Working Draft List of Priority Programs and Projects in the 2017-2022 Public Investment Program (PIP)

under Chapter 6: Pursuing Swift and Fair Administration of Justice* INVESTMENT TARGETS
Project Title
Implementing
Agency
Main Chapter Outcome
Sub-Chapter
Outcome
Expected Outputs
Spatial
Coverage
(as of July
Region 25, of
Mode 2017) Implementation
Implementation Period
(in PhP actual amount)
2017 2018 2019 2020 2021 2022 TOTAL (2017-2022)
Construction of Cagayan de SC Swift and fair administration of Civil, criminal, commercial and 11,353.13 gross floor area of newly- Region X LFP 2016-2018 407,516,590.00 - - - - - 407,516,590.00
Oro City Hall of Justice (HOJ) justice ensured administrative justice systems constructed courtrooms and office space, Specific
enhanced and 3,260 sqm. gross floor area of
parking building
Construction of Cebu City HOJ SC Swift and fair administration of Civil, criminal, commercial and 15,656 sqm. of newly-constructed Region VII LFP 2017-2020 418,719,063.97 92,419,242.25 277,257,726.75 184,838,484.50 - - 973,234,517.47
justice ensured administrative justice systems courtrooms and office space, and 3,150 Specific
enhanced sqm. gross floor area of parking building

Construction of Laoag City HOJ SC Swift and fair administration of Civil, criminal, commercial and 5,074 sqm. gross floor area of newly- Region I LFP 2017-2019 31,621,421.00 170,513,321.00 42,628,330.00 - - - 244,763,072.00
justice ensured administrative justice systems constructed courtrooms and office space Specific
enhanced
Construction of the Mandaue SC Swift and fair administration of Civil, criminal, commercial and 5,077 sqm. gross floor area of newly- Region VII LFP 2017-2019 54,502,493.63 202,153,811.07 50,538,452.77 - - - 307,194,757.47
City HOJ justice ensured administrative justice systems constructed courtrooms and office space Specific
enhanced
Court of Tax Appeals Building Court of Tax Appeals Swift and fair administration of Civil, criminal, commercial and Additional office space and storage Region NCR LFP 2018-2019 - 229,872,178.00 - - - - 229,872,178.00
III justice ensured administrative justice systems facilities for Court of Tax Appeals Specific
enhanced
HOJ in Antipolo, Rizal SC Swift and fair administration of Civil, criminal, commercial and 3898.6 sqm. gross floor area of newly- Region IV-A LFP 2019-2021 - - 36,799,720.00 99,300,840.00 49,650,420.00 - 185,750,980.00
justice ensured administrative justice systems constructed courtrooms and office space Specific
enhanced
HOJ in Aparri, Cagayan SC Swift and fair administration of Civil, criminal, commercial and 1,265 sqm. of renovated courtrooms and Region II LFP 2019-2020 - - 30,049,050.00 - - - 30,049,050.00
justice ensured administrative justice systems office space Specific
enhanced
HOJ in Bacolod City, Negros SC Swift and fair administration of Civil, criminal, commercial and 8,024 sqm. of renovated courtrooms and Region VI LFP 2020-2022 - - - 38,704,040.00 156,659,190.00 - 195,363,230.00
Occidental justice ensured administrative justice systems office space Specific
enhanced
HOJ in Bacoor, Cavite SC Swift and fair administration of Civil, criminal, commercial and 3,489.12 sqm. gross floor area of newly- Region IV-A LFP 2019-2021 - - 25,112,556.00 67,764,040.00 33,882,020.00 - 126,758,616.00
justice ensured administrative justice systems constructed courtrooms and office space Specific
enhanced
HOJ in Balanga, Bataan SC Swift and fair administration of Civil, criminal, commercial and 1,114.6 sqm. gross floor area of newly- Region III LFP 2019-2020 - - 40,399,780.00 - - - 40,399,780.00
justice ensured administrative justice systems constructed courtrooms and office space. Specific
enhanced
HOJ in Baler, Aurora - Building SC Swift and fair administration of Civil, criminal, commercial and 774 sqm. of renovated courtrooms and Region III LFP 2018-2020 - 25,607,820.00 - - - - 25,607,820.00
