S9
Setting out
Excavation
Leveling Concrete
Base
Wall
Re bar work
Deck
WW
CH 5+800
Base
Extended
Shell Wall
Form Work
Deck
WW
Base
Wall
Concreting
Deck
WW
Backfilling

Setting out
Excavation
Leveling Concrete
Base
Wall
Re bar work
Deck
WW
Base
CH 6+205
Wall
Form Work
Deck
WW
Base
Wall
Concreting
Deck
WW
Backfilling

Setting out
Excavation
Leveling Concrete
Base
Wall
Re bar work
Deck
WW
Base
CH 6+220
Wall
Form Work
Deck
WW
Base
Wall
Concreting
Deck
WW
Backfilling

68
Consultancy Services for Design Review and Construction Supervision of Monthly Progress Report
Extension of Southern Expressway Project from Mattala to Hambantota via Andarawewa March 2018

Work Completed Work In Progress None Applicable

Setting out
Excavation
Leveling Concrete
Base
Wall
Re bar work
Deck
WW
Base
CH 6+690
Wall
Form Work
Deck
WW
Base
Wall
Concreting
Deck
WW
Backfilling

69
Consultancy Services for Design Review and Construction Supervision of Monthly Progress Report
Extension of Southern Expressway Project from Mattala to Hambantota via Andarawewa March 2018

Work Completed Work In Progress None Applicable

Section (L to R)
Cul.No Description
S1 S2 S3 S4 S5 S6 S7 S8 S9
Setting out
Excavation
Leveling Concrete
Base
Wall
Re bar work
Deck
WW
Base
CH 7+000
Wall
Form Work
Deck
WW
Base
Wall
Concreting
Deck
WW
Backfilling

Setting out
Excavation
Leveling Concrete
Base
Wall
Re bar work
Deck
WW
Base
CH 7+310
Wall
Form Work
Deck
WW
Base
Wall
Concreting
Deck
WW
Backfilling

Setting out
Excavation
Leveling Concrete
Base
Wall
Re bar work
Deck
WW
Base
CH 7+349
Wall
Form Work
Deck
WW
Base
Wall
Concreting
Deck
WW
Backfilling

70
Consultancy Services for Design Review and Construction Supervision of Monthly Progress Report
Extension of Southern Expressway Project from Mattala to Hambantota via Andarawewa March 2018

Work Completed Work In Progress None Applicable

Section (L to R)
Cul.No Description
S1 S2 S3 S4 S5 S6 S7 S8 S9
Setting out
Excavation
Leveling Concrete
Base
Wall
Re bar work
Deck
WW
Base
CH 7+660
Wall
Form Work
Deck
WW
Base
Wall
Concreting
Deck
WW
Backfilling

Setting out
Excavation
Leveling Concrete
Base
Wall
Re bar work
Deck
WW
Base
CH 8+040
Wall
Form Work
Deck
WW
Base
Wall
Concreting
Deck
WW
Backfilling

Setting out
Excavation
Leveling Concrete
Base
Wall
Re bar work
Deck
WW
Base
CH 8+250
Wall
Form Work
Deck
WW
Base
Wall
Concreting
Deck
WW
Backfilling

71
Consultancy Services for Design Review and Construction Supervision of Monthly Progress Report
Extension of Southern Expressway Project from Mattala to Hambantota via Andarawewa March 2018

Work Completed Work In Progress None Applicable

Section (L to R)
Cul.No Description
S1 S2 S3 S4 S5 S6 S7 S8 S9
Setting out
Excavation
Leveling Concrete
Base
Wall
Re bar work
Deck
WW
Base
CH 8+856
Wall
Form Work
Deck
WW
Base
Wall
Concreting
Deck
WW
Backfilling

Setting out
Excavation
Leveling Concrete
Base
Wall
Re bar work
Deck
WW
Base
CH 9+180
Wall
Form Work
Deck
WW
Base
Wall
Concreting
Deck
WW
Backfilling

Setting out
Excavation
Leveling Concrete
Base
Wall
Re bar work
Deck
WW
CH 9+180 Base
Extended
Wall
Shell Form Work
Deck
WW
Base
Wall
Concreting
Deck
WW
Backfilling

72
Consultancy Services for Design Review and Construction Supervision of Monthly Progress Report
Extension of Southern Expressway Project from Mattala to Hambantota via Andarawewa March 2018

Work Completed Work In Progress None Applicable

Section (L to R)
Cul.No Description
S1 S2 S3 S4 S5 S6 S7 S8 S9
Setting out
Excavation
Leveling Concrete
Base
Wall
Re bar work
Deck
WW
Base
CH 9+550
Wall
Form Work
Deck
WW
Base
Wall
Concreting
Deck
WW
Backfilling

Setting out
Excavation
Leveling Concrete
Base
Wall
Re bar work
Deck
WW
Base
CH 9+650
Wall
Form Work
Deck
WW
Base
Wall
Concreting
Deck
WW
Backfilling

Setting out
Excavation
Leveling Concrete
Base
Wall
Re bar work
Deck
WW
Base
CH 10+970
Wall
Form Work
Deck
WW
Base
Wall
Concreting
Deck
WW
Backfilling

73
Consultancy Services for Design Review and Construction Supervision of Monthly Progress Report
Extension of Southern Expressway Project from Mattala to Hambantota via Andarawewa March 2018

Work Completed Work In Progress None Applicable

Section (L to R)
Cul.No Description
S1 S2 S3 S4 S5 S6 S7 S8 S9
Setting out
Excavation
Leveling Concrete
Base
Wall
Re bar work
Deck
WW
Extended
Base
Cell
CH 10+970 Wall
Form Work
Deck
WW
Base
Wall
Concreting
Deck
WW
Backfilling

Setting out
Excavation
Leveling Concrete
Base
Wall
Re bar work
Deck
WW
Base
CH 11+695
Wall
Form Work
Deck
WW
Base
Wall
Concreting
Deck
WW
Backfilling

