You are on page 1of 1

1)First create asset as an Equipment(with serial number) which is installed in

Functional location.

2)Dismantled the equipment.

3)Do MIGO(Goods receipts against other with 202 movement type)--So stock will be
generated.

4)Transfer material to Vendor(Movement type 541)

5)Receipt material from vendor(Movement type 542)

6) Create Refurbishment order.

7) Enter the external operation(Control key PM03),PR will be generated

8)Convert PR to PO. Accept Entry sheet.

9)Goods receipt for refurbishment( IW8W)

10) Confirm the Order.

You might also like