1 justice ensured administrative justice systems office space Specific
enhanced
HOJ in Baler, Aurora - Building SC Swift and fair administration of Civil, criminal, commercial and 774 sqm. of renovated courtrooms and Region III LFP 2018-2019 - 17,415,000.00 - - - - 17,415,000.00
2 justice ensured administrative justice systems office space Specific
enhanced
HOJ in Bauang, La Union SC Swift and fair administration of Civil, criminal, commercial and 756 sqm. of renovated courtrooms and Region I LFP 2019-2020 - - 25,324,620.00 - - - 25,324,620.00
justice ensured administrative justice systems office space Specific
enhanced
HOJ in Biñan, Laguna SC Swift and fair administration of Civil, criminal, commercial and 800 sqm. of renovated courtrooms and Region IV-A LFP 2020-2021 - - - 63,223,930.00 - - 63,223,930.00
justice ensured administrative justice systems office space Specific
enhanced
HOJ in Bulan, Sorsogon SC Swift and fair administration of Civil, criminal, commercial and 969.12 sqm. of gross floor area of newly- Region V LFP 2018-2019 - 1,636,537.50 44,622,922.50 - - - 46,259,460.00
justice ensured administrative justice systems constructed courtrooms and office space Specific
enhanced
HOJ in Calamba City , Laguna SC Swift and fair administration of Civil, criminal, commercial and 4805.42 sqm. of gross floor area of Region IV-A LFP 2018-2020 - 8,206,706.25 111,884,761.88 111,884,761.87 - - 231,976,230.00
justice ensured administrative justice systems newly-constructed courtrooms and office Specific
enhanced space
HOJ in Calapan, Oriental SC Swift and fair administration of Civil, criminal, commercial and 4,075 sqm. of gross floor area of newly- Region IV-B LFP 2017-2019 9,948,480.00 60,105,400.00 105,702,600.00 - - - 175,756,480.00
Mindoro - Building 2 justice ensured administrative justice systems constructed courtrooms and office space Specific
enhanced
HOJ in Compostela, SC Swift and fair administration of Civil, criminal, commercial and 230 sqm. gross floor area of newly- Region XI LFP 2018-2019 - 7,500,000.00 - - - - 7,500,000.00
Compostela Valley justice ensured administrative justice systems constructed courtrooms and office space Specific
enhanced
HOJ in Dagupan City, SC Swift and fair administration of Civil, criminal, commercial and 2,325 sqm. of renovated courtrooms and Region I LFP 2019-2020 - - 63,148,440.00 - - - 63,148,440.00
Pangasinan justice ensured administrative justice systems office space Specific
enhanced
HOJ in Dumangas, Iloilo SC Swift and fair administration of Civil, criminal, commercial and 230 sqm. gross floor area of newly- Region VI LFP 2018-2019 - 7,500,000.00 - - - - 7,500,000.00
justice ensured administrative justice systems constructed courtrooms and office space Specific
enhanced 2,325 sqm. of renovated courtrooms and
office space
HOJ in Flora, Apayao SC Swift and fair administration of Civil, criminal, commercial and 230 sqm. gross floor area of newly- Region CAR LFP 2018-2019 - 7,500,000.00 - - - - 7,500,000.00
justice ensured administrative justice systems constructed courtrooms and office space Specific
enhanced
HOJ in Iba, Zambales SC Swift and fair administration of Civil, criminal, commercial and 1,530 sqm. of renovated courtrooms and Region III LFP 2019-2020 - - 44,575,890.00 - - - 44,575,890.00
justice ensured administrative justice systems office space Specific
enhanced
HOJ in Iligan City - Building 2 SC Swift and fair administration of Civil, criminal, commercial and 400 sqm. gross floor area of newly- Region X LFP 2018-2019 - 30,000,000.00 - - - - 30,000,000.00
justice ensured administrative justice systems constructed courtrooms and office space Specific
enhanced
HOJ in Imus, Cavite SC Swift and fair administration of Civil, criminal, commercial and 1,125 sqm. of renovated courtrooms and Region IV-A LFP 2020-2021 - - - 21,446,698.00 86,808,062.00 - 108,254,760.00
justice ensured administrative justice systems office space Specific