Setting out
Excavation
Leveling Concrete
Base
Wall
Re bar work
Deck
WW
Base
CH 12+150
Wall
Form Work
Deck
WW
Base
Wall
Concreting
Deck
WW
Backfilling

74
Consultancy Services for Design Review and Construction Supervision of Monthly Progress Report
Extension of Southern Expressway Project from Mattala to Hambantota via Andarawewa March 2018

Work Completed Work In Progress None Applicable

Section (L to R)
Cul.No Description
S1 S2 S3 S4 S5 S6 S7 S8 S9
Setting out
Excavation
Leveling Concrete
Base
Wall
Re bar work
Deck
WW
Base
CH 13+350
Wall
Form Work
Deck
WW
Base
Wall
Concreting
Deck
WW
Backfilling

Setting out
Excavation
Leveling Concrete
Base
Wall
Re bar work
Deck
WW
Base
CH 13+510
Wall
Form Work
Deck
WW
Base
Wall
Concreting
Deck
WW
Backfilling

Setting out
Excavation
Leveling Concrete
Base
Wall
Re bar work
Deck
WW
CH 13+510 Base
Extended Wall
cell Form Work
Deck
WW
Base
Wall
Concreting
Deck
WW
Backfilling

75
Consultancy Services for Design Review and Construction Supervision of Monthly Progress Report
Extension of Southern Expressway Project from Mattala to Hambantota via Andarawewa March 2018

Work Completed Work In Progress None Applicable

Section (L to R)
Cul.No Description
S1 S2 S3 S4 S5 S6 S7 S8 S9
Setting out
Excavation
Leveling Concrete
Base
Wall
Re bar work
Deck
WW
Base
CH 71+299
Wall
Form Work
Deck
WW
Base
Wall
Concreting
Deck
WW
Backfilling

Setting out
Excavation
Leveling Concrete
Base
Wall
Re bar work
Deck
WW
CH 71+299
Base
Extended
cell Wall
Form Work
Deck
WW
Base
Wall
Concreting
Deck
WW
Backfilling

Setting out
Excavation
Leveling Concrete
Base
Wall
Re bar work
Deck
WW
Base
CH 71+385
Wall
Form Work
Deck
WW
Base
Wall
Concreting
Deck
WW
Backfilling

76
Consultancy Services for Design Review and Construction Supervision of Monthly Progress Report
Extension of Southern Expressway Project from Mattala to Hambantota via Andarawewa March 2018

Work Completed Work In Progress None Applicable


Section (L to R)
Cul.No Description
S1 S2 S3 S4 S5 S6 S7 S8 S9
Setting out
Excavation
Leveling Concrete
Base
Wall
Re bar work
Deck
WW
Base
CH 71+500
Wall
Form Work
Deck
WW
Base
Wall
Concreting
Deck
WW
Backfilling

Section (L to R)
Cul.No Description
S1 S2 S3 S4 S5 S6 S7 S8 S9
Setting out
Excavation
Leveling Concrete
Base
Wall
Re bar work
Deck
WW
Base
CH 71+600
Wall
Form Work
Deck
WW
Base
Wall
Concreting
Deck
WW
Backfilling

Setting out
Excavation
Leveling Concrete
Base
Wall
Re bar work
Deck
WW
Base
CH 71+700
Wall
Form Work
Deck
WW
Base
Wall
Concreting
Deck
WW
Backfilling

77
Consultancy Services for Design Review and Construction Supervision of Monthly Progress Report
Extension of Southern Expressway Project from Mattala to Hambantota via Andarawewa March 2018

Work Completed Work In Progress None Applicable


Setting out
Excavation
Leveling Concrete
Base
Wall
Re bar work
Deck
WW
Base
CH 71+822
Wall
Form Work
Deck
WW
Base
Wall
Concreting
Deck
WW
Backfilling

Section (L to R)
Cul.No Description
S1 S2 S3 S4 S5 S6 S7 S8 S9
Setting out
Excavation
Leveling Concrete
Base
Wall
Re bar work
Deck
WW
Base
CH 71+917
Wall
Form Work
Deck
WW
Base
Wall
Concreting
Deck
WW
Backfilling

Section (L to R)
Cul.No Description
S1 S2 S3 S4 S5 S6 S7 S8 S9
Setting out
Excavation
Leveling Concrete
Base
Wall
Re bar work
Deck
WW
CH Base
72+028 Wall
Form Work
Deck
WW
Base
Wall
Concreting
Deck
WW
Backfilling

78
Consultancy Services for Design Review and Construction Supervision of Monthly Progress Report
Extension of Southern Expressway Project from Mattala to Hambantota via Andarawewa March 2018

Setting out
Excavation
Leveling Concrete
Base
Wall
Re bar work
Deck
WW
CH Base
72+210 Wall
Form Work
Deck
WW
Base
Wall
Concreting
Deck
WW
Backfilling

Section (L to R)
Cul.No Description
S1 S1 S1 S1 S1 S1 S1 S1 S1
Setting out
Excavation
Leveling Concrete
Base
Wall
Re bar work
Deck
WW
CH Base
72+262 Wall
Form Work
Deck
WW
Base
Wall
Concreting
Deck
WW
Backfilling

Section (L to R)
Cul.No Description
S1 S2 S3 S4 S5 S6 S7 S8 S9
Setting out
Excavation
Leveling Concrete
Base
Wall
Re bar work
Deck
WW
Base
CH 72+382
Wall
Form Work
Deck
WW
Base
Wall
Concreting
Deck
WW
Backfilling

79
Consultancy Services for Design Review and Construction Supervision of Monthly Progress Report
Extension of Southern Expressway Project from Mattala to Hambantota via Andarawewa March 2018

