STUDI KOORDINASI RELAY PROTEKSI OCR DAN GFR PADA

KUBIKEL 20 KV TRASFORMATOR DAYA UNIT 3 KAPASITAS


60 MVA GARDU INDUK TELUK LEMBU DI PT. PLN (PERSERO)
UNIT PELAYANAN TRANSMISI PEKANBARU

Abstrak

Transformator daya unit 3 memiliki 7 buah kubikel out going feeder, 3 buah
kubikel PLTMG, dan 1 buah kubikel incoming. Pada sistem 20 kV sering terjadi
gangguan yaitu pada out going feeder 20 kV. Gangguan yg biasa terjadi adalah
gangguan phasa ke phasa dan gangguan phasa ke tanah. Guna peningkatan
keandalan sistem maka akan dilakukan evaluasi setting dan koordinasi rele
proteksi kubikel 20 kV transformator daya unit 3 kapasitas 60 MVA khususnya
over current relay dan ground fault relay.
Dalam melakukan penelitian, data yang diambil adalah data sekunder yang
berasal dari PT. PLN (Persero) Unit Pelayanan Transmisi Pekanbaru. Data data
yang digunakan untuk evaluasi ialah data spesifikasi generator, data spesifikasi
rele, dan data setting relay. Kemudian melakukan perhitungan untuk setting over
current relay dan ground fault relay setelah itu membandingkan dengan kondisi
existing untuk dianalisa sesuai standar atau sudah terjadi penurunan fungsi.
Setting over current relay (51) pada feeder Kulim terdapat ketidaksesuaian
antara perhitungan dan kondisi existing yaitu : Iset primer = 2904,501 Ampere, Iset
sekunder = 36,31 Ampere, tset = 0,18 detik. Setting ground fault relay (50 N) pada
pembangkit PT. Hutan Alam terdapat ketidaksesuaian antara perhitungan dan
kondisi existing yaitu : Iset primer = 181,047 Ampere, Iset sekunder = 0,45 Ampere, tset =
0,11 detik. Untuk memaksimalkan kinerja koordinasi OCR dan GFR pada out
going feeder dan pembangkit maka TMS pada GFR pembangkit dinaikkan
menjadi 0,2 detik, maka tset GFR pada pembangkit menjadi 0,22 detik.

Kata kunci : Transformator Daya, Generator, Out going Feeder, OCR dan GFR

vi
RELAY PROTECTION COORDINATION STUDY OF OCR AND GFR
AT 20 KV CUBICLES POWER TRANSFORMER CAPACITY OF
60 MVA UNIT 3 SUBSTATION BAY OX PT. PLN (PERSERO)
UNIT TRANSMISSION SERVICES PEKANBARU

Abstract

Power transformer unit 3 has seven pieces out going feeder cubicles, 3
pieces PLTMG cubicles, and 1 incoming cubicles. At 20 kV system frequent
disturbances that in out going feeder 20 kV. Disorders that usually happens is a
disorder phase to phase and phase to ground disturbance. In order to increase the
reliability of the system will be evaluated protection relay setting and
coordination of cubicles 20 kV power transformer capacity of 60 MVA unit 3,
especially over current relay and ground fault relay.
In conducting the study, the data is taken from secondary data derived
from PT. PLN (Persero) Unit Transmission Services Pekanbaru. The data used
for evaluation of the data is the data generator specification, the specification
data relay, and data relay settings. Then do the calculations for setting over
current relay and ground fault relay after it compares with existing conditions to
be analyzed according to the standard or have decreased function.
Setting over current relay (51) on the feeder Kulim there incompatibility
between the calculations and the existing conditions, namely: Iset primary =
2904.501 Ampere, Iset secondary = 36.31 Ampere, Tset = 0.18 seconds. Setting
ground fault relay (50 N) in the plant PT. Hutan Alam are incompatibility
between the calculations and the existing conditions, namely: Iset primary =
181.047 Ampere, Iset secondary = 0.45 Ampere, Tset = 0.11 second. To maximize
performance OCR and GFR coordination on out going feeder and power plant
generating the TMS in GFR increased to 0.2 seconds, then Tset GFR at the plant
to 0.22 seconds.

Keywords : Power Transformer, Generator, Out going Feeder, OCR and GFR