enhanced
HOJ in Iriga City, Camarines SC Swift and fair administration of Civil, criminal, commercial and 1,771 sqm. of renovated courtrooms and Region V LFP 2020-2021 - - - 57,563,310.00 - - 57,563,310.00
Sur justice ensured administrative justice systems office space Specific
enhanced
HOJ in Ligao, Albay SC Swift and fair administration of Civil, criminal, commercial and 1,702 sqm. of renovated courtrooms and Region V LFP 2020-2021 - - - 48,011,190.00 - - 48,011,190.00
justice ensured administrative justice systems office space Specific
enhanced
HOJ in Lipa City, Batangas SC Swift and fair administration of Civil, criminal, commercial and 1,330 sqm. of renovated courtrooms and Region IV-A LFP 2018-2021 - 38,959,750.00 - - - - 38,959,750.00
justice ensured administrative justice systems office space Specific
enhanced
HOJ Malolos, Bulacan (4 SC Swift and fair administration of Civil, criminal, commercial and 4,087 sqm. of renovated courtrooms and Region III LFP 2020-2021 - - - 27,515,504.00 111,372,276.00 - 138,887,780.00
Buildings) justice ensured administrative justice systems office space Specific
enhanced
HOJ in Mariveles, Bataan SC Swift and fair administration of Civil, criminal, commercial and 1,865.12 sqm. gross floor area of newly- Region III LFP 2019-2020 - - 13,411,360.00 54,284,060.00 - - 67,695,420.00
justice ensured administrative justice systems constructed courtrooms and office space Specific
enhanced
HOJ in Masbate, Masbate SC Swift and fair administration of Civil, criminal, commercial and 2,329.12 sqm. gross floor area of newly- Region V LFP 2018-2019 - 16,754,556.00 67,816,060.00 - - - 84,570,616.00
justice ensured administrative justice systems constructed courtrooms and office space Specific
enhanced

*Working draft as vetted by the Planning Committee 6: Administration of Justice as of July 12, 2017. Page 1 of 4 Working Draft 2017-2022 PIP
Working Draft List of Priority Programs and Projects in the 2017-2022 Public Investment Program (PIP)
under Chapter 6: Pursuing Swift and Fair Administration of Justice* INVESTMENT TARGETS
Project Title
Implementing
Agency
Main Chapter Outcome
Sub-Chapter
Outcome
Expected Outputs
Spatial
Coverage
(as of July
Region 25, of
Mode 2017) Implementation
Implementation Period
(in PhP actual amount)
2017 2018 2019 2020 2021 2022 TOTAL (2017-2022)
HOJ in Mauban, Quezon SC Swift and fair administration of Civil, criminal, commercial and 500 sqm. of gross floor area of newly- Region IV-A LFP 2018-2019 - 15,000,000.00 - - - - 15,000,000.00
Province justice ensured administrative justice systems constructed courtrooms and office space Specific
enhanced
HOJ in Meycauayan City, SC Swift and fair administration of Civil, criminal, commercial and 750 sqm. of gross floor area of newly- Region III LFP 2018-2019 - 1,551,318.75 42,299,291.25 - - - 43,850,610.00
Bulacan justice ensured administrative justice systems constructed courtrooms and office space Specific
enhanced
HOJ in Midsayap, North SC Swift and fair administration of Civil, criminal, commercial and 1226.60 sqm. of gross floor area of Region XII LFP 2018-2019 - 1,869,037.50 50,962,422.50 - - - 52,831,460.00
Cotabato justice ensured administrative justice systems newly-constructed courtrooms and office Specific
enhanced space
HOJ in Naga City - Repair and SC Swift and fair administration of Civil, criminal, commercial and 3,150 sqm. of renovated courtrooms and Region V LFP 2019-2020 - 8,300,250.00 82,436,170.00 - - - 90,736,420.00
Rehab justice ensured administrative justice systems office space Specific
enhanced
HOJ in Naujan, Oriental SC Swift and fair administration of Civil, criminal, commercial and 1618.2 sqm. of gross floor area of newly- Region IV-B LFP 2017-2018 10,669,377.00 60,459,803.00 - - - - 71,129,180.00
Mindoro justice ensured administrative justice systems constructed courtrooms and office Specific
enhanced spaces.