Setting out
Excavation
Leveling Concrete
Base
Wall
Re bar work
Deck
WW
Base
CH 72+500
Wall
Form Work
Deck
WW
Base
Wall
Concreting
Deck
WW
Backfilling

Setting out
Excavation
Leveling Concrete
Base
Wall
Re bar work
Deck
WW
Base
CH 72+567
Wall
Form Work
Deck
WW
Base
Wall
Concreting
Deck
WW
Backfilling

Section (L to R)
Cul.No Description
S1 S2 S3 S4 S5 S6 S7 S8 S9
Setting out
Excavation
Leveling Concrete
Base
Wall
Re bar work
Deck
WW
Base
CH 72+603
Wall
Form Work
Deck
WW
Base
Wall
Concreting
Deck
WW
Backfilling

80
Consultancy Services for Design Review and Construction Supervision of Monthly Progress Report
Extension of Southern Expressway Project from Mattala to Hambantota via Andarawewa March 2018

Setting out
Excavation
Leveling Concrete
Base
Wall
Re bar work
Deck
WW
Base
CH 72+800
Wall
Form Work
Deck
WW
Base
Wall
Concreting
Deck
WW
Backfilling

Setting out
Excavation
Leveling Concrete
Base
Wall
Re bar work
Deck
WW
Base
CH 73+148
Wall
Form Work
Deck
WW
Base
Wall
Concreting
Deck
WW
Backfilling

Section (L to R)
Cul.No Description
S1 S2 S3 S4 S5 S6 S7 S8 S9
Setting out
Excavation
Leveling Concrete
Base
Wall
Re bar work
Deck
WW
Base
CH 73+448
Wall
Form Work
Deck
WW
Base
Wall
Concreting
Deck
WW
Backfilling

81
Consultancy Services for Design Review and Construction Supervision of Monthly Progress Report
Extension of Southern Expressway Project from Mattala to Hambantota via Andarawewa March 2018

Work Completed Work In Progress None Applicable

Section (L to R)
Cul.No Description
S1 S2 S3 S4 S5 S6 S7 S8 S9
Setting out
Excavation
Leveling Concrete
Base
Wall
Re bar work
Deck
WW
CH 74+253
Base
Extended
cell Wall
Form Work
Deck
WW
Base
Wall
Concreting
Deck
WW
Backfilling

Setting out
Excavation 12-08-2016
Leveling Concrete
Base
Wall
Re bar work
Deck
WW
CH 74+390 Base
(R) Wall
Form Work
Deck
WW
Base
Wall
Concreting
Deck
WW
Backfilling

Setting out
Excavation
Leveling Concrete
Base
Wall
Re bar work
Deck
WW
Base
CH 74+808
Wall
Form Work
Deck
WW
Base
Wall
Concreting
Deck
WW
Backfilling

82
Consultancy Services for Design Review and Construction Supervision of Monthly Progress Report
Extension of Southern Expressway Project from Mattala to Hambantota via Andarawewa March 2018

Setting out
Excavation
Leveling Concrete
Base
Wall
Re bar work
Deck
WW
CH 74+808
Base
Extended
Cell Wall
Form Work
Deck
WW
Base
Wall
Concreting
Deck
WW
Backfilling

Section (L to R)
Cul.No Description
S1 S2 S3 S4 S5 S6 S7 S8 S9 S10
Setting out
Excavation
Leveling Concrete
Base
Wall
Re bar work
Deck
WW
CH Base
77+084 Wall
Form Work
Deck
WW
Base
Wall
Concreting
Deck
WW
Backfilling

Setting out
Excavation
Leveling Concrete
Base
Wall
Re bar work
Deck
WW
CH Base
77+150 Wall
Form Work
Deck
WW
Base
Wall
Concreting
Deck
WW
Backfilling

83
Consultancy Services for Design Review and Construction Supervision of Monthly Progress Report
Extension of Southern Expressway Project from Mattala to Hambantota via Andarawewa March 2018

Work Completed Work In Progress None Applicable

Setting out
Excavation
Leveling Concrete
Base
Wall
Re bar work
Deck
WW
CH Base
77+410 Wall
Form Work
Deck
WW
Base
Wall
Concreting
Deck
WW
Backfilling

Section (L to R)
Cul.No Description
S1 S2 S3 S4 S5 S6 S7 S8 S9
Setting out
Excavation
Leveling Concrete
Base
Wall
Re bar work
Deck
CH WW
77+644
Base
[Extension
Wall
of Existing Form Work
Culvert] Deck
WW
Base
Wall
Concreting
Deck
WW
Backfilling

84
Consultancy Services for Design Review and Construction Supervision of Monthly Progress Report
Extension of Southern Expressway Project from Mattala to Hambantota via Andarawewa March 2018

Work Completed Work In Progress None Applicable

Section (L to R)
Cul.No Description
S1 S2 S3 S4 S5 S6 S7 S8 S9
Setting out
Excavation
Leveling
ConcreteBase
Re
Wall
bar
work Deck
WW
CH Base
A1+430 Form Wall
Work Deck
WW
Base
Concr Wall
eting Deck
WW
Backfilling

Setting out
Excavation
Leveling
ConcreteBase
Re
Wall
bar
work Deck
WW
CH Base
A1+792 Form Wall
Work Deck
WW
Base
Concr Wall
eting Deck
WW
Backfilling

Setting out
Excavation
Leveling
ConcreteBase
Re
Wall
bar
work Deck
WW
CH Base
A2+024 Form Wall
Work Deck
WW
Base
Concr Wall
eting Deck
WW
Backfilling

85
Consultancy Services for Design Review and Construction Supervision of Monthly Progress Report
Extension of Southern Expressway Project from Mattala to Hambantota via Andarawewa March 2018