HOJ in Odiongan, Romblon SC Swift and fair administration of Civil, criminal, commercial and 840 sqm. of renovated courtrooms and Region IV-B LFP 2020-2021 - - - 28,901,920.00 - - 28,901,920.00
justice ensured administrative justice systems office space Specific
enhanced
HOJ in Olongapo City, SC Swift and fair administration of Civil, criminal, commercial and 3,060 sqm. of renovated courtrooms and Region III LFP 2019-2020 - - 21,742,495.00 88,005,335.00 - - 109,747,830.00
Zambales justice ensured administrative justice systems office space Specific
enhanced
HOJ in Pinamalayan, Oriental SC Swift and fair administration of Civil, criminal, commercial and 2,836.30 sqm. of gross floor area of Region IV-B LFP 2017-2018 18,616,000.00 156,217,114.00 - - - - 174,833,114.00
Mindoro justice ensured administrative justice systems newly-constructed courtrooms and office Specific
enhanced space
HOJ in Puerto Princesa City - SC Swift and fair administration of Civil, criminal, commercial and 1,530 sqm. of renovated courtrooms and Region IV-B LFP 2020-2021 - - - 82,113,120.00 - - 82,113,120.00
Building 1 justice ensured administrative justice systems office space Specific
enhanced
HOJ in Puerto Princesa City, SC Swift and fair administration of Civil, criminal, commercial and 2,097.12 sqm. gross floor area of newly- Region IV-B LFP 2018-2019 - 15,082,960.00 61,050,060.00 - - - 76,133,020.00
Palawan - Building 2 justice ensured administrative justice systems constructed courtrooms and office space Specific
enhanced
HOJ in Ramon Magsaysay, SC Swift and fair administration of Civil, criminal, commercial and 230 sqm. gross floor area of newly- Region IX LFP 2018-2019 - 7,500,000.00 - - - - 7,500,000.00
Zamboanga del Sur justice ensured administrative justice systems constructed courtrooms and office space Specific
enhanced
HOJ in Rapu-rapu, Albay SC Swift and fair administration of Civil, criminal, commercial and 230 sqm. gross floor area of newly- Region V LFP 2018-2019 - 7,500,000.00 - - - - 7,500,000.00
justice ensured administrative justice systems constructed courtrooms and office space Specific
enhanced
HOJ in Roxas, Palawan SC Swift and fair administration of Civil, criminal, commercial and 230 sqm. gross floor area of newly- Region IV-B LFP 2018-2019 - 7,500,000.00 - - - - 7,500,000.00
justice ensured administrative justice systems constructed courtrooms and office space Specific
enhanced
HOJ in San Carlos City, SC Swift and fair administration of Civil, criminal, commercial and 1,673 sqm. of renovated courtrooms and Region I LFP 2019-2020 - - 28,654,550.00 - - - 28,654,550.00
Pangasinan justice ensured administrative justice systems office space Specific
enhanced
HOJ in San Jose, Camarines SC Swift and fair administration of Civil, criminal, commercial and 774 sqm. of renovated courtrooms and Region V LFP 2020-2021 - - - 18,309,430.00 - - 18,309,430.00
Sur justice ensured administrative justice systems office space Specific
enhanced
HOJ in San Pablo City, Laguna SC Swift and fair administration of Civil, criminal, commercial and 1,572 sqm. of renovated courtrooms and Region IV-A LFP 2020-2021 - - - 35,249,180.00 - - 35,249,180.00
justice ensured administrative justice systems office space Specific
enhanced
HOJ in Surigao City, Surigao SC Swift and fair administration of Civil, criminal, commercial and 1,530 sqm. of gross floor area of Region XIII LFP 2018-2019 - 43,126,830.00 - - - - 43,126,830.00
del Norte justice ensured administrative justice systems renovated courtrooms and office space Specific
enhanced
HOJ in Tabaco, Albay SC Swift and fair administration of Civil, criminal, commercial and 1,295 sqm. of renovated courtrooms and Region V LFP 2020-2021 - - - 38,859,400.00 - - 38,859,400.00
justice ensured administrative justice systems office space Specific
enhanced
HOJ in Tabuk, Kalinga Building SC Swift and fair administration of Civil, criminal, commercial and 437.5 sqm. of gross floor area of newly- Region CAR LFP 2018-2019 - 20,000,000.00 - - - - 20,000,000.00
II justice ensured administrative justice systems constructed courtrooms and office space Specific
enhanced
HOJ in Tanay, Rizal SC Swift and fair administration of Civil, criminal, commercial and 230 sqm. gross floor area of newly- Region IV-A LFP 2018-2019 - 7,500,000.00 - - - - 7,500,000.00
justice ensured administrative justice systems constructed courtrooms and office space Specific
enhanced
HOJ in Tayug, Pangasinan SC Swift and fair administration of Civil, criminal, commercial and 800 sqm. of renovated courtrooms and Region I LFP 2019-2020 - - 18,000,000.00 - - - 18,000,000.00
justice ensured administrative justice systems office space Specific
enhanced
HOJ in Urdaneta City, SC Swift and fair administration of Civil, criminal, commercial and 1,530 sqm. of renovated courtrooms and Region I LFP 2019-2020 - - 51,978,140.00 - - - 51,978,140.00
Pangasinan justice ensured administrative justice systems office space Specific
enhanced
HOJ in Wao, Lanao del Sur SC Swift and fair administration of Civil, criminal, commercial and 500 sqm. gross floor area of newly- Region IX LFP 2018-2019 - - 15,000,000.00 - - - 15,000,000.00
justice ensured administrative justice systems constructed courtrooms and office space Specific
enhanced
Iloilo City HOJ - Fire SC Swift and fair administration of Civil, criminal, commercial and Modern fire suppression system installed Region VI LFP 2018-2019 - 20,427,264.00 - - - - 20,427,264.00
Suppression System justice ensured administrative justice systems Specific
enhanced
New Supreme Court Complex, SC Swift and fair administration of Civil, criminal, commercial and 42,239 sqm. of office space, hearing and Region NCR LFP 2016-2021 1,382,870,402.00 1,466,608,724.00 324,053,432.00 - - - 3,173,532,558.00
Fort Bonifacio, Taguig City justice ensured administrative justice systems function rooms and other facilities Specific
enhanced
Sandiganbayan Building II Sandiganbayan Swift and fair administration of Civil, criminal, commercial and Five-storey building with basement Nationwide Nationwide LFP 2018-2021 - 183,150,000.00 565,240,000.00 234,120,000.00 - - 982,510,000.00
justice ensured administrative justice systems parking
enhanced
Update of the Enterprise SC Swift and fair administration of Civil, criminal, commercial and EISP 2020-2024 developed Nationwide Nationwide LFP 2018-2019 - 30,000,000.00 - - - - 30,000,000.00
Information Systems Plan justice ensured administrative justice systems
enhanced

*Working draft as vetted by the Planning Committee 6: Administration of Justice as of July 12, 2017. Page 2 of 4 Working Draft 2017-2022 PIP
Working Draft List of Priority Programs and Projects in the 2017-2022 Public Investment Program (PIP)
under Chapter 6: Pursuing Swift and Fair Administration of Justice* INVESTMENT TARGETS
Project Title
Implementing
Agency
Main Chapter Outcome
Sub-Chapter
Outcome
Expected Outputs
Spatial
Coverage
(as of July
Region 25, of
Mode 2017) Implementation
Implementation Period
(in PhP actual amount)
2017 2018 2019 2020 2021 2022 TOTAL (2017-2022)
Capability Build-up Program DOJ-BJMP Swift and fair administration of Sector Efficiency and (2017/2018/2019/2020/2021/2022) Nationwide Nationwide LFP 2017-2022 142,674,416.00 1,118,619,655.00 946,579,693.00 801,254,097.00 878,934,600.00 1,057,747,670.00 4,945,810,131.00
justice ensured Accountability Improved Firearms: Short
500/1,220/1000/1000/1000/1000, Long
300/4000/3000/3000/2000/1000,
Prisoner's' Van 20/300/420/258/410/685,
Generator Set 30/35/20/15/43/7, Walk-
Thru Metal Detector 45/191/7/7/7/7, Fire
Extinguisher 100/none/37/28/, CCTV Set
100/571/21/21/432/943, Cellphone
Jammer 50/125/7/7/7/7, Base Radio
58/58/5/57/7/7,
Handheld Radio
300/300/300/1080/64/64, Handcuffs 500/
71,951/ 28,377/ 43,145/ 53,935/ 56,716,
Desktop Comp W/ Printer 200/ 514/ 35/
35/ 35/ 35, Probatons 1,931/ 1,000/
1,000 /1,000 /1,000.