Work Completed Work In Progress None Applicable

Section (L to R)
Cul.No Description
S1 S2 S3 S4 S5 S6 S7 S8 S9
Setting out
Excavation
Leveling Concrete
Base
Wall
Re bar work
Deck
WW
CH Base
A2+388 Wall
Form Work
Deck
WW
Base
Wall
Concreting
Deck
WW
Backfilling

Setting out
Excavation
Leveling Concrete
Base
Wall
Re bar work
Deck
CH WW
B0+223 Base
One cell Wall
extended Form Work
Deck
WW
Base
Wall
Concreting
Deck
WW
Backfilling

86
Consultancy Services for Design Review and Construction Supervision of Monthly Progress Report
Extension of Southern Expressway Project from Mattala to Hambantota via Andarawewa March 2018

Work Completed Work In Progress None Applicable

Section (L to R)
Cul.No Description
S1 S2 S3 S4 S5 S6 S7 S8 S9
Setting out
Excavation
Leveling Concrete
Base
Wall
Re bar work
Deck
WW
CH Base
C0+488 Wall
Form Work
Deck
WW
Base
Wall
Concreting
Deck
WW
Backfilling

Setting out
Excavation
Leveling Concrete
Base
Wall
Re bar work
Deck
WW
CH Base
C0+748 Wall
Form Work
Deck
WW
Base
Wall
Concreting
Deck
WW
Backfilling

Setting out
Excavation
Leveling Concrete
Base
Wall
Re bar work
Deck
WW
CH Base
C1+084 Wall
Form Work
Deck
WW
Base
Wall
Concreting
Deck
WW
Backfilling

87
Consultancy Services for Design Review and Construction Supervision of Monthly Progress Report
Extension of Southern Expressway Project from Mattala to Hambantota via Andarawewa March 2018

Section (L to R)
Cul.No Description
S1 S2 S3 S4 S5 S6 S7 S8 S9
Setting out
Excavation
Leveling Concrete
Base
Wall
Re bar work
Deck
WW
CH Base
C1+920 Wall
Form Work
Deck
WW
Base
Wall
Concreting
Deck
WW
Backfilling

Setting out
Excavation
Leveling Concrete
Base
Wall
Re bar work
Deck
WW
CH Base
D0+300 Wall
Form Work
Deck
WW
Base
Wall
Concreting
Deck
WW
Backfilling

Setting out
Excavation
Leveling Concrete
Base
Wall
Re bar work
Deck
WW
CH Base
D0+791 Wall
Form Work
Deck
WW
Base
Wall
Concreting
Deck
WW
Backfilling

88
Consultancy Services for Design Review and Construction Supervision of Monthly Progress Report
Extension of Southern Expressway Project from Mattala to Hambantota via Andarawewa March 2018

Bridges Progress
Overpass Bridge BRO-01 at CH1+280

Work Completed Work In Progress None Applicable

Date of Spread Found. Pile cap Pier Abt.Wall Pier Head Deck Slab
Scrd Pile Pile
DESCRIPTION SYMBOL LOCATION Commencemen Exc. Back Fill
Con. R/ Bor. Con. F R/ F/ R/ F/ R/ F Co R/ F Co
t F/W Con R/F Con Con Con
F W F W F W F W n F W n

Abutment A1 G0+055 07/07/2017

Pier P1 G0+085 19/07/2017

Abutment A2 G0+115 30/07/2017

Completed up to end of
Item Total/ (Nos) % of Completed
February 2018
Spread Footing 03 03 100.0%
Abutment 02 02 100.0%
Pier Stems 03 03 100.0%
Pier Head 01 01 100.0%
Beam Launching 12 12 100.0%
Deck Slab 02 -

89
Consultancy Services for Design Review and Construction Supervision of Monthly Progress Report
Extension of Southern Expressway Project from Mattala to Hambantota via Andarawewa March 2018

Overpass Bridge BRO-02 at CH2+072

Work Completed Work In Progress None Applicable

Spread Found. Pile cap Pier Abt.Wall Pier Head Deck Slab
Date of Scrd Pile Pile Back
DESCRIPTION SYMBOL LOCATION Exc.
Commencement Con. Bor. Con. R/ F Co Fill
R/F FW Con R/F FW Con R/F FW Con R/F FW Con R/F FW Con
F W n
Abutment A1 G0+055 22/12/2016

Pier P1 G0+085 22/02/2017

Abutment A2 G0+115 22/12/2016

Completed up to end of
Item Total/ (Nos) % of Completed
February 2018
Spread Footing 03 03 100.0%
Abutment 02 02 100.0%
Pier Stems 03 03 100.0%
Pier Head 01 01 100.0%
Beam Launching 12 12 100.0%
Deck Slab 02 -

90
Consultancy Services for Design Review and Construction Supervision of Monthly Progress Report
Extension of Southern Expressway Project from Mattala to Hambantota via Andarawewa March 2018

Bridge BR-1 at CH2+800

Work Completed Work In Progress None Applicable

Deck
Date of Scrd Spread Found. Tie Beam Pier Stem Abt.Wall Pier Head Slab
LOCATIO Pile Pile Back
DESCRIPTION SYMBOL Commencemen Exc. Con R C
N F Bor. Con. R/ F R/ F R/ F R/ F Fill
t . R/F Con Con Con Con FW Con / o
W F W F W F W F W
F n
Abutment A1 2+710 04/11/2016

Pier P1 2+740 16/12/2016

Pier P2 2+770 16/12/2016

Pier P3 2+800 31/03/2017

Pier P4 2+830 12/04/2017

Pier P5 2+860 18/01/2017

Abutment A2 2+890 16/11/2016

Completed up to end of
Item Total/ (Nos) % of Completed
February 2018
Pilling 30 30 100.0%
Tie Beam 10 10 100.0%
Abutment 2 02 100.0%
Pier Stems 30 30 100.0%
Pier Head 10 10 100.0%
Beam Launching 72 -
Deck Slab 12 -