Construction of Jail Offices and DOJ-BJMP Swift and fair administration of Sector Efficiency and (2017) 335 New Jail Buildings and Nationwide Nationwide LFP 2017-2019 3,216,478,000.00 1,549,362,750.00 - - - - 4,765,840,750.00
Facilities justice ensured Accountability Improved Additional Cells, 29 Perimeter Fences, 29
Other Facilities
(2018) 40 New Jail Building, 5 Additional
Cells, 28 Perimeter Fences, 34 Other
Facilities
Construction of Jail Offices and DOJ-BJMP Swift and fair administration of Sector Efficiency and 2017 - Jail Building 8, Perimeter Fence Nationwide Nationwide LFP 2017-2022 39,458,000.00 5,229,713,218.00 1,520,622,019.00 713,698,021.00 589,852,022.00 632,978,028.00 8,726,321,308.00
Facilities justice ensured Accountability Improved 7, Regional Office 0 and Other Facilities
0
2018 - Jail Building 67, Perimeter Fence
54, Regional Office 2, and Other
Facilities 61
2019 - Jail Building 33, Perimeter Fence
32, Regional Office 0, and Other
Facilities 40
2020 - Jail Building 30, Perimeter Fence
14, Regional Office 1, and Other
Facilities 28
2021 - Jail Building 27, Perimeter Fence
26, Regional Office 0, and Other
Facilities 41
2022 - Jail Building 23, Perimeter Fence
14, Regional Office 1, and Other
Facilities 41

Construction of PAO-Central DOJ-PAO Swift and fair administration of Sector Efficiency and Better facilities and provisions for both Nationwide Nationwide LFP 2016-2018 82,400,000.00 965,000,000.00 - - - - 1,047,400,000.00
Office Building justice ensured Accountability Improved employees and clients, and improved
public service by PAO in general. 250
existing employees 250 additional
employees 300 guests and clients Total
of 800 individuals on a daily basis

Corrections Institute DOJ-BUCOR Swift and fair administration of Sector Efficiency and Corrections Institute Building Facilities Region IV-A LFP 2018-2021 - 75,000,000.00 75,000,000.00 75,000,000.00 31,000,000.00 - 256,000,000.00
justice ensured Accountability Improved Specific
Document Management and DOJ-NBI Swift and fair administration of Sector Efficiency and This will preserve the original features of Region NCR LFP 2017-2020 6,970,000.00 7,140,000.00 7,140,000.00 7,140,000.00 - - 28,390,000.00
Retrieval System justice ensured Accountability Improved documents being presented to courts that Specific
replaced the old traditional micro-filming
system.
DOJ Information and DOJ Swift and fair administration of Sector Efficiency and 100% of agency offices/personnel with Nationwide Nationwide LFP 2017-2022 61,926,000.00 167,732,777.00 120,639,777.00 98,107,277.00 - - 448,405,831.00
communication technology justice ensured Accountability Improved basic office productivity hardware and
program software; 100% of central and field
offices with internet connectivity; 100% of
core and major support processes with
ICT support system
eTITLE Project DOJ-LRA Swift and fair administration of Sector Efficiency and This will enhance business regulation & Nationwide Nationwide LFP 2017-2020 41,980,000.00 75,207,936.00 76,140,540.41 77,084,656.79 - - 270,413,133.20
justice ensured Accountability Improved frontline service delivery with the
conversion of old titles to e-Titles thereby
ensuring a more expedient & effective
land registration service.
Implementation of Government DOJ Swift and fair administration of Sector Efficiency and ISO certification secured and/or Nationwide Nationwide LFP 2017-2022 2,400,000.00 2,400,000.00 2,400,000.00 2,400,000.00 2,400,000.00 2,400,000.00 14,400,000.00
Quality Management System justice ensured Accountability Improved maintained for at least one (1) core
process annually.