91
Consultancy Services for Design Review and Construction Supervision of Monthly Progress Report
Extension of Southern Expressway Project from Mattala to Hambantota via Andarawewa March 2018

Underpass Bridge BRU-01 at CH5+200

Work Completed Work In Progress None Applicable

Spread Found. Pile cap Pier Abt.Wall Pier Head Deck Slab
Date of Scrd Pile Pile Back
DESCRIPTION SYMBOL LOCATION Exc.
Commencement Con. Bor. Con. Fill
R/F FW Con R/F FW Con R/F FW Con R/F FW Con R/F FW Con R/F FW Con

R
Abutment A1 5+181 15/02/2017
L
R
Abutment A2 5+216 19/12/2016
L

Completed up to end of
Item Total/ (No’s) % of Completed
February 2018
Pilling 16 16 100.0%
Spread Footing 1 01 100.0%
Pile Cap 2 02 100.0%
Abutment 2 02 100.0%
Beam Launching 12 12 100.0%
Deck Slab 2 01 50.0%

92
Consultancy Services for Design Review and Construction Supervision of Monthly Progress Report
Extension of Southern Expressway Project from Mattala to Hambantota via Andarawewa March 2018

Underpass Bridge BRU-2 at CH77+015

Work Completed Work In Progress None Applicable

Spread Found. Pile cap Pier Abt.Wall Pier Head Deck Slab
Date of Pile Pile Back
DESCRIPTION SYMBOL LOCATION Bor. Con.
Exc. ScrdCon.
Fill
Commencement
R/F FW Con R/F F/W Con R/F FW Con R/F FW Con R/F FW Con R/F FW Con

Abutment A1 76+970 19/12/2016

Pier P1 77+000 29/08/2017

Pier P2 77+030 20/07/2017

Abutment A2 77+060 15/07/2017

Completed up to end of
Item Total/ (No’s) % of Completed
February 2018
Pilling 44 44 100.0%
Pile Cap 08 08 100.0%
Abutment 02 02 100.0%
Pier Stems 12 12 100.0%
Pier Head 04 04 100.0%
Beam Launching 36 36 100.0%
Deck Slab 06 -

93
Consultancy Services for Design Review and Construction Supervision of Monthly Progress Report
Extension of Southern Expressway Project from Mattala to Hambantota via Andarawewa March 2018

Bridge BRI-1 at C1+580

Work Completed Work In Progress None Applicable

Pile cap Pier Stems Abt.Wall Pier Head Deck Slab


Date of Pile Pile Scrd
DESCRIPTION SYMBOL LOCATION Back Fill
Commencement Bor. Con. Con.
R/F FW Con R/F FW Con R/F FW Con R/F FW Con R/F FW Con

Abutment A1 C1+505 20/04/2017

Pier P1 C1+535 19/04/2017

Pier P2 C1+565 19/04/2017

Pier P3 C1+595 20/04/2017

Pier P4 C1+625 23/04/2017

Abutment A2 C+655 24/04/2017

Completed up to end of
Item Total/ (No’s) % of Completed
February 2018
Pilling 28 28 100.0%
Pile Cap 06 06 100.0%
Abutment 02 02 100.0%
Piers Stems 04 04 100.0%
Pier Head 04 04 100.0%
Beam Launching 25 25 100.0%
Deck Slab 05 05 100.0%

94
Consultancy Services for Design Review and Construction Supervision of Monthly Progress Report
Extension of Southern Expressway Project from Mattala to Hambantota via Andarawewa March 2018

Bridge BRI-2 at BO+717


Work Completed Work In Progress None Applicable

Pile cap Bored Pier Abt.Wall Pier Head Deck Slab


Date of Pile Pile Scrd
DESCRIPTION SYMBOL LOCATION Back Fill
Commencement Bor. Con. Con.
R/F FW Con R/F FW Con R/F FW Con R/F FW Con R/F FW Con

Abutment A1 B0+647.3 27/04/2017

Pier1 P1 B0+682.3 28/07/2017

Pier2 P2 B0+717.3 02/08/2017

Pier3 P3 B0+752.3 11/17/2017

Abutment A2 B0+787.3 18/04/2017

Completed up to end of
Item Total/ (No’s) % of Completed
February 2018
Pilling 24 24 100.0%
Pile Cap 05 05 100.0%
Abutment 02 02 100.0%
Piers Stems 09 09 100.0%
Pier Head 03 03 100.0%
Beam Launching 20 20 100.0%
Deck Slab 04 -

95
Consultancy Services for Design Review and Construction Supervision of Monthly Progress Report
Extension of Southern Expressway Project from Mattala to Hambantota via Andarawewa March 2018

Bridge BRI-4 at A0+859


Work Completed Work In Progress None Applicable
Date of Pile cap Tie Beam Bored Pier Abt.Wall Pier Head Deck Slab Back
SYMBOL LOCATION Pile Bor. Pile Con. Scrd Con.
Commencement R/F FW Con R/F FW Con R/F FW Con R/F FW Con R/F FW Con R/F FW Con Fill
A1 A0+424 5-Jun-2017
P1 A0+454 28-Jun-2017
P2 A0+484 07-July-2017
P3 A0+514 06-July-2017
P4 A0+544 06-July-2017
P5 A0+574 04-July-2017
P6 A0+604 28-Jun-2017
P7 A0+634 22-Jun-2017
P8 A0+664 22-Jun-2017
P9 A0+694 20-Jun-2017
P10 A0+729 04-Jun-2017
P11 A0+764 02-July-2017
P12 A0+799 24-Jun-2017
P13 A0+829 16-Jun-2017
P14 A0+859 31-May-2017
P15 A0+889 01-May-2017
P16 A0+919 04-Jun-2017
P17 A0+949 13-Jun-2017
P18 A0+979 08-Jun-2017
P19 A1+009 07-Jun-2017
P20 A1+039 07-Jun-2017
P21 A1+069 24-Jun-2017
P22 A1+099 12-Jun-2017
P23 A1+129 23-May-2017
P24 A1+159 03-May-2017
P25 A1+189 26-May-2017
P26 A1+224 02/05/2017
P27 A1+259 03-May-2017
A2 A1+294 03-May-2017

96
Consultancy Services for Design Review and Construction Supervision of Monthly Progress Report
Extension of Southern Expressway Project from Mattala to Hambantota via Andarawewa March 2018

Item Total/ (No’s) Completed up to end of February % of Completed


2018
Pilling 120 120 100.0%
Pile Cap 23 23 100.0%
Tie Beam 08 08 100.0%
Abutment 02 02 100.0%
Pier Stems 56 50 89.2%
Pier Columns 04 04 100.0%
Pier Walls 01 01 100.0%
Pier Heads 27 27 100.0%
Beam Launching 140 140 100.0%
Deck Slab 28 05 17.8%

97
Consultancy Services for Design Review and Construction Supervision of Monthly Progress Report
Extension of Southern Expressway Project from Mattala to Hambantota via Andarawewa March 2018

Bridge BRI-5 at CH73+217


Work Completed Work In Progress None Applicable

Pile cap Tie Beam Bored Pier Abt.Wall Pier Head Deck Slab
Date of Pile Pile Scrd Back
DESCRIPTION SYMBOL LOCATION Bor. Con. Con. Fill
Commencement
R/F FW Con R/F FW Con R/F FW Con R/F FW Con R/F FW Con R/F FW Con

Abutment A1 73+217 27/02/2017

Pier P1 73+252 10/04/2017

Pier P2 73+287 05/06/2017

Abutment A2 73+322 31/01/2017

Completed up to end of
Item Total/ (No’s) % of Completed
February 2018
Pilling 21 21 100.0%
Pile Cap 02 02 100.0%
Tie Beam 02 02 100.0%
Abutment 02 02 100.0%
Piers Stems 06 06 100.0%
Pier Head 02 02 100.0%
Beam Launching 18 18 100.0%
Deck Slab 03 -

98
Consultancy Services for Design Review and Construction Supervision of Monthly Progress Report
Extension of Southern Expressway Project from Mattala to Hambantota via Andarawewa March 2018

Bridge BRI-6 at CH73+269

Work Completed Work In Progress None Applicable

Pile cap Tie Beam Bored Pier Abt.Wall Pier Head Deck Slab
Date of Pile Pile Scrd Back
DESCRIPTION SYMBOL LOCATION Bor. Con. Con. Fill
Commencement
R/F FW Con R/F FW Con R/F FW Con R/F FW Con R/F FW Con R/F FW Con

Abutment A1 73+217 26/02/2017

Pier P1 73+252 15/03/2017

Pier P2 73+287 24/02/2017

Abutment A2 73+322 31/01/2017

Completed up to end of
Item Total/ (No’s) % of Completed
February 2018
Pilling 21 21 100.0%
Pile Cap 02 02 100.0%
Tie Beam 02 02 100.0%
Abutment 02 02 100.0%
Piers Stems 06 06 100.0%
Pier Head 02 02 100.0%
Beam Launching 18 18 100.0%
Deck Slab 03 01 33.3%

99
Consultancy Services for Design Review and Construction Supervision of Monthly Progress Report
Extension of Southern Expressway Project from Mattala to Hambantota via Andarawewa March 2018

Progress of Viaduct - 01

Work Completed Work In Progress None Applicable

Date of Pile Pile Pile cap Bored Pier Abt.Wall Pier Head Deck Slab
SYMBO LOCATIO Bac
DESCRIPTION Commencemen Bor Con R/ F Co R/ F Co R/ F Co R/ F Co R/ F Co
L N k Fill
t . . F W n F W n F W n F W n F W n
Abutment A1 75 + 031 12/02/2017
Pier P1 75 + 061 30/03/2017
Pier P2 75 + 091 29/03/2017
Pier P3 75 + 121 27/03/2017
Pier P4 75 + 151 27/03/2017
Pier P5 75 + 181 18/03/2017
Pier P6 75 + 211 15/03/2017
Pier P7 75 + 241 11/03/2017
Pier P8 75 + 271 04/03/2017
Pier P9 75 + 301 02/03/2017
Pier P10 75 + 331 07/03/2017
Pier P11 75 + 361 03/02/2017
Pier P12 75 + 391 02/02/2017
Pier P13 75 + 421 15/01/2017
Pier P14 75 + 451 01/12/2017
Pier P15 75 + 481 12/11/2016
Pier P16 75 + 511 22/10/2016
Pier P17 75 + 541 21/10/2016
Pier P18 75 + 571 06/09/2016
Pier P19 75 + 601 06/09/2016
Pier P20 75 + 631 27/09/2016
Abutment A2 75 + 661 28/09/2016

100
Consultancy Services for Design Review and Construction Supervision of Monthly Progress Report
Extension of Southern Expressway Project from Mattala to Hambantota via Andarawewa March 2018

rogress of Viaduct - 01

Completed up to end of February


Item Total/ (Nos) % of Completed
2018
Pilling 192 192 100.0%
Pile Cap 44 44 100.0%
Abutment 02 02 100.0%
Pier Stems 80 80 100.0%
Pier Head 40 40 100.0%
Beam Launching 302 302 100.0%
Deck Slab 42 42 100.0%

101
Consultancy Services for Design Review and Construction Supervision of Monthly Progress Report
Extension of Southern Expressway Project from Mattala to Hambantota via Andarawewa March 2018

Progress of Viaduct – 02

Substructure

Work Completed Work In Progress None Applicable

Spread Found. Bored Pier Abt.Wall Pier Head Deck Slab


Date of Scrd Back
DESCRIPTION SYMBOL LOCATION Exc.
Commencement Con. Fill
R/F FW Con R/F FW Con R/F FW Con R/F FW Con R/F FW Con