ISO Certification Program DOJ-BUCOR Swift and fair administration of Sector Efficiency and GQMS compliant thru ISO 9001:2015 Nationwide Nationwide LFP 2018-2020 - 42,000,000.00 21,000,000.00 21,000,000.00 - - 84,000,000.00
justice ensured Accountability Improved Certified processes
LRA Comprehensive & DOJ-LRA Swift and fair administration of Sector Efficiency and This will improve absorptive capacities in Nationwide Nationwide LFP 2017-2021 84,932,000.00 55,830,000.00 78,455,000.00 50,000,000.00 50,000,000.00 - 319,217,000.00
Integrated Infrastructure justice ensured Accountability Improved the justice system insofar as significantly
Program reducing backlogs in land registration
cases.

*Working draft as vetted by the Planning Committee 6: Administration of Justice as of July 12, 2017. Page 3 of 4 Working Draft 2017-2022 PIP
Working Draft List of Priority Programs and Projects in the 2017-2022 Public Investment Program (PIP)
under Chapter 6: Pursuing Swift and Fair Administration of Justice* INVESTMENT TARGETS
Project Title
Implementing
Agency
Main Chapter Outcome
Sub-Chapter
Outcome
Expected Outputs
Spatial
Coverage
(as of July
Region 25, of
Mode 2017) Implementation
Implementation Period
(in PhP actual amount)
2017 2018 2019 2020 2021 2022 TOTAL (2017-2022)
LRA Information and DOJ-LRA Swift and fair administration of Sector Efficiency and The following are its expected outcome: - Nationwide Nationwide LFP 2018-2018 - 7,843,850.00 - - - - 7,843,850.00
communication technology justice ensured Accountability Improved the training center can conduct CBT
projects (Computer Based Trainings) - a
conducive training center environment
with the required resources - more
focused training guided by internal
experts - online examination area for job
applicants - reduced cost for training and
travels - can be used as laboratory test
bed and as UAT (Users Acceptance Test)
area for in-house developed application
system - videoconferencing for remote
meetings, training, seminar, job interview
anywhere, anytime - 15 large Registries
of Deeds with Queuing Management
System - additional 200 users to connect
to the Local Area Network - the old &
faulty microphone diSCPussion is
replaced with a new digital diSCPussion
system with recording and with 15
microphones - two (2) divisions of the
Central Office will lessen if not eliminate
the backlog for SCPanning plans

LRA ISO QMS CaSCPading DOJ-LRA Swift and fair administration of Sector Efficiency and This shall ensure improvement of Nationwide Nationwide LFP 2017-2021 193,720.00 3,139,700.00 2,557,400.00 2,657,400.00 3,220,000.00 - 11,768,220.00
and Certification justice ensured Accountability Improved processes based on documented facts
and will increase efficiency in the delivery
of the services.
LRA Strategic Human DOJ-LRA Swift and fair administration of Sector Efficiency and This shall ensure improvement of Nationwide Nationwide LFP 2018-2018 - 26,163,900.00 - - - - 26,163,900.00
Resources Management justice ensured Accountability Improved processes based on documented facts
and will increase efficiency in the delivery
of the services.
National Computer Forensic DOJ Swift and fair administration of Sector Efficiency and Improve criminal justice system though Nationwide Nationwide LFP 2017-2022 1,000,000.00 50,000,000.00 60,000,000.00 70,000,000.00 80,000,000.00 130,000,000.00 391,000,000.00
Training Program justice ensured Accountability Improved enabled investigators, prosecutors and
judges in investigating, handling,
prosecuting cyber and related crimes.