Abutment A1 76+140 16/08/16


Pier P1 76+170 15/08/16
Pier P2 76+200 27/08/16
Pier P3 76+230 02/10/16
Pier P4 76+260 25/07/16
Pier P5 76+290 29/07/16
Pier P6 76+320 01/08/16
Pier P7 76+350 03/08/16
Abutment A2 76+380 09/08/16

102
Consultancy Services for Design Review and Construction Supervision of Monthly Progress Report
Extension of Southern Expressway Project from Mattala to Hambantota via Andarawewa March 2018

Progress of Viaduct – 02
Superstructure

Work Completed Work In Progress None Applicable

Bored Pier Abt.Wall Pier Head Diaphragm


Deck slab
Date of Girder Beam Back
DESCRIPTION LOCATION
Commencement Erection fill
R/F FW Con R/F FW Con R/F FW Con R/F FW Con FW R/F Con

Abutment (A1) - Pier (P1) 76+140-76+170 7/02/2017


Pier (P1) - Pier (P2) 76+170-76+200 31/01/2017
Pier (P2) - Pier (P3) 76+200-76+230 24/01/2017
Pier (P3) - Pier (P4) 76+230-76+260 20/01/2017
Pier (P4) - Pier (P5) 76+260-76+290 16/01/2017
Pier (P5) - Pier (P6) 76+290-76+320 11/01/2017
Pier (P6) - Pier (P7) 76+320-76+350 05/01/2017
Pier (P7) - Abutment (A2) 76+350-76+380 25/12/2016

Completed up to end of
Item Total/ (Nos) % of Completed
February 2018
Spread Footing 18 18 100.0%
Abutment 2 2 100.0%
Pier Stems 28 28 100.0%
Pier Head 14 14 100.0%
Beam Launching 96 96 100.0%
Deck Slab 16 16 100.0%

103
Consultancy Services for Design Review and Construction Supervision of Monthly Progress Report
Extension of Southern Expressway Project from Mattala to Hambantota via Andarawewa March 2018

ANNEXURE 10: CONTRACTOR’S KEY STAFF IN FEBRUARY 2018.


No Description Foreign Staff Local Staff Total
1 Key Staff 14 15 29
2 Site Engineer 13 15 28
3 QA Engineer 1 4 5
4 QCI 0 18 18
5 Quantity Surveyor 4 7 11
6 Charge hand 2 5 7
7 Document Controller 0 12 12
8 Office Clerk 5 5 10
9 Safety Officer 4 9 13
10 Surveyor 4 10 14
11 Draughtsman 5 4 9
12 Administration Department Officer 0 1 1
13 General Affair Officer 4 4 8
14 Assistant in Equipment Department 2 1 3
15 Coordinator 0 1 1
16 Environmental officer 0 1 1
17 Material Technician 3 24 27
18 Security Supervisor 0 5 5
19 HR Office 1 4 5
20 Financial Accountant 3 2 5
21 Financial Assistant 1 1 2
22 Lab Technician 3 1 4
23 Foreman 2 21 23
24 Secretary 0 2 2
25 Store Keeper 2 5 7
26 Receiving Clerk in Material Department 1 5 6
27 Purchaser in Material Department 2 4 6
28 Laboratory Assistant 1 64 65
29 Surveyor Helpers 0 24 24
30 Mechanic 1 4 5
31 Electrician 2 5 7
32 Equipment Operator & Driver 6 78 84
33 Batching Plant Operator 1 7 8
34 Bar bender 0 24 24
35 Welder 0 14 14
36 Plumber 0 6 6
37 Mason 0 28 28
38 Carpenter 0 4 4
39 Labour 0 230 230
Total 87 674 761

104
Consultancy Services for Design Review and Construction Supervision of Monthly Progress Report
Extension of Southern Expressway Project from Mattala to Hambantota via Andarawewa March 2018

ANNEXURE 11: CONTRCTOR’S FOREIGN STAFF & LABOUR RETURN IN FEBRUARY 2018.
Functioning
Item Description Changes
January February
(+) or (-)
1 Key Staff 21 -7 14
2 Site Engineer 13 0 13
3 QA Engineer 1 0 1
4 QCI 0 0 0
5 Quantity Surveyor 5 -1 4
6 Charge hand 2 0 2
7 Document Controller 0 0 0
8 Office Clark 5 0 5
9 Safety Officer 4 0 4
10 Surveyor 4 0 4
11 Draughtsman 5 0 5
12 Administration Department Officer 0 0 0
13 General Affair Officer 4 0 4
14 Assistant in Equipment Department 2 0 2
15 Coordinator 0 0 0
16 Environmental officer 0 0 0
17 Material Technician 3 0 3
18 Security Supervisor 0 0 0
19 HR Office 1 0 1
20 Financial Accountant 3 0 3
21 Financial Assistant 1 0 1
22 Lab Technician 3 0 3
23 Foreman 2 0 2
24 Secretary 0 0 0
25 Store Keeper 2 0 2
26 Receiving Clerk in Material Department 1 0 1
27 Purchaser in Material Department 2 0 2
28 Laboratory Assistant 1 0 1
29 Survey Helpers 0 0 0
30 Mechanic 1 0 1
31 Electrician 2 0 2
32 Equipment Operator 6 0 6
33 Batching Plant Operator 1 0 1
34 Bar bender 0 0 0
35 Welder 0 0 0
36 Plumber 0 0 0
37 Mason 0 0 0
38 Carpenter 0 0 0
39 Labor 0 0 0
Total 95 -8 87

105
Consultancy Services for Design Review and Construction Supervision of Monthly Progress Report
Extension of Southern Expressway Project from Mattala to Hambantota via Andarawewa March 2018

ANNEXURE 12: CONTRCTOR’S LOCAL STAFF & LABOUR RETURN IN FEBRUARY 2018.
Functioning
Item Description Changes
January February
(+) or (-)
1 Key Staff 15 0 15
2 Site Engineer 15 0 15
3 QA Engineer 4 0 4
4 QCI 18 0 18
5 Quantity Surveyor 7 0 7
6 Charge hand 5 0 5
7 Document Controller 12 0 12
8 Office Clark 5 0 5
9 Safety Officer 9 0 9
10 Surveyor 10 0 10
11 Draughtsman 4 0 4
12 Administration Department Officer 1 0 1
13 General Affair Officer 4 0 4
14 Assistant in Equipment Department 1 0 1
15 Coordinator 1 0 1
16 Environmental officer 1 0 1
17 Material Technician 24 0 24
18 Security Supervisor 5 0 5
19 HR Office 4 0 4
20 Financial Accountant 2 0 2
21 Financial Assistant 1 0 1
22 Lab Technician 1 0 1
23 Foreman 21 0 21
24 Secretary 2 0 2
25 Store Keeper 5 0 5
Receiving Clerk in Material 5 5
26 0
Department
27 Purchaser in Material Department 4 0 4
28 Laboratory Assistant 64 0 64
29 Survey Helpers 24 0 24
30 Mechanic 4 0 4
31 Electrician 5 0 5
32 Equipment Operator 78 0 78
33 Batching Plant Operator 7 0 7
34 Bar bender 24 0 24
35 Welder 14 0 14
36 Plumber 6 0 6
37 Mason 28 0 28
38 Carpenter 4 0 4
39 Labor 230 -2 228
Total 674 -2 672

106
Consultancy Services for Design Review and Construction Supervision of Monthly Progress Report
Extension of Southern Expressway Project from Mattala to Hambantota via Andarawewa March 2018

ANNEXURE 13: CONTRCTOR’S MACHINERY & EQUIPMENTS IN FEBRUARY 2018.

No Description Unit Actual Quantity remark

1 Bulldozer nr 14
2 Roller nr 28
3 Loader nr 17

4 Excavator nr 58

5 Motor Grader nr 46

6 Dump truck nr 162

7 Crusher nr 03

8 Air Compressor nr 11

9 Vibrating hummer nr 04
10 Concrete pump nr 01

11 Weighbridge nr 03
12 Generator nr 15
13 Steel bar machine nr 03

14 Concrete mixer truck nr 09

15 Mobile crane nr 05
16 Crawler crane nr 03

17 Gantry crane nr 06
18 Transport truck nr 03

19 Ice machine nr 02
20 Paver nr 03
21 Bitumen spray bowser nr 02
22 Tired Roller nr 04

23 Water Bowser nr 39

Total 441

107
Consultancy Services for Design Review and Construction Supervision of Monthly Progress Report
Extension of Southern Expressway Project from Mattala to Hambantota via Andarawewa March 2018

ANNEXURE 14: PROGRESS PICTURES OF KEY ACTIVITIES.

Work description Parapet wall Construction


Location VD 01
Date 25-March-2018

Work description Construction of Deck Slab


Location BRU 02
Date 21-March-2018

108
Consultancy Services for Design Review and Construction Supervision of Monthly Progress Report
Extension of Southern Expressway Project from Mattala to Hambantota via Andarawewa March 2018

Work description Construction of Deck Slab


Location BRI-04
Date 28-March-2018

Work description Back filling


Location BRI-02
Date 29-March-2018

109
Consultancy Services for Design Review and Construction Supervision of Monthly Progress Report
Extension of Southern Expressway Project from Mattala to Hambantota via Andarawewa March 2018

Work description Kerb fixing


Location BRO-02
Date 19-March-2018

Work description Box Culvert Construction


Location 77+084
Date 09-March-2018

110
Consultancy Services for Design Review and Construction Supervision of Monthly Progress Report
Extension of Southern Expressway Project from Mattala to Hambantota via Andarawewa March 2018

Work description Embankment Construction


Location Ch 77+300
Date 08-March-2018

Work description Priming


Location C0 +780
Date 19-March-2018

111
Consultancy Services for Design Review and Construction Supervision of Monthly Progress Report
Extension of Southern Expressway Project from Mattala to Hambantota via Andarawewa March 2018

Work description Laying of Asphalt Binder Course.


Location CH 05+890
Date 28-March-2018

Work description Laying of Asphalt Binder Course.


Location CH 74+450-CH 74+650
Date 05-March-2018

112
Consultancy Services for Design Review and Construction Supervision of Monthly Progress Report
Extension of Southern Expressway Project from Mattala to Hambantota via Andarawewa March 2018

ANNEXURE 15: UPDATED MASTER PROGRAMME.

113
Consultancy Services for Design Review and Construction Supervision of Monthly Progress Report
Extension of Southern Expressway Project from Mattala to Hambantota via Andarawewa March 2018

114
Consultancy Services for Design Review and Construction Supervision of Monthly Progress Report
Extension of Southern Expressway Project from Mattala to Hambantota via Andarawewa March 2018

115
Consultancy Services for Design Review and Construction Supervision of Monthly Progress Report
Extension of Southern Expressway Project from Mattala to Hambantota via Andarawewa March 2018

ANNEXURE 16: WEATHER REPORTS.

116
Consultancy Services for Design Review and Construction Supervision of Monthly Progress Report
Extension of Southern Expressway Project from Mattala to Hambantota via Andarawewa March 2018

117
Consultancy Services for Design Review and Construction Supervision of Monthly Progress Report
Extension of Southern Expressway Project from Mattala to Hambantota via Andarawewa March 2018

118
Consultancy Services for Design Review and Construction Supervision of Monthly Progress Report
Extension of Southern Expressway Project from Mattala to Hambantota via Andarawewa March 2018