National Justice Information DOJ Swift and fair administration of Sector Efficiency and Individual core agency information Nationwide Nationwide LFP 2012-2022 50,970,000.00 32,700,000.00 167,700,000.00 75,000,000.00 82,500,000.00 90,750,000.00 499,620,000.00
System (NJIS) justice ensured Accountability Improved systems, and inter-agency
portals/databases
NBI Academy Modernization DOJ-NBI Swift and fair administration of Sector Efficiency and Multi-purpose training center, firearms Nationwide Nationwide LFP 2018-2022 - 200,000,000.00 175,000,000.00 150,000,000.00 100,000,000.00 75,000,000.00 700,000,000.00
Program justice ensured Accountability Improved proficiency training center, Dante's Alley,
and vehicle proficiency training center

NBI Infrastructure Program DOJ-NBI Swift and fair administration of Sector Efficiency and Completion of 32 projects ongoing, in the Nationwide Nationwide LFP 2016-2022 6,450,000.00 300,000,000.00 448,000,000.00 170,000,000.00 155,000,000.00 120,000,000.00 1,199,450,000.00
justice ensured Accountability Improved pipeline, or proposed
PAO Human Resource DOJ-PAO Swift and fair administration of Sector Efficiency and Effective measurement of all key Nationwide Nationwide LFP 2016-2020 - 13,800,000.00 49,180,000.00 21,180,000.00 - - 84,160,000.00
Information System justice ensured Accountability Improved performance indicators to improve
employee management and
development. Total of 2647 employees
Regional Prison Facilities DOJ-BUCOR Swift and fair administration of Sector Efficiency and One (1) unit three (3) storey Prison Nationwide Nationwide LFP 2018-2021 - 500,000,000.00 500,000,000.00 500,000,000.00 360,000,000.00 - 1,860,000,000.00
justice ensured Accountability Improved Dormitory with 900 inmate capacity
(standard bed capacity 4.7 sq. m) with
complete Rehabilitation Facilities for
each OPPFs (Iwahig, Davao, San
Ramon, Sablayan and Leyte)
Strengthening the SCPientific DOJ-NBI Swift and fair administration of Sector Efficiency and Enhanced capability on forensic Nationwide Nationwide LFP 2016-2022 77,081,256.00 270,729,256.00 117,423,256.00 96,900,000.00 96,900,000.00 135,100,000.00 794,133,768.00
investigation capability of the justice ensured Accountability Improved chemistry, firearms investigation,
NBI questioned documents, and disaster
victims identification
Upgrade of Communication DOJ-NBI Swift and fair administration of Sector Efficiency and To converge the voice and data Nationwide Nationwide LFP 2019-2021 - - 8,340,000.00 8,340,000.00 8,340,000.00 - 25,020,000.00
Facility to VOIP justice ensured Accountability Improved telephone system into voice over internet
protocol (VoIP)
Digitization of Court Records SC Swift and fair administration of Sector Efficiency and Phase 3: 60 million pages of court Inter-regional No regions LFP 2018-2020 143,080,000.00 144,020,000.00 133,030,000.00 - - - 420,130,000.00
Phase 3 and Phase 4 justice ensured Accountability Improved records SCPanned and indexed Phase 4: specified
55 million pages of court records
SCPanned and indexed
Philippine Judicial Academy SC Swift and fair administration of Sector Efficiency and Number of training modules developed Nationwide Nationwide LFP 2018-2020 50,000,000.00 50,000,000.00 50,000,000.00 - - - 150,000,000.00
eLearning Management justice ensured Accountability Improved
System (e-PHILJA) Phase 2
Regional Data Centers Phase 3 SC Swift and fair administration of Sector Efficiency and Five (5) regional data centers constructed Inter-regional No regions LFP 2018-2019 112,080,000.00 140,010,000.00 - - - - 252,090,000.00
justice ensured Accountability Improved specified
PPA Halfway House And DOJ-PPA Swift and fair administration of Sector Efficiency and Enhance the capability of the agency to Region VI LFP 2018 - 54,848,257.60 - - - - 54,848,257.60
Livelihood Training Center justice ensured Accountability Improved promote rehabilitation and reformation of Specific
its clientele
Total Investment Targets 6,454,537,219.60 14,049,198,922.92 6,799,896,516.06 4,239,856,695.16 2,876,518,590.00 2,243,975,698.00 36,663,983,641.74

Note: The implementation mode,investment targets and other project details of the projects as proposed by the implementing agencies/offices, may change in the course of project development, review and approval.

*Working draft as vetted by the Planning Committee 6: Administration of Justice as of July 12, 2017. Page 4 of 4 Working Draft 2017-2022 PIP